This is an Invitation for Bid (IFB) for a construction project at the Salisbury VA Medical Center in North Carolina. The solicitation, numbered 36C24626B0018, seeks competitive sealed bids for Project 659-22-100: Install Campus Emergency Management System, with an estimated construction magnitude between $1,000,000 and $5,000,000. The contract is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS code 238220 with a $19.0 million size standard. The Department of Veterans Affairs, Network Contracting Office 6, issued the solicitation on February 2, 2026, with bids due by March 25, 2026, at 3:00 PM EDT. A mandatory site visit is scheduled for March 5, 2026, at the Salisbury VAMC location (1601 Brenner Avenue, Salisbury, NC 28144), and all questions must be submitted by March 12, 2026, NLT 10:00 AM EST to the Contracting Officer, Mark Griffin, via email at Mark.Griffin2@va.gov.
The project involves upgrading and consolidating Energy Management Systems (DDC) providers serving Building 2 at the Salisbury VAMC campus. The scope includes converting systems from pneumatic controls and obsolete DDC controls to a Siemens Desigo Native BACnet central system, with integration of existing JCI and Schneider components. Key work elements include network modifications (Ethernet and MSTP), terminal unit controls replacements, server installation, graphical user interface modifications, electrical infrastructure upgrades, and full system commissioning and testing. The project must be completed within 365 days with a 1-year warranty on all items. Bidders must comply with Buy American construction materials requirements, prevailing wage determinations per the Davis-Bacon Act, performance and payment bond requirements (20% of bid price or $3M, whichever is less), SDVOSB limitations on subcontracting (75% for special trade contractors), and various federal security and compliance certifications. A bid guarantee is required, and the contract incorporates numerous FAR and VAAR clauses addressing labor standards, small business requirements, cybersecurity, and administrative procedures.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Documents Submission - Drawings.pdf | ||
| 659-22-100_QAQC Bid Docs - Specifications.pdf | ||
| Contractor Invoice Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES NO
a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
1 57
36C24626B0018 X
02-02-2026
659-22-100
Department of Veterans Affairs Network Contracting Office 6 1601 Brenner Ave Salisbury NC 28144
1601 Brenner Ave
Mark Griffin 704-638-9000 x 13359
INVITATION FOR BID: Project 659-22-100 Install Campus Emergency Management System for the Salisbury VA Medical Center.
Magnitude of Construction: Between $1,000,000 and $5,000,000 See Statement of Work and Project Specifications for details.
This is a Total Service-Disabled Veteran Owned Small Business (SDVOSB) Set-Aside.
NAICS: 238220 | Size Standard: $19.0 Million
Site Visit: Thursday, March 5, 2026 No Later Than 10AM. E.S.T.
Location: Salisbury VAMC, 1601 Brenner Ave. Salisbury NC 28144 It is highly recommended that all bidders attend the pre-bid walkthrough to note wall types, existing conditions, required hardware, take rough measurements, etc., necessary for proper bids. Only one site visit will be scheduled.
Questions Due Date: Thursday, March 12, 2026 NLT 10:00 AM EST.
submit all questions to the Contracting Officer, Mark Griffin, via email at Mark.Griffin2@va.gov.
No telephone inquiries will be accepted.
“System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations, including 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals-Representation, and paragraph (t) of 52.212-3, Offeror Representations and Certifications-Commercial Products and Commercial Services. Contracting Officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they
VA Notice of Limitations on Subcontracting - Certificate of Compliance: To be eligible for evaluations and consideration for award, offerors must return the entire Limitations on Subcontracting Certificate of Compliance clause, VAAR 852.219-75, containing a fully completed certification at the time offers are due or the offer will be rejected.
In addition to completing the offeror 'fill-in' requirements for this clause, Offerors must insert the Offeror's name in the brackets containing the follow verbiage, "[Insert Name of Offeror]" to have a fully completed certification.
See Instructions to Offerors for information on bid submission and opening.
3PM EDT
03-25-2026
14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
PHONE: FAX:
28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code)
(Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
(Type or print)
(4 copies unless otherwise specified)
(Type or print) (Type or print)
(Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror)
(To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
1601 Brenner Ave.
FMS-VA-2(101)
Financial Services Center PO Box 149971 Austin TX 78714-9971 512-460-5049 512-460-5221
Table of Contents
PART I - THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,
ALTERATION, OR REPAIR)– BACK
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
1.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB
1998)
1.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
1.3 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—
CERTIFICATION (NOV 2021)
1.4 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)
1.5 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE
OF THE WORK (NOV 2025) (DEVIATION)
1.6 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION
MATERIALS (MAY 2014)
1.7 52.228-1 BID GUARANTEE (SEP 1996)
1.8 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE)
(FEB 2021)
1.9 52.233-2 SERVICE OF PROTEST (SEP 2006)
1.10 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS
REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION)
1.11 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)
1.12 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES
INCORPORATED BY REFERENCE (JAN 2008)
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
REPRESENTATIONS AND CERTIFICATIONS
GENERAL CONDITIONS
4.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
4.2 52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022)
4.3 SUPPLEMENTAL INSURANCE REQUIREMENTS
4.4 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS (OCT 2018)
4.5 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION
(JAN 2025)
4.6 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022)
4.7 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025)
(DEVIATION)
4.8 52.240-93 BASIC SAFEGAURDING OF COVERED CONTRACTOR
INFORMATION SYSTEMS (DEVIATION) (NOV 2025)
4.9 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)
4.10 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—
CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023)
(DEVIATION)
4.11 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV
2018)
4.12 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)
4.13 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)
4.14 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)
4.15 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) .. 66
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
ITEM
NUMBE
R
DESCRIPTION OF
SUPPLIES/SERVIC
ES
QUANTIT
Y
UNI
T UNIT PRICE AMOUNT
0.00
Install energy management systems (DDC) providers serving Buildings 2.
GRAND TOTAL ________________
W.G. (Bill) Hefner Department of Veterans Affairs Medical Center 1601 Brenner Avenue Salisbury, North Carolina 28144
Subject: Statement of Work: Install Campus Energy Management System Location: Campus Project #: 659-22-100 Date: 12 December 2025
STATEMENT OF WORK
Mechanical
1. General:
The project involves the upgrade and consolidation of the Energy Management Systems (DDC) providers serving Buildings 2 on the Salisbury VAMC Campus. The new system will follow Native BACnet protocol and be able to replace existing JCI and Schneider components with a single front-end user interface compatible with Siemens. This project is to convert systems from both pneumatic controls and obsolete DDC controls to the Siemens Desigo Native BACnet central system, where applicable, for Buildings 2. This project should be completed in 365 days and include a 1 year warranty on all items.
2. SCOPE OF WORK:
A. The Scope of work associated with the project includes the following:
Network & User Interface
1) Appropriate modifications to the existing network and cabling layout (Ethernet & MSTP) for the purpose of integration, including the installation of new Desigo panels.
Terminal Unit Controls
1) Modifications required to replace the Tridium/Niagara controls with BACnet, Siemens Desigo compatible controllers and sensors (where required). Include in the recommendation, devices that can remain (relays, switches, valves, damper motors, sensors, etc.)
To include the following:
(i) New Siemens server to replace the existing Siemens server.
(ii) Front-End Graphical User Interface modifications, including new floor plans for every level of Buildings 2.
(iii) Main equipment panel and controller installations.
(iv) Panel installations.
(v) Panel modifications and replacement, and controller replacements, required on the main systems.
(vi) Ethernet-level networking modifications.
(vii) BACnet MSTP networking modifications.
(viii) Pneumatic terminal-unit controller replacements.
(ix) Removal of the compressed air system serving control components and devices.
2) to include all hardware, software, installation, wiring, cabling, programming of systems, graphics, and setup of alarms, schedules and trending; as well as networking requirements required to into a new Siemens server in accordance with the VA standards.
B. Applicable Codes and Standards:
• DVA HVAC Design Manual, March 2024
• ASHRAE Standard 13 – Specifying Building Automation Systems
• ASHRAE Standard 135 – BACnet Communication Protocol
• IEEE 802.3 – Standard for Ethernet
• NFPA 70 – National Electrical Code
3. EXISTING CONDITIONS
A. Network Level
1) The existing Building Automation System (BAS) consists of three (3) separate vender systems: Siemens Desigo, JCI Metasys, and Schneider SmartStruxure. All three (3) headend systems and HMIs are in Building 31 chiller plant offices.
2) The internet modem for the Siemens system-to-remain is in Building 5, Room G048A.
B. Building 2
1) The Siemens Desigo system is currently communicating with most of the areas in Building 2. This control system will remain. The known areas under control by Siemens:
(i) Air handling unit 2-AHU-2
(ii) Air handling unit 2-AHU-3 (ongoing work)
(iii) Air handling unit 2-AHU-4
(iv) Air handling unit 2-AHU-4B
(v) Air handling unit 2-AHU-11
(vi) Chilled water pumps
(vii) O.R. chillers
(viii) 1st Floor isolation rooms
(ix) 3rd Floor isolation rooms
(x) 3rd Floor isolation EFs
(xi) 3rd Floor hot water system
(xii) 3rd Floor temperature zones
(xiii) 4th Floor isolation rooms
(xiv) 4th Floor isolation EFs
(xv) 4th Floor temperature zones
(xvi) 5th Floor isolation rooms
(xvii) 5th Floor isolation EFs
(xviii) 5th Floor temperature zones
2) The JCI Metasys system is active but has had some equipment migrated over to the Siemens system. The remaining known equipment/areas under JCI control:
(i) Air handling unit 2-AHU-1 (AHU-5 in the field)
(ii) Air handling unit 2-AHU-7
(iii) Air handling unit 2-AHU-15
(iv) Air handling unit 2-AHU-16 (presently being migrated to Siemens)
(v) Ground Floor exhaust fans
(vi) Ground Floor hot water system
(vii) Ground Floor temperature zones
(viii) Ground Floor differential space pressure monitors
(ix) 4th Floor isolation rooms
3) The Schneider SmartStruxure system contains the majority of the systems that are to be integrated into the Siemens Desigo system. The known equipment/areas under Schneider control:
(i) Air handling unit 2-AHU-X
(ii) Air handling unit 2-AHU-6
(iii) Air handling unit 2-AHU-9
(iv) Air handling unit 2-AHU-10
(v) Air handling unit 2-AHU-12
(vi) Air handling unit 2-AHU-14
(vii) Air handling unit 2-RTU-1
(viii) Air handling unit 2-RTU-Cardiology
(ix) Air handling unit 2-RTU-Lab
(x) 3rd Floor hot water system
(xi) 3rd Floor temperature zones
(xii) Penthouse hot water systems (Qty 3)
(xiii) Steam zone valves (Qty 6)
4) Survey items remaining for Building 2 scope of work:
(i) Field locations of JCI and Schneider network components for the purpose of developing demolition drawings
(ii) Trace out any remaining pneumatic components associated with building automation
(iii) Fan coil controls
(iv) Temperature zones of the Ground, 1st, and 2nd Floors
4. DESIGN APPROACH
A. Network Level
1) A new server will be provided to replace the existing Siemens server. The server is in Building 31 chiller plant offices. Network Cabling from Building 5 will be re-used to connect to the new server.
2) The building 5 network switch that connects to the Siemens server and to the building #2 fiber network switch will remain in its existing configuration.
B. Building 2
1) The existing fiber network switch, located in the Ground Floor Mechanical Equipment Room G009 will be expanded with a CAT6 to a new network switch, located in the same room.
The new switch shall serve Ground Floor equipment, differential space pressure monitors, and temperature zone controls currently being served by the JCI system.
It is anticipated that the existing JCI cabinet enclosures serving air handling units 2-AHU-5 and 2-AHU-15 can be re-used.
Existing air handling unit 2-AHU-5 will require pneumatic device change-out for the modulating outside air, return air, and relief air control dampers, 2-way cooling coil control valve, and supply and return airflow measuring devices.
The Schneider-controlled steam zone valves, associated sensors, and controller will be replaced and integrated into the Siemens system. The cabinet enclosure will need to be replaced. This work is expected to occur during the summer months.
The points connected to the additional Schneider I/O modules (4 total) in Mechanical Equipment Room G009 that are located in two (2) of the older cabinet enclosures, have yet to be identified.
2) The existing network switch located on the 3rd Floor, Room 3177 will either be expanded or replaced as needed to integrate the Schneider-controlled equipment on this floor. Currently, this switch has one (1) available port.
New CAT6 cabling will be installed in the ceiling space of the occupied 3rd Floor in order to connect the new Siemens controllers serving existing air handling units 2-AHU-X and 2-AHU-6, temperature zones, and hot water heat exchanger and pump set.
3) The existing network switch located on the 4th Floor, Room 4167 will remain asis.
Currently, this switch is being used to replace rooftop equipment controls to existing air handling units 2-AHU-2 and 2-AHU-3, along with the dilution exhaust fans and miscellaneous points.
4) The existing network switch located on the 5th Floor, Room 5003 currently serves the rooftop chillers, air handling units, and occupied areas of the 4th and 5th Floors.
The 5th Floor switch is intended to connect to the new Penthouse switch and to integrate the remaining JCI and Schneider-controlled equipment that are on the 5th Floor level (4th Floor roof included).
New CAT6 cabling will be installed in the ceiling space of the occupied 5th Floor in order to connect the new Siemens controllers serving existing air handling unit
2-AHU-4-OR, temperature zones, and hot water heat exchanger and pump set.
5) A new 24-port network switch will be installed in the Penthouse and will carry the bulk of the equipment being integrated into the Siemens system. Each CAT6 cable to the switch will be dedicated to each equipment controller. The new 24-port switch will have a network drop down to the existing 5th Floor network switch.
(i) Existing air handling unit 2-AHU-7 is currently under DDC control. The new Siemens controller shall replace the existing JCI controller in the same cabinet enclosure.
(ii) Existing air handling unit 2-AHU-8 will require pneumatic device changeout for the 2-position outside air control damper, face-and-bypass steam preheat coil, and 3-way modulating cooling coil control valve. A new control cabinet enclosure will be installed for this unit. This will require extending device signal wiring.
(iii) Existing air handling units 2-AHU-9 and 2-AHU-10 will require pneumatic device change-out for the 2-position outside air control damper, face-and-bypass steam preheat coil, 3-way modulating cooling coil control valve, and humidifier control valve. Devices associated with the humidifier will be new. They include a new discharge humidistat, discharge high-limit switch, and space humidistat. The existing cabinet enclosure can be re-used for these units.
(iv) Existing air handling units 2-AHU-12 and 2-AHU-14 are currently under DDC control. The new Siemens controllers shall replace the existing Schneider/ Andover controllers. The existing 2-AHU-14 cabinet enclosure can be re-used, but 2-AHU-12 will need to be separated from the shared cabinet enclosure with 2-AHU-9. This will require extending device signal wiring for 2-AHU-12.
(v) Existing air handling unit 2-AHU-13 will require pneumatic device change-out for the 2-position outside air control damper, steam preheat coil, and 2-way modulating cooling coil control valve. A new control cabinet enclosure will be installed for this unit. This will require extending device signal wiring.
(vi) Existing air handling unit 2-RTU-1 will require pneumatic device changeout for the 2-position outside air control damper, modulating steam preheat coil control valve, 2-way modulating cooling coil control valve, modulating steam reheat coil control valve, and humidifier control valve. Devices associated with the humidifier will be new. They include a new discharge humidistat, discharge high-limit switch, and return air ductmounted humidistat. A new control cabinet enclosure will be installed for this unit. This will require extending device signal wiring.
(vii) Existing heating hot water systems, exhaust fans, and other miscellaneous points in the Penthouse are expected to be housed in three (3) new cabinet enclosures. This will require extending device signal wiring.
C. Programming for the sequences of operation and graphics mapping will be required for all equipment associated with work in Building 2. New programming will utilize existing, new, and change-over devices and therefore, will only meet ASHRAE 36 guidelines for high-performance sequences of operation where such devices already exist. For example, using AHU static pressure reset by poling VAV box damper positions.
D. Testing, Adjusting, and Balancing Contractor will be required to calibrate new airflow measuring devices and to calibrate the feedback from existing VAV boxes.
Electrical
1. GENERAL
The project involves the upgrade and consolidation of the Energy Management Systems (DDC) providers serving Buildings 2 on the Salisbury VAMC Campus. The new system will follow Native BACnet protocol and be able to replace existing JCI and Schneider components with a single front-end user interface compatible with Siemens. This project is to convert systems from both pneumatic controls and obsolete DDC controls to the Siemens Desigo Native BACnet central system, where applicable, for Buildings 2.
2. SCOPE OF WORK
A. The following systems will be modified to suit the electrical demands of the project:
1) Normal Electrical Distribution at 208/120-volts
2) Emergency Electrical Distribution at 208/120-volts
3) Lighting systems and controls
B. The electrical design shall be in accordance with, but not limited to the following VA design standards:
• VA Electrical Design Manual for New Hospitals, Replacement Hospitals, Ambulatory Care, Clinical Additions, Energy Centers, Outpatient Clinics, Animal Research Facilities, and Laboratory Buildings.
• NFPA 70 National Electrical Code
• National Fire Protection Association (NFPA) Standard 101 Life Safety Code
3. EXISTING CONDITIONS
A. Power
1) Emergency life safety and critical power branch panels are located on every floor of the building. The majority of the panels have spare circuit breakers or spaces to add a new circuit breaker as required.
4. DESIGN APPROACH
A. Power and Lighting
1) The intent of the design shall be to install new BAS panels adjacent to the existing outdated panels. Generally it was impossible to trace the power source of the existing BAS panel, therefore new 120-volt emergency branch circuit shall be routed to the new BAS network controller panel power supplies. This is required by VA standards.
2) Additionally, new network switches shall be installed in various locations throughout the three buildings. Local emergency 120-volt emergency branch circuits shall be provided for network switches as shown on drawings.
3) Where necessary, existing lighting and other ceiling mounted electrical devices shall be taken down and reinstalled in the same location during the course of the construction.
4) The circuits for all mechanical equipment, which have been scheduled for demolition, shall be removed back to the source.
B. Equipment Grounding and Wiring Devices
1) In general, 20-amp duplex receptacles will be located where required. All receptacles shall be hospital-grade, plug-tail type receptacles complying with NEC Art. 517.13(B).
2) All non-current carrying metallic parts of the electrical distribution system will be bonded to the grounding electrode system or building steel.
3) An insulated grounding conductor will be run with all power feeder and branch circuits to supplement the conduit ground.
4) All wiring shall be solid for wire #10 and smaller and stranded for wires larger than #10.
5) Nonflexible metallic conduit will be provided for all emergency circuits due to the need to provide redundant grounding and protection of the branch circuit.
6) Metal-Clad cabling, Type MC, will be permitted for branch circuit wiring where concealed within partitions and above ceilings for lighting fixtures. In addition, liquid-tight flexible metal conduit will be used at motor and other vibration transmissive locations.
Contractor Trades:
Mechanical Contractor
• Coordinate with the controls contractor to ensure seamless HVAC equipment interface and integration.
• Modify or relocate existing mechanical systems as needed to accommodate new control infrastructure.
• Provide support during system commissioning, functional performance testing, and final acceptance.
• Ensure all mechanical work complies with VA HVAC standards and ASHRAE guidelines.
Qualifications:
• Licensed mechanical contractor with experience in healthcare environments.
• Familiarity with Siemens Desigo systems and BACnet protocol preferred.
Controls Contractor (Siemens Certified)
• Install and program Siemens Desigo BACnet control systems, including hardware and software components.
• Replace existing pneumatic and outdated DDC controls with modern digital systems.
• Integrate HVAC equipment into the new Energy Management System (EMS).
• Conduct full commissioning, calibration, and validation of control systems.
• Provide end-user training and documentation for system operation and maintenance.
Qualifications:
• Siemens-certified technician or firm with demonstrated experience in federal or VA projects.
• Must comply with VA cybersecurity and interoperability standards.
Electrical Contractor
• Provide dedicated power supply to Siemens control cabinets and associated network switches.
• Remove and dispose of obsolete electrical components (e.g., Johnson Controls, Schneider Electric).
• Install new branch circuits, electrical panels, and conduit routing per NEC and VA specifications.
• Coordinate electrical shutdowns and temporary power solutions to maintain facility operations.
• Perform firestopping and patching of all penetrations created during electrical work.
Qualifications:
• Licensed electrician with experience in hospital or healthcare facility electrical systems.
• Must be familiar with VA electrical safety protocols and infection control procedures.
Low Voltage / Communications Contractor
• Install CAT6 or higher-rated network cabling for control panels, switches, and EMS components.
• Terminate and test all cable runs to ensure compliance with VA telecom standards.
• Coordinate with VA IT department for switch integration and IP address assignments.
• Label and document all cabling and connections for future maintenance.
Qualifications:
• BICSI-certified technician or equivalent.
• Experience with VA telecom infrastructure and patch panel standards.
General Contractor
• Provide overall coordination and scheduling of all subcontracted trades.
• Manage ceiling removal and replacement as indicated in demolition and construction plans.
• Perform wall patching, painting, and restoration following electrical and control installations.
• Develop phasing plans to minimize disruption to patient care and facility operations.
• Ensure infection control measures are in place during construction activities.
Qualifications:
• Licensed general contractor with experience in VA or federal healthcare construction.
• Must comply with VA Interim Life Safety Measures (ILSM) and infection control protocols.
Firestopping Contractor
• Seal all penetrations through rated walls and floors created during conduit and cable installations.
• Use UL-listed firestopping materials and methods.
• Ensure compliance with NFPA 101, VA standards, and local fire codes.
Qualifications:
• Certified firestopping technician.
• Experience in healthcare facility fire barrier restoration.
Commissioning Agent (CxA)
• Verify that all installed systems meet the design intent and operational requirements.
• Conduct functional performance testing and provide commissioning reports.
• Coordinate with VA stakeholders for final acceptance and turnover.
Qualifications:
• Independent third-party CxA with experience in VA commissioning protocols.
• Must be familiar with ASHRAE Guideline 0 and VA Cx standards.
"General Decision Number: NC20260017 01/02/2026
Superseded General Decision Number: NC20250017
State: North Carolina
Construction Type: Building
Counties: Cabarrus, Lincoln, Rowan and Union Counties in North Carolina.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date 0 01/02/2026
CARP0312-003 06/01/2025
Rates Fringes
DRYWALL HANGER...................$ 29.00 11.20
ELEC0379-001 09/01/2024
Rates Fringes
ELECTRICIAN......................$ 32.31 15.5%+8.65
IRON0848-003 07/01/2025
Rates Fringes
IRONWORKER.......................$ 29.75 18.00
PLUM0421-006 07/01/2023
Rates Fringes
PIPEFITTER.......................$ 33.96 13.48
SHEE0005-008 05/01/2023
Rates Fringes
SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 30.74 16.51
SUNC2018-017 08/08/2023
Rates Fringes
BRICKLAYER.......................$ 19.00 0.00
CARPENTER, Excludes Drywall Hanging..........................$ 21.33 5.16
CEMENT MASON/CONCRETE FINISHER...$ 18.79 0.00
LABORER: Common or General......$ 14.12 2.79
LABORER: Mason Tender - Brick...$ 13.17 0.00
LABORER: Mason Tender - Cement/Concrete..................$ 13.00 4.54
LABORER: Pipelayer..............$ 15.00 2.46
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 16.50 0.08
OPERATOR: Bulldozer.............$ 17.54 2.63
OPERATOR: Forklift..............$ 16.75 0.00
OPERATOR: Grader/Blade..........$ 22.68 3.27
OPERATOR: Roller................$ 15.31 1.46
PAINTER..........................$ 15.55 1.05
PLUMBER..........................$ 22.96 4.81
ROOFER...........................$ 18.26 4.38
SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 19.67 13.27
SPRINKLER FITTER.................$ 18.35 3.06
TRUCK DRIVER: Dump Truck........$ 16.56 3.09
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded.
If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination
On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210.
END OF GENERAL DECISION
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE
AND BONDS
INSTRUCTIONS TO OFFERORS FOR BID PREPARATION THIS SECTION IS FOR
SOLICITATION PURPOSES ONLY.
A COMPLETE BID SHALL CONSIST OF THE FOLLOWING
(a) GENERAL INSTRUCTIONS:
1. Award will be made to the responsible bidder whose bid is deemed responsive to the terms of this invitation for bid and is deemed most advantageous to the Government.
2. All Bid preparation cost will be the sole responsibility of the Offeror. The Government will not reimburse any interested party for their bid preparation expenses (costs) or any expenses (costs) associated with their Pre-Bid Site Visit attendance.
(b) BID OPENING INFORMATION:
A virtual bid opening has been scheduled for Monday, March 23, 2026, at 11:00 AM EST, at the following location:
Microsoft TEAMS - Dial in by phone
+1 872-701-0185,,107879570# United States, Chicago
Find a local number
Phone conference ID: 107 879 570#
(c) SUBMISSION OF BIDS:
1. Electronic Bids Authorized – IAW (RFO) FAR 14.209(e), The Contracting Officer has authorized Electronic Submission of Bids via email. However, should an Offeror elect to submit their Bid electronically, it will be the sole responsibility of the Offeror to ensure that the bid is received, in its entirety, no later than 5:00 PM EST one (1) day prior to the established Bid Opening Date identified. Bids received electronically that conform to this requirement shall be deemed responsive and read aloud during the Bid Opening.
Electronic bids received after the aforementioned date & time (5:00 PM EST, 1 day prior to Bid Opening) will be deemed nonresponsive. Any offeror who elects to submit their Bid Electronically, accepts this term without prejudice. The Contracting Officer may, after the date set for bid opening, request the apparently successful offeror to provide the complete, original signed bid. Offers must be submitted via email to the Contracting Officer, Mark Griffin, at mark.griffin2@va.gov no later than 5:00 PM EST one (1) day prior to the established Bid Opening Date identified. Multiple emails may be required to submit all attachments.
Format for Electronic submission (email) shall be as follows:
IFB Number, Offeror Name, Email 1 of XX
Additionally, the Email must contain the list of attachments for each email submitted.
Electronic documents must be submitted in .pdf, .doc, or .xls and restricted to emails of less than 10MB as that is maximum single email size allowable. Communication containing documents in any other format may be blocked or stripped by the Government's server and may not be received by this office. Files in .zip format or file(s) exceeding 10MB may not be received by this office. It is the contractor’s responsibility to verify that all submissions are received.
tel:+18727010185,,107879570 https://dialin.teams.microsoft.com/14a86cbc-ba2a-4dde-a83a-5b9e20685e48?id=107879570
2. In accordance with (RFO) FAR 14.301, Bidders are responsible for submitting bids, and any modifications or withdrawals, so as to reach the Government office designated by the exact time specified for receipt of bids in the applicable instructions contained herein.
Any bid, modification, or withdrawal of a bid received at the Government office designated in the IFB after the exact time specified for receipt of bids is "late" and will not be considered. Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the bid wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
3. To assure timely and equitable evaluation of bids, Offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements.
Failure to meet all requirements will result in an offer being deemed non-responsive.
Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale for consideration.
(d) SPECIFIC INSTRUCTIONS – A COMPLETE BID MUST CONSIST OF THE FOLLOWING
1. TAB A: General Information
a. Cover page with Solicitation Number and Project Title
b. Table of Contents
c. Company information to include: SAM Unique Entry ID, Cage Code, Tax ID Number, Principal points of contact with addresses, phone numbers, and email addresses.
2. TAB B: Offer, Guarantee, and Certifications
a. Complete the SF 1442, Blocks 14, 15, 16, 17, 19, 20A, 20B, 20C. An official having the authority to bind your company contractually must sign and date the SF 1442 Block 20A-C. One copy of the SF 1442 must bear an original, authorized signature. In doing so, the Offeror accedes to the contract terms and conditions as written in the IFB. All sections of the IFB, excluding Instructions to Offerors and Evaluation Procedures Sections, constitute the model contract. SF1442 Block 19 Acknowledgement of Amendments (as applicable) – Interested Parties need to acknowledge all amendments that were posted to SAM.gov prior to Bid Closing.
b. Bid Bond/Offer/Guarantee IAW FAR Provision 52.228-1.
c. Proof of SDVOSB certification in the SBA certification database at https://search.certifications.sba.gov/
d. Complete the following Clauses and Provisions and certify when necessary.
i. 52.204-7 System for Award Management - Registration (DEVIATION NOV 2025)
ii. 52.209-13 Violation of Arms Control Treaties or Agreements – Certification
(DEVIATION NOV 2025)
iii. 52.219-28 – Postaward Small Business Program Representation (JAN 2025)
Complete Sections (h)(1) through (h)(9) and certify by signing and dating
“Contractor to sign and date and insert authorized signer's name and title.”
iv. 52.225-9 Buy American-Construction Materials (Oct 2022) complete section (d) or mark as Not Applicable by annotating “N/A” within the chart
v. 52.240-90 Security Prohibitions and Exclusions Representations and
Certifications (DEVIATION NOV 2025)
vi. 852.219-75 VA Notice of Limitations on Subcontracting – Certificate of
Compliance for Services and Construction (JAN 2023) (DEVIATION) Paragraph
(d) requires certification to be completed, signed, and returned with bid.
INFORMATION REGARDING BID GUARANTEE AND BONDS
If the bid/offer exceeds $150,000, a bid guarantee is required in an amount not less than twenty (20) percent of the bid/offer price or $3M, whichever is less.
Bidders are reminded that an acceptable Bid Guarantee MUST be received with the bid/offer before the bid opening. Failure to furnish the required bid guarantee in the proper form and amount, by the time set for opening of bids/offers, will require rejection of the bid/offer in all cases except those listed in Federal Acquisition Regulation (FAR) 28.101-4, and may be cause for rejection even then. For guidance, Bidders/Offerors are referred to FAR provision 52.228-1, BID GUARANTEE (SEP 1996) in the solicitation, FAR Part 28.101 Bid Guarantees, and FAR Part 28.2 Sureties and Other Security for Bonds.
Corporate sureties offered for bonds must appear on the list contained in the Department of Treasury Circular 570, Department of the Treasury's Listing of Companies Holding Certificates of Authority
If the contract will exceed $30,000 but will not exceed $150,000, the bidder/offeror to whom award is made will be required to furnish a Payment Bond, Standard Form 25A, or alternative payment protection.
If the contract will exceed $150,000, the bidder/offeror to whom award is made shall be required to furnish a Payment Bond, Standard Form 25A, and a Performance Bond, Standard Form 25.
Copies of the Standard Forms 25A and 25 may be obtained upon application to the Issuing Office.
1.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY
REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
https://www.acquisition.gov/browse/index/far https://www.va.gov/oal/library/vaar/
(End of Provision)
FAR
Number
Title Date
52.204-7 SYSTEM FOR AWARD MANAGEMENT NOV 2024
52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS DEC 2016
52.214-4 FALSE STATEMENTS IN BIDS APR 1984
52.214-5 SUBMISSION OF BIDS DEC 2016
52.214-6 EXPLANATION TO PROSPECTIVE BIDDERS APR 1984
52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND
WITHDRAWALS OF BIDS
NOV 1999
52.214-18 PREPARATION OF BIDS—CONSTRUCTION APR 1984
52.214-19 CONTRACT AWARD—SEALED BIDDING—
CONSTRUCTION
AUG 1996
52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE APR 1991
52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY APR 1991
52.217-5 EVALUATION OF OPTIONS JUL 1990
852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE
RESOLUTION
OCT 2018
852.239-75 INFORMATION AND COMMUNICATION TECHNOLOGY
ACCESSIBILITY NOTICE
FEB 2023
1.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT
2018)
(a) Definitions. As used in this provision—
"Administrative proceeding" means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.
"Federal contracts and grants with total value greater than $10,000,000" means—
(1) The total value of all current, active contracts and grants, including all priced options; and
(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).
"Principal" means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager;
head of a division or business segment; and similar positions).
(b) The offeror [ ] has [ ] does not have current active Federal contracts and grants with total value greater than $10,000,000.
(c) If the offeror checked "has" in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:
(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:
(i) In a criminal proceeding, a conviction.
(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.
(iii) In an administrative proceeding, a finding of fault and liability that results in—
(A) The payment of a monetary fine or penalty of $5,000 or more; or
(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.
(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .