About this opportunity

The Department of the Air Force Air Education and Training Command is seeking proposals for the repair, modification, and upgrade of the mechanical and electrical equipment in Building 847. The project involves replacing all mechanical and plumbing equipment in the mechanical room/yard, except for the boiler and water heater, along with the associated electrical components. Contractors must complete CUI training and submit an acknowledgment form to access the contract documents. A site visit is highly encouraged but not mandatory on July 9, 2024, and all Requests for Information must be submitted by July 11, 2024. The government will evaluate proposals based on the contractor's ability to meet the requirements outlined in the Statement of Work.

This procurement is set aside for small businesses, and the estimated value range is between $250,000 and $500,000. The period of performance for the contract is 210 days. The place of performance is Columbus, MS 39710, USA. There is no information provided about potential incumbent contractors.

Notice text

4 versions

Update #4 · Latest ·

Amendment 03: The purpose of this amendment is to provide Contractors with an updated site visit time change. 

There will be another site visit for B847 at Columbus AFB offered on Wednesday, 31 July 2024 at 9:00 AM CST. In order to attend the site visit, your team must contact the POC to inform them of your intent to attend NLT 10:00 AM CST on Friday, 26 July 2024. If you do not contact the POC by 10:00 AM CST on Friday, 26 July 2024, you will not be able to attend the site visit. All RFIs must be submitted NLT 12:00 PM CST on Friday, 02 August 2024. Proposals are now due on Thursday, 08 August, 2024 at 4:45 PM CST. 

Amendment 02: The purpose of this amendment is to provide Contractors with an updated Solicitation and SOW (see attachment titled B847 Design Build SOW -- Revised 22 Jul 24). Changes from the original SOW dated 16 April 2024 are listed in red. The project will now include replacing the Main Distribution Panel (MDP). 

The B847 Record Drawings has been removed. Please reference the attachment titled (CUI) B847 As-Builts Combined, which includes both As-Builts and Record Drawings.

There will be another site visit for B847 at Columbus AFB offered on Wednesday, 31 July 2024 at 1:00 PM CST. In order to attend the site visit, your team must contact the POC to inform them of your intent to attend NLT 10:00 AM CST on Friday, 26 July 2024. If you do not contact the POC by 10:00 AM CST on Friday, 26 July 2024, you will not be able to attend the site visit. All RFIs must be submitted NLT 12:00 PM CST on Friday, 02 August 2024. Proposals are now due on Thursday, 08 August, 2024 at 4:45 PM CST.

IAW FAR 36.204(f) - The range of magnitude for this procurement is between $250,000 and $500,000.

Contractors/Offers must complete CUI Training Slides then sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" to gain access to drawings and other associated CUI documentation. Send singed MFR to the POC and accesses to the locked documents in SAM.gov will be granted.

Amendment 01: The purpose of this amendment is to provide Contractors with the answers to the RFI questions that were submitted (see attachment titled RFI_01 Answers FA302224R0006). An attachment titled B847 Electricity Consumption was also added in response to RFI Question #6. 

This requirement is to replace, modify, and upgrade mechanical and electrical equipment in B847. The intent of this project is to replace all mechanical and plumbing equipment in the mechanical room/yard, and its associated electrical components, except for the boiler and water heater. Perform all work according to this Statement of Work (SOW), the Concept Design Drawings, and all related AF requirements and other codes and references.

The Government is offering a site visit opportunity on Tuesday, 09 July 2024 at 1:00 PM CST. The site visit is Highly Encouraged but not mandatory. In order to attend the site visit, your team must contact the POC to inform them of your intent to attend NLT 10:00 AM CST on Tuesday, 02 July 2024. If you do not contact the POC by 10:00 AM CST on Tuesday, 02 July 2024, you will not be able to attend the site visit. All RFIs must be submitted NLT 12:00 PM CST on Thursday, 11 July 2024.

IAW FAR 36.204(f) - The range of magnitude for this procurement is between $250,000 and $500,000.

Contractors/Offers must complete CUI Training Slides then sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" to gain access to drawings and other associated CUI documentation. Send singed MFR to the POC and accesses to the locked documents in SAM.gov will be granted.

Update #3 ·

Amendment 02: The purpose of this amendment is to provide Contractors with an updated Solicitation and SOW (see attachment titled B847 Design Build SOW -- Revised 22 Jul 24). Changes from the original SOW dated 16 April 2024 are listed in red. The project will now include replacing the Main Distribution Panel (MDP). 

The B847 Record Drawings has been removed. Please reference the attachment titled (CUI) B847 As-Builts Combined, which includes both As-Builts and Record Drawings.

There will be another site visit for B847 at Columbus AFB offered on Wednesday, 31 July 2024 at 1:00 PM CST. In order to attend the site visit, your team must contact the POC to inform them of your intent to attend NLT 10:00 AM CST on Friday, 26 July 2024. If you do not contact the POC by 10:00 AM CST on Friday, 26 July 2024, you will not be able to attend the site visit. All RFIs must be submitted NLT 12:00 PM CST on Friday, 02 August 2024. Proposals are now due on Thursday, 08 August, 2024 at 4:45 PM CST.

IAW FAR 36.204(f) - The range of magnitude for this procurement is between $250,000 and $500,000.

Contractors/Offers must complete CUI Training Slides then sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" to gain access to drawings and other associated CUI documentation. Send singed MFR to the POC and accesses to the locked documents in SAM.gov will be granted.

Amendment 01: The purpose of this amendment is to provide Contractors with the answers to the RFI questions that were submitted (see attachment titled RFI_01 Answers FA302224R0006). An attachment titled B847 Electricity Consumption was also added in response to RFI Question #6. 

This requirement is to replace, modify, and upgrade mechanical and electrical equipment in B847. The intent of this project is to replace all mechanical and plumbing equipment in the mechanical room/yard, and its associated electrical components, except for the boiler and water heater. Perform all work according to this Statement of Work (SOW), the Concept Design Drawings, and all related AF requirements and other codes and references.

The Government is offering a site visit opportunity on Tuesday, 09 July 2024 at 1:00 PM CST. The site visit is Highly Encouraged but not mandatory. In order to attend the site visit, your team must contact the POC to inform them of your intent to attend NLT 10:00 AM CST on Tuesday, 02 July 2024. If you do not contact the POC by 10:00 AM CST on Tuesday, 02 July 2024, you will not be able to attend the site visit. All RFIs must be submitted NLT 12:00 PM CST on Thursday, 11 July 2024.

IAW FAR 36.204(f) - The range of magnitude for this procurement is between $250,000 and $500,000.

Contractors/Offers must complete CUI Training Slides then sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" to gain access to drawings and other associated CUI documentation. Send singed MFR to the POC and accesses to the locked documents in SAM.gov will be granted.

Update #2 ·

Amendment 01: The purpose of this amendment is to provide Contractors with the answers to the RFI questions that were submitted (see attachment titled RFI_01 Answers FA302224R0006). An attachment titled B847 Electricity Consumption was also added in response to RFI Question #6. 

This requirement is to replace, modify, and upgrade mechanical and electrical equipment in B847. The intent of this project is to replace all mechanical and plumbing equipment in the mechanical room/yard, and its associated electrical components, except for the boiler and water heater. Perform all work according to this Statement of Work (SOW), the Concept Design Drawings, and all related AF requirements and other codes and references.

The Government is offering a site visit opportunity on Tuesday, 09 July 2024 at 1:00 PM CST. The site visit is Highly Encouraged but not mandatory. In order to attend the site visit, your team must contact the POC to inform them of your intent to attend NLT 10:00 AM CST on Tuesday, 02 July 2024. If you do not contact the POC by 10:00 AM CST on Tuesday, 02 July 2024, you will not be able to attend the site visit. All RFIs must be submitted NLT 12:00 PM CST on Thursday, 11 July 2024.

IAW FAR 36.204(f) - The range of magnitude for this procurement is between $250,000 and $500,000.

Contractors/Offers must complete CUI Training Slides then sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" to gain access to drawings and other associated CUI documentation. Send singed MFR to the POC and accesses to the locked documents in SAM.gov will be granted.

Update #1 ·

This requirement is to replace, modify, and upgrade mechanical and electrical equipment in B847. The intent of this project is to replace all mechanical and plumbing equipment in the mechanical room/yard, and its associated electrical components, except for the boiler and water heater. Perform all work according to this Statement of Work (SOW), the Concept Design Drawings, and all related AF requirements and other codes and references.

The Government is offering a site visit opportunity on Tuesday, 09 July 2024 at 1:00 PM CST. The site visit is Highly Encouraged but not mandatory. In order to attend the site visit, your team must contact the POC to inform them of your intent to attend NLT 10:00 AM CST on Tuesday, 02 July 2024. If you do not contact the POC by 10:00 AM CST on Tuesday, 02 July 2024, you will not be able to attend the site visit. All RFIs must be submitted NLT 12:00 PM CST on Thursday, 11 July 2024.

IAW FAR 36.204(f) - The range of magnitude for this procurement is between $250,000 and $500,000.

Contractors/Offers must complete CUI Training Slides then sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" to gain access to drawings and other associated CUI documentation. Send singed MFR to the POC and accesses to the locked documents in SAM.gov will be granted.

Files

Show all 14

Similar open opportunities

Opportunity Agency Set-aside Responses due
Replacement of 10 Ton HVAC Unit, Bldg. 11, PR ANG Carolina, Puerto Rico 00979, United States · NAICS 238220 Army National Guard Total Small Business
Replace HVAC Rooftop Units at Building 2275 March Air Reserve Base, California 92518, United States · NAICS 238220 Army National Guard No set-aside
Repair Mechanical Systems IDIQ (FY 27-32) Wright Patterson Afb, OH 45433 United States 45433 · NAICS 238220 AFLCMC Wright Patterson AFB No set-aside
HVAC Replacement, Bldg. 2821 NAICS 238220 Air Combat Command Total Small Business
Repair Naval Reserve Training Facility B3370 Charleston AFB, South Carolina 29404, United States · NAICS 236220 Air Mobility Command Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity