127EAW26Q0041 - Cone Peak Road Repairs
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 127EAW26Q0041
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Big Sur, California 93920, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Agriculture Forest Service seeks repair of storm-damaged sections of Cone Peak Road (FS Road 20S05.3) in the Los Padres National Forest near Big Sur, California, with quotes due August 20, 2026, at 10 AM Pacific Time. This is a Total Small Business Set Aside; the RFI deadline is August 5, 2026, at 10 AM Pacific Time. A mandatory Forest Service-led site visit is scheduled for July 28, 2026, at 10 AM at the Intersection of Nacimiento Ferguson Road and Cone Peak Road.
Place of performance is Big Sur, CA 93920. The work spans seven repair sites along approximately one mile of road damaged in 2023 storm events. The base bid covers Sites 1, 2, and 6; two optional bid items cover the remaining sites. Work includes reinforced soil slope construction, culvert installation (ranging from 12 inches to 60 inches in diameter), drop inlet structures, drainage systems, riprap placement, erosion control, clearing and grubbing across 3.0 miles of brushing along the road, and road reconditioning. The NAICS code is 237310, Highway, Street, and Bridge Construction, with a small business size standard of $45 million.
The contractor must hold an active California Class A General Engineering Contractor license and commence work within 10 calendar days of Notice to Proceed, with completion required within 180 calendar days. An organized site visit is mandatory; failure to inspect the site does not constitute grounds for claims after award. The contract will be awarded on a Firm Fixed Price basis to the offeror providing the most technically advantageous solution. Evaluation prioritizes technical approach, key personnel, performance schedule, past performance, and price fairness and reasonableness; award will not necessarily go to the lowest-priced offeror. Offerors must submit technical approach (maximum 5 pages), key personnel qualifications (maximum 3 pages), performance schedule using Critical Path Method or Gantt chart (maximum 2 pages), past performance documentation listing three similar projects from the last three years (maximum 3 pages), completed SF 1442 with unit and total pricing, and scanned bid guarantee on Standard Form 24 with Power of Attorney. Performance and payment bonds are required within 10 calendar days of award. Davis-Bacon Act prevailing wage rates apply; the wage determination (CA20260018, Modification 6, effective July 14, 2026) covers Monterey County construction trades. All work must comply with updated project plans dated March 2026 (incorporated by Amendment A00002 posted August 13, 2026); failure to use revised documents will result in non-responsive proposals. Contractors must hire third-party geotechnical firms for compaction testing, develop and implement a Stormwater Pollution Prevention Plan, obtain all required state and county permits, register in SAM.gov, and hold prices firm for 60 calendar days from the offer due date. RFIs must be submitted using the RFI Form attachment and emailed to Contracting Officer Gregory Cunningham (Gregory.Cunningham@usda.gov); telephone requests will not be accepted. Quotes must be emailed to the same address.
Notice text
3 versions
Update #3 · Latest ·
127EAW26Q0041 - Cone Peak Road Repairs: A00002 - RFI Responses
The purpose of this amendment is to post RFI responses, and updated drawings.
Attached is "127EAW26Q0041 - RFI Log" and "4. Cone Peak Road Project Plans - Updated March 2026" which are hereby incorporated into any subsequent contract award. Failure to use the revised documents and requirements revised within will result in your proposal being non-responsive.
////////////////////////////////////////////////////////////////////////////////////
127EAW26Q0041 - Cone Peak Road Repairs: A00001 - Time Extension
The purpose of this amendment is to extend the quote due date while awaiting RFI responses.
Quote due date / time is hereby extended from 08/14/2026 to 08/20/2026, 10:00 AM PST.
////////////////////////////////////////////////////////////////////////////////////
127EAW26Q0041 - Cone Peak Road Repairs
Set Aside: Total Small Business Set Aside
IMPORTANT NOTES:
- See Section "Required Quote Submission Documents" for the Documents to Submit with Your Proposal
- An organized, Forest Service led, site visit will be held. See attachment "1. Statement of Work" for full details. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
PLEASE RSVP TO THE SITE VISIT BY EMAILING: GREGORY.CUNNINGHAM@USDA.GOV
- Requests For Information (RFI’s) are required to be submitted on attachment “RFI Form” and are due to the Contracting Officer (Gregory.Cunningham@usda.gov) via email no later than August 5th, 2026, 10:00 AM Pacific Time. No questions will
be accepted after this date and time.
- All quotes shall be emailed to the Contracting Officer (Gregory.Cunningham@usda.gov) no later than August 14th, 2026, 10:00 AM Pacific Time.
Update #2 ·
127EAW26Q0041 - Cone Peak Road Repairs: A00001 - Time Extension
The purpose of this amendment is to extend the quote due date while awaiting RFI responses.
Quote due date / time is hereby extended from 08/14/2026 to 08/20/2026, 10:00 AM PST.
////////////////////////////////////////////////////////////////////////////////////
127EAW26Q0041 - Cone Peak Road Repairs
Set Aside: Total Small Business Set Aside
IMPORTANT NOTES:
- See Section "Required Quote Submission Documents" for the Documents to Submit with Your Proposal
- An organized, Forest Service led, site visit will be held. See attachment "1. Statement of Work" for full details. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
PLEASE RSVP TO THE SITE VISIT BY EMAILING: GREGORY.CUNNINGHAM@USDA.GOV
- Requests For Information (RFI’s) are required to be submitted on attachment “RFI Form” and are due to the Contracting Officer (Gregory.Cunningham@usda.gov) via email no later than August 5th, 2026, 10:00 AM Pacific Time. No questions will
be accepted after this date and time.
- All quotes shall be emailed to the Contracting Officer (Gregory.Cunningham@usda.gov) no later than August 14th, 2026, 10:00 AM Pacific Time.
Update #1 ·
127EAW26Q0041 - Cone Peak Road Repairs
Set Aside: Total Small Business Set Aside
IMPORTANT NOTES:
- See Section "Required Quote Submission Documents" for the Documents to Submit with Your Proposal
- An organized, Forest Service led, site visit will be held. See attachment "1. Statement of Work" for full details. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
PLEASE RSVP TO THE SITE VISIT BY EMAILING: GREGORY.CUNNINGHAM@USDA.GOV
- Requests For Information (RFI’s) are required to be submitted on attachment “RFI Form” and are due to the Contracting Officer (Gregory.Cunningham@usda.gov) via email no later than August 5th, 2026, 10:00 AM Pacific Time. No questions will
be accepted after this date and time.
- All quotes shall be emailed to the Contracting Officer (Gregory.Cunningham@usda.gov) no later than August 14th, 2026, 10:00 AM Pacific Time.
Files
Show all 14
Notice history
| Notice | Type | Posted |
|---|---|---|
| 127EAW26Q0041 - Cone Peak Road Repairs | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| GAOA Facilities, Barracks Inyo NF | Forest Service | Total Small Business | |
| Jake Rocks Road Reconstruction | Forest Service | Total Small Business | |
| Humbolt pacific crest trail bridge replacement | Forest Service | No set-aside | |
| Custer Gallatin National Forest Ashland and Sioux Road Maintenance | Region 6 - Pacific Northwest Region | Total Small Business | |
| Administrative Parking Lot Repairs | Forest Service | Total Small Business |