Air Monitor ACM Sampling IDIQ Bid Sheet.xlsx

XLSX spreadsheet 78 KB Posted

Attached to
B502--WNY Air Monitoring & Hazardous Material Sampling IDIQ
Solicitation number
36C24224Q0327
Issued by

About this file

This is a combined synopsis and solicitation for asbestos air monitoring and material sampling services at two Veterans Affairs medical centers in New York. The solicitation seeks pricing for line items including certified industrial hygienist and technician services, air and material sampling, laboratory testing, and emergency response. Pricing is required for a one-year base period starting in April 2024 with four one-year option periods. The solicitation is set aside for certified service-disabled veteran-owned small businesses and will result in an indefinite delivery contract. Quotes are due by March 26, 2024 and shall be submitted electronically to the point of contact listed. Evaluation criteria include technical capability, past performance, and price. The solicitation incorporates standard clauses for commercial item contracts with the federal government.

View the file

Other files

File Type Posted
36C24224Q0327_3.docx DOCX document
36C24224Q0327_2.docx DOCX document
VAAR 852.219-75 .docx DOCX document
WD- erie.docx DOCX document
SOW - asbestos air monitoring and material sampling.docx DOCX document
WD-Genesse.docx DOCX document
36C24224Q0327_1.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

New IDIQ WNY Air Monitoring and ACM Sampling IDIQ - Bid Sheet

Item
No.:Description:Units:Est.

Annual Quantity: Price Per Unit (1st Year) Line item Total Dollar Value (1st Year) Price Per Unit (2nd Year) Line item Total Dollar Value (2nd Year) Price Per Unit (3rd Year) Line item Total Dollar Value (3rd Year) Price Per Unit (4th Year) Line item Total Dollar Value (4th Year) Price Per Unit (5th Year) Line item Total Dollar Value (5th Year)

1.0Provide services of a Certified Industrial Hygienist (CIH) during the asbestos air quality monitoring and sampling activities.HR10.0$ - 0$ - 0$ - 0$ - 0$ - 0
2.0Provide services of a Certified Air Sampling Technician during the asbestos air quality monitoring and sampling activities.HR40.0$ - 0$ - 0$ - 0$ - 0$ - 0
3.0Provide services of a Certified Inspector during the asbestos air quality monitoring and sampling activities.HR10.0$ - 0$ - 0$ - 0$ - 0$ - 0
4.0Provide services of a Certified Project Monitor during the asbestos air quality monitoring and sampling activities.HR10.0$ - 0$ - 0$ - 0$ - 0$ - 0
5.0Provide services of a Certified Project Designer during the asbestos air quality monitoring and sampling activities.HR5.0$ - 0$ - 0$ - 0$ - 0$ - 0
6.0Provide air sample collection and Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7402 (Issue 2, Fourth Edition) of the sample with a 24-hour turnaround time.EA40.0$ - 0$ - 0$ - 0$ - 0$ - 0
7.0Provide air sample collection and AHERA TEM analysis of the sample with a 24-hour turnaround time.EA40.0$ - 0$ - 0$ - 0$ - 0$ - 0
8.0Provide air sample collection and Phase Contrast Microscopy (PCM) analysis, the NIOSH Method 7402 (Issue 2, Fourth Edition) of the sample with a 1 week turnaround time.EA40.0$ - 0$ - 0$ - 0$ - 0$ - 0
9.0Provide air sample collection and AHERA TEM analysis of the sample with a 1 week turnaround time.EA40.0$ - 0$ - 0$ - 0$ - 0$ - 0
11.0Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 24-hour turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials.EA40.0$ - 0$ - 0$ - 0$ - 0$ - 0
12.0Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 24-hour turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials.EA40.0$ - 0$ - 0$ - 0$ - 0$ - 0
13.0Provide hazardous material collection and NY ELAP Method 198.6 (PLM) testing for requested non-friable organically bound building materials with a 24-hour turnaround time. Materials can include Floor tiles (vinyl and asphalt), roofing Materials, mastics, caulking and other NOB materials.EA40.0$ - 0$ - 0$ - 0$ - 0$ - 0
14.0Provide hazardous material collection and NY ELAP Method 198.1 (PLM) testing for requested friable material with a 1-week turnaround time. Materials can include, but are not limited to ceiling tile, textiles, insulation and other friable materials.EA40.0$ - 0$ - 0$ - 0$ - 0$ - 0
15.0Provide hazardous material collection and NY ELAP Method 198.4 (TEM) testing for requested non-friable organically bound material with a 1-week turnaround time. Materials can include, VAT, resilient floor tiles, mastic, asphalt shingles, roofing materials, paint chips, caulking, glazing and other NOB materials.EA40.0$ - 0$ - 0$ - 0$ - 0$ - 0
16.0Provide hazardous material collection and NY ELAP Method 198.6 (PLM) testing for requested non-friable organically bound building materials with a 1-week turnaround time. Materials can include Floor tiles (vinyl and asphalt), roofing Materials, mastics, caulking, and other NOB materials.EA40.0$ - 0$ - 0$ - 0$ - 0$ - 0
17.04 hour response time premium to any of the above items.1$ - 0$ - 0$ - 0$ - 0$ - 0

Total Dollar Value of Contract Year $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Total Dollar Value of Contract $ - 0

File details come from the government source that posted it. Updated .