About this opportunity

The Department of Veterans Affairs Veterans Integrated Service Network 6 is seeking competitive sealed bids for the installation of a Campus Energy Management System at the W.G. (Bill) Hefner Department of Veterans Affairs Medical Center in Salisbury, North Carolina. The project involves upgrading and consolidating existing Energy Management Systems (DDC) serving Building 2 by converting pneumatic controls and obsolete JCI and Schneider components to a unified Siemens Desigo Native BACnet central system with a single front-end user interface. Key contract requirements include network and cabling modifications (Ethernet and MSTP), replacement of terminal unit controllers with BACnet-compatible Siemens Desigo controllers, installation of a new Siemens server, creation of graphical user interface floor plans, panel modifications and replacements, and comprehensive system commissioning with testing and training. The contractor must provide all labor, materials, engineering, software licensing, installation, and a one-year warranty on all items. Critical deadlines include a mandatory site visit on March 5, 2026, a question submission deadline of March 12, 2026, at 10:00 AM EST, and a bid due date of March 25, 2026, at 3:00 PM EDT, with inquiries directed to Contracting Officer Mark Griffin at Mark.Griffin2@va.gov.

This solicitation is designated as a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 238220 with a $19.0 million size standard, imposing a 75 percent limitation on subcontracting for special trade contractors. The estimated construction magnitude ranges between $1,000,000 and $5,000,000, with the contract budget reflecting this range. The project must be completed within 365 days from contract award, and all work will be performed at the Salisbury VAMC campus located at 1601 Brenner Avenue, Salisbury, North Carolina 28144. Bidders must comply with Buy American construction materials requirements, Davis-Bacon Act prevailing wage determinations, performance and payment bond requirements (20 percent of bid price or $3 million, whichever is less), and various federal security and compliance certifications. The solicitation incorporates numerous FAR and VAAR clauses addressing labor standards, small business requirements, cybersecurity, and administrative procedures, with performance standards including graphic display refresh within eight seconds, object command response within two seconds, alarm annunciation within ten seconds, and specific temperature, humidity, and airflow control accuracy tolerances.

Notice text

W.G. (Bill) Hefner

Department of Veterans Affairs Medical Center

1601 Brenner Avenue

Salisbury, North Carolina 28144

Subject: Statement of Work: Install Campus Energy Management System

Location: Campus

Project #: 659-22-100

Date: 12 December 2025

STATEMENT OF WORK

Mechanical

General:

The project involves the upgrade and consolidation of the Energy Management Systems (DDC) providers serving Buildings 2 on the Salisbury VAMC Campus. The new system will follow Native BACnet protocol and be able to replace existing JCI and Schneider components with a single front-end user interface compatible with Siemens. This project is to convert systems from both pneumatic controls and obsolete DDC controls to the Siemens Desigo Native BACnet central system, where applicable, for Buildings 2. This project should be completed in 365 days and include a 1 year warranty on all items.

SCOPE OF WORK:

The Scope of work associated with the project includes the following:

Network & User Interface

Appropriate modifications to the existing network and cabling layout (Ethernet & MSTP) for the purpose of integration, including the installation of new Desigo panels.

Terminal Unit Controls

1) Modifications required to replace the Tridium/Niagara controls with BACnet, Siemens Desigo compatible controllers and sensors (where required). Include in the recommendation, devices that can remain (relays, switches, valves, damper motors, sensors, etc.)

To include the following:

(i) New Siemens server to replace the existing Siemens server.

(ii) Front-End Graphical User Interface modifications, including new floor plans for every level of Buildings 2.

(iii) Main equipment panel and controller installations.

(iv) Panel installations.

(v) Panel modifications and replacement, and controller replacements, required on the main systems.

(vi) Ethernet-level networking modifications.

(vii) BACnet MSTP networking modifications.

(viii) Pneumatic terminal-unit controller replacements.

(ix) Removal of the compressed air system serving control components and devices.

to include all hardware, software, installation, wiring, cabling, programming of systems, graphics, and setup of alarms, schedules and trending; as well as networking requirements required to into a new Siemens server in accordance with the VA standards.

Applicable Codes and Standards:

DVA HVAC Design Manual, March 2024

ASHRAE Standard 13 Specifying Building Automation Systems

ASHRAE Standard 135 BACnet Communication Protocol

IEEE 802.3 Standard for Ethernet

NFPA 70 National Electrical Code

EXISTING CONDITIONS

Network Level

1) The existing Building Automation System (BAS) consists of three (3) separate

vender systems: Siemens Desigo, JCI Metasys, and Schneider SmartStruxure. All three (3) headend systems and HMIs are in Building 31 chiller plant offices.

2) The internet modem for the Siemens system-to-remain is in Building 5,

Room G048A.

Building 2

1) The Siemens Desigo system is currently communicating with most of the areas in

Building 2. This control system will remain. The known areas under control by

Siemens:

(i) Air handling unit 2-AHU-2

(ii) Air handling unit 2-AHU-3 (ongoing work)

(iii) Air handling unit 2-AHU-4

(iv) Air handling unit 2-AHU-4B

(v) Air handling unit 2-AHU-11

(vi) Chilled water pumps

(vii) O.R. chillers

(viii) 1st Floor isolation rooms

(ix) 3rd Floor isolation rooms

(x) 3rd Floor isolation EFs

(xi) 3rd Floor hot water system

(xii) 3rd Floor temperature zones

(xiii) 4th Floor isolation rooms

(xiv) 4th Floor isolation EFs

(xv) 4th Floor temperature zones

(xvi) 5th Floor isolation rooms

(xvii) 5th Floor isolation EFs

(xviii) 5th Floor temperature zones

2) The JCI Metasys system is active but has had some equipment migrated over to

the Siemens system. The remaining known equipment/areas under JCI control:

(i) Air handling unit 2-AHU-1 (AHU-5 in the field)

(ii) Air handling unit 2-AHU-7

(iii) Air handling unit 2-AHU-15

(iv) Air handling unit 2-AHU-16 (presently being migrated to Siemens)

(v) Ground Floor exhaust fans

(vi) Ground Floor hot water system

(vii) Ground Floor temperature zones

(viii) Ground Floor differential space pressure monitors

(ix) 4th Floor isolation rooms

The Schneider SmartStruxure system contains the majority of the systems that are to be integrated into the Siemens Desigo system. The known equipment/areas under Schneider control:

(i) Air handling unit 2-AHU-X

(ii) Air handling unit 2-AHU-6

(iii) Air handling unit 2-AHU-9

(iv) Air handling unit 2-AHU-10

(v) Air handling unit 2-AHU-12

(vi) Air handling unit 2-AHU-14

(vii) Air handling unit 2-RTU-1

(viii) Air handling unit 2-RTU-Cardiology

(ix) Air handling unit 2-RTU-Lab

(x) 3rd Floor hot water system

(xi) 3rd Floor temperature zones

(xii) Penthouse hot water systems (Qty 3)

(xiii) Steam zone valves (Qty 6)

Survey items remaining for Building 2 scope of work:

(i) Field locations of JCI and Schneider network components for the purpose

of developing demolition drawings

(ii) Trace out any remaining pneumatic components associated with building

automation

(iii) Fan coil controls

(iv) Temperature zones of the Ground, 1st, and 2nd Floors

DESIGN APPROACH

Network Level

1) A new server will be provided to replace the existing Siemens server. The server

is in Building 31 chiller plant offices. Network Cabling from Building 5

will be re-used to connect to the new server.

2) The building 5 network switch that connects to the Siemens server and to the

building #2 fiber network switch will remain in its existing configuration.

Building 2

1) The existing fiber network switch, located in the Ground Floor Mechanical

Equipment Room G009 will be expanded with a CAT6 to a new network switch,

located in the same room.

The new switch shall serve Ground Floor equipment, differential space pressure

monitors, and temperature zone controls currently being served by the JCI system.

It is anticipated that the existing JCI cabinet enclosures serving air handling units

2-AHU-5 and 2-AHU-15 can be re-used.

Existing air handling unit 2-AHU-5 will require pneumatic device change-out for the modulating outside air, return air, and relief air control dampers, 2-way cooling

coil control valve, and supply and return airflow measuring devices.

The Schneider-controlled steam zone valves, associated sensors, and controller

will be replaced and integrated into the Siemens system. The cabinet enclosure

will need to be replaced. This work is expected to occur during the summer

months.

The points connected to the additional Schneider I/O modules (4 total) in

Mechanical Equipment Room G009 that are located in two (2) of the older cabinet

enclosures, have yet to be identified.

2) The existing network switch located on the 3rd Floor, Room 3177 will either be

expanded or replaced as needed to integrate the Schneider-controlled equipment

on this floor. Currently, this switch has one (1) available port.

New CAT6 cabling will be installed in the ceiling space of the occupied 3rd Floor

in order to connect the new Siemens controllers serving existing air handling units

2-AHU-X and 2-AHU-6, temperature zones, and hot water heat exchanger and

pump set.

3) The existing network switch located on the 4th Floor, Room 4167 will remain asis.

Currently, this switch is being used to replace rooftop equipment controls to

existing air handling units 2-AHU-2 and 2-AHU-3, along with the dilution exhaust

fans and miscellaneous points.

4) The existing network switch located on the 5th Floor, Room 5003 currently serves

the rooftop chillers, air handling units, and occupied areas of the 4th and 5th Floors.

The 5th Floor switch is intended to connect to the new Penthouse switch and to

integrate the remaining JCI and Schneider-controlled equipment that are on the 5th

Floor level (4th Floor roof included).

New CAT6 cabling will be installed in the ceiling space of the occupied 5th Floor

in order to connect the new Siemens controllers serving existing air handling unit

2-AHU-4-OR, temperature zones, and hot water heat exchanger and pump set.

5) A new 24-port network switch will be installed in the Penthouse and will carry the

bulk of the equipment being integrated into the Siemens system. Each CAT6 cable

to the switch will be dedicated to each equipment controller. The new 24-port

switch will have a network drop down to the existing 5th Floor network switch.

(i) Existing air handling unit 2-AHU-7 is currently under DDC control. The

new Siemens controller shall replace the existing JCI controller in the

same cabinet enclosure.

(ii) Existing air handling unit 2-AHU-8 will require pneumatic device changeout

for the 2-position outside air control damper, face-and-bypass steam

preheat coil, and 3-way modulating cooling coil control valve. A new

control cabinet enclosure will be installed for this unit. This will require

extending device signal wiring.

(iii) Existing air handling units 2-AHU-9 and 2-AHU-10 will require

pneumatic device change-out for the 2-position outside air control damper,

face-and-bypass steam preheat coil, 3-way modulating cooling coil control

valve, and humidifier control valve. Devices associated with the

humidifier will be new. They include a new discharge humidistat,

discharge high-limit switch, and space humidistat. The existing cabinet

enclosure can be re-used for these units.

(iv) Existing air handling units 2-AHU-12 and 2-AHU-14 are currently under

DDC control. The new Siemens controllers shall replace the existing

Schneider/ Andover controllers. The existing 2-AHU-14 cabinet

enclosure can be re-used, but 2-AHU-12 will need to be separated from

the shared cabinet enclosure with 2-AHU-9. This will require extending

device signal wiring for 2-AHU-12.

(v) Existing air handling unit 2-AHU-13 will require pneumatic device

change-out for the 2-position outside air control damper, steam preheat

coil, and 2-way modulating cooling coil control valve. A new control

cabinet enclosure will be installed for this unit. This will require extending

device signal wiring.

(vi) Existing air handling unit 2-RTU-1 will require pneumatic device changeout

for the 2-position outside air control damper, modulating steam preheat coil control valve, 2-way modulating cooling coil control valve, modulating steam reheat coil control valve, and humidifier control valve. Devices associated with the humidifier will be new. They include a new discharge humidistat, discharge high-limit switch, and return air ductmounted humidistat. A new control cabinet enclosure will be installed for this unit. This will require extending device signal wiring.

(vii) Existing heating hot water systems, exhaust fans, and other miscellaneous

points in the Penthouse are expected to be housed in three (3) new cabinet

enclosures. This will require extending device signal wiring.

Programming for the sequences of operation and graphics mapping will be required for all equipment associated with work in Building 2. New programming will utilize existing, new, and change-over devices and therefore, will only meet ASHRAE 36 guidelines for high-performance sequences of operation where such devices already exist. For example, using AHU static pressure reset by poling VAV box damper positions.

Testing, Adjusting, and Balancing Contractor will be required to calibrate new airflow measuring devices and to calibrate the feedback from existing VAV boxes.

Electrical

GENERAL

The project involves the upgrade and consolidation of the Energy Management Systems (DDC)

providers serving Buildings 2 on the Salisbury VAMC Campus. The new system will

follow Native BACnet protocol and be able to replace existing JCI and Schneider components with

a single front-end user interface compatible with Siemens. This project is to convert systems from

both pneumatic controls and obsolete DDC controls to the Siemens Desigo Native BACnet central

system, where applicable, for Buildings 2.

SCOPE OF WORK

The following systems will be modified to suit the electrical demands of the project:

Normal Electrical Distribution at 208/120-volts

Emergency Electrical Distribution at 208/120-volts

Lighting systems and controls

B. The electrical design shall be in accordance with, but not limited to the following VA design

standards:

VA Electrical Design Manual for New Hospitals, Replacement Hospitals,

Ambulatory Care, Clinical Additions, Energy Centers, Outpatient Clinics, Animal Research Facilities, and Laboratory Buildings.

NFPA 70 National Electrical Code

National Fire Protection Association (NFPA) Standard 101 Life Safety Code

EXISTING CONDITIONS

Power

1) Emergency life safety and critical power branch panels are located on every floor

of the building. The majority of the panels have spare circuit breakers or spaces to add a new circuit breaker as required.

DESIGN APPROACH

Power and Lighting

1) The intent of the design shall be to install new BAS panels adjacent to the existing

outdated panels. Generally it was impossible to trace the power source of the

existing BAS panel, therefore new 120-volt emergency branch circuit shall be routed to the new BAS network controller panel power supplies. This is required by VA standards.

2) Additionally, new network switches shall be installed in various locations throughout the three buildings. Local emergency 120-volt emergency branch circuits shall be provided for network switches as shown on drawings.

3) Where necessary, existing lighting and other ceiling mounted electrical devices shall be taken down and reinstalled in the same location during the course of the construction.

4) The circuits for all mechanical equipment, which have been scheduled for demolition, shall be removed back to the source.

Equipment Grounding and Wiring Devices

1) In general, 20-amp duplex receptacles will be located where required. All receptacles shall be hospital-grade, plug-tail type receptacles complying with NEC Art. 517.13(B).

2) All non-current carrying metallic parts of the electrical distribution system will be

bonded to the grounding electrode system or building steel.

3) An insulated grounding conductor will be run with all power feeder and branch circuits to supplement the conduit ground.

4) All wiring shall be solid for wire #10 and smaller and stranded for wires larger than #10.

5) Nonflexible metallic conduit will be provided for all emergency circuits due to the

need to provide redundant grounding and protection of the branch circuit.

Metal-Clad cabling, Type MC, will be permitted for branch circuit wiring where concealed within partitions and above ceilings for lighting fixtures. In addition, liquid-tight flexible metal conduit will be used at motor and other vibration transmissive locations.

Contractor Trades:

Mechanical Contractor

Coordinate with the controls contractor to ensure seamless HVAC equipment interface and integration.

Modify or relocate existing mechanical systems as needed to accommodate new control infrastructure.

Provide support during system commissioning, functional performance testing, and final acceptance.

Ensure all mechanical work complies with VA HVAC standards and ASHRAE guidelines.

Qualifications:

Licensed mechanical contractor with experience in healthcare environments.

Familiarity with Siemens Desigo systems and BACnet protocol preferred.

Controls Contractor (Siemens Certified)

Install and program Siemens Desigo BACnet control systems, including hardware and software components.

Replace existing pneumatic and outdated DDC controls with modern digital systems.

Integrate HVAC equipment into the new Energy Management System (EMS).

Conduct full commissioning, calibration, and validation of control systems.

Provide end-user training and documentation for system operation and maintenance.

Qualifications:

Siemens-certified technician or firm with demonstrated experience in federal or VA projects.

Must comply with VA cybersecurity and interoperability standards.

Electrical Contractor

Provide dedicated power supply to Siemens control cabinets and associated network switches.

Remove and dispose of obsolete electrical components (e.g., Johnson Controls, Schneider Electric).

Install new branch circuits, electrical panels, and conduit routing per NEC and VA specifications.

Coordinate electrical shutdowns and temporary power solutions to maintain facility operations.

Perform firestopping and patching of all penetrations created during electrical work.

Qualifications:

Licensed electrician with experience in hospital or healthcare facility electrical systems.

Must be familiar with VA electrical safety protocols and infection control procedures.

Low Voltage / Communications Contractor

Install CAT6 or higher-rated network cabling for control panels, switches, and EMS components.

Terminate and test all cable runs to ensure compliance with VA telecom standards.

Coordinate with VA IT department for switch integration and IP address assignments.

Label and document all cabling and connections for future maintenance.

Qualifications:

BICSI-certified technician or equivalent.

Experience with VA telecom infrastructure and patch panel standards.

General Contractor

Provide overall coordination and scheduling of all subcontracted trades.

Manage ceiling removal and replacement as indicated in demolition and construction plans.

Perform wall patching, painting, and restoration following electrical and control installations.

Develop phasing plans to minimize disruption to patient care and facility operations.

Ensure infection control measures are in place during construction activities.

Qualifications:

Licensed general contractor with experience in VA or federal healthcare construction.

Must comply with VA Interim Life Safety Measures (ILSM) and infection control protocols.

Firestopping Contractor

Seal all penetrations through rated walls and floors created during conduit and cable installations.

Use UL-listed firestopping materials and methods.

Ensure compliance with NFPA 101, VA standards, and local fire codes.

Qualifications:

Certified firestopping technician.

Experience in healthcare facility fire barrier restoration.

Commissioning Agent (CxA)

Verify that all installed systems meet the design intent and operational requirements.

Conduct functional performance testing and provide commissioning reports.

Coordinate with VA stakeholders for final acceptance and turnover.

Qualifications:

Independent third-party CxA with experience in VA commissioning protocols.

Must be familiar with ASHRAE Guideline 0 and VA Cx standards.

Files

File Type Posted
Bid Documents Submission - Drawings.pdf PDF
659-22-100_QAQC Bid Docs - Specifications.pdf PDF
36C24626B0018_2_.pdf PDF
Contractor Invoice Form.pdf PDF

Notice history

Notice Type Posted
4130--Campus Energy Management System Solicitation Amendment Notice 0004 Latest special notice Special Notice
Campus Energy Management System Solicitation Amendment Notice 0003 Special Notice
4130--Campus Energy Management System Solicitation Amendment Notice Special Notice
4130--Campus Energy Management System Solicitation Amendment Notice Solicitation
This notice Solicitation
4130--Campus Energy Management System Pre-Solicitation Notice Pre-Solicitation
4130--Campus Energy Management System Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Z2DA--FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009) Durham, North Carolina 27705, United States · NAICS 236220 Veterans Integrated Service Network 6 Service-Disabled Veteran-Owned Small Business
Z2DA--FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009) Veterans Affiars Medical Center Durham NC 27705 · NAICS 236220 Veterans Integrated Service Network 6 Service-Disabled Veteran-Owned Small Business
Z2DA--Renovate Space for Patient Care Improvements Asheville, North Carolina 28805, United States · NAICS 236220 Veterans Integrated Service Network 6 Service-Disabled Veteran-Owned Small Business
7A21--460-24-009 CLC and Fourth Floor Patient Elopement System Wilmington VA Medical Center 1601 Kirkwood Highway Wilmington DE 19805 · NAICS 541519 Veterans Integrated Service Network 4 Service-Disabled Veteran-Owned Small Business
Z1DA--Local | 460-26- 4-5074-0108 | 460-26-999 | Condenser Water Piping Modification | (VA-26-00077929) Department of Veterans Affairs Wilmington Vamc Wilmington DE 19805 · NAICS 236220 Veterans Integrated Service Network 4 Service-Disabled Veteran-Owned Small Business