36C26125R0093 0002.docx
DOCX document 24 KB Posted
- Attached to
- 5680--NEW NRM - Install Glass Doors at Patient Rooms at Medical Surgical Intensive Care Unit
- Solicitation number
- 36C26125R0093
About this file
This document is an Amendment to a Solicitation for a Department of Veterans Affairs (VA) task order to install glass doors at patient rooms in the Medical Surgical Intensive Care Unit (MSICU) at the VA Palo Alto Health Care System. The solicitation (36C26125R0093) is specifically for VISN 21 Multiple Award Construction Contract (MACC) Group 2 holders, with proposals to be submitted by November 24, 2025, at 10:00 AM PST. The project involves replacing 5 existing patient room doors and installing 9 new patient room doors, with a 420-day performance period and a requirement for the contractor to be licensed in California.
The amendment includes responses to 38 contractor requests for information (RFIs), clarifying key project details such as door specifications (Stanley PROCARE 8300BP MANUAL ICU DOOR), installation requirements, infection control measures (Level 4 ICRA), and specific technical specifications. The contractor will be responsible for all associated work including wall repairs, electrical modifications, installation barriers, and disposal of existing doors. Notably, the VA will not provide design drawings, and contractors must verify site conditions, with the superintendent allowed to serve dual roles as Site Safety and Health Officer (SSHO) and Quality Control (QC) manager.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1-Project Location.pdf | ||
| Stanley Pro Care 8300BP.pdf | ||
| 36C26125R0093 0001.docx | DOCX document | |
| VAAR 852.219-75.docx | DOCX document | |
| 36C26125R0093.docx | DOCX document | |
| S02 RFI FORM.docx | DOCX document | |
| Specifications - Copy.pdf | ||
| Wage determination CA20200018 - Copy.txt | TXT text file | |
| ILSM MSICU.pdf | ||
| Supplemental Price Breakdown.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 11-12-2025 640-26-110
612MCP
Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) Network Contracting Office (NCO) 21 3237 Peacekeeper Way, Bldg 209 McClellan Park
CA
95652
612MCP
Department of Veterans Affairs Network Contracting Office (NCO) 21 3237 Peacekeeper Way, Bldg 209 McClellan
CA
95652 To all Offerors/Bidders
36C26125R0093
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 11-24-2025 10:00 am PST
The purpose of this amendment is to:
- Post answers to RFIs
- Extend the response date to November 24, 2025 at 10:00 AM
Jose Hernandez Contracting Officer RFIs for Solicitation 36C26125R0093 Project Number 640-26-110- Install Glass Doors at Patient Rooms
1. RFP, Scope of Work, #3 – Statement of Bid Items, Paragraph “A” states “Provide all labor, materials, tools, equipment, transportation, supervision, engineering, shop drawings, submittals, service, power, project documentation, as-built drawings, and warranty necessary to accomplish the tasks required in this scope of work and specifications to replace 5 patient room doors at MSICU and install 9 new patient room doors at MSICU.” This solicitation did not contain designed drawings. Alterations will be required for the new door rough openings and possible electrical modifications may also be required. Will the VA provide exact specifics on any A/E design requirements and list all expected deliverables for the “engineering” scope as stated in paragraph “A”?
No. What is on the SOW will be followed.
Alterations and any electrical work required for the completion of the project must be provided by the contractor.
2. RFP, Page 11, #6 – Qualifications states that the Contractor shall be bonded and licensed in the State of California. Many of the MACC Contractors are licensed in states other than California and have performed countless projects throughout VISN 21 for years. Will the VA delete this requirement for a CA license or provide their reasoning for requiring this for this Task Order?
The VA will not delete this requirement.
3. RFP, Page 16, #11 – Project Construction Schedule states the Period of Performance is 540 calendar days. The RFP, SF 1442, Block 11 states the POP is 420 calendar days. Will the VA clarify the Period of Performance?
The period of performance is 420 days after NTP.
4. RFP, Page 19, “Offers Are To Be Sent To” is left blank as to the offer submittal destination. Will the VA clarify what email addresses are to be used for both Proposal submittal and RFI submittals? Offers shall be sent to jose.hernandez1@va.gov
5. Will the VA clarify if any of the new or replacement doors will require electrically powered automatic operators? The Specifications describe both manual and automatic doors.
The new and replacement doors will be manual doors.
6. RFP makes multiple references to “Drawings” being attached but drawings are not listed in the list of attachments. The RFP also makes multiple references to “reference drawings”, (page 11 of 25) but those were also not attached to the solicitation. Assuming there are no design drawings for this solicitation, will the VA provide dimensioned as-built reference drawings including architectural, structural, and electrical for the areas where the new doors are to be installed?
No drawings area available
7. Will the VA provide the “Basis of Design” door manufacturer and model for the doors being requested? Stanley PROCARE™ 8300BP MANUAL ICU DOOR
8. Will the VA clarify if the existing door openings with no existing door, and only a cubicle curtain, will be designated to have the curtain and tracks removed, or only the curtain to be removed?
They will be removed by the contractor during the door installation and will be re-installed after the door installation.
9. Will the VA clarify if the Contractor’s Superintendent, if duly qualified, may also serve in the roles of SSHO and CQC, or will a separate individual be required for either of those two roles?
The superintendent can be the SSHO and CQC.
10. Specification Section 01 00 00, Part 1.12-D requires the Contractor to hire a Professional Land surveyor for this project. Will the VA clarify whether a Surveyor will be required for this project?
No, a Land Surveyor is not required.
11. Specification Section 01 00 00, Parts 1.23 & 1.24 requires the Contractor to construct and erect both a Construction Sign and a Safety Sign. Will the VA clarify if this will be a requirement for this project?
Yes, it is a requirement.
12. Specification Section 01 45 00, Part 3.4-A & C requires the Contractor to retain additional specialized individuals who must be present at all times during work in these individual’s specific area of responsibility. For this project, this requirement would mean the Contractor must retain a Structural Engineer, and an Architect (or Const. Professional with 5 years’ experience), all to be present onsite during activities in their respective areas of responsibility. Since the hiring of these Architects/Engineers, and having them onsite during any work taking place in their respective areas of expertise, will add significantly high costs to this project, will the VA clarify whether this will be a requirement for this project?
Providing Specialized Individuals is a requirement for the contractor but they don’t need to be present at all times. They must be present when needed or when the COR requires the specialized individual to be present.
13. The RFP noted to refer to reference drawings for locations of doors for replacement. The RFP documents did not include drawing attachments. Please provide drawings and or as-builts identifying these door locations.
See attached Drawings (Attachment 1-Project Location)
14. Please advise if any of the doors for replacement will require automated openers/controllers, card readers or auto strikes and locks.
They will require strikes and locks but not automated openers/controllers and card readers.
15. The specification did not identify any hardware set for each door, please advise. Is the intent to use all hardware listed on spec section 08 32 13-10 Par 2.9?
Yes, but not for automatic doors.
16. Please advise working hours for door replacement, should contractor anticipate weekend or off hours for this activity?
7am to 330pm. If weekend and off hours work is needed, it must be approved by the COR.
17. Please advise existing door manufacturer. Is same manufacturer preferred, or can contractor submit an approved equal?
See Question 7
18. Please advise ICRA requirement for this task.
The highest level of ICRA requirement, Level 4.
19. Please advise if contractor will be provided with a laydown yard/temfacil location for this project.
Laydown space can be requested but the contractor will need to provide trailer or connex boxes.
20. These openings will have long lead times; will VA issue an admin NTP after award for submittal and log lead deliveries of materials?
The Project Schedule may be adjusted if needed.
21. The RFP under Task 1 noted that all relevant reference drawings related to the project are provided. These are not included, please provide drawings.
See question 13
22. The RFP did not specify any incidental work due to removal and replacement of doors. Please confirm that contractor to assume repairs to walls/surfaces as needed.
The contractor is responsible for all repairs to walls/surfaces.
23. Task #3 noted that contractor to provide highest level of infection control to include but not limited to hard construction barriers, ante rooms a negative air machines out of the construction area- We propose to use starc walls, does it need to be fire rated? Do we need to install barriers up to deck past the finish ceiling line? Are we required to exhaust out of the building?
The barriers need to be fire rated. Barriers need to be installed past the ceiling line above the ceiling. The contractor is required to exhaust out of the building.
24. With project size, can the superintendent dual hat as SSHO and or QC?
Yes.
25. Based on narrative from the RFP, there are a total of 14 doors for replacement only. Please confirm there is 1 set of doors per room for replacement.
This project will replace 5 patient room doors at MSICU and install 9 new patient room doors at MSICU.
26. The specification (08 32 13-12 par 2.12 I) included a Switchable Privacy Glass- is this required? The RFP requires an unobstructed glass panel for continuous patient monitoring.
Switchable Privacy Glass is not required.
27. Will VA require user/client training and demonstration for operation of the newly installed doors? Is this requirement additional to the standard training provided by the factory rep to the VA maintenance personnel?
Yes.
28. Is VA keeping the old/replaced doors or will it become property of contractor for disposal?
It will become property of the contractor for disposal.
29. Are all doors for replacement mounted on metal studs/drywall or are there any masonry/ concrete walls we need to consider?
The contractor must verify site conditions, the VA does not have this information.
30. The specifications reference divisions 28 and 26 for connection of hold-open devices to the building fire alarm/sprinkler system. Please provide div 26 and 28 as it was not included in the specs.
This does not apply.
31. Are Magnetic Hold-open devices required?
No.
32. Please confirm that contractor may re-use existing power supply for these new doors requiring automation.
The new doors will not require automation.
33. For Electrical system Rough-ins, please provide as-builts for contractor to identify connection to exist power supply.
This does not apply.
34. Please provide spec section 08 71 13 ‘Automatic Door Operators’ if required for this project.
This does not apply.
35. If Access Control Devices are required per specs, please provide spec div 28 ‘Electronic Safety and Security’.
This does not apply.
36. Please confirm if contractor is allowed to use temp power supply from the building during construction.
Yes for low amp devices only.
37. Please confirm contractor is allowed to use facility toilets during performance of work.
No.
38. With submitted RFI’s and response period, Contractor is requesting extension of bid proposal by 2 more weeks in able to source out better quotes and provide a more competitive bid proposal.
A new response date has been established
39. Will VA consider a second site visit?
Not at this time.
------------------- Last Item ----------------------------------
See attached document: Stanley Pro Care 8300BP.
See attached document: Attachment 1-Project Location.