Attachment 2 SOI.pdf
PDF 68 KB Posted
- Attached to
- Buffalo Creek Boiler Replacement
- Solicitation number
- 1240LT26C0020
About this file
This is a Schedule of Items pricing template for a federal construction contract with Pike-San Isabel National Forests & Cimarron and Comanche National Grasslands (PSICC). The document is dated January 23, 2026, and covers the FY26 Buffalo Creek Work Center Boiler Replacement and Electrical Upgrades project.
The schedule contains six base items and one option item, all priced on a lump sum basis with a quantity of one each. Base items include: Propane Gas-Fired Boiler, Backflow Preventer Replacement, Waterline Replacement, Electrical Panel Upgrade, Mold Remediation, and Boiler Room Interior Reconstruction. The option item is Thermostat Replacement. All items use LSQ (Lump Sum Quality) as the method of measurement and require contractors to submit unit prices and total prices for each line item. The document provides space for contractor/UEI identification but contains no pricing information, indicating this is a blank template awaiting contractor bids.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pay Item No. Description Method of
Measurement Pay Unit
Estimated
Quantity Unit Price Total Price
1 PROPANE GAS-FIRED BOILER LSQ LUMP SUM 1
2 BACKFLOW PREVENTER REPLACEMNET LSQ LUMP SUM 1
3 WATERLINE REPLACEMENT LSQ LUMP SUM 1
4 ELECTRICAL PANEL UPGRADE LSQ LUMP SUM 1
5 MOLD REMEDIATION LSQ LUMP SUM 1
6 BOILER ROOM INTERIOR RECONSTRUCTION LSQ LUMP SUM 1
Pay Item No. Description Method of
Measurement Pay Unit
Estimated
Quantity Unit Price Total Price
7 THERMOSTAT REPLACEMENT LSQ LUMP SUM 1
Pike-San Isabel National Forests & Cimarron and Comanche National Grasslands (PSICC)
TOTAL:
SCHEDULE OF ITEMS
DATE:
23-Jan-26
PROJECT TITLE:
FY26 Buffalo Creek Work Center Boiler Replacement and
Electrical Updgrades
Option Items
TOTAL:
Base Items
| PROJECT TITLE: Contractor/UEI |
| FY26 Buffalo Creek Work Center Boiler Replacement and Electrical Updgrades: |
| Unit Price1: |
| Total Price1: |
| Unit Price1_2: |
| Total Price1_2: |
| Unit Price1_3: |
| Total Price1_3: |
| Unit Price1_4: |
| Total Price1_4: |
| Unit Price1_5: |
| Total Price1_5: |
| Unit Price1_6: |
| Total Price1_6: |
| Total PriceTOTAL: |
| Unit Price1_7: |
| Total Price1_7: |
| Total PriceTOTAL_2: |
File details come from the government source that posted it. Updated .