This is a Questions and Answers document for Amendment 2 to solicitation 140R4025R0017 for the Brackish Groundwater National Desalination Research Facility Yard Piping and Flow Measurement Upgrade Phase One, issued by the Department of Interior.

The amendment addresses five clarifications regarding Phase Two evaluation factors and submission requirements. A critical change reduces the internally completed work requirement from 50 percent to 15 percent for the Teaming Agreements evaluation factor. The Government clarified that the price proposal submission will be Attachment 12 (not Attachment 11 as initially stated) and will be provided during Phase Two. Additionally, the solicitation was revised to include detailed Factor 3 Teaming Agreement instructions under Sections L and M, specifying what offerors should submit if selected for Phase Two, including subcontractor names, roles, work percentages, and teaming agreements. The document notes that work performed by the prime contractor's design subcontractor will be addressed in the revised solicitation language. Phase One Qualification submissions are due Friday, November 13, 2026, at 4:00 PM MST (extended from November 6, 2026), and the Past Performance Questionnaire deadline is extended to November 9, 2026, with completed questionnaires to be submitted via email to Valerie_jiron@ios.doi.gov.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 2

140R4025R0017 Brackish Groundwater National Desalination Research Facility Yard

Piping and Flow Measurement Upgrade- Phase One

Questions and Answers

1. Section M, Phase Two Factor (iii) Teaming Agreements, states: “Higher percentages of internally completed work will be rated more favorably, 50 percent internal work minimum.” Is the prime contractor required to self-perform a minimum of 50 percent of the work? Would an offeror proposing less than 50 percent be rated unacceptable, or only rated less favorably?

Answer: The solicitation will be amended to state 15% instead of 50%.

2. Does work performed by the prime contractor’s design subcontractor count as internal work for Factor (iii)?

Answer: See revised solicitation Factor 3 Teaming Agreement under Section L and

Section M.

3. Section L lists Teaming Agreements as a Phase Two Technical Evaluation Factor and

Section M references it, but Section L does not provide Technical Evaluation Factor 3 instructions. Please provide what offerors should plan to submit for this factor if selected for Phase Two (e.g., subcontractor names, roles, percentages of work, teaming agreements, page limits).

Answer: Solicitation revised to include Factor 3 Teaming Agreement under Section L.

4. Section I incorporates FAR 52.219-14, Limitations on Subcontracting, which for general construction limits the amount paid to subcontractors that are not similarly situated entities to 85 percent of the amount paid by the Government, excluding the cost of materials. Section M, Phase Two Factor (iii), states “50 percent internal work minimum.”

Is this minimum intended to establish a self-performance requirement higher than FAR

52.219-14? If so, (a) will it become a contract requirement after award or apply only to evaluation, and (b) will the Government calculate it using the FAR 52.219-14 method, including excluding the cost of materials and counting work performed by similarly situated entities as work performed by the prime?

Answer: The solicitation will be amended to state 15 percent instead of 50 percent.

5. Section L, Phase Two, identifies the Price Proposal as “Attachment 11,” while Section J lists the Price Schedule as Attachment 12 and Attachment 11 as Conceptual Layout

Figures. Please confirm which attachment governs the Phase Two price proposal.

Answer: Price proposal is Attachment 12 and will be provided in Phase Two.

Phase One Qualification due date is also being extended from Friday, November 6, 2026, to Friday, November 13, 2026, at 4:00PM MST.

The Past Performance Questionnaire due date is also being extended from November

3, 2026, to November 9, 2026. Please have references complete and return the questionnaires via email to Valerie_jiron@ios.doi.gov.

mailto:Valerie_jiron@ios.doi.gov