36C24224Q0327_3.docx

DOCX document 18 KB Posted

Attached to
B502--WNY Air Monitoring & Hazardous Material Sampling IDIQ
Solicitation number
36C24224Q0327
Issued by

About this file

This document is an amendment to a previous combined solicitation for asbestos air monitoring and hazardous material sampling services at the Buffalo and Batavia VA Medical Centers. The solicitation is being issued as an SDVOSB set-aside with a NAICS code of 562910 - Remediation Services.

The key details are:

  • The solicitation number is 36C24224Q0327 with a response due date of 04/05/2024.
  • The contractor will provide line item pricing for various air monitoring, asbestos sampling, and hazardous material testing services with different turnaround times.
  • The contract period is a base year from 04/15/2024 to 03/31/2025, with four one-year option periods.
  • The amendment addresses several vendor questions related to air monitoring requirements, clearance sampling, and onsite testing.
  • The evaluation factors are technical capability, past performance, and price.

View the file

Other files

File Type Posted
36C24224Q0327_2.docx DOCX document
VAAR 852.219-75 .docx DOCX document
WD- erie.docx DOCX document
Air Monitor ACM Sampling IDIQ Bid Sheet.xlsx XLSX spreadsheet
SOW - asbestos air monitoring and material sampling.docx DOCX document
WD-Genesse.docx DOCX document
36C24224Q0327_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment to a Previous Combined Solicitation

Amendment to a Previous Combined Solicitation

SUBJECT*
WNY Air Monitoring & Hazardous Material Sampling IDIQ

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
14227
SOLICITATION NUMBER*
36C24224Q0327
RESPONSE DATE/TIME/ZONE
04-05-2024 12:00 EASTERN TIME, NEW YORK, USA
ARCHIVE
90 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
SDVOSBC
PRODUCT SERVICE CODE*
B502
NAICS CODE*
562910
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227

POINT OF CONTACT*

Spivack, Michael Michael.Spivack@va.gov MICHAEL.SPIVACK@va.gov (716)862-8890

PLACE OF PERFORMANCE

ADDRESS
Buffalo VA Medical Center

3495 Bailey Avenue

Buffalo NY

POSTAL CODE
14215
COUNTRY
USA

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION
Department Of Veterans Affairs
AGENCY CONTACT’S EMAIL ADDRESS
Michael.Spivack@va.gov
EMAIL DESCRIPTION
Contracting Officer

DESCRIPTION

This amendment is to answer the following vendor questions:

1. In line 12 of the Air monitor ACM IDIQ Bid sheet I changed the Turnaround time to 1 week because it was a duplicate of line 11(they both said 24hr TAT). Please let me know if this was not a correct assumption.

A. That is correct the turn around time for line item 12 of the Air monitor ACM IDIQ Bid sheet should have a turn around time of one week, not 24 hours.

2. Can you please clarify the need for “Provide services of a Certified Air Sampling Technician during the asbestos air quality monitoring and sampling activities” as a stand-alone bid item?

SOW B.3.1.4 Air Monitoring (E) states ” Contractor shall continuously inspect and monitor conditions inside the work areas to ensure compliance with all regulations . The contractor shall collect all required area samples and analyze all air samples within 24 hours of collection. The contractor shall continuously inspect work areas for any breaches in containment. Contractor shall maintain a daily log of all air monitoring samples and daily activity log. Containment shall stay in place until the clearance samples come back clear and has received authorization from the COR to end containment.”

This means a project monitor will be required daily on task orders. An air sampler can only set up pumps/cassettes, retrieve pumps/cassettes, submit them to the lab, and maintain and air sampling log. An air sampler is not certified to continuously inspect and monitor conditions inside/outside the work area and is not required to maintain a daily activity log. Those responsibilities fall under Project Monitor.

A. This gives the contractor flexibility to offer the sampling technician and project monitor separately providing best value to the VA in the event more than one person is needed, rather than being billed for multiple project monitors.

3. Can you please clarify SOW B.3.1.4 Air Monitoring (F) & (G)?

Section F states “If visual inspection is acceptable, the contractor shall proceed with clearance air samples, using aggressive method. Samples shall be analyzed using the PCM method. All PCM samples shall be analyzed using the NIOSH 7400 method. Onsite testing is preferred.”

Onsite testing is not permitted by CR-56 for air sampling unless the individual is certified by NYSDOH ELAP. Otherwise, it must be performed by a laboratory.

A. The VA agrees with this statement. “Onsite testing is preferred” shall be removed from section B.3.1.4 Air Monitoring (F).

4. Section G states “Final clearance samples shall be conducted in accordance with TEM NIOSH 7402 method. TEM NIOSH samples shall be collected for areas greater than 160 square feet only. TEM for clearance samples is estimated 12 samples per clearance estimated. Contractor shall ensure that NESHAP testing is performed for all renovation and demolition work by asbestos contractors. It includes destructive sampling that AHERA does not cover.”

Section G appears to be a direct contradiction to Section F. By CR-56, clearance samples can be collected and analyzed using PCM methods for any size of project. If a sample fails, all samples can be re-analyzed using TEM Method 7402. It might be more consistent throughout all task orders to request AHERA TEM sampling for all clearance samples regardless of the size of project or require PCM clearance samples regardless the size of the project per CR-56 and if they fail, then use Method 7402.

A. The VA agrees with this recommendation The VA agrees with this statement. Section B.3.1.4 Air Monitoring (G) shall now state:

Final clearance samples shall be conducted using PCM clearance samples regardless the size of the project per CR-56. If a sample fails, all samples shall be re-analyzed using TEM Method 7402. Contractor shall ensure that NESHAP testing is performed for all renovation and demolition work by asbestos contractors.

All other terms and conditions remain the same.

*= Required Field
Amendment to a Previous Combined Solicitation

Page 1 of

Amendment to a Previous Combined Solicitation

File details come from the government source that posted it. Updated .