Bridge Replacement, Stehekin District, North Casca
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 140P8324R0009
- Agency
- Pacific West Region National Park Service, Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Points of contact
-
- Michael Beatty michael_beatty@nps.gov (360) 854-7219
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Interior National Park Service Pacific West Region is seeking proposals for the fabrication and construction of the North Fork Bridge in the Stehekin District of North Cascades National Park. The scope of work includes the fabrication of a steel truss bridge, demolition of the existing bridge, transportation of materials via helicopter, construction of concrete bridge abutments, installation of the prefabricated bridge and approach ramp, and the completion of decking and handrail work. The contract will be awarded on a firm-fixed-price basis, and proposals are due by June 4, 2024. The period of performance is expected to be 270 days after the notice to proceed, tentatively from July 2024 to March 2025. Evaluation criteria will include the offeror's relevant experience, technical approach, and pricing.
This procurement is designated as a 100% small business set-aside. The magnitude of construction is estimated to be between $750,000 and $1,000,000. Subcontracting is limited to 85% of the contract value, excluding materials. The project site is located in a remote area of North Cascades National Park and will require specialized transportation and logistical considerations.
Notice text
3 versions
Update #3 · Latest ·
Amendment # 2 extends the due date for proposala to 6/4/2024 10am PDT IAW FAR 15.206(d).
Update #2 ·
Amendment # 1 issues vendor questions and answers to include revised project drawings.
Update #1 ·
Fabricate and construct North Fork Bridge.
Attachments
| File | Type | Posted |
|---|---|---|
| Sol_140P8324R0009_Amd_0002.pdf | ||
| Sol_140P8324R0009_Amd_0001.pdf | ||
| Attachment_F_Drawings_Revised_0001.pdf | ||
| Attachment_E_North_Fork_Bridge_Questions_and_Answers_0001.pdf | ||
| Sol_140P8324R0009.pdf | ||
| Attachment_A_Project_Specifications_DIV_I_II.pdf | ||
| Form_4_-_Limitations_on_Subcontracting_compliance_worksheet.xlsx | XLSX spreadsheet | |
| Attachment_B__Drawings.pdf | ||
| Attachment_D_Forms_to_Return_with_Proposal.docx | DOCX document | |
| Attachment_C__DOL_Wage_Determination.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Bridge Replacement, Stehekin District, North Cascades NP | Award Notice | |
| Bridge Replacement, Stehekin District, North Casca | Solicitation | |
| Bridge Replacement, Stehekin District, North Cascades NP | Pre-Solicitation | |
| Bridge Replacement, Stehekin District, North Cascades NP | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity