Buffalo Creek Boiler Replacement
Closed Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 1240LT26C0020
- Agency
-
Region 2 - Rocky Mountain Region
Forest Service, Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Place of performance
- Pine, Colorado 80470, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Department of Agriculture Forest Service, Rocky Mountain Region (Region 2) is soliciting quotations for the Buffalo Creek Boiler Replacement project, which involves supplying and installing one high-efficiency propane gas-fired boiler (Dunkirk Quantum 90, Q90-200 or approved equivalent) along with associated plumbing, electrical, and mechanical components. The procurement also includes replacement of a backflow preventer and ball valve, replacement of approximately 14 feet of copper water lines in various sizes, conversion of two outdated electrical panels into one new code-compliant electrical panel, mold remediation and water damage mitigation of the boiler room, and boiler room interior reconstruction. The contract will be awarded on a firm fixed price basis to the responsive and responsible offeror offering the best value, with evaluation based on three factors: Experience/Past Performance (rated as Acceptable, Neutral, or Unacceptable), Technical Approach (rated as High, Some, Low, or Neutral confidence), and Price (evaluated for fair and reasonableness). All quotations must be submitted by March 13, 2026, at 12:00 p.m. Central Time, and prospective bidders must submit questions by March 4, 2026, at 12:00 p.m. Central Time to the Contract Specialist, Erick Plamann (erick.plamann@usda.gov). Each submission must include three years of relevant past performance documentation, a detailed technical approach of 2-4 pages with a construction schedule or Gantt Chart, and pricing on the provided Schedule of Items form.
This solicitation is set aside 100% for small business concerns under NAICS code 238220 (Plumbing, Heating, and Air-Conditioning Contractors), with a size standard of $19 million. The estimated contract value ranges from $25,000 to $100,000, with performance expected to occur from April 1, 2026, through May 20, 2026, with all work to be completed by April 30, 2026. The project location is Buffalo Creek Work Center at 18046 Co Road 126, Pine, Colorado 80470, where a pre-bid site visit was held on February 25, 2026, at 1:00 p.m. Mountain Time; seven bidders attended the site visit, including Rocky Mountain Electric, Flow Right, Clear Creek Construction, Kleir Construction, Home Constructors, Edens Restoration, and Freedom Mechanical CO. Performance and Payment Bonds are required at 100% of the original contract award price within 10 days of award, and all work must comply with OSHA regulations, the International Building Code, International Plumbing Code, National Electric Code, and prevailing wage requirements as established by Department of Labor wage determination CO20260004. Work hours are restricted to Monday through Friday, 8:00 a.m. to 5:00 p.m., with no weekend or federal holiday work permitted.
Notice text
2 versions
Update #2 · Latest ·
Project: Buffalo Creek Boiler Replacement
POC: Erick Plamann, Contract Specialist, erick.plamann@usda.gov
for the replacement of one boiler as outline in attachment 3 Statement of Work (SOW). A- Propane Gas-Fire Boiler - The work shall consist of supplying and installing (1) high efficiency propane gas-fired boiler approved equivalent to the Dunkirk Quantum 90, Q90-200, see attached specifications Attachment 05, at the Buffalo Creek Work Center. Work shall also include the furnishment/installation of any/all plumbing/electrical/expansion tanks/new solenoids/water lines/regulators/miscellaneous components needed for a successful installation. B- Backflow Preventer Replacement – Replace one (1) Caleffi 573012A ½” 573 Backflow Preventer and AutoFill Combination with Pressure Gauge, and one two-way ball valve. C. F- m Water Line Replacement – Replace approximately 5 feet of 1” copper water line, approximately 6 feet of ¾” copper water line, and approximately 3 feet of ½” copper waterline D-Electrical Panel Upgrade – Convert the two (2) outdated electrical panels, located in the entry stairway and attic, respectively, with junction boxes and extend circuits to one (1) new electrical panel. Ensure all new work is appropriately grounded. F-Mold Remediation - Water damage mitigation of the boiler room. Includes temporary removal of plumbing system as necessary, tearing out contaminated plywood and wet insulation, cleaning stud walls, walls, and ceiling, performing detailed HEPA vacuuming, and applying a plant-based antimicrobial agent. F-Boiler Room Interior Reconstruction - The reconstruction phase includes restoring the boiler room and surrounding areas after mitigation.
Magnitude of Construction is between $25,000 and $100,000
Site Visit:
P.O.C. Name: Corey Lewenkamp
Address: 18046 CO RD 126 Pine CO, 80470
Date and Time: February 25, 2026, 1:00 PM Mountain
Telephone: 719-744-7196
P.O.C. Email: corey.lewenkamp@usda.gov
Attachment 1 Solicitation Terms and Conditions
Attachment 2 SOI
Attachment 3 SOW
Attachment 4 BCWC Dwelling Mech & Elec Systems Info
Attachment 5- Product Specs
Attachment 6- Wage Determination
Questions shall be submitted via email to Erick Plamann, Contract Specialist at erick.plamann@usda.gov no later than March 4, 2026, at 12:00 PM Central Time.
Quotes shall be submitted via email to Erick Plamann, Contract Specialist at erick.plamann@usda.gov no later than 12:00 p.m. Central Time on March 13, 2026.
Update #1 ·
Project: Buffalo Creek Boiler Replacement
POC: Erick Plamann, Contract Specialist, erick.plamann@usda.gov
for the replacement of one boiler as outline in attachment 3 Statement of Work (SOW). A- Propane Gas-Fire Boiler - The work shall consist of supplying and installing (1) high efficiency propane gas-fired boiler approved equivalent to the Dunkirk Quantum 90, Q90-200, see attached specifications Attachment 05, at the Buffalo Creek Work Center. Work shall also include the furnishment/installation of any/all plumbing/electrical/expansion tanks/new solenoids/water lines/regulators/miscellaneous components needed for a successful installation. B- Backflow Preventer Replacement – Replace one (1) Caleffi 573012A ½” 573 Backflow Preventer and AutoFill Combination with Pressure Gauge, and one two-way ball valve. C. F- m Water Line Replacement – Replace approximately 5 feet of 1” copper water line, approximately 6 feet of ¾” copper water line, and approximately 3 feet of ½” copper waterline D-Electrical Panel Upgrade – Convert the two (2) outdated electrical panels, located in the entry stairway and attic, respectively, with junction boxes and extend circuits to one (1) new electrical panel. Ensure all new work is appropriately grounded. F-Mold Remediation - Water damage mitigation of the boiler room. Includes temporary removal of plumbing system as necessary, tearing out contaminated plywood and wet insulation, cleaning stud walls, walls, and ceiling, performing detailed HEPA vacuuming, and applying a plant-based antimicrobial agent. F-Boiler Room Interior Reconstruction - The reconstruction phase includes restoring the boiler room and surrounding areas after mitigation.
Magnitude of Construction is between $25,000 and $100,000
Site Visit:
P.O.C. Name: Corey Lewenkamp
Address: 18046 CO RD 126 Pine CO, 80470
Date and Time: February 25, 2026, 1:00 PM Mountain
Telephone: 719-744-7196
P.O.C. Email: corey.lewenkamp@usda.gov
Attachment 1 Solicitation Terms and Conditions
Attachment 2 SOI
Attachment 3 SOW
Attachment 4 BCWC Dwelling Mech & Elec Systems Info
Attachment 5- Product Specs
Attachment 6- Wage Determination
Questions shall be submitted via email to Erick Plamann, Contract Specialist at erick.plmann@usda.gov no later than March 4, 2026, at 12:00 PM Central Time.
Quotes shall be submitted via email to Erick Plamann, Contract Specialist at erick.plmann@usda.gov no later than 12:00 p.m. Central Time on March 13, 2026.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Bridgeport Warehouse Snow Damage Repair and Mitigation | Award Notice | |
| Bridgeport Warehouse Snow Damage Repair and Mitigation | Solicitation | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| GAOA Star Meadows MEP Repairs Utility Installations Flathead NF | Forest Service | Total Small Business | |
| 16292 Steam Boiler Replacement | Air Force Sustainment Center | Total Small Business | |
| Z1DA--FY27 NRM - Replace B98 and B88 Boiler and Sump Pumps | Veterans Integrated Service Network 21 | No set-aside | |
| Z1DA--NRM CONST - 528A7-18-707 - Replace Boiler Stack Rome CBOC | Veterans Integrated Service Network 2 | Total Small Business | |
| Z1DA--Project 695-24-107 Replace Boilers 4 and 5 Clement J. Zablocki, VA Medical Center 5000 West National Avenue Milwaukee, WI 53295 | Veterans Integrated Service Network 12 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity