B.08.03 AMD 0001 W912DR22B0010_4-26-22.pdf
PDF 11 MB Posted
- Attached to
- Building 62 Renovations, Indian Head, MD Federal contract opportunity
- Solicitation number
- W912DR22B0010
About this file
This solicitation is for a competitive 8(a) firm-fixed-price contract to complete full interior and exterior renovations to Building 62 at Naval Support Facility Indian Head in Indian Head, Maryland. The renovation of approximately 5,340 square feet will result in dry lab, office, and auxiliary spaces such as restrooms and a kitchen to accommodate operational needs. Work includes demolition, replacement of floors and roofs, elevator installation, new exterior doors and windows, interior partitions, ceilings, finishes, HVAC, plumbing, lighting and electrical systems. The contractor must engage consultants to conduct hazardous material surveys and produce a report and remediation plan to address lead paint, mold, suspected asbestos and any other hazardous materials identified. Requirements will be coordinated at a preconstruction meeting. Bids are due via an invitation for bid under the Department of the Army Corps of Engineers Engineering District Baltimore.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C.04.01 Abstract of Bids W912DR22B0010 BLDG 62 Renovations, Indian Head, MD.pdf | ||
| B.08.03 AMD 0002 W912DR22B0010_5-02-22.pdf | ||
| B.06.04_B62 Site Visit Sign-in 20220405.pdf | ||
| H.08.01 Building 62- IH B62 RTA Conformed Drawing Set w MDE 2022-01-24.pdf | ||
| H.08.01 Building 62- MDE Stamped Plans 20-SF-0096_MDE Drawings Complete.pdf | ||
| H.08.04 Building 62- IH B62 RTA Specs Volume 2 2022-01-25.pdf | ||
| Solicitation W912DR22B0010 Bldg 62 Renovations.pdf | ||
| H.08.04 Building 62 IH B62 RTA CID PACKAGE - No FFE Costs 2022-02-24.pdf | ||
| H.08.04 Building 62- IH B62 RTA Specs Volume 1 2022-01-25.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Project Title: Building 62 Renovations, Indian Head, Maryland.
The purpose of this Amendment is to:
1. Provide Responses to Requests for Information (RFIs)
2. Extend the Bid Opening date from 29 April 2022 to 06 May 2022
3. Provide an updated Wage Determination dated 25 March 2022
4. Provide revised drawing sheets S-003, S-103 and S-301
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 3 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Apr-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912DR22B0010
X 9B. DATED (SEE ITEM 11)
17-Mar-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Apr-2022
CODE
USACE, BALTIMORE
2 HOPKINS PLAZA
BALTIMORE MD 21201
W912DR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912DR22B0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 29-Apr-2022 11:00 AM to 06-May-2022 11:00
AM.
SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS
The following have been modified:
INSTRUCTION TO BIDDERS
WAGE DETERMINATION
If a U.S. Department of Labor Wage Determination, has been included, it is titled: General Wage Decision No.
MD20220041 dated 3/25/2022, with all current modifications. For construction contracts the wage rate is an attachment located at the end of Section 01 00 00-General Requirements. For Supply, Service and A-E contracts the wage rate is an attachment located in Section J.
If a U.S. Department Labor Wager Determination has not been included, it should be added by amendment prior to the date set for receipt of bids/proposals.
In the event a Department Labor Wage Rates has not been attached to this contract, neither the contractor nor any subcontractor under the contract shall pay any of his employees performing work under the contract (regardless of whether they are service employees) less than minimum wage specified by Section 6(a)(1) of the Fair Labor Standards Act, as amended
(End of text)
SECTION 01 00 00 - GENERAL REQUIREMENTS
The following have been modified:
WAGE DETERMINATION
"General Decision Number: MD20220041 03/25/2022
Superseded General Decision Number: MD20210041
State: Maryland
Construction Type: Building
County: Charles County in Maryland.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.
Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60).
|If the contract is entered |. Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |. The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $15.00 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2022. | |If the contract was awarded on|. Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |. The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $11.25 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours spent performing on | | | that contract in 2022. |
The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.
Additional information on contractor requirements and worker protections under the Executive Orders is available at https://www.dol.gov/agencies/whd/government-contracts.
Modification Number Publication Date 0 01/07/2022 1 01/14/2022 2 02/11/2022 3 02/18/2022 4 02/25/2022 5 03/25/2022
ASBE0024-007 04/01/2021
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 39.27 18.67+a
Includes the application of all insulating materials, protective coverings, coatings and finishes to all types of mechanical systems
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.
ASBE0024-010 04/01/2021
Rates Fringes
ASBESTOS WORKER: HAZARDOUS
MATERIAL HANDLER (Removal of hazardous material from ceilings, floors, mechanical systems, and walls)..............$ 24.46 8.69+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day,the day after Thanksgiving and Christmas Day provided the employee works the regular work day before and after the paid holiday.
BRMD0001-006 05/02/2021
Rates Fringes
TILE SETTER......................$ 31.18 12.60
BRMD0001-009 05/02/2021
Rates Fringes
TILE FINISHER....................$ 25.81 11.55
BRMD0001-011 05/02/2021
Rates Fringes
BRICKLAYER (Excluding Pointing, Caulking and Cleaning)........................$ 34.00 12.59
BRMD0001-012 05/02/2021
Rates Fringes
MASON - STONE....................$ 40.81 19.43
BRMD0001-013 05/02/2021
Rates Fringes
TERRAZZO WORKER/SETTER...........$ 31.18 12.60
CARP0197-001 05/01/2021
Rates Fringes
CARPENTER (Including Acoustical Ceiling Installation, Drywall Hanging, Metal Stud Installation and Form Work)......$ 30.34 13.80
CARP0219-001 05/01/2021
Rates Fringes
MILLWRIGHT.......................$ 35.34 13.53
ELEC0026-021 09/07/2020
Rates Fringes
ELECTRICIAN (Communication and Sound Equipment).............$ 29.05 11.39
* ELEC0026-022 12/06/2021
ELECTRICIAN (Including low voltage wiring for and installation of alarms, HVAC controls)........................$ 50.00 20.49+a a.PAID HOLIDAYS: New Year's Day, Inauguration Day, Martin Luther King Jr.'s Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, the day after Thanksgiving Day and Christmas Day.
ELEV0010-001 01/01/2022
Rates Fringes
ELEVATOR MECHANIC................$ 50.27 36.885+a+b
a. PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day, Christmas Day and the Friday after Thanksgiving.
b. VACATIONS: Employer contributes 8% of basic hourly rate for 5 years or more of service; 6% of basic hourly rate for 6 months to 5 years of service as vacation pay credit.
ENGI0077-017 05/01/2021
Rates Fringes
POWER EQUIPMENT OPERATOR:
Backhoe.....................$ 33.36 10.55+a Bulldozer...................$ 33.36 10.55+a
a. PAID HOLIDAYS: New Year's Day, Inaugural Day, Decoration Day, Independence Day, Labor Day, Martin Luther King's Birthday, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving and Christmas Day.
IRON0005-005 06/01/2021
Rates Fringes
IRONWORKER, STRUCTURAL AND
ORNAMENTAL.......................$ 33.90 24.19
IRON0005-014 05/01/2021
IRONWORKER, REINFORCING..........$ 29.20 22.83
LABO0011-013 06/15/2020
Rates Fringes
LABORER: Mason Tender - Cement/Concrete..................$ 25.88 8.63 LABORER: Pipelayer..............$ 25.88 8.63
PAIN0051-014 06/01/2021
Rates Fringes
GLAZIER
Glazing Contracts $2 million and under...........$ 29.02 12.80 Glazing Contracts over $2 million.....................$ 33.26 12.80
PAIN0051-019 06/01/2021
Rates Fringes
PAINTER
Brush, Roller, Spray and Drywall Finisher/Taper......$ 25.50 11.27 Industrial..................$ 32.70 13.18
PLAS0891-005 07/01/2021
Rates Fringes
PLASTERER........................$ 30.53 7.93
PLAS0891-006 02/01/2020
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 28.82 11.68
PLAS0891-008 08/01/2016
Rates Fringes
PLASTERER (Fireproofing Including Sprayer, Mixer, and Handler) Handler.....................$ 16.50 4.89 Mixer/Pump..................$ 18.50 4.89 Sprayer.....................$ 23.00 4.89
PLUM0005-010 08/01/2021
PLUMBER..........................$ 45.92 20.35+a
a. PAID HOLIDAYS: Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving, Christmas Day, New Year's Day, Martin Luther King's Birthday, Memorial Day and the Fourth of July.
PLUM0602-013 08/01/2021
Rates Fringes
PIPEFITTER (HVAC Pipe and System Installation Only)........$ 45.39 23.12+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thanksgiving Day and the day after Thanksgiving and Christmas Day.
ROOF0030-016 07/01/2021
Rates Fringes
ROOFER...........................$ 31.26 14.56
SFMD0669-001 01/01/2022
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 36.95 24.56
SHEE0100-015 11/01/2021
Rates Fringes
SHEET METAL WORKER (Including HVAC Duct Installation)..........$ 44.37 21.33+a
a. PAID HOLIDAYS: New Year's Day, Martin Luther King's Birthday, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Christmas Day
* SUMD2010-089 08/20/2010
Rates Fringes
LABORERS
Common or General...........$ 11.38 ** Grade Checker...............$ 16.00 2.90 Landscape...................$ 9.23 **
Mason Tender - Brick........$ 13.00 ** Mason Tender - Stone........$ 14.03 ** Mason Tender for Pointing, Caulking and Cleaning.......$ 13.25 ** Mortar Mixer................$ 16.61 9.09
PIPEFITTER (Excluding HVAC Pipe and System Installation)....$ 28.96 11.35
POINTER, CAULKER, CLEANER,
Includes pointing, caulking, cleaning of existing masonry, brick, stone and cement structures (restoration work); excludes pointing, caulking, cleaning of new or replacement masonry, brick, stone or cement...........................$ 19.17
POWER EQUIPMENT OPERATOR:
Asphalt Roller..............$ 21.35 5.38 Bobcat/Skid Loader..........$ 18.05 8.78 Boom........................$ 21.44 8.29 Crane.......................$ 20.95 6.18 Excavator...................$ 20.00 Forklift....................$ 16.00 5.12 Gradall.....................$ 20.50 8.42 Grader/Blade................$ 14.50 ** 5.18 Loader......................$ 22.75 4.91 Paver.......................$ 17.47 6.36 Roller excluding Asphalt....$ 17.60 3.88
TRUCK DRIVER
Dump Truck..................$ 15.90 1.12 Tractor Haul Truck..........$ 17.87 9.98
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
** Workers in this classification may be entitled to a higher minimum wage under Executive Order 14026 ($15.00) or 13658 ($11.25). Please see the Note at the top of the wage determination for more information.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
(End of Summary of Changes)
Controlled Unclassified Information (CUI) Only
Bid Inquiry Contractor Report All Inquiries
Project: Bldg 62 Renovations, Indian Head, MD Review: Bldg 62 Renovation, Indian Head, MD (00001) (sorted by CommentID ) Displaying 136 inquiries.
Id Discipline Sheet Detail Spec 9654853 Industrial Hygiene RFP Description Comment Classification: Controlled Unclassified Information (CUI)
Please provide a copy of the limited hazardous material survey conducted at Building 62. The SAM notice states it is attached at the end of this section, but we cannot find it.
On: Mar 23 2022.
Government Response. . Hazardous material survey report is provided in solicitation at the end of Specification Section 01 11 00.
On: Apr 19 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9661879 Architectural 08 44 00 Comment Classification: Controlled Unclassified Information (CUI)
Please specify the finish for the windows and curtain wall.
On: Mar 28 2022.
Government Response. . Curtain wall and storefront to be clear metal finish from manufacturer standard color chart and approved by Government. On: Apr 25 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9661883 Architectural 08 44 00 Comment Classification: Controlled Unclassified Information (CUI)
Please provide the window/storefront basis of design. The elevation appear to be for a Kawneer 451T of TU but no basis of design has been provided.
On: Mar 28 2022.
Government Response. . Basis of design is not provided to Contractor on government projects. Contractor must meet the requirements as noted in the Contract specifications and drawings. On: Apr 25 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9661886 Contracting Solicitation Comment Classification: Controlled Unclassified Information (CUI)
Please provide the wage scale for this project.
On: Mar 28 2022.
Government Response. . Please see solicitation. On: Mar 29 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9661889 Architectural 08 44 00 Comment Classification: Controlled Unclassified Information (CUI)
Are there any blast requirements for the storefront, windows or curtain wall?
On: Mar 28 2022.
Government Response. . Minimum blast requirements are provided in Specification Section 01 81 23. Parking has been appropriately offset to minimize ATFP requirements. Window glazing must meet requirements for blast. Also windows and doors must meet physical security for ATFP. On: Apr 25 2022
Current Request Status: Request Closed Information for this report is procurement sensitive.
9661893 Architectural 08 44 00 Comment Classification: Controlled Unclassified Information (CUI) https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=CommentID https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Discipline https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Sheet https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=Detail https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAll&strReportType=AllCont&RequestTimeout=1000&pagStrRowSort=SpecText
Specification 08 44 00 1.9.1 a. said steel fire-rated CW system, Kawneer 1600 7-1/2CW is not fire-rated, please let us know if windows and curtainwall is supposed to meet fire-rating, if so, please provide specification and rating requirements.
On: Mar 28 2022.
Government Response. . Curtain wall system included in Specification Section 08 44 00 is not required to be "fire-rated". All other requirements of 08 44 00 shall remain in place. On: Apr 25 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9661896 Architectural 08 44 00 Comment Classification: Controlled Unclassified Information (CUI)
Please provide exact insulated units makeup, specifications are very generic. If any laminated glass in the units required, pelase let us know if it has to be on inboard or outboard.
On: Mar 28 2022.
Government Response. . Minimum blast requirements are provided in Specification Section 01 81 23. Parking has been appropriately offset to minimize ATFP requirements. Window glazing must meet requirements for blast. Also windows and doors must meet physical security for ATFP. On: Apr 25 2022
Current Request Status: Request Closed Information for this report is procurement sensitive.
9661921 Interior Design 12 50 00 Comment Classification: Controlled Unclassified Information (CUI)
Are there any furniture manufacturers selected, or are we supposed to provided furniture pricing based off of the specs for the furniture items?
On: Mar 28 2022.
Government Response. . Specific manufacturers indicated in the FF&E specifications shall be considered the basis of design.
The Contractor may provided specified FF&E brand or equal. FF&E must meet the requirements of Section 3.4.3. On: Apr 18 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9662777 Communications T-001 13 27 10 00 Comment Classification: Controlled Unclassified Information (CUI)
Per note 13 under new work, "The NAVFAC I.T. and security installer/vendor to provide all telecommunications and network equipment and devices..." I interpret that as NAVFAC providing a complete telecommunications package and the GC is to only provide boxes with ring in string. Please confirm or clarify.
On: Mar 29 2022.
Government Response. . General contractor shall provide IT and security pathways (i.e., conduits, junction boxes, etc.) and required cabling as required by Contract drawings and specifications. Provide cable loop at both end of cable runs for use by Government installer in completing terminations. On: Apr 25 2022
Current Request Status: Request Closed Information for this report is procurement sensitive.
9667821 Other DWG I-111 Comment Classification: Controlled Unclassified Information (CUI)
DWG I-111, General Note 1 says the furniture is funded under a separate contract, but also says it is CFCI. General Note 2 says the Furniture drawings are for reference only, but to include all FF&E components required. Can you clarify the furniture scope that the GC's should include in this bid?
On: Mar 31 2022.
Government Response. . All costs (i.e., interior designer, material, delivery and installation) associated with FF&E shall be included in Bid Option 002. On: Apr 19 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9667832 Other DWG A201, A202, A203, A204 Note 29
Comment Classification: Controlled Unclassified Information (CUI)
Can you please provide a specification for the Flood Gates shown in Note 29 of each of the following drawings: A201, A202, A203, and A204?
On: Mar 31 2022.
Government Response. . Requirements for "deployable floor barriers" are provided on Drawing CS101, General Sheet Note # 2.
On: Apr 25 2022
Current Request Status: Request Closed Information for this report is procurement sensitive.
9670151 Architectural 11 81 29 Comment Classification: Controlled Unclassified Information (CUI)
I see a detail for the roof anchors, but not for the wall mounted anchors. Does this detail exist, if so, where?
On: Apr 01 2022.
Government Response. . Wall anchors are not required; therefore, no detail is specified. On: Apr 25 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9670159 Architectural 11 81 29 Comment Classification: Controlled Unclassified Information (CUI)
The spec section calls for horizontal lifeline system, but the drawings refer to the system as "roof tie back anchors." These are two distinct systems, the difference being that the horizontal lifeline has cable spanning the anchors. Please advise which system we are to quote.
On: Apr 01 2022.
Government Response. . Provide horizontal lifeline system. Contractor to submit manufacturer standard details for review and approval On: Apr 25 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9670507 Contracting Solicitation Comment Classification: Controlled Unclassified Information (CUI)
Is this proejct tax exempt?
On: Apr 01 2022.
Government Response. . No. On: Apr 08 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9676221 Contracting Solicitation Comment Classification: Controlled Unclassified Information (CUI)
Based on the use of the DD-3150 for the site visit, are subcontractors required to be vaccinated. Are there any requirement around vaccination or testing?
On: Apr 05 2022.
Government Response. . Requirements for COVID-19 vaccination and testing are based upon current CDC COVID-19 Community
Levels for Charles County, Maryland. DD Form 3150 or proof of a negative FDA approved or COVID-19 authorized test (completed no earlier than 72 hours before base entry) may be required for all Contractor employees based upon Community Level. It should be assumed that DD Form 3150 or proof of a negative test may be required in the future. On: Apr 25 2022
Current Request Status: Request Closed Information for this report is procurement sensitive.
9676876 General N/A NA N/A Comment Classification: Controlled Unclassified Information (CUI)
Provide as-builts for the building(s) and surrounding site (utilities).
On: Apr 05 2022.
Government Response. . Full as-built drawings of the building and surrounding site will not be made available as part of this solicitation. See responses to other RFIs for specific as-built drawings. On: Apr 25 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9676877 General N/A NA N/A Comment Classification: Controlled Unclassified Information (CUI)
Provide current geotechnical report.
On: Apr 05 2022.
Government Response. . Geotechnical engineering report is provided in solicitation at the end of Specification Section 01 11 00.
On: Apr 19 2022
9676879 General N/A NA N/A Comment Classification: Controlled Unclassified Information (CUI)
Is enhanced commissioning required for this project?
On: Apr 05 2022.
Government Response. . Refer to Specification Section 01 33 29 for enhanced commissioning requirements to meet LEED Silver certification. On: Apr 25 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9676884 General N/A NA N/A Comment Classification: Controlled Unclassified Information (CUI)
Please confirm the contractor be purchasing and installing the FF & E.
On: Apr 05 2022.
Government Response. . All costs (i.e., interior designer, material, delivery and installation) associated with FF&E shall be included in Bid Option 002. On: Apr 18 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9676885 General N/A NA N/A Comment Classification: Controlled Unclassified Information (CUI)
Verify that the Owner will be responsible for removing ALL equipment, unbolted furniture, personal effects, etc from the affected areas prior to construction.
On: Apr 05 2022.
Government Response. . Government will salvage any equipment, furniture, etc. that they want to keep prior to construction. Any equipment, furniture, etc. remaining in the building and not required for the construction work will become property of the Contractor at the start of construction. Contractor will be responsible for removing and disposing of any such equipment, furniture, etc. before the completion of construction as part of their final cleaning. On: Apr 18 2022
Current Request Status: Request Closed Information for this report is procurement sensitive.
9676889 General N/A NA N/A Comment Classification: Controlled Unclassified Information (CUI)
Provide Hazardous Material Report for this project.
On: Apr 05 2022.
Government Response. . Hazardous material survey report is provided in solicitation at the end of Specification Section 01 11 00.
On: Apr 19 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9676890 General N/A NA N/A Comment Classification: Controlled Unclassified Information (CUI)
Will the government perform all project risk hazard assessments if it has not already been done or will the design-build team be performing the risk assessment?
On: Apr 05 2022.
Government Response. . All project risk hazard assessments, as required during construction, shall be completed by the
Contractor. On: Apr 19 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9676892 General N/A NA N/A Comment Classification: Controlled Unclassified Information (CUI)
Provide sign-in sheets for the pre-bid site walk/meeting.
On: Apr 05 2022.
Government Response. . The site visit list of attendees has been posted to SAM.gov. On: Apr 07 2022 Government Response. . The text below appends or clarifies ALL previous replies.
Disregard previous post. On: Apr 07 2022
9676894 General N/A NA N/A Comment Classification: Controlled Unclassified Information (CUI)
How is the Government going to accommodate the current price escalation being experienced in the marketplace with regards to commodities such as wood, steel, plastics, etc?
On: Apr 05 2022.
Government Response. . All claims for additional costs associated with price escalation, extended lead times, and material manufacturing / delivery delays will be evaluated and processed on a case-by-case basis as outlined in the Contract documents. On:
Apr 18 2022
Current Request Status: Request Closed Information for this report is procurement sensitive.
9676895 General N/A NA N/A Comment Classification: Controlled Unclassified Information (CUI)
How is the Government going to accommodate the current extended lead times and material manufacturing and delivery delays that are occurring in the construction industry?
On: Apr 05 2022.
Government Response. . All claims for additional costs associated with price escalation, extended lead times, and material manufacturing / delivery delays will be evaluated and processed on a case-by-case basis as outlined in the Contract documents. On:
Apr 18 2022
Current Request Status: Request Closed Information for this report is procurement sensitive.
9676897 General N/A NA N/A Comment Classification: Controlled Unclassified Information (CUI)
Confirm that the Government will allow proposers a minimum of seven (7) days to respond to the RFP starting from the date that the Government responds to 100% of the RFIs received.
On: Apr 05 2022.
Government Response. . Confirmed. On: Apr 08 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9676902 Architectural AD101 Keynote 18 Comment Classification: Controlled Unclassified Information (CUI)
Keyed Notes #18 not show on plan please clarify
On: Apr 05 2022.
Government Response. . Key note 18 refers to Drawing AD102 rather than Drawing AD101. Drawing AD102, Key Note 18 to be updated to "Demolish concrete/masonry wall as required to coordinate with new work". On: Apr 25 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9676910 Engineering Support AD101 Comment Classification: Controlled Unclassified Information (CUI)
Please confirm the first floor slab must be demoed has no function as a support to the retaining wall.
On: Apr 05 2022.
Government Response. . First floor slab must be removed. Contractor must take all bracing and shoring measures necessary to protect the existing construction to remain. Bracing/shoring plan to be submitted to the Government for review and approval prior to demolition. On: Apr 25 2022
Current Request Status: Request Closed Information for this report is procurement sensitive.
9676914 Architectural A202 Comment Classification: Controlled Unclassified Information (CUI)
Exterior finish legend D; Please provide quantity of the 3 coat cement plaster.
On: Apr 05 2022.
Government Response. . The location(s) of 3-coat cement plaster have been identified in the documents. It is the Contractor's responsibility to do an area take-off and include that value in their proposal. On: Apr 25 2022
Information for this report is procurement sensitive.
9676977 Architectural N/A NA 12 50 00.13 10 Comment Classification: Controlled Unclassified Information (CUI)
The furniture spec sheets lists Knoll & Herman Miller. Are we required to provide equal/ substitution or must it be brand?
On: Apr 05 2022.
Government Response. . Specific manufacturers indicated in the FF&E specifications shall be considered the basis of design.
Contractor may provide specified FF&E brand or equal. FF&E must meet the requirements of Section 3.4.3 "Performance Criteria".
FF&E shall be priced based off of the solicitation documents. On: Apr 18 2022
Current Request Status: Request Closed Information for this report is procurement sensitive.
9677764 General n/a n/a Comment Classification: Controlled Unclassified Information (CUI)
Please provide a copy of all sign-in sheets for all attendees of the 4/5/22 pre-bid site visit at Bldg 62
On: Apr 06 2022.
Government Response. . The Site Visit Sign-In sheet has been posted on the SAM.gov website. On: Apr 08 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9677773 General n/a n/a Comment Classification: Controlled Unclassified Information (CUI)
Will the all existing furniture or equipment still remaining in the building be removed by the govt or will this be removed and disposed of by the contractor.
On: Apr 06 2022.
Government Response. . Government will salvage any equipment, furniture, etc. that they want to keep prior to construction. Any equipment, furniture, etc. remaining in the building and not required for the construction work will become property of the Contractor at the start of construction. Contractor will be responsible for removing and disposing of any such equipment, furniture, etc. before the completion of construction as part of their final cleaning. On: Apr 18 2022
Current Request Status: Request Closed Information for this report is procurement sensitive.
9677917 Structural note 10 Comment Classification: Controlled Unclassified Information (CUI) at the site visit on 4/5/22 a door was opened by govt personnel on the west side of the building that led to an underground tunnel. The only notation on the drawings about this tunnel is on drawing S-101, keynote 10 that states "existing tunnel abandoned". Is there any work per this RFP that is to be performed within this tunnel or at any interior or exterior connection to it?
On: Apr 06 2022.
Government Response. . The building end user has no plans to re-use the tunnel associated with Building 62. Abandon in place and waterproof seal the entrance(s) where they interface with new work. On: Apr 25 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9677933 Utilities Engineering N/A Comment Classification: Controlled Unclassified Information (CUI)
Utilities - Please provide a point of contact for the Base Utility Contractors.
On: Apr 06 2022.
Government Response. . All contact with base utility personnel will be coordinated through the Government. On: Apr 18 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9677947 Specifications General Sheet Notes Comment Classification: Controlled Unclassified Information (CUI)
Design Drawings - On several drawing sheets, under General Sheet Notes, it is stated under Note #2- Repetitive features are not drawn in their entirely and shall be completely provided as if drawn in full. Please clarify what these features are and location to be provided.
On: Apr 06 2022.
Government Response. . This is a standard general sheet note and refers to the six (6) demolition sheets. Contractor to verify existing conditions. On: Apr 25 2022
Current Request Status: Request Closed Information for this report is procurement sensitive.
9678277 Environmental 01 11 00, para 1.2.1 Comment Classification: Controlled Unclassified Information (CUI) section 01 11 00, para 1.2.1, 1st para, states The Contractor shall assume the presence of hazardous materials for the purposes of bidding based on a limited hazardous material survey conducted at Building 62 attached at the end of this section. Prior to commencement of the work, the Contractor must engage a suitably licensed consulting firm to conduct a complete hazardous materials survey of all building areas.
Para 1.2.1, 2nd para, states The Contract Bid and Work will include the survey, report, plan, remediation of Lead Paint, Mold, suspected Asbestos Containing Materials (ACM), and any other hazardous material described in the new report. Please note, for bidding purposes we can only assume and bid what is in the limited haz material survey provided. The 2nd para states to include in our bid, remediation of any hazardous material described in the new report. There is no way to accurately quantify and include cost for something in our proposal that's existence hasn't been confirmed yet. Please confirm that any haz material found to exist in the new survey report that was not included in the limited haz material survey provided by the govt in the RFP will be considered a changed condition and the cost and time to perform this work will be added to the contract after award and a modification issued.
On: Apr 06 2022.
Government Response. . Contractor shall base their bid on the hazardous materials identified in the hazardous materials survey provided in Specification Section 01 11 00. Abatement / remediation costs for hazardous materials shall be determined based upon the proximity of identified hazardous substances and based on similar materials being potential hazardous substances. Any Contract changes for additional costs due to hazardous material abatement / remediation will be evaluated and processed on a case-by-case basis as outlined in the Contract documents. On: Apr 25 2022
Current Request Status: Request Closed Information for this report is procurement sensitive.
9678311 Environmental 01 11 00, para 1.2.1 Comment Classification: Controlled Unclassified Information (CUI)
01 11 00, para 1.2.1, para 2, states to include mold accessment in the new haz mat survey to be performed after award. There is no indication that mold was addressed or found in the limited haz mat survey provided in the RFP. However, during the site visit there appeared to be what could be mold on some of the surfaces. Since the building windows were boarded up and the interior of the building was inadequately illuminated during the site visit the presence of mold or the quantity of it could not be accurately determined. Please confirm that any pricing for the remediation of mold if found to be present in the after award haz mat survey will be considered a changed condition and the cost and time to perform this work will be added to the contract after award and a modification issued.
On: Apr 06 2022.
Government Response. . Contractor shall base their bid on the hazardous materials identified in the hazardous materials survey provided in Specification Section 01 11 00. Abatement / remediation costs for hazardous materials shall be determined based upon the proximity of identified hazardous substances and based on similar materials being potential hazardous substances. Any Contract changes for additional costs due to hazardous material abatement / remediation will be evaluated and processed on a case-by-case basis as outlined in the Contract documents. On: Apr 25 2022
Current Request Status: Request Closed Information for this report is procurement sensitive.
9679975 Other Spec Spec Comment Classification: Controlled Unclassified Information (CUI)
Due to the longevity of this opportunity, has the budget and/or funding for this opportunity been updated to reflect the extreme fluctuations during Covid?
On: Apr 07 2022.
Government Response. . The Government budget related to this project will not be disclosed and should not be a factor considered by bidders. On: Apr 18 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9679977 Other Spec Spec Comment Classification: Controlled Unclassified Information (CUI)
The bid documents do not discuss Covid other than for the site visit. Can you confirm this project will not be following the Covid requirements outlined in FAR 52.223-99?
On: Apr 07 2022.
Government Response. . FAR 52.223-99 does not apply. On: Apr 08 2022 Current Request Status: Request Closed
9679979 Other Site Visit Site Visit
Comment Classification: Controlled Unclassified Information (CUI)
Can you provide a copy of the sign-in sheet from the site visit?
On: Apr 07 2022.
Government Response. . The Site Visit Sign-In sheet has been posted on the SAM.gov website. On: Apr 08 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9679986 Other DWG CG101 and CG203 Comment Classification: Controlled Unclassified Information (CUI)
Using DWG CG101 and CG203 as reference, during the site visit, there appeared to be underground tunnels that may have extended underneath the grass area (north east of the exterior stairs and south east of Building 62). Can you provide the elevation of the top of these tunnels, can you provide a layout of the tunnels, and can you provide the weight capacity over these tunnels (i.e. can grading equipment be used on top of the tunnels)?
On: Apr 07 2022.
Government Response. . The building end user has no plans to re-use the tunnel associated with Building 62. Abandon in place and waterproof seal the entrance(s) where they interface with new work.
Heavy equipment must not traverse over the abandoned tunnel. Mark the construction site appropriately to prevent heavy equipment from traversing over the abandoned tunnel. On: Apr 25 2022
Current Request Status: Request Closed Information for this report is procurement sensitive.
9680607 Interior Design CID package Comment Classification: Controlled Unclassified Information (CUI)
Please confirm that the CID package provided as part of this solicitation/RFP meets all of the requirements for the SID, Structural Interior Design and FF&E, Furniture Fixtures and Equipment Design and that the contractor is not to provide any further design for the CID (SID or FF&E) and the contractor is not to include any cost in their proposal for CID design of the SID or design of the FF&E.
On: Apr 07 2022.
Government Response. . See Section 3.4.1 of Jacobs Comprehensive Interior Design (CID) Package revised 24 January 2022 and Specification Section 12 50 00.13 10 for requirements of interior design of FF&E. On: Apr 25 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9680735 Architectural request for pictures Comment Classification: Controlled Unclassified Information (CUI)
At the site visit we requested to take pictures and were told that we could not take any pictures. However, we were offered the option if we wanted pictures we could send in a request for the govt to take pictures that they would then provide via amendment. Since all of our subcontractors could not attend the site visit due to conflicts and the project consist of a variety of construction details and characteristics that cannot be clearly determined by the drawings we request the govt provide pictures of the following. Please provide pictures of each interior room of the building that provides a representation of the floors, walls, ceilings and any unique characteristics of each room. Pictures are also needed of the interior side of each type of existing opening itself and the door or window in the opening. Pictures of any interior stairways, columns, or items to be salvaged and reinstalled would also be necessary. Without provision of the requested pictures, accurate, fair and balanced pricing among all contractors cannot be determined.
On: Apr 07 2022.
Government Response. . During the site visit, the attendees were instructed by Government to submit detailed requests for photographs of specific project features / items through the RFI process. This request is neither detailed nor specific, and therefore photographs will not be provided in response to this request. On: Apr 25 2022
Current Request Status: Request Closed Information for this report is procurement sensitive.
9680788 Mechanical INSTRUMENTATION AND CONTROL FOR
HVAC
Comment Classification: Controlled Unclassified Information (CUI)
Does the Instrumentation and Control of HVAC systems operate under a basewide proprietary system such as Johnson Controls, Automated Logic, Siemens or other. If so, which Proprietary system does the base operate under. If not can we use any system we choose?
On: Apr 07 2022.
Government Response. . The instrumentation and control of HVAC systems do not operate under a base-wide proprietary system.
Contractor's may propose any system complying with the requirements of the Solicitation documents. On: Apr 18 2022 Current Request Status: Request Closed
9680812 Security 01 81 23, para 1.5
In para 1.5 the chart references "appropriate" standoff distances. What is the "appropriate" standoff distance for this facility?
On: Apr 07 2022.
Government Response. . See Drawings CS101 and CS102 for standoff distances. On: Apr 25 2022 Current Request Status: Request Closed
Information for this report is procurement sensitive.
9680828 Security 01 81 23, para 1.4 Comment Classification: Controlled Unclassified Information (CUI)
Para 1.4 addresses design procedures for Blast requirements. Is the contractor required to provide design engineering for any blast rated systems or is all design engineering and testing to be provided/performed by the manufacturers of all blast rated systems?
On: Apr 07 2022.
Government Response. . All design engineering and testing to…