B502--WNY Air Monitoring & Hazardous Material Sampling IDIQ

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
36C24224Q0327
Agency
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business

Opportunity facts

NAICS code
562910 Remediation Services
Place of performance
Buffalo VA Medical Center Buffalo, New York 14215, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs (VA) is seeking quotes for asbestos air monitoring and hazardous material sampling services at the Buffalo and Batavia VA Medical Centers in New York. The VA requires pricing for certified industrial hygienist, air sampling technician, and inspector services, as well as air and material sample collection and analysis with 24-hour and 1-week turnaround times. Evaluation criteria include technical capability, past performance, and price. Quotes are due by March 26, 2024, with the contract award anticipated by April 15, 2024.

This is a Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside solicitation with a NAICS code of 562910 - Remediation Services. The contract will be an indefinite delivery contract with a base year from April 15, 2024 to March 31, 2025, and four one-year option periods extending through March 31, 2029. The places of performance are the Buffalo and Batavia VA Medical Centers in New York.

Notice text

3 versions

Update #3 · Latest ·

This amendment is to answer the following vendor questions:

In line 12 of the Air monitor ACM IDIQ Bid sheet I changed the Turnaround time to 1 week because it was a duplicate of line 11(they both said 24hr TAT). Please let me know if this was not a correct assumption.

That is correct the turn around time for line item 12 of the Air monitor ACM IDIQ Bid sheet should have a turn around time of one week, not 24 hours.

Can you please clarify the need for Provide services of a Certified Air Sampling Technician during the asbestos air quality monitoring and sampling activities as a stand-alone bid item?Â

SOW B.3.1.4 Air Monitoring (E) states Contractor shall continuously inspect and monitor conditions inside the work areas to ensure compliance with all regulations . The contractor shall collect all required area samples and analyze all air samples within 24 hours of collection. The contractor shall continuously inspect work areas for any breaches in containment. Contractor shall maintain a daily log of all air monitoring samples and daily activity log. Containment shall stay in place until the clearance samples come back clear and has received authorization from the COR to end containment.

This means a project monitor will be required daily on task orders. An air sampler can only set up pumps/cassettes, retrieve pumps/cassettes, submit them to the lab, and maintain and air sampling log. An air sampler is not certified to continuously inspect and monitor conditions inside/outside the work area and is not required to maintain a daily activity log. Those responsibilities fall under Project Monitor.

This gives the contractor flexibility to offer the sampling technician and project monitor separately providing best value to the VA in the event more than one person is needed, rather than being billed for multiple project monitors.

Can you please clarify SOW B.3.1.4 Air Monitoring (F) & (G)? Â

Section F states If visual inspection is acceptable, the contractor shall proceed with clearance air samples, using aggressive method. Samples shall be analyzed using the PCM method. All PCM samples shall be analyzed using the NIOSH 7400 method. Onsite testing is preferred. Â

Onsite testing is not permitted by CR-56 for air sampling unless the individual is certified by NYSDOH ELAP. Otherwise, it must be performed by a laboratory.Â

The VA agrees with this statement. Onsite testing is preferred shall be removed from section B.3.1.4 Air Monitoring (F).

Section G states Final clearance samples shall be conducted in accordance with TEM NIOSH 7402 method. TEM NIOSH samples shall be collected for areas greater than 160 square feet only. TEM for clearance samples is estimated 12 samples per clearance estimated. Contractor shall ensure that NESHAP testing is performed for all renovation and demolition work by asbestos contractors. It includes destructive sampling that AHERA does not cover.

Section G appears to be a direct contradiction to Section F. By CR-56, clearance samples can be collected and analyzed using PCM methods for any size of project. If a sample fails, all samples can be re-analyzed using TEM Method 7402. It might be more consistent throughout all task orders to request AHERA TEM sampling for all clearance samples regardless of the size of project or require PCM clearance samples regardless the size of the project per CR-56 and if they fail, then use Method 7402.  Â

The VA agrees with this recommendation The VA agrees with this statement. Section B.3.1.4 Air Monitoring (G) shall now state:

Final clearance samples shall be conducted using PCM clearance samples regardless the size of the project per CR-56. If a sample fails, all samples shall be re-analyzed using TEM Method 7402. Â Contractor shall ensure that NESHAP testing is performed for all renovation and demolition work by asbestos contractors.

All other terms and conditions remain the same.

Update #2 ·

This amendment to combined synopsis/solicitation 36C24224Q0327answers the following vendor question.

If an A/E firm were to pursue and be awarded the above IDIQ contract, would the firm then be precluded from pursuing any design projects that may utilize this IDIQ contract for air monitoring or material sampling services?

Answer: As there is no conflict of interest created, an A/E firm would not be precluded from pursuing any design projects that may utilize this IDIQ contract for air monitoring or material sampling services.

All other terms and conditions remain the same.

Update #1 ·

Page 6 of 8

COMBINED SYNOPSIS/SOLICITATION

Indefinite Delivery Contract for Asbestos Air Monitoring and Material Sampling Services at the Buffalo and Batavia VA Medical Centers

(i) This is a combined synopsis/solicitation for a commercial item prepared in accordance with the format in FAR Subpart 12.6 and FAR 13 Simplified Acquisition Procedures, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.

(ii) This solicitation is issued as a request for quote (RFQ). Request for Quote will be submitted through email on RFQ reference number 36C24224Q0327.

(iii) This solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2024-03 (eff. 02/23/2024).

(iv) This procurement is being issued as a SDVOSB set-aside solicitation. The North American Industry Classification System (NAICS) code is 562910, Remediation Services, with a small business size standard of $25 Million.

(v) The Contractor shall provide line item pricing for asbestos air monitoring and material sampling services at the Buffalo and Batavia VA Medical CentersApricing to 3-year electrical testing and inspection of electrical distribution system at the Bath VA Medical Center. See table below for instrumentation and time frame of pricing periods:

B.2 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER

DESCRIPTION OF SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

0001

1.00

HR

________________

Provide services of a Certified Industrial Hygienist (CIH) during the asbestos air quality monitoring and sampling activities.

Contract Period: Base

POP Begin: 04-15-2024

POP End: 03-31-2025

0002

1.00

HR

_______________

Provide services of a Certified Air Sampling Technician during the asbestos air quality monitoring and sampling activities.

Contract Period: Base

POP Begin: 04-15-2024

POP End: 03-31-2025

0003

1.00

HR

_______________

Provide services of a Certified Inspector during the asbestos air quality monitoring and sampling activities.

Contract Period: Base

POP Begin: 04-15-2024

POP End: 03-31-2025

0004

1.00

HR

_______________

Provide services of a Certified Project Monitor during the asbestos air quality monitoring and sampling activities.

Contract Period: Base

POP Begin: 04-15-2024

POP End: 03-31-2025

0005

1.00

HR

_______________

Provide services of a Certified Project Designer during the asbestos air quality monitoring and sampling activities.

Contract Period: Base

POP Begin: 04-15-2024

POP End: 03-31-2025

0006

1.00

EA

______________

Provide air sample collection and Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7402 (Issue 2, Fourth Edition) of the sample with a 24-hour turnaround time.

Contract Period: Base

POP Begin: 04-15-2024

POP End: 03-31-2025

0007

1.00

EA

______________

Provide air sample collection and AHERA TEM analysis of the sample with a 24-hour turnaround time.

Contract Period: Base

POP Begin: 04-15-2024

POP End: 03-31-2025

0008

1.00

EA

______________

Provide air sample collection and Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7402 (Issue 2, Fourth Edition) of the sample with a 1 week turnaround time.

Contract Period: Base

POP Begin: 04-15-2024

POP End: 03-31-2025

0009

1.00

EA

______________

Provide air sample collection and AHERA TEM analysis of the sample with a 1 week turnaround time.

Contract Period: Base

POP Begin: 04-15-2024

POP End: 03-31-2025

0010

1.00

EA

______________

Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 24-hour turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials.

Contract Period: Base

POP Begin: 04-15-2024

POP End: 03-31-2025

0011

1.00

EA

______________

Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 24-hour turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials.

Contract Period: Base

POP Begin: 04-15-2024

POP End: 03-31-2025

0012

1.00

EA

______________

Provide hazardous material collection and NY ELAP Method 198.6 (PLM) testing for requested non-friable organically bound building materials with a 24-hour turnaround time. Materials can include Floor tiles (vinyl and asphalt), roofing Materials, mastics, caulking and other NOB materials.

Contract Period: Base

POP Begin: 04-15-2024

POP End: 03-31-2025

0013

1.00

EA

______________

Provide hazardous material collection and NY ELAP Method 198.1 (PLM) testing for requested friable material with a 1-week turnaround time. Materials can include, but are not limited to ceiling tile, textiles, insulation and other friable materials.

Contract Period: Base

POP Begin: 04-15-2024

POP End: 03-31-2025

0014

1.00

EA

______________

Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 1-week turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials.

Contract Period: Base

POP Begin: 04-15-2024

POP End: 03-31-2025

0015

1.00

EA

______________

Provide hazardous material collection and NY ELAP Method 198.6 (PLM) testing for requested non-friable organically bound building materials with a 1-week turnaround time. Materials can include Floor tiles (vinyl and asphalt), roofing Materials, mastics, caulking, and other NOB materials.

Contract Period: Base

POP Begin: 04-15-2024

POP End: 03-31-2025

0016

1.00

JB

______________

4 hour response time premium to any of the above items.

Contract Period: Base

POP Begin: 04-15-2024

POP End: 03-31-2025

1001

1.00

HR

______________

Provide services of a Certified Industrial Hygienist (CIH) during the asbestos air quality monitoring and sampling activities.

Contract Period: Option 1

POP Begin: 04-01-2025

POP End: 03-31-2026

1002

1.00

HR

______________

Provide services of a Certified Air Sampling Technician during the asbestos air quality monitoring and sampling activities.

Contract Period: Option 1

POP Begin: 04-01-2025

POP End: 03-31-2026

1003

1.00

HR

______________

Provide services of a Certified Inspector during the asbestos air quality monitoring and sampling activities.

Contract Period: Option 1

POP Begin: 04-01-2025

POP End: 03-31-2026

1004

1.00

HR

______________

Provide services of a Certified Project Monitor during the asbestos air quality monitoring and sampling activities.

Contract Period: Option 1

POP Begin: 04-01-2025

POP End: 03-31-2026

1005

1.00

HR

_____________

Provide services of a Certified Project Designer during the asbestos air quality monitoring and sampling activities.

Contract Period: Option 1

POP Begin: 04-01-2025

POP End: 03-31-2026

1006

1.00

EA

_____________

Provide air sample collection and Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7402 (Issue 2, Fourth Edition) of the sample with a 24-hour turnaround time.

Contract Period: Option 1

POP Begin: 04-01-2025

POP End: 03-31-2026

1007

1.00

EA

_____________

Provide air sample collection and AHERA TEM analysis of the sample with a 24-hour turnaround time.

Contract Period: Option 1

POP Begin: 04-01-2025

POP End: 03-31-2026

1008

1.00

EA

_____________

Provide air sample collection and Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7402 (Issue 2, Fourth Edition) of the sample with a 1 week turnaround time.

Contract Period: Option 1

POP Begin: 04-01-2025

POP End: 03-31-2026

1009

1.00

EA

_____________

Provide air sample collection and AHERA TEM analysis of the sample with a 1 week turnaround time.

Contract Period: Option 1

POP Begin: 04-01-2025

POP End: 03-31-2026

1010

1.00

EA

_____________

Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 24-hour turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials.

Contract Period: Option 1

POP Begin: 04-01-2025

POP End: 03-31-2026

1011

1.00

EA

_____________

Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 24-hour turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials.

Contract Period: Option 1

POP Begin: 04-01-2025

POP End: 03-31-2026

1012

1.00

EA

_____________

Provide hazardous material collection and NY ELAP Method 198.6 (PLM) testing for requested non-friable organically bound building materials with a 24-hour turnaround time. Materials can include Floor tiles (vinyl and asphalt), roofing Materials, mastics, caulking and other NOB materials.

Contract Period: Option 1

POP Begin: 04-01-2025

POP End: 03-31-2026

1013

1.00

EA

_____________

Provide hazardous material collection and NY ELAP Method 198.1 (PLM) testing for requested friable material with a 1-week turnaround time. Materials can include, but are not limited to ceiling tile, textiles, insulation and other friable materials.

Contract Period: Option 1

POP Begin: 04-01-2025

POP End: 03-31-2026

1014

1.00

EA

_____________

Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 1-week turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials.

Contract Period: Option 1

POP Begin: 04-01-2025

POP End: 03-31-2026

1015

1.00

EA

_____________

Provide hazardous material collection and NY ELAP Method 198.6 (PLM) testing for requested non-friable organically bound building materials with a 1-week turnaround time. Materials can include Floor tiles (vinyl and asphalt), roofing Materials, mastics, caulking, and other NOB materials.

Contract Period: Option 1

POP Begin: 04-01-2025

POP End: 03-31-2026

1016

1.00

JB

_____________

4 hour response time premium to any of the above items.

Contract Period: Option 1

POP Begin: 04-01-2025

POP End: 03-31-2026

2001

1.00

HR

_____________

Provide services of a Certified Industrial Hygienist (CIH) during the asbestos air quality monitoring and sampling activities.

Contract Period: Option 2

POP Begin: 04-01-2026

POP End: 03-31-2027

2002

1.00

HR

_____________

Provide services of a Certified Air Sampling Technician during the asbestos air quality monitoring and sampling activities.

Contract Period: Option 2

POP Begin: 04-01-2026

POP End: 03-31-2027

2003

1.00

HR

_____________

Provide services of a Certified Inspector during the asbestos air quality monitoring and sampling activities.

Contract Period: Option 2

POP Begin: 04-01-2026

POP End: 03-31-2027

2004

1.00

HR

_____________

Provide services of a Certified Project Monitor during the asbestos air quality monitoring and sampling activities.

Contract Period: Option 2

POP Begin: 04-01-2026

POP End: 03-31-2027

2005

1.00

HR

_____________

Provide services of a Certified Project Designer during the asbestos air quality monitoring and sampling activities.

Contract Period: Option 2

POP Begin: 04-01-2026

POP End: 03-31-2027

2006

1.00

EA

_____________

Provide air sample collection and Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7402 (Issue 2, Fourth Edition) of the sample with a 24-hour turnaround time.

Contract Period: Option 2

POP Begin: 04-01-2026

POP End: 03-31-2027

2007

1.00

EA

_____________

Provide air sample collection and AHERA TEM analysis of the sample with a 24-hour turnaround time.

Contract Period: Option 2

POP Begin: 04-01-2026

POP End: 03-31-2027

2008

1.00

EA

_____________

Provide air sample collection and Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7402 (Issue 2, Fourth Edition) of the sample with a 1 week turnaround time.

Contract Period: Option 2

POP Begin: 04-01-2026

POP End: 03-31-2027

2009

1.00

EA

____________

Provide air sample collection and AHERA TEM analysis of the sample with a 1 week turnaround time.

Contract Period: Option 2

POP Begin: 04-01-2026

POP End: 03-31-2027

2010

1.00

EA

____________

Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 24-hour turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials.

Contract Period: Option 2

POP Begin: 04-01-2026

POP End: 03-31-2027

2011

1.00

EA

____________

Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 24-hour turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials.

Contract Period: Option 2

POP Begin: 04-01-2026

POP End: 03-31-2027

2012

1.00

EA

____________

Provide hazardous material collection and NY ELAP Method 198.6 (PLM) testing for requested non-friable organically bound building materials with a 24-hour turnaround time. Materials can include Floor tiles (vinyl and asphalt), roofing Materials, mastics, caulking and other NOB materials.

Contract Period: Option 2

POP Begin: 04-01-2026

POP End: 03-31-2027

2013

1.00

EA

____________

Provide hazardous material collection and NY ELAP Method 198.1 (PLM) testing for requested friable material with a 1-week turnaround time. Materials can include, but are not limited to ceiling tile, textiles, insulation and other friable materials.

Contract Period: Option 2

POP Begin: 04-01-2026

POP End: 03-31-2027

2014

1.00

EA

____________

Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 1-week turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials.

Contract Period: Option 2

POP Begin: 04-01-2026

POP End: 03-31-2027

2015

1.00

EA

____________

Provide hazardous material collection and NY ELAP Method 198.6 (PLM) testing for requested non-friable organically bound building materials with a 1-week turnaround time. Materials can include Floor tiles (vinyl and asphalt), roofing Materials, mastics, caulking, and other NOB materials.

Contract Period: Option 2

POP Begin: 04-01-2026

POP End: 03-31-2027

2016

1.00

JB

____________

4 hour response time premium to any of the above items.

Contract Period: Option 2

POP Begin: 04-01-2026

POP End: 03-31-2027

3001

1.00

HR

____________

Provide services of a Certified Industrial Hygienist (CIH) during the asbestos air quality monitoring and sampling activities.

Contract Period: Option 3

POP Begin: 04-01-2027

POP End: 03-31-2028

3002

1.00

HR

____________

Provide services of a Certified Air Sampling Technician during the asbestos air quality monitoring and sampling activities.

Contract Period: Option 3

POP Begin: 04-01-2027

POP End: 03-31-2028

3003

1.00

HR

____________

Provide services of a Certified Inspector during the asbestos air quality monitoring and sampling activities.

Contract Period: Option 3

POP Begin: 04-01-2027

POP End: 03-31-2028

3004

1.00

HR

____________

Provide services of a Certified Project Monitor during the asbestos air quality monitoring and sampling activities.

Contract Period: Option 3

POP Begin: 04-01-2027

POP End: 03-31-2028

3005

1.00

HR

____________

Provide services of a Certified Project Designer during the asbestos air quality monitoring and sampling activities.

Contract Period: Option 3

POP Begin: 04-01-2027

POP End: 03-31-2028

3006

1.00

EA

____________

Provide air sample collection and Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7402 (Issue 2, Fourth Edition) of the sample with a 24-hour turnaround time.

Contract Period: Option 3

POP Begin: 04-01-2027

POP End: 03-31-2028

3007

1.00

EA

____________

Provide air sample collection and AHERA TEM analysis of the sample with a 24-hour turnaround time.

Contract Period: Option 3

POP Begin: 04-01-2027

POP End: 03-31-2028

3008

1.00

EA

____________

Provide air sample collection and Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7402 (Issue 2, Fourth Edition) of the sample with a 1 week turnaround time.

Contract Period: Option 3

POP Begin: 04-01-2027

POP End: 03-31-2028

3009

1.00

EA

____________

Provide air sample collection and AHERA TEM analysis of the sample with a 1 week turnaround time.

Contract Period: Option 3

POP Begin: 04-01-2027

POP End: 03-31-2028

3010

1.00

EA

___________

Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 24-hour turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials.

Contract Period: Option 3

POP Begin: 04-01-2027

POP End: 03-31-2028

3011

1.00

EA

__________

Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 24-hour turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials.

Contract Period: Option 3

POP Begin: 04-01-2027

POP End: 03-31-2028

3012

1.00

EA

__________

Provide hazardous material collection and NY ELAP Method 198.6 (PLM) testing for requested non-friable organically bound building materials with a 24-hour turnaround time. Materials can include Floor tiles (vinyl and asphalt), roofing Materials, mastics, caulking and other NOB materials.

Contract Period: Option 3

POP Begin: 04-01-2027

POP End: 03-31-2028

3013

1.00

EA

__________

Provide hazardous material collection and NY ELAP Method 198.1 (PLM) testing for requested friable material with a 1-week turnaround time. Materials can include, but are not limited to ceiling tile, textiles, insulation and other friable materials.

Contract Period: Option 3

POP Begin: 04-01-2027

POP End: 03-31-2028

3014

1.00

EA

__________

Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 1-week turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials.

Contract Period: Option 3

POP Begin: 04-01-2027

POP End: 03-31-2028

3015

1.00

EA

__________

Provide hazardous material collection and NY ELAP Method 198.6 (PLM) testing for requested non-friable organically bound building materials with a 1-week turnaround time. Materials can include Floor tiles (vinyl and asphalt), roofing Materials, mastics, caulking, and other NOB materials.

Contract Period: Option 3

POP Begin: 04-01-2027

POP End: 03-31-2028

3016

1.00

JB

___________

4 hour response time premium to any of the above items.

Contract Period: Option 3

POP Begin: 04-01-2027

POP End: 03-31-2028

4001

1.00

HR

___________

Provide services of a Certified Industrial Hygienist (CIH) during the asbestos air quality monitoring and sampling activities.

Contract Period: Option 4

POP Begin: 04-01-2028

POP End: 03-31-2029

4002

1.00

HR

___________

Provide services of a Certified Air Sampling Technician during the asbestos air quality monitoring and sampling activities.

Contract Period: Option 4

POP Begin: 04-01-2028

POP End: 03-31-2029

4003

1.00

HR

___________

Provide services of a Certified Inspector during the asbestos air quality monitoring and sampling activities.

Contract Period: Option 4

POP Begin: 04-01-2028

POP End: 03-31-2029

4004

1.00

HR

___________

Provide services of a Certified Project Monitor during the asbestos air quality monitoring and sampling activities.

Contract Period: Option 4

POP Begin: 04-01-2028

POP End: 03-31-2029

4005

1.00

HR

____________

Provide services of a Certified Project Designer during the asbestos air quality monitoring and sampling activities.

Contract Period: Option 4

POP Begin: 04-01-2028

POP End: 03-31-2029

4006

1.00

EA

____________

Provide air sample collection and Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7402 (Issue 2, Fourth Edition) of the sample with a 24-hour turnaround time.

Contract Period: Option 4

POP Begin: 04-01-2028

POP End: 03-31-2029

4007

1.00

EA

____________

Provide air sample collection and AHERA TEM analysis of the sample with a 24-hour turnaround time.

Contract Period: Option 4

POP Begin: 04-01-2028

POP End: 03-31-2029

4008

1.00

EA

___________

Provide air sample collection and Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7402 (Issue 2, Fourth Edition) of the sample with a 1 week turnaround time.

Contract Period: Option 4

POP Begin: 04-01-2028

POP End: 03-31-2029

4009

1.00

EA

___________

Provide air sample collection and AHERA TEM analysis of the sample with a 1 week turnaround time.

Contract Period: Option 4

POP Begin: 04-01-2028

POP End: 03-31-2029

4010

1.00

EA

___________

Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 24-hour turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials.

Contract Period: Option 4

POP Begin: 04-01-2028

POP End: 03-31-2029

4011

1.00

EA

___________

Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 24-hour turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials.

Contract Period: Option 4

POP Begin: 04-01-2028

POP End: 03-31-2029

4012

1.00

EA

___________

Provide hazardous material collection and NY ELAP Method 198.6 (PLM) testing for requested non-friable organically bound building materials with a 24-hour turnaround time. Materials can include Floor tiles (vinyl and asphalt), roofing Materials, mastics, caulking and other NOB materials.

Contract Period: Option 4

POP Begin: 04-01-2028

POP End: 03-31-2029

4013

1.00

EA

___________

Provide hazardous material collection and NY ELAP Method 198.1 (PLM) testing for requested friable material with a 1-week turnaround time. Materials can include, but are not limited to ceiling tile, textiles, insulation and other friable materials.

Contract Period: Option 4

POP Begin: 04-01-2028

POP End: 03-31-2029

4014

1.00

EA

___________

Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 1-week turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials.

Contract Period: Option 4

POP Begin: 04-01-2028

POP End: 03-31-2029

4015

1.00

EA

___________

Provide hazardous material collection and NY ELAP Method 198.6 (PLM) testing for requested non-friable organically bound building materials with a 1-week turnaround time. Materials can include Floor tiles (vinyl and asphalt), roofing Materials, mastics, caulking, and other NOB materials.

Contract Period: Option 4

POP Begin: 04-01-2028

POP End: 03-31-2029

4016

1.00

JB

___________

4 hour response time premium to any of the above items.

Contract Period: Option 4

POP Begin: 04-01-2028

POP End: 03-31-2029

(vi) Description of requirement - Scope of Work (SOW)

See attached document

(vii) Awardee shall coordinate with the Contracting Officer s Representative (COR) prior to performance.

FOB Destination

Buffalo VA Medical Center

3495 Bailey Avenue

Buffalo, NY 14215

Batavia VA Medical Center

222 Richmond Avenue

Batavia NY 14020

(viii) The provision at FAR 52.212-1, Instructions to Offerors-Commercial Items, applies to this acquisition. The following provisions are included as addenda to FAR 52.212-1:

52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment (DEC 2019)

52.204-29 Federal Acquisition Supply Chain Security Act Orders-Representation and Disclosures (DEC 2023)

52.252-1 Solicitation Provisions Incorporated by Reference (FEB 1998)

52.204-7 System for Award Management (OCT 2018)

52.204-16 Commercial and Government Entity Code Reporting (JUL 2016)

52.225-4 Buy American -Free Trade Agreements -Israeli Trade Act Certificate (NOV 2023)

(ix) The provision at FAR 52.212-2, Evaluation-Commercial Items (OCT 2014), applies to this acquisition.

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. Responses to this RFQ shall contain sufficient information to conduct a comparative evaluation of the following factors:

Factor 1 - Technical Capability: Technical capability is defined as an offeror s ability to satisfy the solicitation s requirements, providing the highest quality service to the specified facilities. Technical Capability shall be determined on the basis of the qualification of the offeror s capability statement.

1) Provide a capability statement, of length no greater than 5 pages, demonstrating your ability to meet all requirements in the Statement of Work with no additional cost to the VA in manpower or dollars.

2) Provide the following documents/certifications:

Active New York State Department of Labor Asbestos Handling License (B.3.1.1 A))

Active New York State Department of Labor Asbestos Certificates for all technicians working on site (B.3.1.1 B)

Qualifications for laboratories to be used for this contract (B3.1.1 C) and D))

Resume and qualifications for any Certified Industrial Hygienist involved with air monitoring or material sampling under this contract (B.3.1 E) and B.3.1.2 C))

3) Provide a statement that the Contractor can meet the response times for emergency services stated in section (B.3.1.4 J)).

Factor 2 Past Performance: The Government shall evaluate the offeror s past performance. By past performance, the Government means the offeror s reputation for conforming to specifications and to standards of good workmanship, i.e., reliable service, qualifications, adherence to contract schedules to include both technical and administrative aspects of performance. The Government shall evaluate past performance based on information that may be obtained from the Offeror or from any other source such as previous commercial or Government contracts. The Government may also use any relevant information in its possession or in the public domain. Offerors without a record of relevant past performance may not be evaluated favorably or unfavorably.

Factor 3 Price: Vendor s price must be fair and reasonable as determined by Contracting Officers price analysis. Vendor shall complete the line item table in section v. of this combined synopsis/solicitation and the attached bid sheet. The total dollar value of the bid sheet shall be used to compare pricing between quotes and to properly evaluate price reasonableness.

Failure to provide the information requested in the evaluation criteria may result in being found non-responsive.

(c) Following receipt of quotes, the Government will perform a comparative evaluation in accordance with FAR Part 13. The Government will compare quotes to one another to select the offering that best benefits the Government.

(d) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

(x) The provisions at FAR 52.212-3, Offeror Representations and Certifications-Commercial Items applies to this acquisition. * All firms or individuals submitting a quote shall include a completed copy of this provision OR have current Representations and Certifications in the System for Award Management (SAM - https://www.sam.gov). Representations, Certifications, and SAM must be current at award. IF NOT CURRENT AND/OR YOU DO NOT SUBMIT A COMPLETED COPY OF THIS PROVISION, YOUR QUOTE WILL BE CONSIDERED NON-RESPONSIVE.

(xi) The clause at FAR 52.212-4, Contract Terms and Conditions-Commercial Items, applies to this acquisition. The following clauses are included as addenda to FAR 52.212-4:

52.216-18 Ordering (AUG 2020)

Fill-ins: (04/01/2024), (03/31/2029)

52.216-19 Order Limitations (OCT 1995)

Fill-ins: ($100.00), ($30,000.00), ($50,000.00), (15), (5)

52.216-22 Indefinite Quantity (OCT 1995)

Fill-ins: (03/31/2029)

852.201-70 Contracting Officer s Representative (DEC 2022)

852.203-70 Commercial Advertising (JAN 2008)

852.219-73 VA Notice to Total Set-Aside for Certified Service-Disabled Veteran-Owned

Small Businesses (JAN 2023)(Deviation)

Fill ins: (),(X)

852.219-75 VA Notice of Limitations on Subcontracting Certificate of Compliance for Services and Construction (JAN 2023) (DEVIATION)

852.232-72 Electronic Submission of payment requests (NOV 2018)

852.237-75 Key Personnel (OCT 2019)

852.242-71 Administrative Contracting Officer (OCT 2020)

CL-120 Supplemental Insurance Requirements

Fill-ins: ($500,000.00), ($200,000.00), ($500,000.00), $20,000.00)

52.252-2 Clauses Incorporated by Reference (FEB 1998)

52.204-13 System for Award Management Maintenance (OCT2 2018)

52.204-18 Commercial and Government Entity Code Maintenance (AUG 2020)

52.228-5 Insurance-Work on a Government Installation (JAN 1997)

52.232-40 Providing Accelerated Payments to Small Business Subcontractors (DEC 2013) (DEVIATION AUG 2020)

(xii) The clause at FAR 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Order- Commercial items, applies to this acquisition. The following subparagraphs of FAR 52.212-5 are applicable:

52.203-17, Contractor Employee Whistleblower Rights (Nov 2023)

52.204-10 Reporting Executive Compensation & First-Tier Subcontract Awards (JUN 2020)

52.204-15 Service Contract Reporting Requirements for Indefinite-Delivery Contracts (OCT 2016)

52.204-27 Prohibition on a ByteDance Covered Application (JUN 2023)

52.204 30 Federal Acquisition Supply Chain Security Act Orders Prohibition. (Dec 2023)

52.209-6 Protecting the Government s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (JUN 2020)

52.219-28 Post Award Small Business Program Re-representation (SEP 2021)

52.222-3 Convict Labor ( JUN 2003)

52.222-21 Prohibition of Segregated Facilities (APR 2015)

52.222-26 Equal Opportunity (SEPT 2016)

52.222-36 Equal Opportunity for Workers with Disabilities (JUN 2020)

52.222-41 Service Contract Labor Standards (AUG 2018)

52.222-42 Statement of Equivalent Rates for Federal Hires (MAY 2014)

52.222-50 Combating Trafficking in Persons (OCT 2020)

52.222-55 Minimum Wages Under Executive Order 13658 (NOV 2020)

52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017)

52.225-3 Buy American--Free Trade Agreements--Israeli Trade Act (NOV 2023)

52.232-18 Encouraging Contract Policies to Ban Text Messaging While Driving (JUN 2020)

52.225-13 Restrictions on Certain Foreign Purchases (FEB 2021)

52.232-33 Payment by Electronic Funds Transfer System for Award Management (OCT2018)

(xiii) The Service Contract Act of 1965 does apply to this procurement See attached Wage Determinations.

(xiv) N/A

(xv) This is as a SDVOSB set-aside combined synopsis/solicitation for asbestos air monitoring and material sampling services at the Buffalo and Batavia VA Medical Centers. The Government intends to award an indefinite delivery contract as a result of this combined synopsis/solicitation that will include the terms and conditions set forth herein. To facilitate the award process, all quotes must include a statement regarding the terms and conditions herein as follows:

"The terms and conditions in the solicitation are acceptable to be included in the award document without modification, deletion, or addition."

OR

"The terms and conditions in the solicitation are acceptable to be included in the award document with the exception, deletion, or addition of the following:"

The Quoter shall list exception(s) and rationale for the exception(s). Quotes received without this statement will be assumed to infer that terms and conditions are acceptable without modification, deletion or addition.

Submission shall be received NO LATER THAN 12:00 PM EDT, Monday, March 26th, 2024. The Government shall only accept electronic submissions via email, please send all quotations to Michael.Spivack@va.gov. Late submissions shall be treated in accordance with the solicitation provision at FAR 52.212-1(f). Request for information (RFI) will not be accepted after Monday, March 19th, 2024 @ 12:00 pm EST.

(xvi) Any questions or concerns regarding this solicitation should be forwarded in writing via e-mail to Michael Spivack, Contracting Specialist; Michael.Spivack@va.gov .

Combined Synopsis/Solicitation Notice

Combined Synopsis/Solicitation Notice

Page 8 of 8

Combined Synopsis/Solicitation Notice

*= Required Field

Combined Synopsis/Solicitation Notice

Page 1 of

DESCRIPTION

See attached document: Canandaigua VA - 2022 EM One-lines - BW.

See attached document: Canandaigua VA - 2022 Normal One-lines - BW.

See attached document: Equipment Inventory Electrical Distribution Testing.

See attached document: Canandaigua - 2022 Campus One-line Overview.

See attached document: MAIN BREAKERS PER BUILDING.

See attached document: Canandaigua VA - 2022 EM One-lines - Color.

See attached document: Canandaigua VA - 2022 Normal One-lines - Color.

See attached document: WD Ontario.

See attached document: WD DBA Ontario.

Files

File Type Posted
36C24224Q0327_3.docx DOCX document
36C24224Q0327_2.docx DOCX document
SOW - asbestos air monitoring and material sampling.docx DOCX document
WD-Genesse.docx DOCX document
36C24224Q0327_1.docx DOCX document
VAAR 852.219-75 .docx DOCX document
WD- erie.docx DOCX document
Air Monitor ACM Sampling IDIQ Bid Sheet.xlsx XLSX spreadsheet

Notice history

Notice Type Posted
B502--WNY Air Monitoring & Hazardous Material Sampling IDIQ Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
F108--620-26-206 Asbestos Abatement Department of Veterans Affairs VA Hudson Valley Health Care Montrose, New York 10548, United States · NAICS 562910 Veterans Integrated Service Network 2 Service-Disabled Veteran-Owned Small Business
F108--657A4-21-800 - VPIH Services for Remove and Replace End of Life Heating, Ventilation and Air Conditioning Construction John J. Pershing VA Medical Center 1500 N. Westwood Blvd Poplar Bluff Missouri 63901 · NAICS 541620 Veterans Integrated Service Network 15 Service-Disabled Veteran-Owned Small Business
F109--Water Management Program and Chemical Testing Amendment 001- Q&A Department of Veterans Affairs Vamc Boston Healthcare System Boston MA 02130, United States · NAICS 561210 Veterans Integrated Service Network 1 Service-Disabled Veteran-Owned Small Business
H245--FY27 - VH WNY Backflow Prevention Testing Services VA Western New York Healthcare System Buffalo VA Medical Center Buffalo, New York 14215, United States · NAICS 238220 Veterans Integrated Service Network 2 No set-aside
H941--Chemical Hoods & HEPA PM Richard L. Roudebush VA Medical Center 1481 W. 10th Street Indianapolis, Indiana 46202, United States · NAICS 541620 Veterans Integrated Service Network 10 Service-Disabled Veteran-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors