Big Bend Left Abutment Collector Pipe System
Closed Pre-Solicitation Posted
A newer special notice was posted. See the latest special notice from .
- Solicitation number
- W9128F23B0005
- Agency
- ENDIST Omaha US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Fort Thompson, South Dakota 57339, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Corps of Engineers Engineering District Omaha will be soliciting proposals to replace the left abutment collector pipe system near the toe of Big Bend Dam. The solicitation will require contractors to furnish all personnel, equipment, materials, and services necessary to dewater the work area, properly dispose of contaminated soil and water, excavate and remove the existing slotted and solid pipes, install replacement pipes along with a two-stage filter, manholes, backfill, and seeding. The solicitation number will be W9128F23B0005 and will be posted to SAM.GOV on November 30th, 2022 using a two-step IFB process. A non-mandatory site visit is scheduled for December 16th, 2022 at 1:00 PM Mountain Time.
There is no set-aside designated for this procurement. The primary NAICS code is 237110 and PSC code is C512. The contracting agency is the Department of the Army Corps of Engineers Engineering District Omaha. The solicitation will require replacement of the entire existing collector pipe system near the toe of the dam.
Notice text
PRESOLICITATION NOTICE: On or about 30 November 2022, a solicitation will be posted to SAM.GOV for the Big Bend Left Abutment Collector Pipe System
"The contractor shall furnish all personnel, services, equipment, materials and other requirements necessary for replacement of le abutment collector pipe near the toe of the dam. The work includes but not limited to dewatering of the area, proper disposal of contaminated soil and water, excavation, removal and replacement of slotted and solid pipes, placement of 2 stage filter, installation of manholes, backfill, and seeding."
The Contract Method: 2-Step IFB Process, with Step-One being posted on or before 30 November 2022
Tentative Site Visit Date and Time: 16-Dec-2022 / 1:00 PM MT
Attachments
| File | Type | Posted |
|---|---|---|
| BB Left Abutment Specsification.pdf | ||
| BB Left Abutment Drawings.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Big Bend Left Abutment Collector Pipe System | Special Notice | |
| Big Bend Left Abutment Collector Pipe System | Solicitation | |
| Big Bend Left Abutment Collector Pipe System | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity