2026 Distributed Wind Turbine Competitiveness Improvement Project
Open Solicitation Posted
- Solicitation number
- RFX-2026-10008
- Agency
-
Office of Science
Department of Energy
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- PSC
- AJ12 General Science And Technology R&D Services; General Science And Technology; Applied Research
- Place of performance
- Colorado 80007, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The National Laboratory of the Rockies (NLR), managed by Alliance for Energy Innovation, LLC under DOE Contract No. DE-AC36-08GO28308, is soliciting proposals on behalf of the Department of Energy for the 2026 Distributed Wind Turbine Competitiveness Improvement Project, with proposals due November 16, 2026 at 12:00 PM MST as extended by Amendment No. 2. The solicitation, RFX-2026-10008, carries no set-aside and is open to any offeror that meets the mandatory qualifications: U.S. incorporation, electrical power output, U.S.-based work unless justified, new turbine hardware, and current relevant certifications.
The project covers thirteen topic areas: seven wind turbine development areas, three power electronics areas, and three common areas (Manufacturing Process Innovation, Technology Commercialization, and Field Validation). Per the Government File summary of the RFP, awards range from $200,000 to $800,000 per topic, with minimum price participation of 20% to 50%. The anticipated period of performance is 21 months per topic, up to 60 months for Field Validation. Offerors may submit single-topic proposals of up to 15 pages or multi-topic proposals of up to three topic areas of up to 20 pages, with multi-topic work proceeding serially through go/no-go gates. Small Turbine Certification and/or Listing is capped at 150 kW, and other turbine topics are generally capped at 1,000 kW. Component innovation requires a baseline turbine design with stated OEM support.
The listed place of performance is Arvada, Colorado 80007. Work must occur in the United States or its territories unless otherwise justified and approved. Active SAM.gov registration is required at award, not at proposal submission. Required submissions include the Eligibility Verification form, Figure of Merit-Cost of Energy, Turbine/Power Electronics Specifications, Deliverable Summary Table, price/cost proposal, representations and certifications, and organizational conflict of interest statements.
NLR will award on a Best Value basis. Qualitative merit is substantially more important than evaluated price. Proposals are emailed to Kyndall.Jackson@nlr.gov, the Subcontract Administrator. Amendment No. 1 (October 26, 2026) answered 62 offeror questions and did not change the receipt date. Amendment No. 2 (November 10, 2026) moved the deadline from November 13 at 2:00 PM MT to November 16 at 12:00 PM MST.
Notice text
3 versions
Update #3 · Latest ·
11/10/26 Amendment No. 2 extends the due date to November 16th at 12:00 PM MST.
10/26/26 Amendment No. 1 posted in reponsonse to questions.
The 2026 Distributed Wind Turbine Competitiveness Improvement Project (CIP) is comprised of thirteen (13)
different topic areas, as specified in the Statement of Work (Attachment 1), dated September 14, 2026:
Wind turbine development topic areas
1. Prototype Design Development
2. Prototype Manufacture
3. Prototype Installation and Testing
4. Component Innovation
5. System Optimization
6. Small Turbine Certification and/or Listing
7. Type Certification and Listing
Power electronics development topic areas
8. Power Electronics Development
9. Power Electronics Pre-Testing
10. Power Electronics Listing
Topics areas common to turbine and power electronics development
11. Manufacturing Process Innovation
12. Technology Commercialization
13. Field Validation
Update #2 ·
10/26/26 Amendment No. 1 posted in reponsonse to questions.
The 2026 Distributed Wind Turbine Competitiveness Improvement Project (CIP) is comprised of thirteen (13)
different topic areas, as specified in the Statement of Work (Attachment 1), dated September 14, 2026:
Wind turbine development topic areas
1. Prototype Design Development
2. Prototype Manufacture
3. Prototype Installation and Testing
4. Component Innovation
5. System Optimization
6. Small Turbine Certification and/or Listing
7. Type Certification and Listing
Power electronics development topic areas
8. Power Electronics Development
9. Power Electronics Pre-Testing
10. Power Electronics Listing
Topics areas common to turbine and power electronics development
11. Manufacturing Process Innovation
12. Technology Commercialization
13. Field Validation
Update #1 ·
The 2026 Distributed Wind Turbine Competitiveness Improvement Project (CIP) is comprised of thirteen (13)
different topic areas, as specified in the Statement of Work (Attachment 1), dated September 14, 2026:
Wind turbine development topic areas
1. Prototype Design Development
2. Prototype Manufacture
3. Prototype Installation and Testing
4. Component Innovation
5. System Optimization
6. Small Turbine Certification and/or Listing
7. Type Certification and Listing
Power electronics development topic areas
8. Power Electronics Development
9. Power Electronics Pre-Testing
10. Power Electronics Listing
Topics areas common to turbine and power electronics development
11. Manufacturing Process Innovation
12. Technology Commercialization
13. Field Validation
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Distributed Wind Competitiveness Improvement Project | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Building America Subject Matter Expert Technical Support | Office of Science | No set-aside | |
| National Laboratory of the Rockies Energy Systems Integration Facility (ESIF) HIGH PERFORMANCE COMPUTING PRE-SOLICITATION NOTICE | Office of Science | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity