B18 Cooling Tower Repair

Closed Solicitation Posted

Solicitation number
FA706024RPR01
Agency
District Washington Headquarters Air Force, Department of Defense
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
811310 Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance
PSC
J041 Maint/Repair/Rebuild Of Equipment- Refrigeration, Air Conditioning, And Air Circulating Equipment
Place of performance
Bolling AFB, District of Columbia 20032, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Air Force Headquarters District Washington is seeking a contractor to replace the motor for the Chiller Plant (Building 18) at Joint Base Anacostia-Bolling in Washington, D.C. The key requirements include removing the old inoperable motor, installing a direct replacement motor, and ensuring the motor is fully operational. The contractor will utilize a crane to move the motors, set the new motor, install new belts, and align them. The contractor will also dispose of all old equipment and perform required testing and services, including a Legionella test and annual manufacturer-recommended services for all cooling towers. The contract will be awarded to the responsible offeror whose offer is most advantageous to the government considering technical capability and price.

This opportunity is a Total Small Business Set-Aside with a NAICS code of 811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance. The contractor must comply with all industry standards, federal/local/state laws and regulations, and will not perform any inherently governmental functions. Offers are due by 4:00 PM EST on September 25, 2024 and must be valid for at least 60 days. A site visit is scheduled for September 19, 2024 and questions are due by September 20, 2024.

Notice text

2 versions

Update #2 · Latest ·

Replacing the motor for the Chiller Plant (Building 18) will ensure cooling capabilities for twenty-six facilities across the installation.  Having the cooling tower fully operational, will allow for redundancies in the system.

Replace the inoperable motor.

Remove the old motor and install a direct replacement. The Contractor will utilize a crane to move the motors. The Contractor will set the new motor, install new belts, and align them. The Contractor will also ensure the motor is fully operational and will dispose of all old equipment.

Amendment 0001 - Added Questions and Answers Document, updated PWS "Attachment 1 - B18 Cooling Tower_PWS updated Final" to reflect changes as a result of the Q&A.

Update #1 ·

Replacing the motor for the Chiller Plant (Building 18) will ensure cooling capabilities for twenty-six facilities across the installation.  Having the cooling tower fully operational, will allow for redundancies in the system.

Replace the inoperable motor.

Remove the old motor and install a direct replacement. The Contractor will utilize a crane to move the motors. The Contractor will set the new motor, install new belts, and align them. The Contractor will also ensure the motor is fully operational and will dispose of all old equipment.

Attachments

Files attached to this notice, newest first
File Type Posted
Attachment 1 - B18 Cooling Tower_PWS updated Final.docx DOCX document
Questions and Answers to Solicitation FA706024RPR01_B18 Cooling Tower.docx DOCX document
Attachment 1 - B18 Cooling Tower_PWS Final.docx DOCX document
Combined Synopsis Solicitation - B-18 Cooling Towers Signed.pdf PDF

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity