Attachment_B__Drawings.pdf
PDF 3 MB Posted
- Attached to
- Bridge Replacement, Stehekin District, North Casca Federal contract opportunity
- Solicitation number
- 140P8324R0009
About this file
This document is a set of drawings and specifications for the replacement of the North Fork Bridge located in Chelan County, Washington within the North Cascades National Park. The drawings provide details on the construction of a new steel truss bridge with a 66-foot 8-inch span, including the design of the concrete footings and abutments, steel superstructure, timber decking and railings, and approach spans. Key requirements include using weathering steel materials, a 42-inch minimum guardrail height, and a 5,000 psi concrete compressive strength. The drawings also show the site location, existing conditions, and staging areas. This project is the subject of a federal solicitation, Solicitation Number 140P8324R0009, issued by the Department of the Interior National Park Service Pacific West Region for the fabrication and construction of the North Fork Bridge replacement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8324R0009_Amd_0002.pdf | ||
| Attachment_E_North_Fork_Bridge_Questions_and_Answers_0001.pdf | ||
| Sol_140P8324R0009_Amd_0001.pdf | ||
| Attachment_F_Drawings_Revised_0001.pdf | ||
| Form_4_-_Limitations_on_Subcontracting_compliance_worksheet.xlsx | XLSX spreadsheet | |
| Attachment_D_Forms_to_Return_with_Proposal.docx | DOCX document | |
| Attachment_C__DOL_Wage_Determination.pdf | ||
| Sol_140P8324R0009.pdf | ||
| Attachment_A_Project_Specifications_DIV_I_II.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBSHEET
SHEET
DRAWN BY:
PMIS NO.
D
ES
C R
IP
TI
O N
D
AT
E N
O
R
EV
IS
IO
N S
324008
NWA
G-001
C H
EL
AN
C O
U N
TY
W
AS
H
IN
G
TO
N
R
EP
LA
C
E N
O R
TH
F
O R
K
BR
ID
G
E
- P
C T
TIC NO.
168-192607
TI
TL
E
SH
EE
T
SHEET INDEX
DESCRIPTIONSHEET
G-001 G-002
TITLE SHEET
GENERAL PROJECT INFORMATION
U.S DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
PACIFIC WEST REGION
CHELAN COUNTY, WASHINGTON
C-001 GENERAL SITE PLAN
C-002 REMOVALS
S-001 FOUNDATION PLAN
S-002 BRIDGE PLAN & PROFILE
S-003 BRIDGE SECTION
S-004 DETAILS
S-005 DETAILS
PROJECT LOCATION
S-006 SOUTH APPROACH SPAN PLAN
DRAWN BY:
PMIS NO.
D
ES
C R
IP
TI
O N
D
AT
E N
O
R
EV
IS
IO
N S
324008
NWA
G-002
C H
EL
AN
C O
U N
TY
W
AS
H
IN
G
TO
N
R
EP
LA
C
E N
O R
TH
F
O R
K
BR
ID
G
E
- P
C T
TIC NO.
168-192607
G
EN
ER
AL
P R
O
JE
C T
IN
FO
R M
AT
IO
N
WHERE PUBLIC UTILITY FIXTURES OR FACILITIES ARE SHOWN AS EXISTING ON
THE PLANS OR ENCOUNTERED WITHIN THE CONSTRUCTION AREA, IT SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE OWNERS OF THESE
UTILITIES PRIOR TO THE BEGINNING OF ANY CONSTRUCTION INVOLVING
EXCAVATION. THE CONTRACTOR SHALL AFFORD ACCESS TO THESE FACILITIES
FOR NECESSARY MODIFICATION OF SERVICES OR RELOCATION. UNDERGROUND
FACILITIES, STRUCTURES AND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE
SURVEYS, RECORDS AND UTILITY OPERATOR LOCATION MARKINGS; THEREFORE
THEIR LOCATIONS MUST BE CONSIDERED APPROXIMATE ONLY. TYPE, SIZE AND
GENERAL LOCATION OF THE FACILITIES WERE REQUESTED OF THE OPERATORS
AND SHOWN ON THE PLANS, AND IF NECESSARY, UPDATED WITHIN 90 DAYS OF
COMPLETION OF THE FINAL PLANS. IT IS POSSIBLE THERE MAY BE OTHERS, THE
EXISTENCE OF WHICH IS PRESENTLY NOT KNOWN OR SHOWN. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO DETERMINE THEIR EXISTENCE AND EXACT
LOCATION AND TO AVOID DAMAGE THERETO. NO CLAIMS FOR ADDITIONAL
COMPENSATION WILL BE ALLOWED TO THE CONTRACTOR FOR ANY
INTERFERENCE OR DELAY CAUSED BY THE WORK.
BASIS FOR DESIGN
1. GEOTECHNICAL MEMORANDUM 41-21 DEC 16 2021 GEOLOGICAL SITE VISIT REPORT AND FOUNDATION RECOMMENDATIONS FOR NORTH FORK TRAIL BRIDGE, BRIDGE CREEK NORTH CASCADES NATIONAL
PARK CHELAN COUNTY WASHINGTON.
2. AASHTO LRFD WITH PEDESTRIAN BRIDGE SUPPLEMENT.
3. SPAN LENGTH 66'-8" BASED ON SOUTH FOOTING AND SETBACK FROM NORTH ABUTMENT BASED ON
GEOTECHNICAL REPORT.
4. 6'-1" CLEAR BETWEEN GUARDRAIL.
GENERAL NOTES
1. SCOPE OF WORK:
- REPLACEMENT OF STOCK TRAIL BRIDGE.
- INSTALL NEW NORTH AND SOUTH CONCRETE FOOTINGS PER DESIGN DRAWINGS AND
SPECIFICATIONS.
- INSTALL SUPERSTRUCTURE PER PROVIDED CRITERIA.
2. THE WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE SPECIFICATIONS, DRAWINGS, AND ALL
APPLICABLE BUILDING CODES.
3. FABRICATED STEEL BRIDGE WEIGHS APPROXIMATELY 10,000 LBS. ACCESS TO SITE IS VIA TRAILS OR
HELICOPTER LIFT.
4. ALL MATERIALS SHALL BE AS SPECIFIED OR ALTERNATIVES SHALL BE APPROVED BY THE NPS PRIOR
TO FABRICATION AND CONSTRUCTION.
5. ALL SPECIFIED MATERIALS SHALL BE INSTALLED PER ALL MANUFACTURER RECOMMENDATIONS.
6. LOADS ARE FROM AASHTO AND INCLUDE:
SNOW LOAD: 226 LB/SF BASED ON WASHDOT CRITERIA FOR 2530' ABOVE SEA LEVEL AND NEAREST
SNOTEL STATIONS
SEISMIC:
RISK CAT II
SEISMIC IMPORTANCE FACTOR = 1.0
SDS = 0.47G
SD1 = 0.21G
SITE CLASS = C
WIND: 110 MPH EXPOSURE B
RAILINGS AND OTHER LOADS PER AASHTO
STRUCTURAL NOTES
1. THE STEEL ELEMENTS SHALL BE ASTM A847, A588, A242 OR A606 GRADE 50KSI WEATHERING STEEL.
2. HORIZONTAL GUARDRAILS SHALL BE PLACED ON THE STRUCTURE UP TO A MINIMUM HEIGHT OF
FORTY-TWO INCHES (42”) ABOVE THE DECK SURFACES. GUARDRAILS SHALL BE PLACED TO PREVENT
A FOUR INCH (4”) SPHERE FROM PASSING THROUGH ANY OPENING. SUPPORTS ARE PROVIDED
ALONG THE BRIDGE GIRDERS TO RECEIVE TIMBER AND STEEL POSTS WITH BOLTED CONNECTIONS.
FOUNDATION NOTES
1. SOIL BEARING CAPACITY IS ASSUMED TO BE 8 KSF PER GEOTECHNICAL REPORT.
2. MATERIALS USED TO PRODUCE CONCRETE AND TESTING THEREOF SHALL COMPLY WITH THE
APPLICABLE STANDARDS LISTED IN CHAPTERS 19 AND 20 OF ACI 318 OR ACI 332, F’C = 5000 PSI.
3. STEEL REINFORCEMENT SHALL COMPLY WITH THE REQUIREMENTS OF ASTM A615, A706 OR A996. THE
MINIMUM YIELD STRENGTH OF REINFORCING STEEL SHALL BE 60,000 PSI.
4. REINFORCEMENT SHALL BE SECURED IN THE PROPER LOCATION IN THE FORMS WITH TIE WIRE OR
OTHER BAR SUPPORT SYSTEM TO PREVENT DISPLACEMENT DURING THE CONCRETE PLACEMENT
OPERATION. STEEL REINFORCEMENT IN CONCRETE CAST AGAINST THE EARTH SHALL HAVE A
MINIMUM COVER OF 3 INCHES. MINIMUM COVER FOR REINFORCEMENT IN CONCRETE CAST IN
REMOVABLE FORMS THAT WILL BE EXPOSED TO THE EARTH OR WEATHER SHALL BE 1.5 INCHES FOR NO. 5 BARS AND SMALLER. FOR CONCRETE CAST IN REMOVABLE FORMS THAT WILL NOT BE EXPOSED TO THE EARTH OR WEATHER, AND FOR CONCRETE CAST IN STAY-IN-PLACE FORMS, MINIMUM COVER
SHALL BE 3/4 INCH.
5. THE TOP SURFACE OF FOOTINGS SHALL BE LEVEL. THE BOTTOM SURFACE OF FOOTINGS SHALL NOT HAVE A SLOPE EXCEEDING ONE UNIT VERTICAL IN 10 UNITS HORIZONTAL (10-PERCENT SLOPE).
FOOTINGS SHALL BE STEPPED WHERE IT IS NECESSARY TO CHANGE THE ELEVATION OF THE TOP
SURFACE OF THE FOOTINGS OR WHERE THE SLOPE OF THE BOTTOM SURFACE OF THE FOOTINGS
WILL EXCEED ONE UNIT VERTICAL IN 10 UNITS.
6. REMOVE OR DRILL & BREAK ROCKS CONFLICTING WITH NEW FOOTING EXCAVATIONS. OBTAIN NPS
FIELD INSPECTION AND APPROVAL OF ALL FOOTINGS AND REINFORCING PRIOR TO PLACING
CONCRETE.
7. BRIDGE ANCHOR BOLTS SHALL BE ASTM A240, TYPE 316, 30,000 PSI MINIMUM YIELD STRENGTH, WITH TYPE 316 NUTS AND WASHERS. 3/4" DIA. WITH 12" MINIMUM EPOXY EMBEDMENT INTO CONCRETE.
CENTER BOLTS IN SLOTS. FINGER TIGHTEN NUTS AND CAP WITH LOCKING NUTS.
8. ELASTOMERIC BEARING PADS SHALL CONFORM WITH AASHTO AND ASTM M251, SHORE A 70
DUROMETER, NEOPRENE ELASTOMERIC.
9. SHIMS CONTAINED IN LAMINATED BEARING PADS SHALL BE MILL ROLLED STEEL SHEETS NOT LESS
THAT 20 GAGE IN THICKNESS WITH A MINIMUM COVER OF 1
16" THICKNESS INTO EQUAL LAMINATIONS.
THE BOND BETWEEN THE ELASTOMER AND METAL SHIMS SHALL BE SUCH THAT, WHEN A SAMPLE IS TESTED FOR SEPARATION, FAILURE SHALL OCCUR WITHIN THE ELASTOMER AND NOT BETWEEN THE
ELASTOMER AND THE METAL SHIM.
LUMBER NOTES
1. ALL LUMBER SHALL BE YELLOW CEDAR #1, OR DOUGLAS FIR #1, FULL SAWN ROUGH, TIGHT KNOT, MAX KNOT SIZE 2", NO WANE, MINIMUM 10 GROWTH RINGS PER INCH. DECK BOARDS SHALL HAVE
GRAIN 35° OR MORE FROM SURFACE.
2. SAWN LUMBER SHALL BE IDENTIFIED BY A GRADE MARK OF AN ACCREDITED LUMBER GRADING OR
INSPECTION AGENCY AND HAVE DESIGN VALUES CERTIFIED BY AN ACCREDITATION BODY THAT
COMPLIES WITH DOC PS 20. IN LIEU OF A GRADE MARK, A CERTIFICATE OF INSPECTION ISSUED BY A LUMBER GRADING OR INSPECTION AGENCY MEETING THE REQUIREMENTS OF THIS SECTION SHALL
BE ACCEPTED, UNLESS NOTED OTHERWISE.
3. FASTENERS A325 TYPE 3 BOLTS WEATHERING STEEL NUTS AND WASHERS AND SIMPSON SDWS
SCREWS.
BRIDGE SITE - STAGING, SLING DROPS, AND CAMPING APPROXIMATE LOCATIONS
25252525
30 25
35 25 40 25
45 25 50 25
SUBSHEET
SHEET
DRAWN BY:
PMIS NO.
D
ES
C R
IP
TI
O N
D
AT
E N
O
R
EV
IS
IO
N S
324008
NWA
C-001
C H
EL
AN
C O
U N
TY
W
AS
H
IN
G
TO
N
R
EP
LA
C
E N
O R
TH
F
O R
K
BR
ID
G
E
- P
C T
TIC NO.
168-192607
G
EN
ER
AL
S
IT
E
PL
AN
2020 0 40
HORIZ.
BRIDGE CREEK
PROPOSED
BRIDGE
PACIFIC CREST TRAIL
PACIFIC CREST TRAIL
NORTH FORK BRIDGE CREEK
NOTES
THIS SHEET IS INTENDED THE RELATIVE TOPOGRAPHY OF THE
SITE, AND WAS DERIVED FROM LIDAR DATA.
A FULL TOPOGRAPHIC SURVEY OF THE SITE WAS NOT
COMPLETED. CONTRACTOR SHALL VERIFY ACTUAL SITE
CONDITIONS.
TO HWY 20
TO STEHEKIN
DRAWN BY:
PMIS NO.
D
ES
C R
IP
TI
O N
D
AT
E N
O
R
EV
IS
IO
N S
324008
NWA
C-002
C H
EL
AN
C O
U N
TY
W
AS
H
IN
G
TO
N
R
EP
LA
C
E N
O R
TH
F
O R
K
BR
ID
G
E
- P
C T
TIC NO.
168-192607
R
EM
O
VA
LS
2020 0 40
HORIZ.
REMOVE EXISTING APPROACH SPAN
EXISTING SOUTH CONCRETE FOOTING TO REMAIN
EXISTING BOULDER TO REMAIN
EXISTING WOOD SLEEPER TO REMAIN UNTIL NEW
ABUTMENT IS POURED, THEN REMOVE
EXISTING CONCRETE ABUTMENTS
TO REMAIN
REMOVE EXISTING CABLES
REMOVE EXISTING
CABLE BRIDGE
NEW FOOTING TO BE CONSTRUCTED
PER FOUNDATION PLAN
PHOTOGRAPH A: SOUTH ABUTMENT PHOTOGRAPH B: NORTH ABUTMENT
DATUM FOR NEW BRIDGE FOOTING
IS 8" ABOVE EXISTING SOUTH PIER
DRAWN BY:
PMIS NO.
D
ES
C R
IP
TI
O N
D
AT
E N
O
R
EV
IS
IO
N S
324008
NWA
S-001
C H
EL
AN
C O
U N
TY
W
AS
H
IN
G
TO
N
R
EP
LA
C
E N
O R
TH
F
O R
K
BR
ID
G
E
- P
C T
TIC NO.
168-192607
FO
U
N D
AT
IO
N P
LA
N
2.52.5 0 5
HORIZ.
7'
2'
8"
3'
8"
5' 1'
1'
℄EAST TRUSS
℄WEST TRUSS
5' 1'
1'
9'
CONSTRUCT NEW 8" CONCRETE
CAP ON TOP OF EXISTING PIERS
1' 1'
FOUNDATION PLAN
FOUNDATION ELEVATION
1' 1'
ABANDONED PIERS
EXISTING FOOTING
TO REMAIN
ABANDONED PIER
NEW BRIDGE DECK LEVEL
GRADE TREAD TO
TOP OF SLEEPER
66'-8"
DATUM FOR NEW BRIDGE FOOTING
IS 8" ABOVE EXISTING SOUTH PIER
BASE PLATE FOR
NEW BRIDGE
1'-6"1'-6"
1 BASE PLATE POSITION ON EACH PIER
MAY BE ALTERED UP TO 2" ±
DEPENDING ON OPTIMUM LOCATION
FOR NORTH PIER
2 VERIFY WITH BRIDGE AS CONSTRUCTED
FILL VOID WITH
COMPACTED FILL
SOUTH ABUTMENT
NORTH ABUTMENT
CONSTRUCT NEW CONCRETE
FOOTING
EXISTING
CONCRETE
PARAPET
CONSTRUCT NEW CONCRETE
PIERS AND PARAPET
EXISTING CONCRETE
FOOTING
3' MIN
SOUTH PIER CAP DETAIL
(10) 10" LONG NO. 4 DOWELS SPACED
EVENLY AS SHOWN - STANDARD HOOKS AT TOP
- DRILL AND EPOXY 4" INTO EXISTING PIER3"
3"
NORTH ABUTMENT DETAILS
NO.4 HORIZONTAL HOOPS
@ 12" O.C. VERTICALLY
1'-8"
CONSTRUCTION JOINT
(2) #4 DOWELS W/ 4" EMBED INTO
EACH EXISTING PIER W/
STANDARD HOOK INTO NEW PIER
NO. 4 BARS AT 12" O.C.
BOTH WAYS
SET LOWER PARAPET REINFORCEMENT
12" INTO PIERSET DOWEL 6"
INTO PIER
#3 HORIZONTAL HOOPS
@ 12" O.C. VERTICALLY
VERTICAL REINFORCEMENT
NO.4 BARS @ 12" O.C. AROUND HOOP
3"
CONSTRUCT PARAPET
6" MIN BELOW GRADE
FILL AND GRADE
SURFACE
SET TO SAME ELEVATION
AS TOP OF SOUTH PIER
PLACE SALVAGED ROCKS
ALONG EDGE TO SHAPE APPROACH
(ALL SIDES)
SIDE PROFILE
PLAN
SECTION
(2) #3 HOOPS EVENLY
SPACED IN 8" CAP
EXISTING PIERS
APPROX. 2'X3'
NEW 8" THICK
CONCRETE CAP
8"
EXISTING PIERS
SEE PHOTO SHEET C-002
3' M
IN
2'
4X6 FLAT RETAINING WALL SLEEPER
AT GRADE W/ (2) 5/8" THREADED ROD
EPOXY ANCHORS W/RECESSED NUTS/WASHERS
7.5"
10.5" TO CL APPROACH
SPAN BEAM REF S-006
WOOD FRAMED APPROACH SPAN
FIELD VERIFY AND ADJUST THE LENGTH OF THE
SPAN TO MATCH FIELD CONDITIONS.
THE MAX LENGTH OF THE SPAN SHALL BE 6'
SOUTH FOOTING DETAIL
(5) HORIZONTAL REINF.
#4 BARS
#4 BARS @ 12" O.C.
1'
2'
8"
5'
1' -8
2'
3'
8"
4' -4
2'
POUR AGAINST EXISTING
FOOTING FILLING VOID AS
REQUIRED
6" MIN
SEE DETAIL THIS SHEET
SEE DETAIL THIS SHEET
SEE DETAIL THIS SHEET
DRAWN BY:
PMIS NO.
D
ES
C R
IP
TI
O N
D
AT
E N
O
R
EV
IS
IO
N S
324008
NWA
S-002
C H
EL
AN
C O
U N
TY
W
AS
H
IN
G
TO
N
R
EP
LA
C
E N
O R
TH
F
O R
K
BR
ID
G
E
- P
C T
TIC NO.
168-192607
BR
ID
G E
PL
AN
A N
D P
R O
FI
LE
2.52.5 0 5
HORIZ.
PL 12 X 12 X 34
2X6 RAILING. 10" O.C.
STAGGER JOINTS
C 12 X 20.3
HSS 4 X 8 X 14
2X8 DECKING
4X8X 14' LONG MEMBER @ 9" O.C.
STAGGER JOINTS
(TYP OF 9 ROWS)
L 2 X 2 X 14
6'-8"6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8" 6'-8"
7' 2'
-6
2' -6
ORIENTATE
BACK TO
BACK
BRIDGE PLAN
BRIDGE PROFILE
DETAIL 1 DETAIL 3
DETAIL 2
DETAIL 5
DETAIL 4
6' -8
L 1 12 X 1 12 X 14L 1 12 X 1 12 X 14L 1 12 X 1 12 X 14L 1 12 X 1 12 X 14
HSS 3 X 3 X 14HSS 3 X 3 X 14
HSS 2 12 X 2 12 X 14 HSS 2 12 X 2 12 X 14
A S003
SYMMETRIC ABOUT ℄
WELD BACKS OF ANGLES
TOGETHER
HSS 4X6X1
4 TOP CHORD
HSS 4X6X1
4 TOP CHORD
H
SS
X
X
1 4
H
SS
X
X
1 4
H
SS
X
X
1 4
H
SS
X
X
1 4
H
SS
X
X
1 4
HSS 4 X 6 X 14
4X6 POST
4X6 POST
4X6 POST
4X6 POST
SCREW RAILS TO POST
WOOD FRAMING EXTENDS 8" BEYOND CL OF
BASE PLATE, TYPICAL EACH END OF BRIDGE
DECKING STOPS 12" SHORT OF
NEW PARAPET WALL SLEEPER
SEE SHEET S-006 FOR SOUTH
WOOD FRAMED APPROACH SPAN
SEE SHEET S-006 FOR SOUTH
WOOD FRAMED APPROACH SPAN
DRAWN BY:
PMIS NO.
D
ES
C R
IP
TI
O N
D
AT
E N
O
R
EV
IS
IO
N S
324008
NWA
S-003
C H
EL
AN
C O
U N
TY
W
AS
H
IN
G
TO
N
R
EP
LA
C
E N
O R
TH
F
O R
K
BR
ID
G
E
- P
C T
TIC NO.
168-192607
BR
ID
G E
SE
C
TI
O
N
8"8" 0 16"
HORIZ.
SECTION A
1 HSS 4 X 6X 14 TOP CHORD
2 HSS 4 X 6 X 14 BOTTOM CHORD
3 HSS 4 X 8 X 14 CROSS BEAM
4 HSS 3 X 3 X 14 VERTICAL
5 HSS 2 X 2 X 14 KICKER
6 HSS DIAGONAL
7 HSS LATERAL BRACING ANGLE
8 PL 4 X 8 X 14
9 4X4 NAILER BOLTED TO CROSS BEAM WITH 38"
THREADED STUDS WELDED TO CROSS BEAM
10 4X8 FLAT FLOOR JOISTS @ 9" O.C.
11 2X8 DECKING
12 2X4 NAILER BOLTED TO VERTICAL BEAM WITH 38"
THREADED STUDS WELDED TO VERTICAL
13 2X6 RAILING 10" O.C., BOTH SIDES
9 10
6'-1"
7'
2'-6"2'-6"
6' -8
5'
4" TYP
6"
A S003
1' 2'
-6
4' -2
DRAWN BY:
PMIS NO.
D
ES
C R
IP
TI
O N
D
AT
E N
O
R
EV
IS
IO
N S
324008
NWA
S-004
C H
EL
AN
C O
U N
TY
W
AS
H
IN
G
TO
N
R
EP
LA
C
E N
O R
TH
F
O R
K
BR
ID
G
E
- P
C T
TIC NO.
168-192607
D
ET
AI
LS
DETAIL 1 - TOP CHORD CONNECTION
1 HSS 4 X 6 X 14 TOP CHORD
2 HSS DIAGONAL
3 HSS 3 X 3 X 14 VERTICAL
4 PL 5 12 X 9 X 14 DOUBLE PLATE
NO SCALE
1 HSS 4 X 6X 14 BOTTOM CHORD
2 HSS DIAGONAL
3 HSS 3 X 3 X 14 VERTICAL
4 HSS 4 X 8 X 14 CROSS BEAM
DETAIL 2 - BOTTOM CHORD CONNECTION
NO SCALE
5 L 2 12 X2 12 X 5
16 DISTRIBUTION SHOE
6 HORIZONTAL BRACING ANGLE
DETAIL 3 - ABUTMENT CONNECTION
NO SCALE
1 HSS 4 X 6X 14 TOP CHORD
2 HSS 3 X 3X 14 DIAGONAL
3 HSS 3 X 3 X 14 VERTICAL
4 HSS 4 X 6X 14 ABUTMENT DIAGONAL
5 PL 5 12 X 8 X 14
6 COPE TOP CHORD TO FIT OVER DIAGONAL
DETAIL 4 - SPLICE CONNECTION
NO SCALE
1 HSS 4 X 6X 14 CHORD
2 PL 5 58 X 9 X 1/4
B S005
DRAWN BY:
PMIS NO.
D
ES
C R
IP
TI
O N
D
AT
E N
O
R
EV
IS
IO
N S
324008
NWA
S-005
C H
EL
AN
C O
U N
TY
W
AS
H
IN
G
TO
N
R
EP
LA
C
E N
O R
TH
F
O R
K
BR
ID
G
E
- P
C T
TIC NO.
168-192607
D
ET
AI
LS
DETAIL 5 - BEARING PLATE CONNECTION
3 C 12 X 20.3
4 PL 12 X 12 X 34
NO SCALE
DETAIL 5A -BEARING PLATE ISOMETRIC VIEW
NO SCALE
SECTION B
NO SCALE
1 HSS 4 X 6 X 14 BOTTOM CHORD
2 HSS DIAGONAL
3 HSS 3 X 3 X 14 VERTICAL
HSS 4 X 6X 14 ABUTMENT DIAGONAL
5 LATERAL BRACING ANGLE
6 FLANGE FACING CROSS BEAM IN
LOCATION WITH DIAGONAL
HSS 4 X 6X 14 BOTTOM CHORD
5 PL 4 X 20 X 38
6 LATERAL BRACING
8" X 2" LONG SLOTTED HOLES
HOLE FOR 58" BOLT
12" 12"
2" CLEAR
CUT NOTCH
HSS 4 X 8 X 14 CROSS BEAM
LOCATION WITH DIAGONALLOCATION W/O DIAGONAL
7 FLANGE FACING AWAY FROM CROSS
BEAM IN LOCATION WITHOUT DIAGONAL
2" 4"
B S005
2"1"
ATTACH 4X6 WOOD RAIL POST
4X6 NAILER FLAT
DETAIL 6 - BRIDGE DECK AND RAILING ISOMETRIC VIEW
NO SCALE
3 A325 TYPE 3 WELDED STUD, NUT AND 3
X 3 X 14 WEATHERING STEEL WASHER
4 2 X 8 RAILING
HSS 3 X 3 X 14 VERTICAL
2 X 6 NAILER
5 SIMPSON SDWS TIMBER SCREW - 4" LONG
6 STAGGER JOINTS. USE 14' LONG
RAILING MEMBERS MINIMUM
7 GALVANIZED 20D SPIKE
8 2 X 8 DECKING
9 4 X 8 JOIST AT 9" O.C.
10 A325 TYPE 3 WELDED STUD, NUT AND 3
X 3 X 14 WEATHERING STEEL WASHER
11 4 X 6 NAILER
12 HSS 4 X 8 X 14 CROSS BEAM
13 SIMPSON SDWS TIMBER SCREW - 6" LONG
14 STAGGER JOINTS. USE 14' LONG
MEMBERS MINIMUM 13
1.5"
2"
ELASTOMERIC BEARING PADS: EACH BASE PLATE
TO RECEIVE 12" X 12" X 1" THICK BEARING PAD
PER SPECIFICATIONS - SLOT BEARING PAD HOLES
TO MATCH BASE PLATE SLOTS
NOTE: BOTTOM CHORD MUST BE FULLY
WELDED TO DIAGONAL TOP CHORD PRIOR
TO ATTACHMENT OF BASE PLATE. SHOP
WELD INSPECTOR TO SPECIFICALLY
REVIEW AND DOCUMENT THIS
CONNECTION SEQUENCE
WELD BOTTOM CHORD TO
DIAGONAL PRIOR TO
ATTACHING BASEPLATE
COPE ANGLE WITH RADIUS CUT
9 ELASTOMER BEARING PAD
DRAWN BY:
PMIS NO.
D
ES
C R
IP
TI
O N
D
AT
E N
O
R
EV
IS
IO
N S
324008
NWA
S-006
C H
EL
AN
C O
U N
TY
W
AS
H
IN
G
TO
N
R
EP
LA
C
E N
O R
TH
F
O R
K
BR
ID
G
E
- P
C T
TIC NO.
168-192607
SO
U
TH
A
PP
R
O
AC
H S
PA
N
P
LA
N
1.251.25 0 2.5
HORIZ.
ADJUST GRADE
TO MATCH
DECK
1 4 X 10 BEAM
2 4 X 6 POST
PROFILE
PLAN
SECTION
8" PL SHOE
3 4 X 6 BRACE
4 2 X 6 RAILING
5 4X8 FLAT FLOOR JOISTS @ ~9" O.C.
6 2X8 DECKING
6 5
6 5
NOTE
FIELD VERIFY AND ADJUST THE LENGTH OF THE SPAN TO MATCH FIELD CONDITIONS.
THE MAX LENGTH OF THE SPAN SHALL BE APPROXIMATELY 6'
2" GAP
(1) 5/8" DIA. THRU BOLT - LOCATE 1"
ABOVE BOTTOM LIP OF BEVEL CUT
3/8" PL FABRICATED SHOE 5" WIDE X 7.5"
TALL X 8" CLEAR THROAT - W/(2) 3/4"
DIA HOLES FOR 5/8" THRU BOLTS - TYP.
(4) SHOE LOCATIONS - ANCHOR SHOES
TO FOUNDATION W/(1) 5/8"X4" EMBED EPOXY
ANCHOR
(2) 5/8" DIA. THRU BOLTS
W/2" EDGE DISTANCE (TYP).
BRIDGE DECK FRAMING EXTENDS 8"
BEYOND CL OF BRIDGE BASE PLATE
RAILING & DECKING
EXTENDS 2"
BEYOND POST/BEAM
3 3
4X6 FLAT RETAINING WALL SLEEPER
AT GRADE W/ (2) 5/8" THREADED ROD
EPOXY ANCHORS W/RECESSED
NUTS/WASHERS
8" PL SHOE
NEW FOOTING4 X 6 SHIM POST
FIELD CUT TO HEIGHT
2'-6"
2"
1.5"
ON NORTH SIDE SHOE ATTACHES TO
EXTENDED POST/SHIM. ON SOUTH SIDE
SHOE ATTACHES TO POST & 4 X 10. SECTION
SHOWN INCORRECT TO ILLUSTRATE
DIFFERENCE BETWEEN NORTH AND
SOUTH SUPPORT CONDITIONS
6' -2
" 5' -6
7.5"
8"
SHOE
FRAMING EXTENDS 2" BEYOND POST
SEE NOTE10.5"
AutoCAD SHX Text FILE PATH: C:\Users\nwanderson\OneDrive - DOI\REDW\NOCA BRIDGE CAD\NOCA 324008 DESIGN.dwg LAST SAVE: 3/10/2024 1:56 PM SAVED BY: NWANDERSON PLOT DATE: 3/10/2024 2:12 PMC:\Users\nwanderson\OneDrive - DOI\REDW\NOCA BRIDGE CAD\NOCA 324008 DESIGN.dwg LAST SAVE: 3/10/2024 1:56 PM SAVED BY: NWANDERSON PLOT DATE: 3/10/2024 2:12 PM LAST SAVE: 3/10/2024 1:56 PM SAVED BY: NWANDERSON PLOT DATE: 3/10/2024 2:12 PM3/10/2024 1:56 PM SAVED BY: NWANDERSON PLOT DATE: 3/10/2024 2:12 PM SAVED BY: NWANDERSON PLOT DATE: 3/10/2024 2:12 PMNWANDERSON PLOT DATE: 3/10/2024 2:12 PM PLOT DATE: 3/10/2024 2:12 PM3/10/2024 2:12 PM
AutoCAD SHX Text FILE PATH: C:\Users\nwanderson\OneDrive - DOI\REDW\NOCA BRIDGE CAD\NOCA 324008 DESIGN.dwg LAST SAVE: 3/10/2024 1:56 PM SAVED BY: NWANDERSON PLOT DATE: 3/10/2024 2:12 PMC:\Users\nwanderson\OneDrive - DOI\REDW\NOCA BRIDGE CAD\NOCA 324008 DESIGN.dwg LAST SAVE: 3/10/2024 1:56 PM SAVED BY: NWANDERSON PLOT DATE: 3/10/2024 2:12 PM LAST SAVE: 3/10/2024 1:56 PM SAVED BY: NWANDERSON PLOT DATE: 3/10/2024 2:12 PM3/10/2024 1:56 PM SAVED BY: NWANDERSON PLOT DATE: 3/10/2024 2:12 PM SAVED BY: NWANDERSON PLOT DATE: 3/10/2024 2:12 PMNWANDERSON PLOT DATE: 3/10/2024 2:12 PM PLOT DATE: 3/10/2024 2:12 PM3/10/2024 2:12 PM
| NOCA 324008 DESIGN-G-001 |
| Sheets and Views |
| NOCA 324008 DESIGN-G-001 |
| NOCA 324008 DESIGN-G-002 |
| Sheets and Views |
| NOCA 324008 DESIGN-G-002 |
| NOCA 324008 DESIGN-C-001 |
| Sheets and Views |
| NOCA 324008 DESIGN-C-001 |
| NOCA 324008 DESIGN-C-002 |
| Sheets and Views |
| NOCA 324008 DESIGN-C-002 |
| NOCA 324008 DESIGN-S-001 |
| Sheets and Views |
| NOCA 324008 DESIGN-S-001 |
| NOCA 324008 DESIGN-S-002 |
| Sheets and Views |
| NOCA 324008 DESIGN-S-002 |
| NOCA 324008 DESIGN-S-003 |
| Sheets and Views |
| NOCA 324008 DESIGN-S-003 |
| NOCA 324008 DESIGN-S-004 |
| Sheets and Views |
| NOCA 324008 DESIGN-S-004 |
| NOCA 324008 DESIGN-S-005 |
| Sheets and Views |
| NOCA 324008 DESIGN-S-005 |
| NOCA 324008 DESIGN-S-006 |
| Sheets and Views |
| NOCA 324008 DESIGN-S-006 |