6515--Reprocessing Sinks - Cancelled
Closed Solicitation Posted
- Solicitation number
- 36C24526Q0379
- Agency
-
Veterans Integrated Service Network 5
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 339113 Surgical Appliance and Supplies Manufacturing
- Place of performance
- Martinsburg Wv Va Medical Center 510 Butler Ave., United States
- Points of contact
Notice details come from SAM.gov. Updated .
Notice text
4 versions
Update #4 · Latest ·
AMENDMENT TO SOLICITATION 36C24526Q0379
SOLICITATION 36C24526Q0379 has been CANCELLED as of 4/1/2026.
Thank you for your interest.
Update #3 ·
AMENDMENT TO SOLICITATION 36C24526Q0379
This amendment is to extend the closing of the solicitation including removing brand name model numbers and descriptions. Please complete the spreadsheet CLINS for bid quote.
The solicitation will now close on Monday 4/6/2026 at 5PM EST.
Update #2 ·
AMENDMENT TO SOLICITATION - 36C24526Q0379
Solicitation will no longer be brand name only and will be extended to:
Wednesday, 4/1/26, at 12PM EST.
Reprocessing Sinks
Brand Name or Equal
SCOPE OF WORK: Contractor shall provide specifications, rough-in drawings, or construction cut sheets for review by architects/contractors/owners and for the use by the necessary trades performing the installation. The vendor will make a complete delivery of all deliverables listed in item C. Contracting technicians will arrive onsite to assemble all acquired sinks. FMS personnel of Martinsburg VAMC will remove the current sinks and install the hardlines for utility services. Upon installation, contracting personnel will validate proper operation of the new sinks per equipment manufacturer instructions. Upon successful installation, the customer (SPS) will then validate the equipment with their SOP. Upon completion of the contractor s validation and customer validation, unit will be in service for operation. Documentation will be provided to SPS and Biomed recording all work done. The warranties on all equipment will not start until the successful installation and VA validation. Vendors will comply with all applicable federal government requirements.
Update #1 ·
Contractor shall provide specifications, rough-in drawings, or construction cut sheets for review by architects/contractors/owners and for the use by the necessary trades performing the installation. The vendor will make a complete delivery of all deliverables listed in item 3. contracting technicians will arrive onsite to assemble all acquired sinks.
FMS personnel of Martinsburg VAMC will remove the current sinks and install the hardlines for utility services. Upon installation, contracting personnel will validate proper operation of the new sinks per equipment manufacturer instructions. Upon successful installation, the customer (SPS) will then validate the equipment with their SOP. Upon completion of the contractor s validation and customer validation, unit will be in service for operation. Documentation will be provided to SPS and Biomed recording all work done. The warranties on all equipment will not start until the successful installation and VA validation. Vendors will comply with all applicable federal government requirements.
Files
| File | Type | Posted |
|---|---|---|
| 36C24526Q0379_4.docx | DOCX document | |
| 36C24526Q0379 Reprocessing Sinks REV 2.pdf | ||
| 36C24526Q0379_3.docx | DOCX document | |
| CLINS.xlsx | XLSX spreadsheet | |
| 36C24526Q0379 Reprocessing Sinks REV.pdf | ||
| 36C24526Q0379_2.docx | DOCX document | |
| 36C24526Q0379 Reprocessing Sinks.pdf | ||
| Attach 1 Single Source Justification MPT to SAT Reprocessing sinks_Redacted.pdf | ||
| 36C24526Q0379_1.docx | DOCX document |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity