333302-26-RF0010007 Install Emergency Generator at National Museum of American History (NMAH)
Cancelled Solicitation Posted
- Solicitation number
- 333302-26RF-0010007
- Agency
-
Smithsonian Institution
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Washington, District of Columbia, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Smithsonian Institution solicitation 333302-26-RF0010007 for installation of emergency generators at the National Museum of American History has been cancelled as of the most recent update, with the Smithsonian stating it is reviewing and updating project documents and requirements to ensure sufficient detail for responsive proposals. The revised RFP will be posted at a later date.
The original procurement, posted April 15 with a June 16 proposal deadline, sought a firm fixed-price construction contract to replace an aging 300 kW diesel-fueled generator with two new 500 kW natural gas-fueled generators mounted on the museum's roof. Work includes routing new natural gas lines through the building, converting existing collections storage space (Room 4606) into an Emergency Electrical Room with new switchboard, automatic transfer switches, transformers, and panelboards, decommissioning and removing the existing lower-level diesel generator, and performing all associated structural, mechanical, electrical, plumbing, security, hazardous material abatement, and architectural modifications. The museum remains fully operational and open to the public throughout construction.
Place of performance is 1300 Constitution Avenue NW, Washington, DC. The NAICS codes are 236220 (Commercial and Institutional Building Construction, $45.0 million size standard) and 238210 (Electrical Contractors and Other Wiring Installation Contractors, $19.0 million size standard). The construction budget exceeds $10 million, with $5 million allocated in FY 2026, $5 million in FY 2027, and remaining balance in FY 2028. No set-aside was used.
Key personnel requirements included a licensed Master Electrician superintendent with seven years' experience in generator replacement, a licensed Professional Electrical Engineer project manager with ten years' experience, and a Quality Control professional with ten years' construction experience. A mandatory pre-proposal site visit occurred April 28. Three amendments were issued: Amendment 1 establishing the site visit; Amendment 2 and Amendment 3 providing 39 cumulative responses to Requests for Information addressing generator specifications, docking station configurations, personnel qualifications, and design clarifications. The Smithsonian required a Small Business Subcontracting Plan targeting 40 percent of planned subcontracting dollars to small business concerns, with 7 percent to service-disabled Veteran-owned small business concerns. Award was to be made on best-value basis with technical evaluation weighted more heavily than cost.
Notice text
5 versions
Update #5 · Latest ·
Subject: CANCELLATION OF REQUEST FOR PROPOSAL 333302-26RF-0010007
After careful consideration it has been determined that cancellation of solicitation, 333302-26RF-0010007 for the Install Emergency Generator at National Museum of Natural History is necessary and in the best interest of the Smithsonian Institution.
The reason for this cancellation is to allow for the review and updating of the project documents and requirements. The updates are necessary to ensure that the solicitation accurately provides sufficient information for offerors to prepare responsive proposals.
We appreciate the time, effort, and resources you invested in preparing your response to this RFP. We apologize for any inconvenience this may cause. The revised RFP will be posted at a later date.
If you have any questions or would like further clarification, please feel free to contact me at grantCA@si.edu . Thank you again for your understanding and your interest in collaborating with us.
Update #4 ·
1. Amendment 1 - Sign In Sheet (see attachments).
2. Amendment 2 - RFI's ( see attachments)
3. Amendment 3 - RFI follow-up ( see attachments)
The Smithsonian Institution (“Smithsonian”) is providing this Notice of a Pending Solicitation for the installation of emergency generator at National Museum of American History (NMAH) 1300 Constitution Ave NW, Washington, D.C., 20560.
The applicable North American Industry Classification Codes (“NAICS”) are:
- 236220 - Commercial and Institutional Building Construction size standard is $45.0 million.
- 238210 – Electrical Contractors and Other Wiring Installation Contractors size standard is $19.0 million.
Construction Budget: Over $10M.
Project Information: The purpose of the NMAH: Install Emergency Generator project is to replace an aging 300 kW diesel-fueled generator located on the museum’s lower level, which has exceeded its operational lifespan. This will be accomplished by furnishing and installing two (2) new 500kW natural gas-fueled generators, on the roof adjacent to the existing emergency generator. The project also includes all necessary work to support the installation, including routing a new natural gas line through the building, and performing all associated structural, mechanical, electrical, plumbing, security, hazardous material abatement, and architectural modifications required to ensure full functionality, seamless integration with existing systems, and future serviceability and maintenance.
Specifically, work under this project includes but is not limited to:
- Install two (2) new natural gas powered 500kW generators with integral paralleling gear on a new rooftop structural steel platform. Convert existing collections storage space (Room 4606) to a new Emergency Electrical Room to contain a new switchboard, ATS’s, transformers and panelboards. Decommission and remove existing Diesel generator on lower level.
- Coordination between complex existing building which will remain fully operational and open to the public during the duration of the work and new electrical and gas service pathways throughout.
- Existing conditions documentation early in the construction phase for implementation into BIM models.
- Development of coordination and construction BIM models early in the construction phase that depict existing conditions and proposed service pathways to enable the short circuit Study.
- A short circuit study of the proposed project prior to equipment submittals.
- Protection of existing finishes in the areas of work.
- Subcontract with a qualified collections handler to relocate objects in the cabinets indicated in the logistics plan to storage location within the building. Collections handler and GC shall be insured and qualified to work in a collection’s environment.
- Relocation of collections storage equipment including shelves and cabinets.
- Installation of a new gas line throughout the building to the roof to serve the new generators, including a quality control in situ mock-up.
- Installation of new conduit, MI cabling, panelboards, and pull-boxes throughout the building. Removal of existing conduit, panelboards, and pull-boxes throughout the building.
- Working around existing IT/Fiber Optic within the 4th floor corridors to allow for new conduit installation.
- Two switchover events: One for existing temporary emergency power supplies and one for temporary to new emergency power supplies.
- Reinforcement of the existing structure to support the new generators.
- Removal of the existing diesel generator at the lower level.
- Testing for lead and asbestos on existing piping at new points of connection.
- Mechanical work in the lower level to provide new fuel oil pumps.
- Work within and adjacent to sensitive Collection Storage areas that will have access restrictions and will require security escort.
- Work within and adjacent to sensitive 5th floor spaces including the Library and the Director’s Suite.
- All work is within an operational Museum with both staff and the public present.
- Ceiling removals and installation on the 4th and 5th floors.
- Hot-work required to weld the gas and containment pipe sections, cutting of existing pipe, and heat producing hot applied roofing membrane.
- Erection of temporary construction safety barriers, dust and debris air filtration and localized welding fume extraction.
- Integration and coordination of new mechanical and generator control systems into existing Siemens BAS.
- Initial testing, commissioning and black start of new electrical emergency generator systems.
The museum will be open to visitors, and area adjacent to the construction site may remain open to visitors and staff.
Construction Schedule: Total period of performance allowed for construction is 669 calendar days from the Notice to Proceed.
This notice does not oblige the Government to award a contract or otherwise pay for the information provided in response.
TOUR OF THE SITE:
The tour will be conducted on April 28, 2026. Offerors can contact Christine Grant at grantca@si.edu to schedule.
QUESTIONS/ SUBMITTALS
It is desired that all questions be sent in word format, sequentially numbered for example first questions 1, 2, 3, second set of questions 4, 5, 6, etc. to grantca@si.edu . It is requested that all questions be sent in by May 12, 2026 no later than 3PM ET.
Proposals must be submitted via Dropbox June 16, 2026 no later than 3PM ET using the following link: https://www.dropbox.com/request/nYiuJ2GoTec73ZIPw6mV . Please upload two separate files, clearly labeled “Technical” and “Cost.”
SUBCONTRACTING PLAN REQUIREMENTS:
The successful Offeror submits with their proposal a Small Business Subcontracting Plan which will be evaluated for compliance with FAR 19.7.
For the purposes of this project, the following goals are considered reasonable and achievable during the term of the contract:
40 % a minimum of the planned subcontracting dollars to be placed with small business concerns. (The following are subsets of the small business goal):
7 % a minimum of the planned subcontracting dollars to be placed with service-disabled Veteran owned small business (SDVSB) concerns
Update #3 ·
1. Amendment 1 - Sign In Sheet (see attachments).
2. Amendment 2 - RFI's ( see attachments)
The Smithsonian Institution (“Smithsonian”) is providing this Notice of a Pending Solicitation for the installation of emergency generator at National Museum of American History (NMAH) 1300 Constitution Ave NW, Washington, D.C., 20560.
The applicable North American Industry Classification Codes (“NAICS”) are:
- 236220 - Commercial and Institutional Building Construction size standard is $45.0 million.
- 238210 – Electrical Contractors and Other Wiring Installation Contractors size standard is $19.0 million.
Construction Budget: Over $10M.
Project Information: The purpose of the NMAH: Install Emergency Generator project is to replace an aging 300 kW diesel-fueled generator located on the museum’s lower level, which has exceeded its operational lifespan. This will be accomplished by furnishing and installing two (2) new 500kW natural gas-fueled generators, on the roof adjacent to the existing emergency generator. The project also includes all necessary work to support the installation, including routing a new natural gas line through the building, and performing all associated structural, mechanical, electrical, plumbing, security, hazardous material abatement, and architectural modifications required to ensure full functionality, seamless integration with existing systems, and future serviceability and maintenance.
Specifically, work under this project includes but is not limited to:
- Install two (2) new natural gas powered 500kW generators with integral paralleling gear on a new rooftop structural steel platform. Convert existing collections storage space (Room 4606) to a new Emergency Electrical Room to contain a new switchboard, ATS’s, transformers and panelboards. Decommission and remove existing Diesel generator on lower level.
- Coordination between complex existing building which will remain fully operational and open to the public during the duration of the work and new electrical and gas service pathways throughout.
- Existing conditions documentation early in the construction phase for implementation into BIM models.
- Development of coordination and construction BIM models early in the construction phase that depict existing conditions and proposed service pathways to enable the short circuit Study.
- A short circuit study of the proposed project prior to equipment submittals.
- Protection of existing finishes in the areas of work.
- Subcontract with a qualified collections handler to relocate objects in the cabinets indicated in the logistics plan to storage location within the building. Collections handler and GC shall be insured and qualified to work in a collection’s environment.
- Relocation of collections storage equipment including shelves and cabinets.
- Installation of a new gas line throughout the building to the roof to serve the new generators, including a quality control in situ mock-up.
- Installation of new conduit, MI cabling, panelboards, and pull-boxes throughout the building. Removal of existing conduit, panelboards, and pull-boxes throughout the building.
- Working around existing IT/Fiber Optic within the 4th floor corridors to allow for new conduit installation.
- Two switchover events: One for existing temporary emergency power supplies and one for temporary to new emergency power supplies.
- Reinforcement of the existing structure to support the new generators.
- Removal of the existing diesel generator at the lower level.
- Testing for lead and asbestos on existing piping at new points of connection.
- Mechanical work in the lower level to provide new fuel oil pumps.
- Work within and adjacent to sensitive Collection Storage areas that will have access restrictions and will require security escort.
- Work within and adjacent to sensitive 5th floor spaces including the Library and the Director’s Suite.
- All work is within an operational Museum with both staff and the public present.
- Ceiling removals and installation on the 4th and 5th floors.
- Hot-work required to weld the gas and containment pipe sections, cutting of existing pipe, and heat producing hot applied roofing membrane.
- Erection of temporary construction safety barriers, dust and debris air filtration and localized welding fume extraction.
- Integration and coordination of new mechanical and generator control systems into existing Siemens BAS.
- Initial testing, commissioning and black start of new electrical emergency generator systems.
The museum will be open to visitors, and area adjacent to the construction site may remain open to visitors and staff.
Construction Schedule: Total period of performance allowed for construction is 669 calendar days from the Notice to Proceed.
This notice does not oblige the Government to award a contract or otherwise pay for the information provided in response.
TOUR OF THE SITE:
The tour will be conducted on April 28, 2026. Offerors can contact Christine Grant at grantca@si.edu to schedule.
QUESTIONS/ SUBMITTALS
It is desired that all questions be sent in word format, sequentially numbered for example first questions 1, 2, 3, second set of questions 4, 5, 6, etc. to grantca@si.edu . It is requested that all questions be sent in by May 12, 2026 no later than 3PM ET.
Proposals must be submitted via Dropbox June 16, 2026 no later than 3PM ET using the following link: https://www.dropbox.com/request/nYiuJ2GoTec73ZIPw6mV . Please upload two separate files, clearly labeled “Technical” and “Cost.”
SUBCONTRACTING PLAN REQUIREMENTS:
The successful Offeror submits with their proposal a Small Business Subcontracting Plan which will be evaluated for compliance with FAR 19.7.
For the purposes of this project, the following goals are considered reasonable and achievable during the term of the contract:
40 % a minimum of the planned subcontracting dollars to be placed with small business concerns. (The following are subsets of the small business goal):
7 % a minimum of the planned subcontracting dollars to be placed with service-disabled Veteran owned small business (SDVSB) concerns
Update #2 ·
1. Amendment 1 - Sign In Sheet (see attachments).
The Smithsonian Institution (“Smithsonian”) is providing this Notice of a Pending Solicitation for the installation of emergency generator at National Museum of American History (NMAH) 1300 Constitution Ave NW, Washington, D.C., 20560.
The applicable North American Industry Classification Codes (“NAICS”) are:
- 236220 - Commercial and Institutional Building Construction size standard is $45.0 million.
- 238210 – Electrical Contractors and Other Wiring Installation Contractors size standard is $19.0 million.
Construction Budget: Over $10M.
Project Information: The purpose of the NMAH: Install Emergency Generator project is to replace an aging 300 kW diesel-fueled generator located on the museum’s lower level, which has exceeded its operational lifespan. This will be accomplished by furnishing and installing two (2) new 500kW natural gas-fueled generators, on the roof adjacent to the existing emergency generator. The project also includes all necessary work to support the installation, including routing a new natural gas line through the building, and performing all associated structural, mechanical, electrical, plumbing, security, hazardous material abatement, and architectural modifications required to ensure full functionality, seamless integration with existing systems, and future serviceability and maintenance.
Specifically, work under this project includes but is not limited to:
- Install two (2) new natural gas powered 500kW generators with integral paralleling gear on a new rooftop structural steel platform. Convert existing collections storage space (Room 4606) to a new Emergency Electrical Room to contain a new switchboard, ATS’s, transformers and panelboards. Decommission and remove existing Diesel generator on lower level.
- Coordination between complex existing building which will remain fully operational and open to the public during the duration of the work and new electrical and gas service pathways throughout.
- Existing conditions documentation early in the construction phase for implementation into BIM models.
- Development of coordination and construction BIM models early in the construction phase that depict existing conditions and proposed service pathways to enable the short circuit Study.
- A short circuit study of the proposed project prior to equipment submittals.
- Protection of existing finishes in the areas of work.
- Subcontract with a qualified collections handler to relocate objects in the cabinets indicated in the logistics plan to storage location within the building. Collections handler and GC shall be insured and qualified to work in a collection’s environment.
- Relocation of collections storage equipment including shelves and cabinets.
- Installation of a new gas line throughout the building to the roof to serve the new generators, including a quality control in situ mock-up.
- Installation of new conduit, MI cabling, panelboards, and pull-boxes throughout the building. Removal of existing conduit, panelboards, and pull-boxes throughout the building.
- Working around existing IT/Fiber Optic within the 4th floor corridors to allow for new conduit installation.
- Two switchover events: One for existing temporary emergency power supplies and one for temporary to new emergency power supplies.
- Reinforcement of the existing structure to support the new generators.
- Removal of the existing diesel generator at the lower level.
- Testing for lead and asbestos on existing piping at new points of connection.
- Mechanical work in the lower level to provide new fuel oil pumps.
- Work within and adjacent to sensitive Collection Storage areas that will have access restrictions and will require security escort.
- Work within and adjacent to sensitive 5th floor spaces including the Library and the Director’s Suite.
- All work is within an operational Museum with both staff and the public present.
- Ceiling removals and installation on the 4th and 5th floors.
- Hot-work required to weld the gas and containment pipe sections, cutting of existing pipe, and heat producing hot applied roofing membrane.
- Erection of temporary construction safety barriers, dust and debris air filtration and localized welding fume extraction.
- Integration and coordination of new mechanical and generator control systems into existing Siemens BAS.
- Initial testing, commissioning and black start of new electrical emergency generator systems.
The museum will be open to visitors, and area adjacent to the construction site may remain open to visitors and staff.
Construction Schedule: Total period of performance allowed for construction is 669 calendar days from the Notice to Proceed.
This notice does not oblige the Government to award a contract or otherwise pay for the information provided in response.
TOUR OF THE SITE:
The tour will be conducted on April 28, 2026. Offerors can contact Christine Grant at grantca@si.edu to schedule.
QUESTIONS/ SUBMITTALS
It is desired that all questions be sent in word format, sequentially numbered for example first questions 1, 2, 3, second set of questions 4, 5, 6, etc. to grantca@si.edu . It is requested that all questions be sent in by May 12, 2026 no later than 3PM ET.
Proposals must be submitted via Dropbox June 16, 2026 no later than 3PM ET using the following link: https://www.dropbox.com/request/nYiuJ2GoTec73ZIPw6mV . Please upload two separate files, clearly labeled “Technical” and “Cost.”
SUBCONTRACTING PLAN REQUIREMENTS:
The successful Offeror submits with their proposal a Small Business Subcontracting Plan which will be evaluated for compliance with FAR 19.7.
For the purposes of this project, the following goals are considered reasonable and achievable during the term of the contract:
40 % a minimum of the planned subcontracting dollars to be placed with small business concerns. (The following are subsets of the small business goal):
7 % a minimum of the planned subcontracting dollars to be placed with service-disabled Veteran owned small business (SDVSB) concerns
Update #1 ·
The Smithsonian Institution (“Smithsonian”) is providing this Notice of a Pending Solicitation for the installation of emergency generator at National Museum of American History (NMAH) 1300 Constitution Ave NW, Washington, D.C., 20560.
The applicable North American Industry Classification Codes (“NAICS”) are:
- 236220 - Commercial and Institutional Building Construction size standard is $45.0 million.
- 238210 – Electrical Contractors and Other Wiring Installation Contractors size standard is $19.0 million.
Construction Budget: Over $10M.
Project Information: The purpose of the NMAH: Install Emergency Generator project is to replace an aging 300 kW diesel-fueled generator located on the museum’s lower level, which has exceeded its operational lifespan. This will be accomplished by furnishing and installing two (2) new 500kW natural gas-fueled generators, on the roof adjacent to the existing emergency generator. The project also includes all necessary work to support the installation, including routing a new natural gas line through the building, and performing all associated structural, mechanical, electrical, plumbing, security, hazardous material abatement, and architectural modifications required to ensure full functionality, seamless integration with existing systems, and future serviceability and maintenance.
Specifically, work under this project includes but is not limited to:
- Install two (2) new natural gas powered 500kW generators with integral paralleling gear on a new rooftop structural steel platform. Convert existing collections storage space (Room 4606) to a new Emergency Electrical Room to contain a new switchboard, ATS’s, transformers and panelboards. Decommission and remove existing Diesel generator on lower level.
- Coordination between complex existing building which will remain fully operational and open to the public during the duration of the work and new electrical and gas service pathways throughout.
- Existing conditions documentation early in the construction phase for implementation into BIM models.
- Development of coordination and construction BIM models early in the construction phase that depict existing conditions and proposed service pathways to enable the short circuit Study.
- A short circuit study of the proposed project prior to equipment submittals.
- Protection of existing finishes in the areas of work.
- Subcontract with a qualified collections handler to relocate objects in the cabinets indicated in the logistics plan to storage location within the building. Collections handler and GC shall be insured and qualified to work in a collection’s environment.
- Relocation of collections storage equipment including shelves and cabinets.
- Installation of a new gas line throughout the building to the roof to serve the new generators, including a quality control in situ mock-up.
- Installation of new conduit, MI cabling, panelboards, and pull-boxes throughout the building. Removal of existing conduit, panelboards, and pull-boxes throughout the building.
- Working around existing IT/Fiber Optic within the 4th floor corridors to allow for new conduit installation.
- Two switchover events: One for existing temporary emergency power supplies and one for temporary to new emergency power supplies.
- Reinforcement of the existing structure to support the new generators.
- Removal of the existing diesel generator at the lower level.
- Testing for lead and asbestos on existing piping at new points of connection.
- Mechanical work in the lower level to provide new fuel oil pumps.
- Work within and adjacent to sensitive Collection Storage areas that will have access restrictions and will require security escort.
- Work within and adjacent to sensitive 5th floor spaces including the Library and the Director’s Suite.
- All work is within an operational Museum with both staff and the public present.
- Ceiling removals and installation on the 4th and 5th floors.
- Hot-work required to weld the gas and containment pipe sections, cutting of existing pipe, and heat producing hot applied roofing membrane.
- Erection of temporary construction safety barriers, dust and debris air filtration and localized welding fume extraction.
- Integration and coordination of new mechanical and generator control systems into existing Siemens BAS.
- Initial testing, commissioning and black start of new electrical emergency generator systems.
The museum will be open to visitors, and area adjacent to the construction site may remain open to visitors and staff.
Construction Schedule: Total period of performance allowed for construction is 669 calendar days from the Notice to Proceed.
This notice does not oblige the Government to award a contract or otherwise pay for the information provided in response.
TOUR OF THE SITE:
The tour will be conducted on April 28, 2026. Offerors can contact Christine Grant at grantca@si.edu to schedule.
QUESTIONS/ SUBMITTALS
It is desired that all questions be sent in word format, sequentially numbered for example first questions 1, 2, 3, second set of questions 4, 5, 6, etc. to grantca@si.edu . It is requested that all questions be sent in by May 12, 2026 no later than 3PM ET.
Proposals must be submitted via Dropbox June 16, 2026 no later than 3PM ET using the following link: https://www.dropbox.com/request/nYiuJ2GoTec73ZIPw6mV . Please upload two separate files, clearly labeled “Technical” and “Cost.”
SUBCONTRACTING PLAN REQUIREMENTS:
The successful Offeror submits with their proposal a Small Business Subcontracting Plan which will be evaluated for compliance with FAR 19.7.
For the purposes of this project, the following goals are considered reasonable and achievable during the term of the contract:
40 % a minimum of the planned subcontracting dollars to be placed with small business concerns. (The following are subsets of the small business goal):
7 % a minimum of the planned subcontracting dollars to be placed with service-disabled Veteran owned small business (SDVSB) concerns
Files
Show all 13
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| 333302-26-RF0010007 NMAH: Install Emergency Generator | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity