BB90_Plans_Advertisement_Set_11-08-22 Pg 1-15.pdf
PDF 13 MB Posted
- Attached to
- Big Bend Left Abutment Collector Pipe System Federal contract opportunity
- Solicitation number
- W9128F23B0005
About this file
This federal solicitation requests proposals for the Big Bend Left Abutment Collector Pipe System project. The contractor shall furnish all personnel, services, equipment, materials and other requirements necessary for Replacement of Left Abutment Collector Pipe near the toe of the dam. The work includes but is not limited to dewatering of the area, proper disposal of contaminated soil and water, excavation, removal and replacement of slotted and solid pipes, placement of 2 stage filter, installation of manholes, backfill, and seeding. The solicitation will utilize a two-step IFB process, with step one proposals due by January 4, 2023 at 2:00 PM Central Time. A site visit will be held on December 12, 2022 at 10:00 AM Central Time. The agency responsible for this project is the Department of the Army Corps of Engineers Engineering District Omaha.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 02 61 13 AM0003.pdf | ||
| 01 22 00 AM0003 .pdf | ||
| 02 81 00 AM0003.pdf | ||
| W9128F23B0005 AM0003.pdf | ||
| Am0002 - Extend Due Date and WD.pdf | ||
| Pre-Bid-2023 Sign In_W9128F23B0005.pdf | ||
| Pre-Bid-Site Visit-Agenda_W9128F23B0005.pdf | ||
| W9128F23B0005 - BB Left Abutment Am0001.pdf | ||
| W9128F23B0005 BB Left Abument Specs.pdf | ||
| BB90 Geotechnical Data Report STEP 1 Pg 1-268.pdf | ||
| BB90 Geotechnical Data Report STEP 1 Pg 685-804.pdf | ||
| BB90 Geotechnical Data Report STEP 1 Pg 269-562.pdf | ||
| BB90 Geotechnical Data Report STEP 1 Pg 563-684.pdf | ||
| BB90_Plans_Advertisement_Set_11-08-22 Pg 16-29.pdf | ||
| W9128F23B0005 - BB Left Abutment Step-1 IFB Solicitation.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
.1
X
W
F
C x x x x
W
F
B
O M
A H
A
N E
B R
A S
K A
OMAHA DISTRICT
F O
R T T
H O
M P
S O
N S
O U
T H D
A K
O T
A
B
IG
B
E N
D D
A M L
A K
E S
H A
R P
E
C O
L L E
C T
O R P
IP
E S
Y S
T E
M
R E
P L
A C
E M
E N
T O
F L
E F
T A
B U
T M
E N
T
K P
B
C L
R
C L
R
B J L
R J
C
B J L
A L
B
N
V E
M B
E R
%PRODUCTION DATA 4%%PRODUCTION DATA 3%%PRODUCTION DATA 2%
%PRODUCTION DATA 1%
of Engineers
US Army Corps
Omaha District
G-001
C O
V E
R
G .D
G N
W9128F23B0005
W9128F23Cxxxx
SOLICITATION NO.:
CONTRACT NO.:
DATE: NOVEMBER 2022
(95% DRAWING SET)
STEP 1 SOLICITATION
MISSOURI RIVER
BIG BEND DAM, SOUTH DAKOTA
ABUTMENT COLLECTOR PIPE SYSTEM
REPLACEMENT OF LEFT
RESOURCE (FOR INFORMATION ONLY)
EXIST
FT
EL
BOP
PZ
RW
EXISTING
FEET
ELEVATION
BOTTOM OF PIPE
PIEZOMETER
RELIEF WELL
INDEX LEGEND:
1. SHEET IDENTIFICATION NUMBERS: 2. DISCIPLINE DESIGNATORS:
M - 2 0 1
SHEET SEQUENCE NUMBER
w/ Level 2 Designator
DISCIPLINE DESIGNATOR
R
T
E
M
D
P
F
Q
I
A
S
L
C
B
V
H
G
RESOURCE
TELECOMMUNICATIONS
ELECTRICAL
MECHANICAL
PROCESS
PLUMBING
FIRE PROTECTION
EQUIPMENT
INTERIORS
ARCHITECTURAL
STRUCTURAL
LANDSCAPE
CIVIL
GEOTECHNICAL
SURVEY / MAPPING
HAZARDOUS MATERIALS
GENERAL
Designator)
RELEASE 3.0 for Level 2
(see A/E/C CADD STANDARD
SHEET TYPE DESIGNATOR
3. SHEET TYPE DESIGNATORS:
FOR INFORMATION ONLY
3D REPRESENTATIONS
USER DEFINED
USER DEFINED
SCHEDULES & DIAGRAMS
DETAILS
LARGE-SCALE VIEWS
SECTIONS
ELEVATIONS
PLANS
GENERAL
F
IN
D
E X A
N D V
IC
IN
IT
Y M
A P
G-002
INDEX
GENERAL
CIVIL
ABBREVIATION LEGEND:
RESOURCE (FOR INFORMATION ONLY)
B B
G .D
G N
VICINITY MAP
NO SCALE
CHANNEL STABILIZATION RIPRAP - D/S LEFT ABUTMENT SUBDRAIN - 2010FIO-12BB90C-FIO_DRAWINGS.DGN
GEOLOGICAL PROFILE A-A' REPLACEMENT WELLSFIO-11BB90C-FIO_DRAWINGS.DGN
GEOLOGICAL PROFILE C-C' SUBSURFACE INVESTIGATIONFIO-10BB90C-FIO_DRAWINGS.DGN
GEOLOGICAL PROFILE B-B' SUBSURFACE INVESTIGATIONFIO-9BB90C-FIO_DRAWINGS.DGN
GEOLOGICAL PROFILE A-A' SUBSURFACE INVESTIGATIONFIO-8BB90C-FIO_DRAWINGS.DGN
SOIL BORING LOCATION MAPFIO-7BB90C-FIO_DRAWINGS.DGN
RELIEF WELL AND RELIEF WELL PIEZOMETER OBSERVATIONSFIO-6BB90C-FIO_DRAWINGS.DGN
EMBANKMENT FOUNDATION PIEZOMETERS LINE "H" STATION 121+00FIO-5BB90C-FIO_DRAWINGS.DGN
EMBANKMENT FOUNDATION PIEZOMETERS LINE "J" STATION 126+00FIO-4BB90C-FIO_DRAWINGS.DGN
RELIEF WELL MODIFICATION DETAILS (1966)FIO-3BB90C-FIO_DRAWINGS.DGN
RELIEF WELL MODIFICATION PROFILES (1966)FIO-2BB90C-FIO_DRAWINGS.DGN
RELIEF WELL MODIFICATION PLAN AND DETAIL PLAN (1966)FIO-1BB90C-FIO_DRAWINGS.DGN
DESCRIPTIONSHEET ID NO.DESIGN FILE
PIPE BEDDING AND BACKFILL DETAILSC-505BB90C-505.DGN
REPLACEMENT RELIEF WELL OUTFALL DETAILSC-504BB90C-504.DGN
EXISTING RELIEF WELL AND MANHOLE ABANDONMENT DETAILSC-503BB90C-503.DGN
EXISTING RELIEF WELL AND MANHOLE DETAILSC-502BB90C-502.DGN
NEW MANHOLE, RISER AND PIEZOMETER DETAILSC-501BB90C-501.DGN
24-INCH RCP EXTENSION - PLAN, SECTION, AND RIPRAP APRON DETAILSC-306BB90C-306.DGN
24" CMP EXTENSION (CULVERT "A") - PLAN (GRADING) AND PROFILEC-305BB90C-305.DGN
RW COLLECTOR PIPE REPLACEMENT & NEW OUTFALLS - PLAN, PROFILE & SECTIONS - SHEET 2 OF 2C-304BB90C-304.DGN
RW COLLECTOR PIPE REPLACEMENT & NEW OUTFALLS - PLAN, PROFILE & SECTIONS - SHEET 1 OF 2C-303BB90C-303.DGN
TOE DRAIN OUTFALL REPLACEMENT - PLAN, PROFILE AND SECTIONSC-302BB90C-302.DGN
TOE DRAIN REPLACEMENT - PLAN, PROFILE AND SECTIONC-301BB90C-301.DGN
DEMOLITION PLANC-300BB90C-300.DGN
WORK PLANC-201BB90C-201.DGN
EXISTING CONDITIONSC-101BB90C-101.DGN
GENERAL PLAN, SITE ACCESS, AND CONTROL DATAG-101BB90G-101.DGN
INDEX AND VICINITY MAPG-002BB90G-002.DGN
COVERG-001BB90G-001.DGN
DESCRIPTIONSHEET ID NO.DESIGN FILE
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
.1
X
W
F
C x x x x
W
F
B
O M
A H
A
N E
B R
A S
K A
OMAHA DISTRICT
F O
R T T
H O
M P
S O
N S
O U
T H D
A K
O T
A
B
IG
B
E N
D D
A M L
A K
E S
H A
R P
E
C O
L L E
C T
O R P
IP
E S
Y S
T E
M
R E
P L
A C
E M
E N
T O
F L
E F
T A
B U
T M
E N
T
K P
B
C L
R
C L
R
B J L
R J
C
B J L
A
V E
M B
E R
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
.1
X
W
F
C x x x x
W
F
B
O M
A H
A
N E
B R
A S
K A
OMAHA DISTRICT
F O
R T T
H O
M P
S O
N S
O U
T H D
A K
O T
A
B
IG
B
E N
D D
A M L
A K
E S
H A
R P
E
C O
L L E
C T
O R P
IP
E S
Y S
T E
M
R E
P L
A C
E M
E N
T O
F L
E F
T A
B U
T M
E N
T
K P
B
C L
R
C L
R
B J L
R J
C
B J L
A
V E
M B
E R
O
HP
O
HP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
SEE NOTE 5
24" RCP STORM DRAIN
RISER 9
RISER 7
RISER 23
RISER 8
D340R
POWER POLES X3
GUY WIRES
RISER 2
OHP POWER POLE
POWER POLE
1400 1400
POWER POLES
POWER POLE
POWER POLE
SERVICE TOE ROAD
OHP
OHP
OHP
OHP
8" SOLID HDPE 8" SOLID HDPE
OHP
RW-64A
RW-64B
RW-65
RW-65A
D250R
D560Ra
D560Rb D560Rb-12
E130R
E130Rb
E570R
E570Rb
H560Ra H560Rb
H560Rb-12
H810Ra-12 H810Rb H810Rba
J171Rb
J320Ra
J320Rb
J474Ra
J474Rb
J662Ra
J662Rb
PZ 26
PZ 27
PZ 28
PZ 29
PZ 30
PZ-18
PZ-18R
PZ-18R-12
PZ-19
PZ-20
PZ-20-12
PZ-21
PZ-22
PZ-24
RW-66A
RW-66
OHP
OHP
R
ELI
EF
W
ELL
C
H
AN
N
EL
S E R
V
IC
E T
O E R
O A
D
SP
IL
LW
A
Y A C C
ES
S R
O A
D
SPILLWAY ACCESS ROAD
S P
IL
L W
A Y D
IK
E A
C C
E S
S R
O A
D
PZ-25R
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
O
HP
O
HP
RISER 21
" P
E R
FO
R A
TE
D C
M P
S
O L
ID
H
D P
E
12" PERFORATED CMP 12" PERFORATED CMP
POWER POLES
RISER 9
" P
E R
FO
R A
TE
D C
M P
24" CMP CULVERT "B"
RISER 7
HERRING BONE DRAIN AND RISERS
RISER 4
RW-68B
RW-68A
RW-67
" P
E R F . C
M P
S
O L
ID
H
D P E
RISER 23
RISER 8
24" CMP CULVERT "A"
" P
E R
F O
R A
T E
D C
M P
8" PERFORATED CMP
8" PERFORATED CMP
POWER POLES X3
GUY WIRES
RISER-1
OHP POWER POLE
POWER POLE
POWER POLE
POWER POLE
RW-66B
RW-66C
RW-67A
RW-67B
RISER 3
MH-1
OW20-01OW20-02
" S
O L
ID
H
D P E
S
O L
ID
H
D P
E
8" S
O
LI
D H
D P E
" S
O L
ID
C
M P
OHP
OHP
MH-2
RW-68
SEE NOTE 5
DAM CREST / HWY 47
DAM
C
RES
T / H
W Y
SCALE: 1''=60'-0"
60' 0 60'
OHP
E X
IS
T
IN
G C
O N
D
IT
IO
C .D
G N
S6. ALL UTILITIES WERE LOCATED BY 811 CONTRACT.
S5. COMBINED GRID FACTOR IS: 0.999874125.
S4. CONTOUR INTERVAL IS 1 US SURVEY FOOT.
STATION SURVEY METHODS. FIELD SURVEY DATE: MAY 2020.
S3. TOPOGRAPHY IS DERIVED FROM GPS/RTK AND TOTAL
INFORMATION IS SHOWN ON SHEET G-101.
REFER TO LOCAL PROJECT DATUM. CONTROL POINT
S2. ELEVATIONS ARE REFLECTED IN US SURVEY FEET AND
POINT PD-1 AND PD-4.
DAKOTA SOUTH 4002. THEY ARE BASED ON CONTROL
(NAD 83) STATE PLANE COORDINATE SYSTEM FOR: SOUTH
FEET AND REFER TO THE NORTH AMERICAN DATUM OF 1983
S1. GRID COORDINATES ARE REFLECTED IN US SURVEY
SURVEY NOTES:
EXISTING CONDITIONS
DAM CREST / HWY 47
C-101
INFORMATION.
GEOSYNTHETIC MAT. SEE SHEET FIO-12 FOR ADDITIONAL
OF RELIEF WELL CHANNEL BENEATH THE GRAVEL-FILLED
FROM PREVIOUS CONTRACT IN BOTTOM AND WEST SLOPE
5. CONTRACTOR MAY ENCOUNTER STABILIZATION RIPRAP
PARAGRAPH 1.4.2.
AND IN SPECIFICATION 01 12 00 CONSTRUCTION GENERAL
BONE DRAINAGE AREA AS INDICATED ON THE DRAWINGS
4. NO DISTURBANCE WILL BE ALLOWED OVER THE HERRING
MATERIAL FOR DISPOSAL REQUIREMENTS.
SPECIFICATION 02 82 00, TITLED ASBESTOS-CONTAINING
ASBESTOS TREATED BITUMINOUS COATED PIPE. SEE
3, AND 4 ALONG WITH RELIEF WELL OUTFALLS HAVE
3. THE EXISTING 8", 12" AND 15" PERFORATED CMP, RISERS 1, 2,
NON-WORK AREAS.
INCLUDES FEATURES SHOWN IN WORK AREAS AND
REPLACED AT THE CONTRACTOR'S EXPENSE. THIS
DAMAGES TO THESE FEATURES WILL BE REPAIRED OR
SUBDRAINS NOT PART OF THIS CONTRACT. ANY
OUTFALLS, RELIEF WELLS, PIEZOMERS, RISERS AND
2. CONTRACTOR WILL PROTECT ALL MANHOLES, CASINGS,
GOVERNMENT.
REPAIRED BY THE CONTRACTOR AT NO COST TO THE
EXCAVATION OR CONSTRUCTION TO UTILITIES WILL BE
REQUIREMENTS. ANY DAMAGES INCURRED DURING
REFER TO SPECIFICATIONS FOR ADDITIONAL
FOR UTILITY LOCATION CLEARING PRIOR TO EXCAVATING.
SHALL BE PROTECTED. CONTRACTOR IS RESPONSIBLE
LOCATED NEAR THE PROPOSED EXCAVATION AREAS AND
1. OVERHEAD POWERLINES AND POWER POLES ARE
NOTES:
OVERHEAD POWER LINES
POWER POLEHERRING BONE DRAIN
MANHOLEHERRING BONE RISER
TREE / VEGETATIONOBSERVATION WELL
CULVERTRELIEF WELL
GUY WIRES / ANCHORSPIEZOMETER
GRAVEL SYSTEM RISER
LEFT ABUTMENT COLLECTOR
MINOR CONTOUR
SYSTEM DRAIN / OUTFALL
MAJOR CONTOURLEFT ABUTMENT COLLECTOR
LEGEND
MANHOLE/
RISER ID
NORTHING EASTING
TOP OF
MANHOLE/
RISER
TOP OF
BASE SLAB
RISER
MANHOLE
INLET
MANHOLE
OUTLET
RELIEF WELL
OUTFALL AT
MANHOLE
MH‐1 629,856.89 2,199,497.36 1,388.00 1,373.50 NA NA 1,374.00 NA
MH‐2 629,580.68 2,199,388.09 1,383.00 1,371.75 NA 1,372.00 1,372.00 NA
MH‐3 629,589.27 2,199,491.64 1,380.00 1,370.00 NA 1,371.25 1,370.25 1371.25 (RW‐68AR) MH‐4 269,445.47 2,199,504.61 1,378.00 1,366.25 NA 1,367.50 1,366.50 1367.50 (RW‐68R)
1368.00 (RW‐67A)*
1365.00 (RW‐67R)
RISER 1 629,732.86 2,199,384.30 1,387.00 NA 1,375.00 NA NA NA
RISER 3 629,431.52 2,199,408.93 1,379.80 NA 1,376.00 NA NA NA
* OUTFALL MAY REQUIRE FIELD FITTING TO MANHOLE
TABLE 1 ‐ MANHOLE LOCATIONS AND ELEVATIONS (FEET LPD)
MH‐5 629,255.23 2,199,644.71 1,372.00 1,364.75 1,365.001,366.00NA
INVERT
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
.1
X
W
F
C x x x x
W
F
B
O M
A H
A
N E
B R
A S
K A
OMAHA DISTRICT
F O
R T T
H O
M P
S O
N S
O U
T H D
A K
O T
A
B
IG
B
E N
D D
A M L
A K
E S
H A
R P
E
C O
L L E
C T
O R P
IP
E S
Y S
T E
M
R E
P L
A C
E M
E N
T O
F L
E F
T A
B U
T M
E N
T
K P
B
C L
R
C L
R
B J L
R J
C
B J L
A
V E
M B
E R
RISER 9
RISER 23
RISER 8
RISER 21 RISER 9
RISER 23
RISER 8
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
RW-65
RW-65A
RW-66B
RW-66C
RW-67A
RW-67B
H560Ra H560Rb
H560Rb-12
J320Ra
J320Rb
J474Ra
J474Rb
J662Ra
J662Rb
PZ 26
PZ 27
PZ 28
PZ 29
PZ 30
PZ-18
PZ-18R
PZ-18R-12
PZ-19
PZ-22
PZ-24
RW-66A
RW-66
R
ELI
EF
W
ELL
C
H
AN
N
EL
S P
IL
L W
A Y D
IK
E A
C C
E S
S R
O A
D
SP
ILL
W
AY
ACCES
S
ROAD
SPILLWAY ACCESS ROAD
AND REMOVED
OW20-02 TO BE ABANDONED
SEE NOTE 7
AND OUTFALL,
REMOVE RW-68B
ABANDON AND
SEE NOTE 7
AND OUTFALL,
REMOVE RW-68A
ABANDON AND
SEE NOTE 7
AND RW-66A,
REMOVE RW-66
ABANDON AND
SEE NOTE 7
AND 8" CMP OUTFALL,
REMOVE RW-67
ABANDON AND
SEE NOTE 1
AND RW-66A OUTFALLS,
GROUT IN PLACE RW-66
PZ-25R
OW20-01
OHP
1400 1400
1415OHP
OHP
FLARED END
REMOVE AND REUSE
TO BE REMOVED
12" PERFORATED CMP
TO BE REMOVED
15" PERFORATED CMP
TO REMAIN
EXISTING 24" RCP
SEE NOTE 7
REMOVE RW-68,
ABANDONED AND
SEE NOTE 4.
REMOVED THIS CONTRACT,
15" PERFORATED CMP TO BE
POWER POLES
TO REMAIN
EXISTING 24" CMP
CULVERT "B"
TO REMAIN
HDPE OUTFALL
EXISTING RW-66B
BE REMOVED
RISER 4 TO
PROTECTED
MH-1 TO BE
REMOVED
MH-2 TO BE
TO REMAIN
EXISTING 24" CMP
CULVERT "A"
BE REMOVED
RISER 2 TO
SEE NOTE 3
TO BE REMOVED
8" PERFORATED CMP
BE REMOVED
RISER 3 TO
BE REMOVED
RISER 1 TO
RISER-1
C-300
C
.D
G N
D E
M O
L
IT
IO
N P
L A
N
DEMOLITION PLAN
LEGEND SCALE: 1 INCH = 40 FEET
40' 0 40'
HERRING BONE RISER
HERRING BONE DRAIN
NON-WORK AREA
OHP OVERHEAD POWER LINES
MAJOR CONTOUR
MINOR CONTOUR
GUY WIRES / ANCHORS
CULVERT
TREE / VEGETATION
MANHOLE TO BE PROTECTED
TO BE REMOVED THIS CONTRACT
PERFORATED CMP / SOLID PIPE
REPLACED THIS CONTRACT
MANHOLE TO BE REMOVED AND
PIEZOMETER TO BE PROTECTED
RELIEF WELL TO BE PROTECTED
ABANDONED THIS CONTRACT
OBSERVATION WELL TO BE
OBSERVATION WELL TO BE PROTECTED
CONTRACT
REMOVED OR ABANDONED THIS
RELIEF WELL / RISER TO BE
NEW CASINGS AND THE NEW OUTFALLS ARE COMPLETED.
NOT BE ABANDONED UNTIL THE REPLACEMENT RELIEF WELLS,
EXISTING WELLS, 36-INCH CASINGS AND THEIR OUTFALLS MUST
7. WITH THE EXCEPTION OF EXISTING RELIEF WELL RW-68, ALL
PARAGRAPH 1.4.2.
AND IN SPECIFICATION 01 12 00 CONSTRUCTION GENERAL
BONE DRAINAGE AREA AS INDICATED ON THE DRAWINGS
6. NO DISTURBANCE WILL BE ALLOWED OVER THE HERRING
MATERIAL FOR DISPOSAL REQUIREMENTS.
SPECIFICATION 02 82 00, TITLED ASBESTOS-CONTAINING
ASBESTOS TREATED BITUMINOUS COATED PIPE. SEE
3, AND 4 ALONG WITH RELIEF WELL OUTFALLS HAVE
5. THE EXISTING 8", 12" AND 15" PERFORATED CMP, RISERS 1, 2,
BETWEEN RW-68 AND MH-2.
NOT FOLLOW THE EXISTING DRAIN ALIGNMENT SHOWN
MANHOLES MH-4 AND MH-5 (SHOWN ON SHEET C-201) DOES
4. THE NEW HORIZONTAL DRAIN ALIGNMENT BETWEEN NEW
AND HANDLING OF CONTAMINATED MATERIALS.
HANDLED ACCORDING TO SPECIFICATION 02 61 13 EXCAVATION
EXCAVATED CONTAMINATED SOIL AND WATER MUST BE
SPECIFICATION 02 32 13 SUBFURFACE DRILLING AND SAMPLING.
GEOTECHNICAL FIELD INVESTIGATION ACCORDING TO
AREA IS UNKOWN. CONTRACTOR MUST PERFORM A
LOCATIONS. NOTE THE FULL EXTENT OF THE CONTAMINATED
FOR MORE INFORMATION. SEE SHEET FIO-7 FOR BORING
GREATER THAN 10 MG/KG, SEE GEOTECHNICAL DATA REPORT
ENCOUNTERED TPH-DRO IN THE SOIL WITH CONCENTRATIONS
AND SOIL SAMPLE, AND BORING BH20-11 (NEAR RW-67),
(TPH)-DIESEL RANGE ORGANICS (DRO) IN BOTH GROUNDWATER
BH20-12 (NEAR RW-66A), TOTAL PETROLEUM HYDROCARBONS
9. CONTAMINATED SOILS WERE ENCOUNTERED IN BORING
DEWATERING REQUIREMENTS.
CONDITIONS. SEE SPECIFICATION 33 26 00 REGARDING
(MINIMUM OF 7) FOR MONITORING GROUND WATER
NTP HAS BEEN ISSUED AND PIEZOMETERS INSTALLED
8. WORK SHALL NOT PROCEED UNTIL DEWATERING
SPECIFICATION 31 23 00.00 20.
10. FOR TRENCH EXCAVATION LIMITATIONS AND SEQUENCING SEE
GRAVEL
APPROVED BY THE CONTRACTING OFFICER.
EXTENT REQUIRED TO REMOVE AND REPLACE THE DRAIN AS
THE LIMITS OF ASPHALT REMOVAL WILL BE LIMITED TO THE
AND BACKFILL FOR THE NEW TOE DRAIN OUTFALL IS COMPLETE.
ROAD CLOSURE AND REPAIR OF ASPHALT AFTER INSTALLATION
CONTRACTOR IS RESPONSIBLE FOR PROPER SIGNAGE FOR
REMOVAL OF THE ASPHALT SPILLWAY ACCESS ROAD. THE
EXISTING RISER 2 AND RISER 4 WILL REQUIRE PARTIAL
3. REPLACEMENT OF THE TOE DRAIN OUTFALL BETWEEN
REPLACED AT THE CONTRACTOR'S EXPENSE.
DAMAGES TO THESE FEATURES WILL BE REPAIRED OR
AND SUB DRAINS NOT PART OF THIS CONTRACT. ANY
CASING OUTFALLS, RELIEF WELLS, PIEZOMERS, RISERS
2. CONTRACTOR WILL PROTECT ALL MANHOLES, CASINGS,
OF POTENTIAL CONTAMINATED SOILS IN THIS AREA.
AND FILLED WITH FLOWABLE FILL TO MINIMIZE EXCAVATION
RW-66A WILL BE LEFT IN PLACE WITH THE OUTFALL CAPPED
1. THE CASING OUTFALL FOR RELIEF WELLS RW-66 AND
:NOTES
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
.1
X
W
F
C x x x x
W
F
B
O M
A H
A
N E
B R
A S
K A
OMAHA DISTRICT
F O
R T T
H O
M P
S O
N S
O U
T H D
A K
O T
A
B
IG
B
E N
D D
A M L
A K
E S
H A
R P
E
C O
L L E
C T
O R P
IP
E S
Y S
T E
M
R E
P L
A C
E M
E N
T O
F L
E F
T A
B U
T M
E N
T
K P
B
C L
R
C L
R
B J L
R J
C
B J L
A
V E
M B
E R
RISER 9
RISER 23
RISER 8
PZ-25R
MH-2
1410 1415
OHP
OHP
OHP
OHP
RISER 21 RISER 9
RISER 23
RISER 8
OHP
OHP
RW-65A
RW-66
RW-66A
RW-66B
RW-67A
RW-67B
RW-68B RW-68A
RW-66C
H560Ra H560Rb
H560Rb-12
J b
J320Ra
J320Rb
J474Ra
J474Rb
J a
J
PZ 27
PZ 28
PZ 29
PZ 30
PZ-18
PZ-18R
PZ-18R-12
PZ-19
PZ-21
PZ-22
PZ-24
C -3
RW-66R RW-66AR
RW-67R
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
RW-67
THIS CONTRACT
NEW RISER 3,
C-301
RW-68
RW-68R
RW-68AR RW-68BR
THIS CONTRACT
NEW RISER 1,
C-301
PIPE, THIS CONTRACT
NEW 12" SLOTTED HDPE
THIS CONTRACT
NEW MH-2,
OHP
PIPE, THIS CONTRACT
NEW 12" SLOTTED HDPE
C -3
OHP
OHP
OW20-01
OW20-02
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
MH-4
MH-5
MH-3
MH-1
OHP
OHP
OHP
9+7010+0010+5011+0011+5012+0012+5013+0013+20
ELEVATION 1372.00
ELEVATION 1372.00
12" SLOTTED HDPE PIPE
12" COARSE AGGREGATE
12" SLOTTED HDPE PIPE
EXISTING GRADE
SEEDING TO MATCH
6" TOPSOIL AND
L
ELEVATION 1376.00
L
L
FILTER SAND
ELEVATION 1375.00
E L E
V A
T
IO
N F
E E
T L
P D
E L E
V A
T
IO
N F
E E
T L
P D
SAND
FILTER
EXISTING GRADE
SEEDING TO MATCH
6" TOPSOIL AND
HDPE PIPE
12" SOLID
5' 5'
FILTER SAND
MANHOLE AND BASE SLAB
PRE-CAST CONCRETE
INVERT ELEVATION 1371.75
12" TOE DRAIN OUTFALLTO MH-3
C
STATION 13+03
SEE SHEET C-501
RISER 3 - 12" SOLID HDPE PIPE C
STATION 10+00
SEE SHEET C-501
RISER 1 - 12" SOLID HDPE PIPE
24" IMPERVIOUS BACKFILL
SAND
FILTER
12" FILTER SAND BEDDING
12" COARSE AGGREGATE BEDDING
24" IMPERVIOUS BACKFILL
12" COARSE AGGREGATE BEDDING
12" FILTER SAND BEDDING
STATION 11+54
RISER 3 OUTFALL
STATION 11+50
RISER 1 OUTFALL
12" COARSE AGGREGATE
SEE NOTE 2
SEE NOTE 2
C
TOP ELEVATION 1383.00
TOE DRAIN STATION 11+52
MH-2
0 10 20 30 40 50 60
1360 1360
SPILLWAY ACCESS ROAD
C L
FILTER SAND
EMBANKMENT S
LOPE
E L E
V A
T
IO
N F
E E
T
L P
D
E L E
V A
T
IO
N F
E E
T
L P
D
70 80 90
HDPE PIPE
12" SLOTTED
RANDOM FILL
EXISTING
COARSE AGGREGATE BEDDING
COARSE AGGREGATE
LLIFKCAB SUOIVREPMI "42
FILTER SAND BEDDING
SEE NOTE 2
TO MATCH EXISTING GRADE
6" TOPSOIL AND SEEDING
APPROXIMATE EMBANKMENT TOE
DRAIN, SEE NOTE 1
EXIST. EMB. CORE
C-301
RIPRAP STILLING BASIN PLAN VIEW SCALE: 1 INCH = 20 FEET
20' 0 20'
C
.D
G N
C-301 C-301
C-301 C-301
SECTION
TOE DRAIN STATION 11+82
TOE DRAIN REPLACEMENT - PLAN
WELL COLLECTOR REPLACEMENT
TOE DRAIN OUTLET AND RELIEF
T O
E D
R A
IN
R
E P
L A
C E
M E
N T
1 1
2 2
P L
A N P
R O
F
IL
E A
N D S
E C
T
IO
N
CULVERT EXTENSION
RELIEF WELL OUTFALLS
(SEE DEMOLITION PLAN)
ORIGINAL COLLECTOR ALIGNMENT
LEGEND
SCALE: 1 INCH = 40 FEET
40' 0 40'
HERRING BONE RISER
HERRING BONE DRAIN
NON-WORK AREA
OHP OVERHEAD POWER LINES
OBSERVATION WELL
MAJOR CONTOUR
MINOR CONTOUR
GUY WIRES / ANCHORS
CULVERT
SYSTEM RISER
LEFT ABUTMENT COLLECTOR
MANHOLE
TREE / VEGETATION
TOE DRAIN REPLACEMENT PIEZOMETER
EXISTING RELIEF WELL
INSTALLED BY USACE
REPLACEMENT RELIEF WELL
PROFILE
TOE DRAIN
SEE SHEET C-505 FOR EXCAVATION AND BACKFILLING DETAILS.
2. THE EXCAVATION AND SLOPES SHOWN ARE FOR VISUAL REFERENCE ONLY.
CORE DRAIN MATERIAL.
IS IN CONTINUOUS CONTACT AND MATCHES THE FULL THICKNESS OF THE
SHALL BE FIELD VERIFIED BY THE CONTRACTOR TO ENSURE FILTER SAND
1. ELEVATION AND THICKNESS OF EMBANKMENT CORE DRAIN VARIES AND
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
.1
X
W
F
C x x x x
W
F
B
O M
A H
A
N E
B R
A S
K A
OMAHA DISTRICT
F O
R T T
H O
M P
S O
N S
O U
T H D
A K
O T
A
B
IG
B
E N
D D
A M L
A K
E S
H A
R P
E
C O
L L E
C T
O R P
IP
E S
Y S
T E
M
R E
P L
A C
E M
E N
T O
F L
E F
T A
B U
T M
E N
T
K P
B
C L
R
C L
R
B J L
R J
C
B J L
A
V E
M B
E R
RISER 9
RISER 23
RISER 8
RISER 21 RISER 9
RISER 23
RISER 8
OHP
RW-65A
RW-66
RW-66A
RW-66B
RW-67A
RW-67B
RW-68B RW-68A
RW-66C
H560Ra H560Rb
H560Rb-12
J
J320Ra
J320Rb
J474Ra
J474Rb
J
PZ 27
PZ 28
PZ 29
PZ 30
PZ-18
PZ-18R
PZ-18R-12
PZ-21
PZ-22
PZ-24
PZ-25R
C-302
C-302
RW-66R RW-66AR
RW-67R
RW-68R
RW-68AR RW-68BR
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
C -3
15+04
THIS CONTRACT
NEW MH-3,
14+50
RW-67
14+00
RW-68
C -3
CONTRACT (SEE NOTE 3)
ASPHALT ROAD, THIS
REMOVE AND REPLACE
RISER-1
THIS CONTRACT
NEW MH-2,
OHP
PIPE, THIS CONTRACT
NEW 12" SLOTTED HDPE
OHP
OW20-01
OW20-02
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
MH-4
MH-5
MH-3
MH-1
MH-2
OHP
OHP
RISER-3
24" IMPERVIOUS BACKFILL
C
TOP OF SLAB ELEVATION 1380.00
TOE DRAIN OUTFALL STATION 15+06
MH-3
13+60 14+00 14+50 15+00 15+40
12" SLOTTED HDPE PIPE
ELEVATION 1372.00
L
ASPHALT ROAD SEE NOTE 3
FILTER SAND
L
INVERT ELEVATION 1371.25
E L E
V A
T
IO
N F
E E
T L
P D
E L E
V A
T
IO
N F
E E
T L
P D
REMOVE AND REPLACE
5'
MANHOLE & BASE SLAB
PRE-CAST CONCRETE
MANHOLE & BASE SLAB
PRE-CAST CONCRETE
C
TOP ELEVATION 1383.00
TOE DRAIN OUTFALL STATION 13+98
MH-2EXISTING GROUND
COARSE AGGREGATE BEDDING
FILTER SAND BEDDING
FILL
RANDOM
EXIST.
6" AGGREGATE BASE COURSE
4" ASPHALT SURFACING
12" SOLID HDPE PIPE
COARSE AGGREGATE
SEE NOTE 2
SEE NOTE 2
ELEVATION 1370.25
COLLECTOR PIPE OUTLET
INVERT ELEVATION 1371.25
COLLECTOR PIPE OUTFALL
RW-68AR OUTFALL AND
SAND
FILTER
SAND
FILTER
TO MATCH EXISTING GRADE
6" TOPSOIL AND SEEDING
ELEVATION 1372.00
FROM RISER 1 AND RISER 3
2 x 12" TOE DRAIN OUTFALL
STATION 15+04
TOE DRAIN OUTFALL
SEE NOTE 1
CORE DRAIN,
EMBANKMENT
EXISTING
STATION 14+00
TOE DRAIN OUTLET
0204050 -20 -40 -50
4" ASPHALT ROADWAY
E L E
V A
T
IO
N F
E E
T
L P
D
E L E
V A
T
IO
N F
E E
T
L P
D
12" SLOTTED HDPE PIPE
FILTER SANDBASE COURSE
MINIMUM 6" AGGREGATE
COARSE AGGREGATE
COARSE AGGREGATE BEDDING
SEE NOTE 2
SEE NOTE 3
REMOVE AND REPLACE EXISTING ASPHALT
SEE NOTE 2
FILTER SAND BEDDING
24" IMPERVIOUS BACKFILL
C-302
C
.D
G N
C-302 C-302
3 3 C-302 C-302
4 4
PROFILE
TOE DRAIN OUTFALL
P L
A N P
R O
F
IL
E A
N D S
E C
T
IO
N S
TOE DRAIN OUTFALL REPLACEMENT - PLAN
T O
E D
R A
IN
O
U T F
A L L R
E P
L A
C E
M E
N T
(SEE DEMOLITION PLAN)
ORIGINAL COLLECTOR ALIGNMENT
LEGEND SCALE: 1 INCH = 40 FEET
40' 0 40'
HERRING BONE RISER
HERRING BONE DRAIN
NON-WORK AREA
GUY WIRES / ANCHORS
CULVERT
SYSTEM RISER
LEFT ABUTMENT COLLECTOR
PIEZOMETER
EXISTING RELIEF WELL
INSTALLED BY USACE
REPLACEMENT RELIEF WELL
MANHOLE
TREE / VEGETATION
CULVERT EXTENSION
RELIEF WELL OUTFALLS
TOE DRAIN OUTFALL REPLACEMENT
COLLECTOR REPLACEMENT
TOE DRAIN AND RELIEF WELL
SECTION
TOE DRAIN OUTFALL STATION 14+56
AND REPLACE THE DRAIN AS APPROVED BY THE CONTRACTING OFFICER.
ASPHALT REMOVAL WILL BE LIMITED TO THE EXTENT REQUIRED TO REMOVE
BACKFILL FOR THE NEW TOE DRAIN OUTFALL IS COMPLETE. THE LIMITS OF
FOR ROAD CLOSURE AND REPAIR OF ASPHALT AFTER INSTALLATION AND
ACCESS ROAD. THE CONTRACTOR IS RESPONSIBLE FOR PROPER SIGNAGE
AND RISER 4 WILL REQUIRE PARTIAL REMOVAL OF THE ASPHALT SPILLWAY
3. REPLACEMENT OF THE TOE DRAIN OUTFALL BETWEEN EXISTING RISER 2
SEE SHEET C-505 FOR EXCAVATION AND BACKFILLING DETAILS.
2. THE EXCAVATION AND SLOPES SHOWN ARE FOR VISUAL REFERENCE ONLY.
CORE DRAIN MATERIAL.
IS IN CONTINUOUS CONTACT AND MATCHES THE FULL THICKNESS OF THE
SHALL BE FIELD VERIFIED BY THE CONTRACTOR TO ENSURE FILTER SAND
1. ELEVATION AND THICKNESS OF EMBANKMENT CORE DRAIN VARIES AND
NOTES:
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
.1
X
W
F
C x x x x
W
F
B
O M
A H
A
N E
B R
A S
K A
OMAHA DISTRICT
F O
R T T
H O
M P
S O
N S
O U
T H D
A K
O T
A
B
IG
B
E N
D D
A M L
A K
E S
H A
R P
E
C O
L L E
C T
O R P
IP
E S
Y S
T E
M
R E
P L
A C
E M
E N
T O
F L
E F
T A
B U
T M
E N
T
K P
B
C L
R
C L
R
B J L
R J
C
B J L
A
V E
M B
E R
RISER 9
RISER 23
RISER 8
C -3
C -3
7 C -3
OHP
OHP
RISER 21 RISER 9
RISER 23
RISER 8
OHP
OHP
OHP
J
J474Ra
J474Rb
PZ 30
PZ-22
7 C -3
8 C -3
C -3
PZ-25R
RW-68B RW-68A
RW-67A
RW-66C RW-66C
RW-66B RW-66B
H560Rb
H560Ra
H560Rb-12
PZ 27
PZ-24
PZ 29
J
PZ-18R-12
PZ-18R
PZ-18
RW-65A
RW-66
PZ 28
RW-66A
J320Ra J320Rb
PZ-21
PIPE, THIS CONTRACT
NEW 12" SLOTTED HDPE
SEE NOTE 1
RELIEF WELL (RW-67R)
USACE-INSTALLED REPLACEMENT
SEE NOTE 1
RELIEF WELL (RW-66AR)
USACE-INSTALLED REPLACEMENT
SEE NOTE 1
RELIEF WELL (RW-66R)
USACE-INSTALLED REPLACEMENT
THIS CONTRACT
RW CASING OUTFALL,
NEW 8" SLOTTED HDPE
SHEET C-505
(STATIONS 3+20 TO 3+30),
EXCAVATION DETAIL
SEE POWER POLE TRENCH
SHEET C-505
(STATIONS 3+20 TO 3+30),
EXCAVATION DETAIL
SEE POWER POLE TRENCH
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
MH-5, THIS CONTRACT
RW-67A OUTFALL TO NEW
CONNECT EXISTING
PIPE, THIS CONTRACT
NEW 12" SLOTTED HDPE
C -3
THIS CONTRACT (SEE DETAIL, SHEET C-504)
TO NEW RELIEF WELL COLLECTOR,
CONNECT EXISTING RW-66B OUTFALL
STA. 7+20, THIS CONTRACT
SOLID 18" HDPE PIPE AT
TRANSITION SLOTTED TO
THIS CONTRACT
(RW-66R AND RW-66A),
RELIEF WELL CASING OUTFALLS
NEW 8" SOLID HDPE
THIS CONTRACT
HDPE PIPE,
NEW 15" SLOTTED
THIS CONTRACT
NEW MH-4,
THIS CONTRACT
NEW MH-5,
C-303
TO BE PROTECTED
EXISTING MH-1THIS CONTRACT
NEW MH-3,
RW-67B
RW-67
RW-68
RISER-1
OHP
6 C -3
C -3
OW20-01
OW20-02
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
OHP
MH-2
CONTRACT
TO BE INSTALLED, THIS
WELL CASING OUTFALL
NEW 8" SOLID HDPE RELIEF
OHP
CONTRACT
TO BE INSTALLED, THIS
WELL CASING OUTFALL
NEW 8" SOLID HDPE RELIEF
OHP
OHP
RISER-3
SEE NOTE 1
RELIEF WELL (RW-68AR)
USACE-INSTALLED REPLACEMENT
SEE NOTE 1
WELL (RW-68R)
REPLACEMENT RELIEF
USACE-INSTALLED
SEE NOTE 1
RELIEF WELL (RW-68RB)
USACE-INSTALLED REPLACEMENT
CONTRACT
TO BE INSTALLED, THIS
WELL CASING OUTFALL
NEW 8" SOLID HDPE RELIEF
0 10 20 30 40 50 60 70-10-20-30
1370 1370
SPILLWAY ACCESS ROAD
C L
1400 1400
EXISTING GROUND
12" SLOTTED HDPE PIPE
E L E
V A
T
IO
N F
E E
T
L P
D
E L E
V A
T
IO
N F
E E
T
L P
D
FILTER SAND
SEE NOTE 2
LLIFKCAB SUOIVREPMI "42
FILTER SAND BEDDING
COARSE AGGREGATE BEDDING
COARSE AGGREGATE
SEE NOTE 2
TO MATCH EXISTING GRADE
6" TOPSOIL AND SEEDING
MIN 12"1370
0 10 20 30 40 50 60 70 80 90 100-10-20-30-40-50
1360 1360
SPILLWAY ACCESS ROAD
C L
EXISTING GROUND
E L E
V A
T
IO
N F
E E
T
L P
D
E L E
V A
T
IO
N F
E E
T
L P
D
NEW 15" SLOTTED HDPE PIPE ALIGNMENT
COARSE AGGREGATE
COARSE AGGREGATE BEDDING FILTER SAND BEDDING
SEE NOTE 2
6" TOPSOIL AND SEEDING
SEE NOTE 2
FILTER SAND
REMOVE EXISTING CMP COLLECTOR PIPE (SEE NOTE 3)
CL REALIGNED DITCH NIARD OT EPOLS
24" IMPERVIOUS FILL/BACKFILL
C-303
B
C
.D
G N
C-303 C-303
STATION 5+20
RELIEF WELL COLLECTOR
C-303 C-303
5 5
STATION 1+00
RELIEF WELL COLLECTOR 6
S H
E E
T O
F
RELIEF WELL COLLECTOR PIPE REPLACEMENT - PLAN
N E
W O
U T F
A L L S P
L A
N P
R O
F
IL
E S
E C
T
IO
N S
R W C
O L L E
C T
O R P
IP
E R
E P
L A
C E
M E
N T
(SEE DEMOLITION PLAN)
ORIGINAL COLLECTOR ALIGNMENT
LEGEND SCALE: 1 INCH = 40 FEET
40' 0 40'
HERRING BONE RISER
HERRING BONE DRAIN
NON-WORK AREA
GUY WIRES / ANCHORS
CULVERT
SYSTEM RISER
LEFT ABUTMENT COLLECTOR
PIEZOMETER
EXISTING RELIEF WELL
INSTALLED BY USACE
REPLACEMENT RELIEF WELL
MANHOLE
TREE / VEGETATION
CULVERT EXTENSION
RELIEF WELL OUTFALLS
OUTFALL REPLACEMENT
TOE DRAIN AND TOE DRAIN
REPLACEMENT
RELIEF WELL CASING OUTFALL
RELIEF WELL COLLECTOR PIPE AND
ALIGNMENT AS SHOWN ON THE PLAN.
MH-5 DOES NOT FOLLOW THE EXISTING DRAIN
3. THE HORIZONTAL ALIGNMENT BETWEEN MANHOLES MH-4 AND
BACKFILLING DETAILS.
REFERENCE ONLY. SEE SHEET C-505 FOR EXCAVATION AND
2. THE EXCAVATION AND SLOPES SHOWN ARE FOR VISUAL
RELIEF WELLS WILL BE INSTALLED THIS CONTRACT.
CONTRACTOR. CASING OUTFALLS FOR THE REPLACEMENT
SHOWN ON DRAWINGS AND WILL BE PROVIDED TO THE
APPROXIMATE. FINAL LOCATIONS MAY VARY FROM WHAT IS
INSTALLED BY USACE PRIOR TO CONTRACT AWARD ARE
1. LOCATION OF REPLACEMENT RELIEF WELLS TO BE
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
.1
X
W
F
C x x x x
W
F
B
O M
A H
A
N E
B R
A S
K A
OMAHA DISTRICT
F O
R T T
H O
M P
S O
N S
O U
T H D
A K
O T
A
B
IG
B
E N
D D
A M L
A K
E S
H A
R P
E
C O
L L E
C T
O R P
IP
E S
Y S
T E
M
R E
P L
A C
E M
E N
T O
F L
E F
T A
B U
T M
E N
T
K P
B
C L
R
C L
R
B J L
R J
C
B J L
A
V E
M B
E R
-0+10 0+00 1+00 2+00 3+00
12" COLLECTOR OUTLET
3+90
12" SLOTTED HDPE PIPE
12" SLOTTED HDPE PIPE
RW-68BR OUTFALL
8" SOLID HDPE
CL
CL
GROUND
EXISTING
INVERT ELEVATION 1371.25
12" COLLECTOR OUTFALL
INVERT ELEVATION 1370.25
HDPE PIPE
12" SOLID
FILTER SAND
FILTER SAND
5'
E L E
V A
T
IO
N F
E E
T L
P D
0+20 0+40 0+60 0+80 1+20 1+40 1+60 1+80 2+20 2+40 2+60 2+80 3+20 3+40 3+60 3+80
OUTLET ELEVATION 1374.00
STATION 0+00
STATION 2+67
STATION 2+71
APPROXIMATE STATION 1+62
ELEVATION 1373.00
APPROXIMATE INVERT
CONCRETE BASE SLAB
EXISTING CMP MANHOLE WITH
MANHOLE AND BASE SLAB
PRE-CAST CONCRETE
24" IMPERVIOUS BACKFILL
TOP ELEVATION 1388.00
STATION -0+02
EXISTING MH-1
FILTER SAND BEDDING
COARSE AGGREGATE BEDDING
COARSE AGGREGATE
FILTER SAND BEDDING
COARSE AGGREGATE BEDDING
COARSE AGGREGATE
TOP ELEVATION 1380.00
COLLECTOR PIPE STATION 2+70
MH-3
LLIFKCAB SUOIVREPMI "42
12" SOLID HDPE PIPE
INVERT ELEVATION 1371.25
12" TOE DRAIN OUTFALL FROM MH-2
8" OUTFALL FROM RW-68AR
TO MATCH EXISTING GRADE
6" TOPSOIL AND SEEDING
TO MATCH EXISTING GRADE
6" TOPSOIL AND SEEDING
EXISTING GROUND
BEDDING
AGGREGATE
COARSE
NOTE 3
SEE
4+00 5+00 6+00 7+00
STATION
STATION 7+77
ELEVATION 1367.50
15" COLLECTOR OUTLET
ELEVATION 1366.50
18" COLLECTOR OUTLET
ELEVATION 1366.00
ELEVATION 1365.00
24" CMP EXTENSION LOCATION
7+803+90
18" SLOTTED HDPE PIPE
15" SLOTTED HDPE PIPE
8" SOLID HDPE
CL
CL
RW-66B OUTFALL
INVERT ELEVATION 1365.00
E: 2199768.048 N: 629127.757
ELEVATION 1364.70
FILTER SAND
18" SOLID HDPE PIPE
INVERT ELEVATION 1365.00
RW-67R OUTFALL
FILTER SAND
SAND
FILTER
HDPE PIPE
12" SOLID
4+20 4+40 4+60 4+80 5+20 5+40 5+60 5+80 6+20 6+40 6+60 6+80 7+20 7+40 7+60
STATION 4+16
STATION 4+12
STATION 6+46
STATION 6+50
INVERT ELEVATION 1368.00
RW-67A OUTFALL
12" IMPERVIOUS FILL
LLIFKCAB SUOIVREPMI "42
TOP ELEVATION 1378.00
STATION 4+14
MH-4
5' 5'
COARSE AGGREGATE
COARSE AGGREGATE BEDDING
FILTER SAND BEDDING
STATION 4+94
SEE SHEET C-305
DRAINAGE DITCH MODIFICATIONS
MANHOLE AND BASE SLAB
PRE-CAST CONCRETE
SEE NOTE 2
STATION 7+20
COARSE AGGREGATE
24" TO 12" FROM STATIONS 6+89 TO 7+39
TRANSITION IMPERVIOUS BACKFILL FROM
TO MATCH EXISTING GRADE
6" TOPSOIL AND SEEDING
24" IMPERVIOUS BACKFILL
INVERT ELEVATION 1367.50
RW-68R OUTFALL
15" SOLID HDPE PIPE
TO MATCH EXISTING GRADE
6" TOPSOIL AND SEEDING
BEDDING
AGGREGATE
COARSE
12" COLLECTOR OUTFALL
MANHOLE AND BASE SLAB
PRE-CAST CONCRETE
15" COLLECTOR OUTFALL
FILTER SAND BEDDING
COARSE AGGREGATE BEDDING
TOP ELEVATION 1372.00
COLLECTOR PIPE STATION 6+49
MH-5
TO SOLID HDPE PIPE
TRANSITION SLOTTED
BOTTOM, SEE NOTE 1
EXISTING 6" GRAVEL CHANNEL
8+00 9+00 9+90
STATION 9+51.65
ELEVATION 1364.00
7+80
RW-66AR OUTFALL
8" SOLID HDPE
18" SOLID HDPE PIPE
8" SOLID HDPE
RW-66R OUTFALL
INVERT ELEVATION 1365.00
E L E
V A
T
IO
N F
E E
T L
P D
ELEVATION 1367.00
TOP OF RIPRAP
SPALLS
FILTER SAND
12" IMPERVIOUS FILL
8+20 8+40 8+60 8+80 9+20 9+40 9+60 9+80
APPROXIMATE STATION 8+29
ELEVATION 1364.85
APPROXIMATE INVERT
APPROXIMATE STATION 8+69
ELEVATION 1364.65
APPROXIMAT INVERT SEE NOTE 1
CHANNEL BOTTOM
EXISTING 6" GRAVEL
TO MATCH TOP OF CHANNEL
6" TOPSOIL AND SEEDING
COARSE AGGREGATE
18" OUTFALL WITH FLAPGATE
SEE SHEET C-306
RIPRAP APRON
FILTER SAND BEDDING
16+0016+5017+00
STATION
STATION 15+98.50
ELEVATION 1365.45
8" SLOTTED HDPE PIPE
GROUND
EXISTING
STATION 16+00
MANHOLE AND BASE SLAB
PRE-CAST CONCRETE
COARSE AGGREGATE BEDDING
FILTER SAND BEDDING
RW-67R CASING
24" IMPERVIOUS BACKFILL
8" SOLID HDPE PIPE
CL
TOP ELEVATION 1372.00
RW-67R OUTFALL STATION 16+73
MH-5
TO MATCH EXISTING GRADE
6" TOPSOIL AND SEEDING
15+80
EL. 1365.00
STA. 16+71
FILTER SAND
ELEVATION 1368.00
RW-67A OUTFALL
ELEVATION 1365.00
18" COLLECTOR PIPE
ELEVATION 1366.00
15" COLLECTOR PIPE
5'
COARSE AGGREGATE FILTER SAND
NOTE 3
SEE
NOTE 3
SEE
18" SOLID HDPE PIPE
FILTER SAND BEDDING
RW-66B OUTFALL EXTENSION
FILTER SAND
0 10 20 30-10-20-30-40
24" RCP
EXISTING
12" IMPERVIOUS FILL
GROUND
EXISTING
E L E
V A
T
IO
N F
E E
T
L P
D
E L E
V A
T
IO
N F
E E
T
L P
D SEEDING
6" TOPSOIL AND
C-304
B
C
.D
G N
M A
T C
H L
IN
E T
H
IS
S
H E
E T
E L E
V A
T
IO
N F
E E
T L
P D
M A
T C
H L
IN
E T
H
IS
S
H E
E T
E L E
V A
T
IO
N F
E E
T L
P D
M A
T C
H L
IN
E T
H
IS
S
H E
E T
E L E
V A
T
IO
N F
E E
T L
P D
M A
T C
H L
IN
E T
H
IS
S
H E
E T
E L E
V A
T
IO
N F
E E
T L
P D
C-303
RELIEF WELL COLLECTOR PROFILE
C-303C-303
RW-67R OUTFALL PROFILE
C-304 C-303STATION 7+70
RELIEF WELL COLLECTOR
S H
E E
T O
F
C-303 C-304 C-304
C-304 C-304
C-303 C-304
C-303
RELIEF WELL COLLECTOR PROFILE
C-303 C-304 C-304
C-303
RELIEF WELL COLLECTOR PROFILE
C-303 C-304 C-304
R W C
O L L E
C T
O R P
IP
E R
E P
L A
C E
M E
N T
W O
U T F
A L L S P
L A
N P
R O
F
IL
E S S
E C
T
IO
N S
9 9
9 9
9 9
7 7
8 8
BACKFILLING DETAILS.
REFERENCE ONLY. SEE SHEET C-505 FOR EXCAVATION AND
3. THE EXCAVATION AND SLOPES SHOWN ARE FOR VISUAL
STATIONS 7+20 TO 7+21.
THE SLOTTED PIPE TO SOLID HDPE TRANSITION BETWEEN
HDPE ON THIS DETAIL MUST EXTEND LATERALLY 1 F00T PAST
2. COARSE AGGREGATE BACKFILL SURROUNDING THE SLOTTED
INFORMATION.
GEOSYNTHETIC MAT. SEE SHEET FIO-12 FOR ADDITIONAL
RELIEF WELL CHANNEL BENEATH THE GRAVEL-FILLED
PREVIOUS CONTRACT IN BOTTOM AND WEST SLOPE OF
1. CONTRACTOR MAY ENCOUNTER STABILIZATION RIPRAP FROM
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
.1
X
W
F
C x x x x
W
F
B
O M
A H
A
N E
B R
A S
K A
OMAHA DISTRICT
F O
R T T
H O
M P
S O
N S
O U
T H D
A K
O T
A
B
IG
B
E N
D D
A M L
A K
E S
H A
R P
E
C O
L L E
C T
O R P
IP
E S
Y S
T E
M
R E
P L
A C
E M
E N
T O
F L
E F
T A
B U
T M
E N
T
K P
B
C L
R
C L
R
B J L
R J
C
B J L
A
V E
M B
E R
19+80 20+00 20+60 21+00 21+30
STATION
ELEVATION 1376.05
NEW 24" CMP CULVERT EXTENSION
EXISTING 24" CMP CULVERT
E: 2199518.828 N: 629371.422
ELEVATION 1373.08
EXISTING GROUND
E L E
V A
T
IO
N F
E E
T
L P
D
E L E
V A
T
IO
N F
E E
T
L
D
20+20 20+40 20+80 21+20
THIS CONTRACT
FLARED END
INSTALL NEW
STATION 20+70
NEW 24" CMP EXTENSION
24" CMP, START OF
END OF EXISTING
STATION 21+08
CMP EXTENSION
END OF 24"
E: 2199556.241 N: 629380.213
ELEVATION 1372.00
FILTER SAND BEDDING COARSE AGGREGATE BEDDING
COARSE AGGREGATE
SLOPE TO DRAIN
1V ON 3H
FILTER SAND
ELEVATION 1365.6
15" RELIEF WELL COLLECTOR PIPE
6" TOPSOIL AND SEED
IMPERVIOUS BACKFILLFILTER SAND BEDDING
STATION 20+00
24" CMP
BEGINNING OF EXISTING
(SEE NOTE 1)
EXTENSION
PLACED AROUND
IMPERVIOUS FILL
RW-66
72 1372
O H
P
16+
16+
16+
H
PZ-24
RW-67A
PZ 30
THIS CONTRACT
FLARED END
INSTALL NEW
RW-67B
D R
A
IN
S L O P E T
O
MH-4
RW-68R
MH-5
6+
E: 2199518.828 N: 629371.422
STATION 20+70
24" CMP EXTENSION
START OF NEW
APPROXIMATE GRADING LIMITS
0EXSITING 24" CMP CULVERT
CULVERT "A"
EXSITING 24" RCP
5+
OW20-02
OW20-01
O H
P
N E
W
S
L O
T T
E D H
D P
E P
IP
E
C-30
C-30
O H
C-305
SCALE: 1 INCH = 20 FEET
20' 20'
B B
C
.D
G N
C-305
C-305
CULVERT "A"
C M
P E
X T
E N
S
IO
N
C U
L V
E R
T
A
24" CMP EXTENSION (CULVERT "A") - PLAN
24" CMP EXTENSION - PROFILE
P L
A N
G R
A D
IN
G
A N
D P
R O
F
IL
E
LEGEND
NON-WORK AREA
OHP OVERHEAD POWER LINES
PIEZOMETER
RELIEF WELL
MANHOLE
FINAL GRADE CONTOUR
EXISTING CONTOUR
CULVERT
CULVERT EXTENSION
INSTALLED BY USACE
REPLACEMENT RELIEF WELL
OBSERVATION WELL
AND OUTFALLS
RELIEF WELL COLLECTOR
MUST NOT BE LESS THAN 12 INCHES.
1. MINIMUM COVER OVER CMP CULVERT
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
.1
X
W
F
C x x x x
W
F
B
O M
A H
A
N E
B R
A S
K A
OMAHA DISTRICT
F O
R T T
H O
M P
S O
N S
O U
T H D
A K
O T
A
B
IG
B
E N
D D
A M L
A K
E S
H A
R P
E
C O
L L E
C T
O R P
IP
E S
Y S
T E
M
R E
P L
A C
E M
E N
T O
F L
E F
T A
B U
T M
E N
T
K P
B
C L
R
C L
R
B J L
R J
C
B J L
A
V E
M B
E R
EXISTING FILTER SAND
EXISTING GRAVEL
12"
20'
VARIES
12"
6"
6"
6"
VARIES
CLASS A RIPRAP
SD DOT
18"
8" 18"
FILTER SAND BEDDING
NEW SPALLS
12"
REPOSE
ANGLE OF
NOT TO SCALE
AND 24" RCP EXTENSION
RIPRAP APRON DETAIL B FOR 18" RELIEF WELL COLLECTOR
NEW 24" RCP EXTENSION (OFFSET)
COARSE AGGREGATE
INSTALL FLAP GATE
(SEE NOTE 2)
CHANNEL BOTTOM
CHOKE RIPRAP WITH FILTER SAND
IMPERVIOUS FILL
TOPSOIL & SEEDING
FILTER SAND
24" RCP EXTENSION
18" SOLID HDPE OUTFALL
1364.00 (SEE NOTE 5)
INVERT ELEVATION
COLLECTOR OUTFALL
16+80 17+00 17+50 18+00 18+50 19+00 19+50 20+00 20+20
STATION
STATION 17+00
ELEVATION 1369.10
ELEVATION 1366.00
NEW 24" RCP EXTENSION
ELEVATION 1364.00EXISTING 24" RCP
SLOPE TO DRAIN
E L E
V A
T
IO
N F
E E
T
L
E
V A
T
IO
N F
E E
T
L
24" CMP
INLET OF EXISTING
EXISTING GROUND
ELEVATION 1367.00
TOP OF RIPRAP
STATION 19+83.41
END OF RCP EXTENSION
12" MIN. IMPERVIOUS FILL
EXISTING GRADE
SEEDING TO MATCH
6" TOPSOIL AND
1V:10H
FILTER SAND BEDDING
FILTER SAND
.(SEE DETAILS THIS SHEET)
RIPRAP APRON
PLACEMENT
START OF FILL
STATION 18+32
BEGIN NEW EXTENSION
STATION 18+54
END OF EXISTING RCP
OHP
RW-66C
PZ-30
OUTFALL
NEW RW-66A
TRANSITION
1V:10H SLOPE
RW-66B
PZ-21
PZ-28
H560Rb-12
H560Rb
H560Ra
PZ-27
C -3
PZ-18
PZ-18R
PZ-18R-12
CHANNEL SLOPES.
EXISTING GRAVEL ON
NEW RIPRAP INTO
BLEND / TRANSITION
PZ-26
C -3
PZ 29
OHP
RW-66AR
RW-66R
MH-5
16+
16+
RW-66A
RW-66
RW-65A
RISER 21
OUTFALL
NEW RW-66AR 9+52
WELL COLLECTOR
HDPE RELIEF
NEW 18" SOLID
C-306
16+
WELL CASING OUTFALL
NEW 8" SLOTTED RELIEF
SLOPE TO DRAIN
19+83
9+00
8+00
7+00
19+00
WELL COLLECTOR
CONNECT TO 18" RELIEF
NEW RW-66B OUTFALL TO
ELEV. 1366.00
E: 2199768.048
N: 629127.757
24" RCP EXTENSION
START OF NEW
18+00
EXISTING 24" CMP
CULVERT "B"
EXISTING 24" RCP
CHANNEL FILL LIMITS
APPROXIMATE
17+00
C-306
EXISTING 24" RCP
BEGINNING OF
OHP
OHP
OHP
OHP
RW-67R
12"
18"
6" EXISTING GRAVEL
6" EXISTING FILTER SAND
32' - 7 1/2"
CULVERT B EXISTING 24" CMP
NOT TO SCALE
RIPRAP APRON DETAIL C - EXISTING 24" CMP (CULVERT B)
EXISTING OUTFALL INVERT ELEVATION 1364.00
RIPRAP
CLASS A
SD DOT
CHANNEL SLOPE
EXISTING RELIEF WELL
REUSE EXISTING FLARED END
18" SOLID HDPE PIPE
24" RCP PIPE
SEE NOTE 1
0 10 20 30-10-20-30-40
40 50 60 70 80 90 100 110 120
E L E
V A
T
IO
N F
E E
T
L P
D
FILTER SAND
6" TOPSOIL AND SEEDING
12" IMPERVIOUS FILL
E L E
V A
T
IO
N F
E E
T
L P
D
C-306
IP
R A
P A
P R
O N D
E T
A
IL
S
C-306
C-306
020' 20'
SCALE: 1 INCH = 20 FEET
B B
C
.D
G N
C-306 C-306
PROFILE - 24-INCH RCP EXTENSION
SECTION - 24-INCH RCP EXTENSION AND RW COLLECTOR
LEGEND
NON-WORK AREA
OHP OVERHEAD POWER LINES
PIEZOMETER
RELIEF WELL
MANHOLE
FINAL GRADE CONTOUR
EXISTING CONTOUR
CULVERT
CULVERT EXTENSION
INSTALLED BY USACE
REPLACEMENT RELIEF WELL
-I
N C
H R
C P E
X T
E N
S
IO
N
OBSERVATION WELL
POWER POLE
HERRING BONE RISER
HERRING BONE DRAIN
P L
A N S
E C
T
IO
N
A N
D
PLAN - 24-INCH RCP EXTENSION
TO THE EXTENT REQUIRED FOR OUTFALL INSTALLATION.
PRIOR TO EXCAVATION. REMOVAL EXTENTS OF GEOSNYTHETIC MAT MUST BE LIMITED
GEOSYNTHETIC MAT ON THE SLOPE OF THE RELIEF WELL CHANNEL MUST BE REMOVED
3. FOR 24-INCH RCP EXTENSION AND RELIEF WELL COLLECTOR PIPE, THE EXISTING
GEOSYNTHETIC MAT. SEE SHEET FIO-12 FOR ADDITIONAL INFORMATION.
IN BOTTOM AND WEST SLOPE OF RELIEF WELL CHANNEL BENEATH THE GRAVEL-FILLED
2. CONTRACTOR MAY ENCOUNTER STABILIZATION RIPRAP FROM PREVIOUS CONTRACT
PLUNGE POOL AREA. OUTFALLS WILL BE A MINIMUM OF 3.5 FEET APART AT END.
1. DISTANCE BETWEEN RCP EXTENSION AND NEW COLLECTOR VARIES UNTIL REACHING
NOTES:
AND OUTFALLS
RELIEF WELL COLLECTOR
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
.1
X
W
F
C x x x x
W
F
B
O M
A H
A
N E
B R
A S
K A
OMAHA DISTRICT
F O
R T T
H O
M P
S O
N S
O U
T H D
A K
O T
A
B
IG
B
E N
D D
A M L
A K
E S
H A
R P
E
C O
L L E
C T
O R P
IP
E S
Y S
T E
M
R E
P L
A C
E M
E N
T O
F L
E F
T A
B U
T M
E N
T
K P
B
C L
R
C L
R
B J L
R J
C
B J L
A
V E
M B
E R
NO SCALE
CASING AND RISER
BETWEEN PROTECTIVE
INSTALL PEA GRAVEL
GROUND SURFACE
APPROXIMATE EXISTING
OF SOLID 12" PIPE
MINIMUM 4" ABOVE TOP
COVER FOR ACCESS
LOCKABLE HINGED
HDPE PIPE
NEW 12" SLOTTED
GROUND SURFACE
INSTALL 3' BELOW
24" CMP CASING
DETAIL E - NEW RISER 1 AND RISER 3 SUBDRAIN
RANDOM FILL
EXISTING
(SEE NOTE 10 & SHEET C-301)
EXISTING CORE DRAIN
(SEE NOTE 11)
ANGLE OF REPOSE
EMBANKMENT SLOPE
APPROXIMATE EXISTING
COARSE AGGREGATE BEDDING
FILTER SAND BEDDING
RISER
PIPE
HDPE
SOLID
NEW 12"
12" DIA. HDPE 45 DEGREE ELBOW JOINT
COARSE AGGREGATE
FILTER SAND
FILTER SAND
24"
IM
PERVIO
US B
ACKFIL
L
24" IMPERVIOUS BACKFILL
.2
81.8706°
88.7393°
DIRECTION
FLOW
DIRECTION
FLOW
DIRECTION
FLOW
DIRECTION
FLOW
DIRECTION
FLOW
DIRECTION
FLOW
DIRECTION
FLOW
DIRECTION
FLOW
DIRECTION
FLOW
DIRECTION
FLOW
DIRECTION
FLOW
DIRECTION
FLOW
MANHOLE NO 5
TO OUTLET CHANNEL
NEW 18" PIPE
FROM RW-67R
NEW 8" PIPE
FROM RW-67A
NEW 8" PIPE
.2
FROM MANHOLE 4
NEW 15" PIPE
41.9138°44 .75
.9
NEW MANHOLE NO 4
TO MANHOLE 5
NEW 15" PIPE
FROM RW-68R
NEW 8" PIPE
FROM MANHOLE 3
NEW 12" PIPE
.7
84.8487°
53.7116°
TO MANHOLE 4
NEW 12" PIPE
FROM MANHOLE 2
NEW 12" PIPE
FROM MANHOLE 1
NEW 12" PIPE
84.8594° 88 .7
5°
.7
94.8403°
MANHOLE 3
NEW 12" PIPE TO
NEW MANHOLE NO 3
NEW MANHOLE 2
EXISTING MANHOLE 1
TO MANHOLE 3
NEW 12" PIPE
.8
5°
FROM RISER 3
NEW 12" PIPE
FROM RISER 1
NEW 12" PIPE
SEE MANHOLE NOTES.
E: 2,199,504.61
N: 629,445.47
E: 2,199,644.71
N: 629,255.23
E: 2,199,491.64
N: 629,589.27
E: 2,199,497.36
N: 629,856.89
E: 2,199,388.09
N: 629,580.68
FROM RW-68AR
NEW 8" PIPE
2' - 6"
MIN.
2' - 6"
TYPICAL
1/4"
7"
7"
A A
HALF PLAN
MANHOLE COVER AND FRAME
NO SCALE
B
6"
4' - 0"
M A
X
C .C
7"
APPROX. WT. - 58 LBS
NO SCALE
M A
X
PLAN
16"
AND FRAME
MANHOLE COVER SIDE RAIL LADDER
GALVANIZED STEEL
SECTION A: TYPICAL PRECAST MANHOLE
B
M A
X
RISER
CONCRETE
PRECAST
ELEVATION
RIM OR TOP
EACH WAY TOP
#4 BARS @ 11" O.C.
RAIL LADDER
STEEL SIDE
GALVANIZED
" DIA. RUNGS4
MCF-30-LD
FLAT TOP
PRECAST CONCRETE
SIDE RAILS
"2
" X2
V A
R
IE
S
VARIES
OUTLET
COLLECTOR
WAY BOTTOM
O.C. EACH
#4 BARS @ 6"
7'
C-501 C-501
6"
OF MANHOLE
WITH INNER DIAM.
OUTLET PIPE FLUSH
6" INTO MANHOLE
INLET PIPE EXTENDS
F L
O W
FLOW
SECTION B-B
BASE (SEE NOTE 4)
PRE-CAST CONCRETE
BASE
CONCRETE
PRE-CAST
2' 2'
HDPE INLET (SEE NOTE 8)
FLOW FROM SOLID
2" CLEAR
WAY TOP FACE
#4 @ 12" EACH
30"
34.65"
35"
3.78"
OPTIONAL FL760/SK12 SKIRT
BEDDING
FILTER SAND
NO SCALE
EXISTING GROUND SURFACE
CASING AND RISER
BETWEEN PROTECTIVE
INSTALL PEA GRAVEL
OF SOLID 12" PIPE
MINIMUM 4" ABOVE TOP
COVER FOR ACCESS
LOCKABLE HINGED
MIN. 1' STICKUP
ELBOW JOINT
2 X 45 DEGREE
12" DIA. HDPE
GROUND SURFACE
INSTALL 3' BELOW
24" CMP CASING
HDPE PIPE RISER
NEW 12" SOLID
MH-2
FLOW TO
DETAIL D - NEW RISER 1 AND RISER 3
COARSE AGGREGATE BEDDING
FILTER SAND BEDDING
24" IMPERVIOUS BACKFILL
24" IMPERVIOUS BACKFILL
FILTER SAND FILTER SAND
NEW 12" SLOTTED HDPE PIPE
(SEE NOTE 11)
ANGLE OF REPOSE
COARSE AGGREGATE
10 FT BELOW GW
BOTTOM OF SCREEN
BOTTOM CAP
BOTTOM OF SCREEN
~ 1 FOOT BELOW
1 FOOT ABOVE SCREEN
FILTER TOP
NO SCALE
NEW PIEZOMETER DETAIL
BOREHOLE
MINIMUM 8"
SCREEN AND CASING
SCHEDULE 80
2-INCH
FREEZE THAW AND FROST HEAVE
INSTALL CASING TO AVOID
MINIMUM 3' STICKUP
WITH LOCKING CAP
4-INCH SQUARE STEEL CASING
3/8" MEDIUM SIZE
CHIPS/PELLETS
BENTONITE
AT INSTALLATION
GROUND WATER
TOP OF SCREEN AT
(20 - 40 SILICA SAND)
FILTER PACK
WRAP SCREEN
10 SLOT CONTINUOUS
10' LONG
C-501
6"
C
.D
G N
P
IE
Z O
M E
T E
R D
E T
A
IL
S
N E
W M
A N
H O
L E
R
IS
E R A
N D
11. THE EXCAVATION AND SLOPES SHOWN ARE FOR VISUAL REFERENCE ONLY. SEE SHEET C-505 FOR EXCAVATION AND BACKFILLING DETAILS.
10. FOR EMBANKMENT CORE DRAIN CONNECTION REQUIREMENTS, REFER TO SPECIFICATION 31 23 00.00 20, EXCAVATION AND BACKFILLING FOR LEFT ABUTMENT COLLECTOR PIPE SYSTEM.
9. MANHOLE MH-1 HAS ASBESTOS BITUMINOUS COATING ON THE INSIDE OF THE RISER, SEE SPECIFICATIONS SECTION 02 82 00 ASBESTOS CONTAINING MATERIALS FOR ADDITIONAL REQUIREMENTS.
CONNECTION MUST NOT EXCEED 5 FEET.
8. THE SEGMENT OF PIPES CONNECTING TO AND/OR PROTRUDING INTO MANHOLES MUST BE MADE WITH SOLID HDPE PIPE TO ALLOW GROUTING AND/OR FLOW MEASUREMENTS. THE MAXIMUM LENGTH OF THE SOLID HDPE
7. A MINIMUM LAYER OF 6" COMPACTED FILTER SAND BEDDING MUST BE PLACED BENEATH THE PRE-CAST CONCRETE MANHOLE.
DEPTH GREATER THAN 20 FEET. DEPTH OF MANHOLES MUST BE MEASURED FROM THE TOP OF THE FRAME TO THE INVERT OF THE SUBDRAIN.
6. PERMANENTLY INSTALLED GALVANIZED SIDE RAIL LADDERS MUST BE INSTALLED IN ALL MANHOLES. IN ADDITION TO STEEL LADDERS, A LADDER CLIMBING SAFETY DEVICE MUST BE INSTALLED IN ALL MANHOLES WITH A
5. MANHOLE COVERS AND FRAMES ARE FIBRELITE FL760.
4. MANHOLE BASE SLABS ARE 6-FOOT DIAMETER BY 8-INCH THICK PRE-CAST CONCRETE BASES.
3. THICKNESS AND REINFORCING FOR PRECAST CONCRETE MANHOLE WALLS AND REINFORCING FOR PRECAST CONCRETE FLAT TOPS ARE SHOWN ON SECTION A, TYPICAL PRE-CAST MANHOLE DETAIL.
2. MANHOLES HAVE PRECAST CONCRETE FLAT TOPS.
1. PRECAST MANHOLES INCLUDING FRAMES, COVERS, RISERS, TOPS, AND LADDERS WILL BE FURNISHED AND INSTALLED BY CONTRACTOR.
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
.1
X
W
F
C x x x x
W
F
B
O M
A H
A
N E
B R
A S
K A
OMAHA DISTRICT
F O
R T T
H O
M P
S O
N S
O U
T H D
A K
O T
A
B
IG
B
E N
D D
A M L
A K
E S
H A
R P
E
C O
L L E
C T
O R P
IP
E S
Y S
T E
M
R E
P L
A C
E M
E N
T O
F L
E F
T A
B U
T M
E N
T
K P
B
C L
R
C L
R
B J L
R J
C
B J L
A
V E
M B
E R
14"1"
6"
14"
O
NO SCALE
EXISTING RELIEF WELL RW-68 DETAILS
EL. 1367.97
GROUND SURFACE
APPROXIMATE
GRAVEL PACK
EXISTING
RISER
RELIEF WELL RW-68
PIPE RISER
8" I.D. PLASTIC
EXISTING
36" CASING (RW-68)
12" PERFORATED CMP15" PERFORATED CMP
TO MANHOLE MH-2
15" PERFORATED CMP
CMP FROM RISER 4
12" PERFORATED
EL. 1368.60
EL. 1367.94
EL. 1366.96
NO SCALE
EXISTING RELIEF WELL RW-66 AND RW-67 DETAILS
12"
THE GROUND SURFACE
FILL WITHIN 12 INCHES OF
12 INCHES OF FLOWABLE
RISER
RIM
RISER
INVERT OF
PACK
EXISTING GRAVEL
TO RELIEF WELL CHANNEL
8" DIA. CMP OUTFALL
GROUND SURFACE
APPROX. EXISTING
36" DIA. CMP CASING
CONCRETE BASE SLAB
REINFORCED
SEE TABLE 2
INVERT ELEVATION,
RISER PIPE
EXISTING 8" PLASTIC
14" 14"
NO SCALE
TOP OF MANHOLE
6"
6"
GROUND SURFACE
APPROX. EXISTING
EL. 1368.85
PIPE FROM RW-67A
8" SOLID HDPE
FROM RW-67
8" SOLID PIPE
FROM RW-67A
8" SOLID PIPE
BASE SLAB
REINFORCED CONCRETE
EL. 1366.06
EL. 1366.20
EL. 1365.70
FROM RW-67 EL. 1366.1
8" PERFORATED CMP PIPE
15" DIA. CMP
MANHOLE
36" DIA. CMP
CMP
15" DIA.
15" CMP
15" CMP
EXISTING MANHOLE MH-2 DETAILS
PRE-PACKED SCREEN
EXISTING 5" I.D.
UNKNOWN
DETAILS
CONNECTION
C.M.P.
12" DIA.
SEAL
EXISTING BENTONITE
UNKNOWN
REINFORCEMENT @ 12"
BASE SLAB WITH #4
REINFORCED CONCRETE
SQUARE 4'x4'x6"
M
IN
V A
R
IE
S
SEE FIO-6 FOR COVER DETAIL
GROUND ELEV.
APPROXIMATE
LIFTING HANDLE
HDPE CASING
36" DIA. CORRUGATED
SEE TABLE 2
INVERT ELEVATION VARIES
HDPE OUTFALL PIPE
8" CORRUGATED
VALVE ASSEMBLY
RELIEF WELL
STEEL RISER PIPE
SCHEDULE 40 STAINLESS
EXISTING 5" I.D. (5 1/2" O.D.)
STEEL CLAMP TO CASING
ROPE WITH STAINLESS
STAINLESS STEEL WIRE
NO SCALE
M
IN
GROUND ELEV.
APPROXIMATE
LIFTING HANDLE
HDPE CASING
36" DIA. CORRUGATED
HDPE OUTFALL PIPE
8" CORRUGATED
VALVE ASSEMBLY
RELIEF WELL
SLAB WITH #4@12"
BASE SLAB REINFORCED
SQUARE 4'x4'x6" CONCRETE
SEAL
EXISTING BENTONITE
STEEL RISER PIPE
SCHEDULE 40 STAINLESS
EXISTING 5" I.D. (5 1/2" O.D.)
PRE-PACKED SCREEN
EXISTING 5" I.D.
C-502
STEEL CLAMP TO CASING
WITH STAINLESS
WIRE ROPE
STAINLESS STEEL
EXISTING RELIEF WELL RW-68A, RW-68B DETAILS EXISTING RELIEF WELL RW-66A DETAILS
NO SCALE
X
IS
T
IN
G R
E L
IE
F W
E
A
D M
A N
H O
L E D
E T
A
IL
S
V A
R
IE
S
SEE FIO-6 FOR COVER DETAIL
B B
C
.D
G N
THE GROUND SURFACE
FILL WITHIN 12 INCHES OF
12 INCHES OF FLOWABLE
VARIES SEE TABLE 2
INVERT ELEVATION
L
IC
IT
A T
IO
N N
O
F
IL
E N
A M
E
D W
N B
Y
C K
D B
Y
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
D
2 3
C
4 5
A
B
M A
R K
A P
P R
NUMBER
IDENTIFICATION
SHEET
OF ENGINEERS
US ARMY CORPS
D A
T E
F
IL
E N
U M
B E
R
S
IZ
E
S U
B M
IT
T E
D B
Y
P L
O T S
C A
L E
P L
O T D
A T
E
D A
T E
C O
R P
S O
F E
N G
IN
E E
R S
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T
M A
R K
D E
S C
R
IP
T
IO
N A
P P
R
D A
T E
C O
N T
R A
C T N
.1
X
W
F
C x x x x
W
F
B
O M
A H
A
N E
B R
A S
K A
OMAHA DISTRICT
F O
R T T
H O
M P
S O
N S
O U
T H D
A K
O T
A
B
IG
B
E N
D D
A M L
A K
E S
H A
R P
E
C O
L L E
C T
O R P
IP
E S
Y S
T E
M
R E
P L
A C
E M
E N
T O
F L
E F
T A
B U
T M
E N
T
K P
B
C L
R
C L
R
B J L
R J
C
B J L
A
V E
M B
E R
PIPE
INNNER RELIEF WELL
REMOVE CASING AND
20'
IMPERVIOUS MATERIAL
SURFACE AND FILL WITH
2' REMOVE BELOW GROUND
GROUT
CEMENT BENTONITE
RELIEF WELL
GROUT TO TOP OF
TREMIE HIGH DENSITY
AND SEED
6" TOP SOIL
GROUND SURFACE
APPROX. EXISTING
PACK
EXISTING GRAVEL
TO BE REMOVED
AND RELIEF WELL OUTFALLS
SUBDRAIN, COLLECTOR
STUB WITH CAP
SEE NOTE 7
EXISTING RISER PIPE
SURFACE
PLACED 3' BELOW GROUND
HIGH DENSITY GROUT TO BE
IDENTIFICATION
LOCATION AND
STEEL MARKER PLATE FOR
6" DIAMETER, 1/4" THICK
SEE NOTE 7
RISER PIPE
EXISTING
BELOW GROUND SURFACE (SEE NOTE 2)
CUTOFF AND REMOVE 36" C.M.P 3 FEET
GROUND SURFACE
TO WITHIN 6" OF
IMPERVIOUS BACKFILL
WITH REINFORCEMENT
CONCRETE BASE SLAB
NO SCALE
ABANDONMENT DETAILS FOR RW-67, RW-68A, AND RW-68B
AND SEED
6" TOPSOIL
RELIEF WELL.
PLACED 1.5' ABOVE TOP OF
HIGH DENSITY GROUT TO BE
CHANNEL
NEAR RELIEF WELL
NEW CAP AT OUTFALL
GROUND SURFACE
TO WITHIN 6" OF
BACKFILL IMPERVIOUS FILL
GROUND SURFACE
APPROX. EXISTING
IDENTIFICATION
LOCATION AND
STEEL MARKER PLATE FOR
6" DIAMETER, 1/4" THICK
NO SCALE
RELIEF WELL RW-66, AND RW-66A ABANDONMENT DETAILS
WELL
TO TOP OF RELIEF
DENSITY GROUT
TREMIE HIGH
SEE NOTE 7
EXISTING RISER PIPE
FILL (SEE NOTE 4).
AND FILLED WITH FLOWABLE
WELL CHANNEL TO BE CAPPED
8" DIA. CMP OUTFALL TO RELIEF
BELOW GROUND SURFACE (SEE NOTE 2)
CUTOFF AND REMOVE 36" C.M.P 1 FOOT
EXISTING GRAVEL PACK
TOP OF CASING
6"
8" PIPE FROM RW-67
REMOVE PERFORATED
CONNECTED
INCLUDING ALL PIPES
IN ITS ENTIRETY
REMOVE MANHOLE
GROUND SURFACE
APPROX. EXISTING
FROM RW-67A
8" SOLID PIPE
REMOVE
REMOVE BASE SLAB
36" DIA. CMP CASING
GROUND SURFACE
APPROX. EXISTING
PACK
EXISTING GRAVEL
NO SCALE
ABANDONMENT DETAILS FOR RW-68
BASE SLAB
GROUT TO TOP OF
TREMIE HIGH DENSITY
TO BE REMOVED
RELIEF WELL OUTFALL
6"
AND SEED
6" TOPSOIL
(SEE NOTE 2)
36" CMP AT BASE SLAB
CUTOFF AND REMOVE
(SEE NOTE 7)
TO TOP BASE SLAB
PIPE TO BE REMOVED
EXISTING RISER
C-503
MANHOLE 2 REMOVAL DETAILS
NO SCALE
E X
IS
T
IN
G R
E L
IE
F W
E L L A
M A
N H
O L E A
B A
N D
O N
M E
N T
D E
T A
IL
S
B B
C
.D
G N
ADDITIONAL ABANDONMENT DETAILS
SEE SPECIFICATIONS FOR
ABANDONMENT DETAILS FOR OW20-02
INSTALLED FOR RW-66A, RW-68A, RW-68B,
7. 8" PLASTIC RISER PIPES WERE INSTALLED FOR RW-66, RW-67, RW-68. 5" STAINLESS STEEL RISERS WERE
RISERS AND MAY REQUIRE REMOVAL TO ABANDON WELL.
6. DURING INITIAL INSTALLATION OF RW-66 AND RW-66A FLOWABLE FILL WAS PLACED AROUND CORRUGATED
5. EXCAVATION DETAILS NOT SHOWN.
IN THE SPECIFICATIONS.
4. FLOWABLE FILL REQUIREMENTS FOR THE ABANDONMENT OF RELIEF WELLS RW-66 AND RW-66A CAN BE FOUND
3. SEE SPECIFICATIONS FOR RELIEF WELL ABANDONMENT REQUIREMENTS.
SPECIFICATION SECTION 02 82 00 TITLE "ASBESTOS CONTAINING MATERIALS" FOR REQUIREMENTS.
ABANDONMENT OF THE WELLS AND DISCONNECTION OF OUTFALL PIPES FROM THE COLLECTOR PIPE SYSTEM. SEE
OUTFALL PIPES, THE 8'' TOE DRAIN RISERS (1,2,3,4) AND MANHOLE 2. CARE SHOULD BE TAKE DURING
WELLS RW-66, RW-67, AND RW-68, THE INTERIOR OF PERFORATED CMP COLLECTOR PIPES, THE INTERIOR OF 8"
2. ASBESTOS TREATED BITUMINOUS COATING IS LOCATED ON THE INTERIOR OF THE 36" CMP CASING OF RELIEF
ACCORDANCE WITH THE SPECIFICATIONS.
1. CONTRACTOR MUST SUBMIT FOR APPROVAL A SHORING AND SHEETING PLAN AND A DEWATERING PLAN IN