ATC 004 Sch B.pdf

PDF 34 KB Posted

Attached to
Albert Pike Loop B, SST Relocation Federal contract opportunity
Solicitation number
12445124Q0024
Issued by
Department of Agriculture Forest Service

About this file

This document appears to be a pricing schedule for a federal contract opportunity to relocate a vault toilet from one recreation area to another, with an option to construct an ADA-compliant concrete sidewalk.

The key details are:

  • The contract is for relocating a CXT vault toilet from Shirley Creek Recreation Area to Albert Pike Recreation Area Loop B, including removal, hauling, excavation, placement, backfilling, grading, seeding, and other incidental work (base line item).
  • There is an optional line item for the contractor to provide labor, tools, equipment, and materials to build an ADA-compliant concrete sidewalk from the vault toilet entry to the Loop B drive.
  • The related federal contract opportunity is solicitation number 12445124Q0024 for the "Albert Pike Loop B, SST Relocation" project, issued by the USDA Forest Service. The project is located in the Ouachita National Forest in Arkansas.
  • The contractor shall provide all labor, tools, equipment, and materials to complete the work.

View the file

Other files for this federal contract opportunity

Other files attached to Albert Pike Loop B, SST Relocation, newest first.
File Type Posted
Solcitation Extension.docx DOCX document
Contractor questions 1.docx DOCX document
12445124Q0024.pdf PDF
Cover page Solcitation Albert Pike SST Relocation.pdf PDF
ATC 001 Albert Pike Loop B Relocation Spec.pdf PDF
ATC 002 Albert Pike Clauses.pdf PDF
ATC 003 DBW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Number Description Qty Price Total 001 relocate a CXT vault toilet from Shirley Creek Recreation Area to Albert Pike Recreation Area Loop B, including removing the toilet, hauling, excavation and placement of toilet at Albert Pike, backfilling, grading, seeding, and other incidental work.

002 Option 1: Contractor to provide all labor, tools, equipment, materials to build an ADA compliant concrete sidewalk from the vault toilet entry to the loop B drive.

Total Cost

Option line item must be included for o er to be considered.