About this opportunity

The Department of Veterans Affairs Veterans Integrated Service Network 21 (VISN 21) is soliciting proposals for the installation of glass doors at patient rooms in the Medical Surgical Intensive Care Unit (MSICU) at the VA Palo Alto Health Care System. This task order proposal request is limited exclusively to pre-approved VISN 21 Multiple Award Construction Contract (MACC) Group 2 holders, and proposals from contractors not on this approved list will not be accepted. Key requirements include that contractors must be bonded and licensed in the State of California, provide all labor, materials, tools, equipment, engineering, shop drawings, submittals, and as-built drawings, and be responsible for any required alterations and electrical modifications as the VA will not provide design drawings. The scope encompasses replacing 5 existing patient room doors and installing 9 new patient room doors with Stanley PROCARE 8300BP Manual ICU doors. The proposal due date is November 24, 2025, at 10:00 AM PST, with the contracting officer Jose A. Hernandez available for inquiries at jose.hernandez1@va.gov, and the period of performance is 420 calendar days following Notice to Proceed.

This solicitation is not subject to any small business set-aside designation. The eight eligible MACC Group 2 contractors are Acierto LLC, Hawk Contracting Group LLC, Bexar-Advanced Solutions Group LLC, Patriot Construction Inc., Saw-Greenland JV, D Square Construction LLC, Sergents Mechanical Systems Inc., and ESA South Inc. No specific budget range has been disclosed in the solicitation documentation. The project involves the replacement and installation of 14 total doors (5 replacements and 9 new installations) at the VA Palo Alto Health Care System located at 3801 Miranda Avenue, Palo Alto, California 94304, with work to be completed within 420 calendar days of the Notice to Proceed. Contractors are responsible for site-specific verification, infection control measures at Level 4 ICRA (Infection Control Risk Assessment), wall repairs, installation barriers, and disposal of existing doors, with the superintendent permitted to serve dual roles as Site Safety and Health Officer and Quality Control manager.

Notice text

3 versions

Update #3 · Latest ·

RFIs for Solicitation 36C26125R0093 Project Number 640-26-110- Install Glass Doors at Patient Rooms

RFP, Scope of Work, #3 Statement of Bid Items, Paragraph A states Provide all labor, materials, tools, equipment, transportation, supervision, engineering, shop drawings, submittals, service, power, project documentation, as-built drawings, and warranty necessary to accomplish the tasks required in this scope of work and specifications to replace 5 patient room doors at MSICU and install 9 new patient room doors at MSICU. This solicitation did not contain designed drawings. Alterations will be required for the new door rough openings and possible electrical modifications may also be required. Will the VA provide exact specifics on any A/E design requirements and list all expected deliverables for the engineering scope as stated in paragraph A ?

No. What is on the SOW will be followed.

Alterations and any electrical work required for the completion of the project must be provided by the contractor.

RFP, Page 11, #6 Qualifications states that the Contractor shall be bonded and licensed in the State of California. Many of the MACC Contractors are licensed in states other than California and have performed countless projects throughout VISN 21 for years. Will the VA delete this requirement for a CA license or provide their reasoning for requiring this for this Task Order?

The VA will not delete this requirement.

RFP, Page 16, #11 Project Construction Schedule states the Period of Performance is 540 calendar days. The RFP, SF 1442, Block 11 states the POP is 420 calendar days. Will the VA clarify the Period of Performance?

The period of performance is 420 days after NTP.

RFP, Page 19, Offers Are To Be Sent To is left blank as to the offer submittal destination. Will the VA clarify what email addresses are to be used for both Proposal submittal and RFI submittals? Offers shall be sent to jose.hernandez1@va.gov

Will the VA clarify if any of the new or replacement doors will require electrically powered automatic operators? The Specifications describe both manual and automatic doors.

The new and replacement doors will be manual doors.

RFP makes multiple references to Drawings being attached but drawings are not listed in the list of attachments. The RFP also makes multiple references to reference drawings , (page 11 of 25) but those were also not attached to the solicitation. Assuming there are no design drawings for this solicitation, will the VA provide dimensioned as-built reference drawings including architectural, structural, and electrical for the areas where the new doors are to be installed?

No drawings area available

Will the VA provide the Basis of Design door manufacturer and model for the doors being requested? Stanley PROCARE 8300BP MANUAL ICU DOOR

Will the VA clarify if the existing door openings with no existing door, and only a cubicle curtain, will be designated to have the curtain and tracks removed, or only the curtain to be removed?

They will be removed by the contractor during the door installation and will be re-installed after the door installation.

Will the VA clarify if the Contractor s Superintendent, if duly qualified, may also serve in the roles of SSHO and CQC, or will a separate individual be required for either of those two roles?

The superintendent can be the SSHO and CQC.

Specification Section 01 00 00, Part 1.12-D requires the Contractor to hire a Professional Land surveyor for this project. Will the VA clarify whether a Surveyor will be required for this project?

No, a Land Surveyor is not required.

Specification Section 01 00 00, Parts 1.23 & 1.24 requires the Contractor to construct and erect both a Construction Sign and a Safety Sign. Will the VA clarify if this will be a requirement for this project?

Yes, it is a requirement.

Specification Section 01 45 00, Part 3.4-A & C requires the Contractor to retain additional specialized individuals who must be present at all times during work in these individual s specific area of responsibility. For this project, this requirement would mean the Contractor must retain a Structural Engineer, and an Architect (or Const. Professional with 5 years experience), all to be present onsite during activities in their respective areas of responsibility. Since the hiring of these Architects/Engineers, and having them onsite during any work taking place in their respective areas of expertise, will add significantly high costs to this project, will the VA clarify whether this will be a requirement for this project?

Providing Specialized Individuals is a requirement for the contractor but they don t need to be present at all times. They must be present when needed or when the COR requires the specialized individual to be present.

The RFP noted to refer to reference drawings for locations of doors for replacement. The RFP documents did not include drawing attachments. Please provide drawings and or as-builts identifying these door locations.

See attached Drawings (Attachment 1-Project Location)

Please advise if any of the doors for replacement will require automated openers/controllers, card readers or auto strikes and locks.

They will require strikes and locks but not automated openers/controllers and card readers.

The specification did not identify any hardware set for each door, please advise. Is the intent to use all hardware listed on spec section 08 32 13-10 Par 2.9?

Yes, but not for automatic doors.

Please advise working hours for door replacement, should contractor anticipate weekend or off hours for this activity?

7am to 330pm. If weekend and off hours work is needed, it must be approved by the COR.

Please advise existing door manufacturer. Is same manufacturer preferred, or can contractor submit an approved equal?

See Question 7

Please advise ICRA requirement for this task.

The highest level of ICRA requirement, Level 4.

Please advise if contractor will be provided with a laydown yard/temfacil location for this project.

Laydown space can be requested but the contractor will need to provide trailer or connex boxes.

These openings will have long lead times; will VA issue an admin NTP after award for submittal and log lead deliveries of materials?

The Project Schedule may be adjusted if needed.

The RFP under Task 1 noted that all relevant reference drawings related to the project are provided. These are not included, please provide drawings.

See question 13

The RFP did not specify any incidental work due to removal and replacement of doors. Please confirm that contractor to assume repairs to walls/surfaces as needed.

The contractor is responsible for all repairs to walls/surfaces.

Task #3 noted that contractor to provide highest level of infection control to include but not limited to hard construction barriers, ante rooms a negative air machines out of the construction area- We propose to use starc walls, does it need to be fire rated? Do we need to install barriers up to deck past the finish ceiling line? Are we required to exhaust out of the building?

The barriers need to be fire rated. Barriers need to be installed past the ceiling line above the ceiling. The contractor is required to exhaust out of the building.

With project size, can the superintendent dual hat as SSHO and or QC?

Yes.

Based on narrative from the RFP, there are a total of 14 doors for replacement only. Please confirm there is 1 set of doors per room for replacement.

This project will replace 5 patient room doors at MSICU and install 9 new patient room doors at MSICU.

The specification (08 32 13-12 par 2.12 I) included a Switchable Privacy Glass- is this required? The RFP requires an unobstructed glass panel for continuous patient monitoring.

Switchable Privacy Glass is not required.

Will VA require user/client training and demonstration for operation of the newly installed doors? Is this requirement additional to the standard training provided by the factory rep to the VA maintenance personnel?

Yes.

Is VA keeping the old/replaced doors or will it become property of contractor for disposal?

It will become property of the contractor for disposal.

Are all doors for replacement mounted on metal studs/drywall or are there any masonry/ concrete walls we need to consider?

The contractor must verify site conditions, the VA does not have this information.

The specifications reference divisions 28 and 26 for connection of hold-open devices to the building fire alarm/sprinkler system. Please provide div 26 and 28 as it was not included in the specs.

This does not apply.

Are Magnetic Hold-open devices required?

No.

Please confirm that contractor may re-use existing power supply for these new doors requiring automation.

The new doors will not require automation.

For Electrical system Rough-ins, please provide as-builts for contractor to identify connection to exist power supply.

This does not apply.

Please provide spec section 08 71 13 Automatic Door Operators if required for this project.

This does not apply.

If Access Control Devices are required per specs, please provide spec div 28 Electronic Safety and Security .

This does not apply.

Please confirm if contractor is allowed to use temp power supply from the building during construction.

Yes for low amp devices only.

Please confirm contractor is allowed to use facility toilets during performance of work.

No.

With submitted RFI s and response period, Contractor is requesting extension of bid proposal by 2 more weeks in able to source out better quotes and provide a more competitive bid proposal.

A new response date has been established

Will VA consider a second site visit?

Not at this time.

------------------- Last Item ----------------------------------

Update #2 ·

No additional information.

Update #1 ·

NCO 21 MACC

GROUP 2

TASK ORDER PROPOSAL REQUEST

Draft Name of Project: Install Glass Doors

Place of Performance: VA Palo Alto Health Care System, 3801 Miranda Avenue, Palo Alto, CA 94304

NOTICE TO VETERANS INTEGRATED SERVICE NETWORK 21 (VISN 21)

MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) GROUP 2 HOLDERS

Description: THE SOLICITATION IS TASK ORDER PROPOSAL REQUEST. Proposals will only be requested and accepted from contractors who were awarded a Veterans Integrated Service Network 21 (VISN 21) Multiple-Award Construction Contract (MACC) from Network Contracting Office 21 (NCO 21).

Project specifications and all associated project documents are incorporated into this Task Order Proposal Request.

Point of Contact: Jose A. Hernandez, Contracting Officer, jose.hernandez1@va.gov.

Site Visit: Site visits details and RFI and proposal due dates are on the continuation page of the solicitation.

MACC GROUP 2

Acierto, LLC

Hawk Contracting Group, LLC

2053 North 2000 West

2400 E Main St. STE F

OGDEN, UT 84404

Montrose, CO 81401

Bexar-Advanced Solutions Group, LLC

Patriot Construction, Inc.

47 E Crestwood Road

4646 Qantas Lane, Ste B4

STE 2

Stockton, CA 95206

Kaysville, UT 84037

Saw-Greenland JV

D Square Construction, LLC

760 Lynnhaven PKWY STE 210

530 E 27th St.

Virginia Beach, VA 23452

Tucson, AZ 85713

Sergents Mechanical Systems Inc.

ESA South, Inc.

235 Quail CT

1681 Success Drive

Santa Paula, CA 93060

Cantonment, FL 32533

Any offers received from contractors not mentioned above will not be accepted.

Files

File Type Posted
Attachment 1-Project Location.pdf PDF
Stanley Pro Care 8300BP.pdf PDF
36C26125R0093 0002.docx DOCX document
36C26125R0093 0001.docx DOCX document
ILSM MSICU.pdf PDF
36C26125R0093.docx DOCX document
VAAR 852.219-75.docx DOCX document
Wage determination CA20200018 - Copy.txt TXT text file
Supplemental Price Breakdown.docx DOCX document
S02 RFI FORM.docx DOCX document
Specifications - Copy.pdf PDF
Show all 11

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
5680--NEW NRM - Install Glass Doors at Patient Rooms at Medical Surgical Intensive Care Unit Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Z1DZ--Project No. 640A0-27-104, Replace Roof at Building 347 - Menlo Park Menlo Park, California 94025, United States · NAICS 236220 Veterans Integrated Service Network 21 Service-Disabled Veteran-Owned Small Business
J079--Housekeeping Equipment Maintenance VA Palo Alto Health Care System (Palo Alto Campus, Menlo Park, and Livermore) Palo Alto CA 94304, United States · NAICS 811310 Veterans Integrated Service Network 21 No set-aside
Modernize 6N Inpatient Restrooms (Swing for 3N) Shreveport, Louisiana 71101, United States · NAICS 236220 Veterans Integrated Service Network 16 Service-Disabled Veteran-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors