Big Bend Left Abutment Collector Pipe System

Closed Solicitation Posted

A newer special notice was posted. See the latest special notice from .

Solicitation number
W9128F23B0005
Agency
ENDIST Omaha US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Y1QA Construction Of Restoration Of Real Property (Public Or Private)
Place of performance
Fort Thompson, South Dakota 57339, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks to replace the left abutment collector pipe system near the toe of the Big Bend Dam in Fort Thompson, South Dakota. The Department of the Army Corps of Engineers Engineering District Omaha requires contractors to furnish all personnel, services, equipment, materials and other requirements necessary to dewater the area, properly dispose of contaminated soil and water, excavate and remove existing slotted and solid pipes, install a two-stage filter, backfill and seed. A two-step IFB process will be used, with technical proposals due by February 9, 2023 at 2:00 PM Central Time. Evaluation will be based on technical approach and past performance.

The solicitation carries no set-aside designations. Relevant NAICS codes include 237110 and 237310. The place of performance is Fort Thompson, South Dakota. Pricing is required for base work including excavation of approximately 1,000 cubic yards of soil and installation of approximately 500 linear feet of replacement collector pipes to be completed within 120 calendar days of the notice to proceed. Multiple site visits have been held and amendments extend deadlines and revise specifications.

Notice text

6 versions

Update #6 · Latest ·

****AMENDMENT 0003  IS TO UPDATE SPECIFICATION INFORMATION FOR SECTIONS 01 22 00, 02 61 13, and 02 81 00. THE AMENDMENT AND SUPPORTING SECTIONS ARE UPLOADED IN THE ATTACHMENT SECTION FOR REVIEW. STEP-1 PROPOSALS ARE DUE ON 9 FEBRUARY 2023 ON OR BEFORE 2:00 PM CT*** 

***AMENDMENT 0002 - FOR TIME HAS BEEN APPROVED. CHANGED FROM 1 FEBRUARY 2023 TO 9 FEBRUARY 2023.  THE WAGE DETERMINATION HAS BEEN UPDATED AS WELL. SEE AM0002 ATTACHMENT FOR FURTHER DETAILS*** 

***Site Visit Sign-In Sheet and Agenda Attachments have been posted as of 18 January 2023 at 1245 CT. Please see documents in the attachment section.***

***AMENDMENT 0001 - A TIME EXTENSION HAS BEEN CHANGED FROM 4 JANUARY 2023 TO 1 FEBRUARY 2023.  IN ADDITION, A SECOND SITE VISIT HAS BEEN SCHEDULED FOR 18 JANAUARY 2023 AT 1000 CT.  PLEASE REVIEW THE ATTACHED SF30 - MODIFICATION AM0001 FOR UPDATES. ***

Big Bend Replacement of Left Abutment Collector Pipe System, Fort Thompson, South Dakota

The contractor shall furnish all personnel, services, equipment, materials and other requirements necessary for Replacement of Left Abutment Collector Pipe near the toe of the dam. The work includes but not limited to dewatering of the area, proper disposal of contaminated soil and water, excavation, removal and replacement of slotted and solid pipes, placement of 2 stage filter, installation of manholes, backfill, and seeding.

The Contract Method: 2-Step IFB Process, with Step-One being posted on 1 December 2022 with Proposal due date of 4 January 2023 by 2:00 PM CT.

Tentative Site Visit Date and Time: 12 December 2022 at 10:00 AM CT - See solicitation for further information regarding the Site Visit.

ROM: $1 - $5 million dollars

Update #5 ·

***AMENDMENT 0002 - FOR TIME HAS BEEN APPROVED. CHANGED FROM 1 FEBRUARY 2023 TO 9 FEBRUARY 2023.  THE WAGE DETERMINATION HAS BEEN UPDATED AS WELL. SEE AM0002 ATTACHMENT FOR FURTHER DETAILS*** 

***Site Visit Sign-In Sheet and Agenda Attachments have been posted as of 18 January 2023 at 1245 CT. Please see documents in the attachment section.***

***AMENDMENT 0001 - A TIME EXTENSION HAS BEEN CHANGED FROM 4 JANUARY 2023 TO 1 FEBRUARY 2023.  IN ADDITION, A SECOND SITE VISIT HAS BEEN SCHEDULED FOR 18 JANAUARY 2023 AT 1000 CT.  PLEASE REVIEW THE ATTACHED SF30 - MODIFICATION AM0001 FOR UPDATES. ***

Big Bend Replacement of Left Abutment Collector Pipe System, Fort Thompson, South Dakota

The contractor shall furnish all personnel, services, equipment, materials and other requirements necessary for Replacement of Left Abutment Collector Pipe near the toe of the dam. The work includes but not limited to dewatering of the area, proper disposal of contaminated soil and water, excavation, removal and replacement of slotted and solid pipes, placement of 2 stage filter, installation of manholes, backfill, and seeding.

The Contract Method: 2-Step IFB Process, with Step-One being posted on 1 December 2022 with Proposal due date of 4 January 2023 by 2:00 PM CT.

Tentative Site Visit Date and Time: 12 December 2022 at 10:00 AM CT - See solicitation for further information regarding the Site Visit.

ROM: $1 - $5 million dollars

Update #4 ·

***Site Visit Sign-In Sheet and Agenda Attachments have been posted as of 18 January 2023 at 1245 CT. Please see documents in the attachment section.***

***AMENDMENT 0001 - A TIME EXTENSION HAS BEEN CHANGED FROM 4 JANUARY 2023 TO 1 FEBRUARY 2023.  IN ADDITION, A SECOND SITE VISIT HAS BEEN SCHEDULED FOR 18 JANAUARY 2023 AT 1000 CT.  PLEASE REVIEW THE ATTACHED SF30 - MODIFICATION AM0001 FOR UPDATES. ***

Big Bend Replacement of Left Abutment Collector Pipe System, Fort Thompson, South Dakota

The contractor shall furnish all personnel, services, equipment, materials and other requirements necessary for Replacement of Left Abutment Collector Pipe near the toe of the dam. The work includes but not limited to dewatering of the area, proper disposal of contaminated soil and water, excavation, removal and replacement of slotted and solid pipes, placement of 2 stage filter, installation of manholes, backfill, and seeding.

The Contract Method: 2-Step IFB Process, with Step-One being posted on 1 December 2022 with Proposal due date of 4 January 2023 by 2:00 PM CT.

Tentative Site Visit Date and Time: 12 December 2022 at 10:00 AM CT - See solicitation for further information regarding the Site Visit.

ROM: $1 - $5 million dollars

Update #3 ·

***Site Visit Sign-In Sheet and Agenda Attachments have been posted as of 18 January 2023 at 1245 CT. Please see documents in the attachment section.***

***AMENDMENT 0001 - A TIME EXTENSION HAS BEEN CHANGED FROM 4 JANUARY 2023 TO 1 FEBRUARY 2023.  IN ADDITION, A SECOND SITE VISIT HAS BEEN SCHEDULED FOR 18 JANAUARY 2023 AT 1000 CT.  PLEASE REVIEW THE ATTACHED SF30 - MODIFICATION AM0001 FOR UPDATES. ***

Big Bend Replacement of Left Abutment Collector Pipe System, Fort Thompson, South Dakota

The contractor shall furnish all personnel, services, equipment, materials and other requirements necessary for Replacement of Left Abutment Collector Pipe near the toe of the dam. The work includes but not limited to dewatering of the area, proper disposal of contaminated soil and water, excavation, removal and replacement of slotted and solid pipes, placement of 2 stage filter, installation of manholes, backfill, and seeding.

The Contract Method: 2-Step IFB Process, with Step-One being posted on 1 December 2022 with Proposal due date of 4 January 2023 by 2:00 PM CT.

Tentative Site Visit Date and Time: 12 December 2022 at 10:00 AM CT - See solicitation for further information regarding the Site Visit.

Update #2 ·

***AMENDMENT 0001 - A TIME EXTENSION HAS BEEN CHANGED FROM 4 JANUARY 2023 TO 1 FEBRUARY 2023.  IN ADDITION, A SECOND SITE VISIT HAS BEEN SCHEDULED FOR 18 JANAUARY 2023 AT 1000 CT.  PLEASE REVIEW THE ATTACHED SF30 - MODIFICATION AM0001 FOR UPDATES. ***

Big Bend Replacement of Left Abutment Collector Pipe System, Fort Thompson, South Dakota

The contractor shall furnish all personnel, services, equipment, materials and other requirements necessary for Replacement of Left Abutment Collector Pipe near the toe of the dam. The work includes but not limited to dewatering of the area, proper disposal of contaminated soil and water, excavation, removal and replacement of slotted and solid pipes, placement of 2 stage filter, installation of manholes, backfill, and seeding.

The Contract Method: 2-Step IFB Process, with Step-One being posted on 1 December 2022 with Proposal due date of 4 January 2023 by 2:00 PM CT.

Tentative Site Visit Date and Time: 12 December 2022 at 10:00 AM CT - See solicitation for further information regarding the Site Visit.

Update #1 ·

Big Bend Replacement of Left Abutment Collector Pipe System, Fort Thompson, South Dakota

The contractor shall furnish all personnel, services, equipment, materials and other requirements necessary for Replacement of Left Abutment Collector Pipe near the toe of the dam. The work includes but not limited to dewatering of the area, proper disposal of contaminated soil and water, excavation, removal and replacement of slotted and solid pipes, placement of 2 stage filter, installation of manholes, backfill, and seeding.

The Contract Method: 2-Step IFB Process, with Step-One being posted on 1 December 2022 with Proposal due date of 4 January 2023 by 2:00 PM CT.

Tentative Site Visit Date and Time: 12 December 2022 at 10:00 AM CT - See solicitation for further information regarding the Site Visit.

Attachments

Show all 16

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Big Bend Left Abutment Collector Pipe System Latest special notice Special Notice
Big Bend Left Abutment Collector Pipe System This notice Solicitation
Big Bend Left Abutment Collector Pipe System Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity