Albert Pike Loop B, SST Relocation

Closed Solicitation Posted

Solicitation number
12445124Q0024
Agency
Forest Service Department of Agriculture
Responses due
Set-aside
Service-Disabled Veteran-Owned Small Business Sole Source

Opportunity facts

NAICS code
238910 Site Preparation Contractors
PSC
Z2JZ Repair Or Alteration Of Miscellaneous Buildings
Place of performance
Mount Ida, Arkansas 71957, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The USDA Forest Service is seeking a contractor to remove an existing vault toilet from the Shirley Creek Recreation Area and relocate it to the Albert Pike Recreation Area Loop B day use area in the Ouachita National Forest in Arkansas. The contractor will be required to fill the hole at the Shirley Creek location, provide grading and vegetation as needed, and may optionally construct an ADA-compliant concrete sidewalk from the vault toilet entry to the loop driveway. Proposals are due by 1200 EST on September 19, 2024 and will be evaluated based on price and past performance. A post-award conference will be scheduled with the successful offeror.

This procurement is set aside for Service-Disabled Veteran-Owned Small Businesses. The estimated value of the contract is between $25,000 and $100,000. The work is to be performed at the Ouachita National Forest near Oden and Langley, Arkansas and must be completed within 120 days after the notice to proceed, with a delivery date of January 23, 2025. The contractor shall provide all labor, tools, equipment, and materials necessary to relocate the existing vault toilet and complete any additional site work.

Notice text

The project is located at the USDA Forest Service Ouachita National Forest Shirley Creek Recreation
Area about 3 miles west of Oden, Arkansas and ¾ miles south of highway 88 on Shirley Creek Lane and
Albert Pike Recreation Area about 6 miles north of Langley, Arkansas at the north end of Highway 369.
The contractor shall provide all labor, tools, equipment, and materials to
 Remove the existing vault toilet at the Shirley Creek Recreation Area and relocate it to the Albert
Pike Recreation Area Loop B day use area in the location shown on the plans.
 Fill the hole at Shirley Creek Recreation Area after removing the vault toilet.
 Provide grading and vegetation as required.
 Option 1: Build an ADA compliant concrete sidewalk from the vault toilet entry to the loop
driveway where shown on the plans.

Attachments

Files attached to this notice, newest first
File Type Posted
Solcitation Extension.docx DOCX document
Contractor questions 1.docx DOCX document
12445124Q0024.pdf PDF
Cover page Solcitation Albert Pike SST Relocation.pdf PDF
ATC 001 Albert Pike Loop B Relocation Spec.pdf PDF
ATC 002 Albert Pike Clauses.pdf PDF
ATC 004 Sch B.pdf PDF
ATC 003 DBW.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Albert Pike Loop B, SST Relocation This notice · Latest solicitation Solicitation
Albert Pike Loop B, SST Relocation Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity