4. Cone Peak Road Project Plans.pdf
PDF 6 MB Posted
- Attached to
- 127EAW26Q0041 - Cone Peak Road Repairs
- Solicitation number
- 127EAW26Q0041
- Issued by
-
Department of Agriculture Forest Service
About this file
This is a set of engineering design drawings for storm damage repair work on Forest Service Road (FSR) 20S05.3 located within the Los Padres National Forest, Monterey Ranger District, California.
The project encompasses seven repair sites spanning approximately 45 miles of forest road requiring comprehensive storm damage restoration. Key work includes installation of multiple corrugated metal pipe (CMP) culverts ranging from 12 inches to 60 inches in diameter with lengths from 20 to 92 feet, reinforced soil slope construction with geotextile and geogrid reinforcement, drop inlet structures (48-inch to 60-inch dimensions), and downdrain pipe systems with protective aprons. Additional work involves overside drain installation, rolling dips for water management, road reconditioning to elevations ranging from 3,032 to 3,092 feet, riprap placement (Class 2, ranging from 10 to 200 cubic yards per site), and erosion control measures including silt fencing, hay bale barriers, rock water bars, and slope drain details. Construction specifications require Class 1 non-woven geotextile, HDPE drain pipe, Mirafi filter fabric, geosynthetic reinforcement (Tensarinc UX1600 MSE or equivalent), and compaction to 95 percent modified AASHTO density. The drawings specify no known control points with actual field locations and staking to be conducted by contractor and approved by the Contracting Officer Representative prior to work commencement. Design drawings are dated January 11, 2025, with erosion control detail sheets updated August 25, 2025.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOREST LOCATION MAP
PROJECT LOCATION MAP
TRAVEL DIRECTIONS:
SHEET OF
United States Department of Agriculture Forest Service
FSR 20S05.3 STORM DAMAGE REPAIR
FROM BRADLEY, CA HEAD NORTH ON TO US HWY 101 NORTH. GET OFF AT EXIT 252 JOLON ROAD TOWARDS FORT HUNTER-LIGGETT. STAY ON JOLON ROAD FOR 21.3 MILES, TURN LEFT ON TO MISSION ROAD AND STAY ON THIS ROADWAY FOR 4 MILES. TAKE A SHARP LEFT TO STAY ON MISSION ROAD, THIS TURNS INTO NACIMIENTO - FERGUSSON ROAD. STAY ON NACIMIENTO - FERGUSSON ROAD FOR
17 MILES. TURN RIGHT ON TO FSR 20S05.3 (CONE PEAK ROAD) AND CONTINUE FOR 3 MILES
GREAT DIVIDE DISTRICT OFFICE
22223 STATE HIGHWAY 13
GLIDDEN, WI 54527
RECOMMENDED BY:
APPROVED:
FOREST ENGINEER
DISTRICT RANGER DATE
DATE
DIRECTOR OF ENGINEERING DATE
FOREST SUPERVISOR DATE
RO FACILITIES PROGRAM MANAGER DATE
/22
/25
:4 4 F
KU
RA
MA
TA
F :\D
OC
UM
EN
TS
\L
OS
P
AD
RE
S\
PR
OJ
EC
TS
\C
ON
E
PE
AK
\L
PN
F_
CO
NE
PE
AK
_2
JB
ED
IT
S2
DW
G.
DW
G;
CALIFORNIA
MONTEREY COUNTY
(R05) SOUTTHWEST PACIFIC REGION
LOS PADRES NATIONAL FOREST
MONTEREY RANGER DISTRICT
INDEX OF SHEETS
SHEET SHEET TITLE DATE
G-101 COVERSHEET 01/11/25
C-102 SITE 2 SITE PLAN 01/11/25
C-103 SITE 2 RSS CROSS SECTION, CULVERT ALIGNMENT AND DRAIN
DETAILS 01/11/25
C-104 SITE 2 REINFORCED SOIL SLOPE 01/11/25
C-105 SITE 2 CULVERT DETAILS 01/11/25
C-106 DOWNDRAIN DETAILS 01/11/25
C-107 DOWNDRAIN ANCHOR ASSEMBLY DETAILS 01/11/25
C-108 DROP INLET DETAILS 8/25/2025
C-109 EROSION CONTROL DETAILS 8/25/2025
SITE 2
+5
+0
+5
+0
14+50
15+00
15+50
16+00
16+50
17+00
17+50
18+00
PROP. 24" X 32' CULVERT
PROP DROP INLET 48"X48"
TYPE "A" INLET
PROP. REINFORCED SOIL SLOPE
END ROAD
RECONDITIONING.
ROAD ELEV. TO 3042
BEGIN ROAD
RECONDITIONING.
ROAD ELEV. TO 3042
PROP. 24" X 34' CULVERT
PROP DROP INLET 48"X48"
TYPE "A" INLET
10 C.Y. CLASS
2 RIP-RAP
10 C.Y. CLASS
2 RIP-RAP
PROP. 24" X 32' CULVERT
PROP DROP INLET 48"X48"
PROPOSED DOWNDRAIN 24" X 60'
TYPE "A" INLET'
200 C.Y. CLASS
2 RIP-RAP
SITE #2
200 C.Y. CLASS
EXCAVATE BASIN TO
ACCOMODATEDROP INLET.
FIELD ADJUSTMENT AS NEEDED
EXCAVATE BASIN TO ACCOMODATE
DROP INLET. FIELD ADJUSTMENT AS NEEDED
EXCAVATE BASIN TO ACCOMODATE
DROP INLET. FIELD ADJUSTMENT AS NEEDED
16.0' 75'
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/22
/25
:4 4 F
KU
RA
MA
TA
F :\D
OC
UM
EN
TS
\L
OS
P
AD
RE
S\
PR
OJ
EC
TS
\C
ON
E
PE
AK
\L
PN
F_
CO
NE
PE
AK
_2
JB
ED
IT
S2
DW
G.
DW
G;
(R05) Pacific Southwest Region
FSR 20S05.3 -
Storm Damage
Los Padres National Forest
MONTEREY
RANGER DISTRICT
SITE 2 SITE PLAN
XX/XX/XXXX
B.COUPE
B.COUPE
F.K.
C-102 2 09
No known control points. Actual locations shall be located in the field and staked by
Contractor. Staking to be approved by COR prior to commencement of work.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
EL
EV
AT
IO
N (F
EE
T)
OFFSET (FEET)
0 10 20 30 40 50 60 70 80 900-10-20-30-40-50-60-70
ROADWAY ELEV.
ft.
SEE SLOPE DRAIN DETAILS
SLOPE SOLID PIPE 2% TO DAYLIGHT
200 C.Y. CLASS 2 RIP-RAP
EXISTING
TOPOGRAPHYGEO-COMPOSITE
ON BACK SLOPE
PROP. REINFORCED SOIL SLOPE
PLACE 4" SURFACE COURSE AGGREGATE.
MAINTAIN MIN. 1 FT COVER OVER RSS
SUBMIT DETAILS PER SECTION 261 FOR A
CONTRACTOR DESIGNED RSS
BURY TOE
MIN 4'
MAINTAIN MIN 2
FT COVER OVER
CULVERT. CULVERT CMP
24 IN, 35 FT
CULVERT CMP
DOWNDRAIN 24
IN, 58 FT
DROP INLET 48"X48"
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/22
/25
:4 4 F
KU
RA
MA
TA
F :\D
OC
UM
EN
TS
\L
OS
P
AD
RE
S\
PR
OJ
EC
TS
\C
ON
E
PE
AK
\L
PN
F_
CO
NE
PE
AK
_2
JB
ED
IT
S2
DW
G.
DW
G;
(R05) Pacific Southwest Region
FSR 20S05.3 -
Storm Damage
Los Padres National Forest
MONTEREY
RANGER DISTRICT
SITE 2 RSS CROSS
SECTION, CULVERT
ALIGNMENT DRAIN
DETAILS
01/11/2025
B.COUPE
B.COUPE
F.K.
C-103 3 09
SLOPE DRAIN DETAILS
AutoCAD SHX Text Single Sided Drainage Geocomposite - drainage face up
AutoCAD SHX Text 4" diameter double walled perforated HDPE pipe
AutoCAD SHX Text Granular backfill conforming to requirements outlined in Section 703.03 (a) of the FP-24.
AutoCAD SHX Text
SUBDRAIN DETAIL
AutoCAD SHX Text Dashed Lines indicate portions of geomcomposite which filter fabric is to be removed
AutoCAD SHX Text Mirafi filterweave fabric or equivalent monfilament.
AutoCAD SHX Text
SLOPE ON DRAINS SHALL BE APPROXIMATELY 2%
AutoCAD SHX Text
4" DIAM SOLID GALV STEEL OUTLET PIPE- EXTEND TO GROUND SURFACE
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/22
/25
:4 4 F
KU
RA
MA
TA
F :\D
OC
UM
EN
TS
\L
OS
P
AD
RE
S\
PR
OJ
EC
TS
\C
ON
E
PE
AK
\L
PN
F_
CO
NE
PE
AK
_2
JB
ED
IT
S2
DW
G.
DW
G;
(R05) Pacific Southwest Region
FSR 20S05.3 -
Storm Damage
Los Padres National Forest
MONTEREY
RANGER DISTRICT
SITE 2 REINFORCED SOIL
SLOPE
01/11/2025
B.COUPE
B.COUPE
F.K.
C-104 4 09
AutoCAD SHX Text
25 FEET
AutoCAD SHX Text
25 FEET
AutoCAD SHX Text
25 FEET
AutoCAD SHX Text
25 FEET
AutoCAD SHX Text
25 FEET
AutoCAD SHX Text
25 FEET
AutoCAD SHX Text
25 FEET
AutoCAD SHX Text
25 FEET
AutoCAD SHX Text
25 FEET
AutoCAD SHX Text
25 FEET
AutoCAD SHX Text
25 FEET
AutoCAD SHX Text
25 FEET
AutoCAD SHX Text
25 FEET
AutoCAD SHX Text
25 FEET
AutoCAD SHX Text
25 FEET
AutoCAD SHX Text 4 degrees on bench to direct drainage. Compact to 95% T180. Level up bench upon installing drain prior to construction of wall.
AutoCAD SHX Text
2 FEET
AutoCAD SHX Text
1 FOOT
AutoCAD SHX Text
EROSION CONTROL MAT
AutoCAD SHX Text REQUIRED MATERIALS: 1. DRAIN PIPE: For NON PERFORATED DAYLIGHTED SECTION, USE A NON-COMBUSTABLE PRODUCT SUCH AS STAINLESS STEEL OF GALVENIZED STEEL 2. GEOCOMPOSITE: USE DOUBLE SIDED DRAIN 3. HDPE FILTER FABRIC GEOTEXTILE: Use Mirafi monofilament (filterweave) or equivalent. 4. GEOGRID: Tensar UX1700 MSE or equivalent.or equivalent.
AutoCAD SHX Text
5 FEET
AutoCAD SHX Text
5 FEET
AutoCAD SHX Text
5 FEET
AutoCAD SHX Text
5 FEET
AutoCAD SHX Text
5 FEET
AutoCAD SHX Text
5 FEET
AutoCAD SHX Text
5 FEET
AutoCAD SHX Text
5 FEET
AutoCAD SHX Text
5 FEET
AutoCAD SHX Text
5 FEET
AutoCAD SHX Text
5 FEET
AutoCAD SHX Text
5 FEET
AutoCAD SHX Text
5 FEET
AutoCAD SHX Text
5 FEET
AutoCAD SHX Text
RIP-RAP 200 CU. YD.
AutoCAD SHX Text Mirafi Filter Weave
AutoCAD SHX Text Erosion Mat
AutoCAD SHX Text Mirafi Filter Weave
AutoCAD SHX Text Geogrid
AutoCAD SHX Text REQUIRED MATERIALS: 1. HDPE DRAIN PIPE: Non-perforated and perforated, double walled, 4" diameter HDPE pipe. Use Hancor Hi-Q or equivalent. 2. GEOCOMPOSITE: Use Aquadrain 20H on foundation with the drainage surface facing up or equivalent. 3. HDPE FILTER FABRIC GEOTEXTILE: Use Mirafi monofilament (filterweave) or equivalent. 4. WELDED WIRE RETAINING WALL: Hilfiker or equivalent. 5. GEOGRID: Tensar UX1700 MSE or equivalent.or equivalent.
AutoCAD SHX Text REINFORCED SOIL SLOPE - MAXIMUM SECTION PROVIDE RSS DESIGN AS PART OF PAY ITEM 261 - REINFORCED SOIL SLOPES
AutoCAD SHX Text
1:1.5 SLOPE
AutoCAD SHX Text CONSTRUCTION NOTES: 1. ALL OF THE MATERIALS THAT ARE ALL OF THE MATERIALS THAT ARE EXCAVATED FROM THE SLOPE WILL BE SALVAGED FOR THE CONSTRUCTION OF THE REINFORCED SOIL SLOPE, RETAINING WALL, AND BUILDING UP THE ROAD GRADE.THE REINFORCED SOIL SLOPE MUST BE CONSTRUCTED FIRST. 2. EXCAVATION MUST LEAVE IN 3 FT EXCAVATION MUST LEAVE IN 3 FT X 3FT BENCHES FOR INTERLOCKING OF EXISTING AND NEW FILL. 3. THE RIP-RAP KEY AT THE TOE OF THE RIP-RAP KEY AT THE TOE OF THE SLOPE IS 2 FT X 20 FT. 4 FT WILL EXTEND OUT FROM THE TOE OF THE SLOPE AND RUN UP THE SLOPE TO ELEV. 2994 FT. BOTTOM ELEV. OF THE RIP-RAP KEY IS 2988 FT. 4. THE BOTTOM LAYER OF THE THE BOTTOM LAYER OF THE REINFORCED SOIL SLOPE WILL BE AT ELEV. 2990 FT. 5. THERE ARE TWO REINFORCEMENTS THERE ARE TWO REINFORCEMENTS ON THE SLOPE; GEOGRID (25 FT LONG, PLACED IN 2 FT LIFTS), AND GEOFABRIC (5 FT LONG, PLACED IN 1 FT LIFTS BETWEEN THE GEOGRID LAYERS. 6. THE SLOPE OF SOLID PIPE THE SLOPE OF SOLID PIPE SECTION WILL DAYLIGHT AT A 2% SLOPE AT STATIONS 15+00, 15+35, 15+75. LENGTH OF PIPE NEEDED IS AT EACH STATION IS APPROXIMATELY 45 FT. FIELD VERIFY PRIOR TO INSTALLATION. 7. COMPACTION WILL BE TO 95%.COMPACTION WILL BE TO 95%.
AutoCAD SHX Text Geocomposite
AutoCAD SHX Text
25 FEET
AutoCAD SHX Text
5 FEET
AutoCAD SHX Text
25 FEET
AutoCAD SHX Text
5 FEET
AutoCAD SHX Text
25 FEET
AutoCAD SHX Text
5 FEET
AutoCAD SHX Text
25 FEET
AutoCAD SHX Text
5 FEET
AutoCAD SHX Text
25 FEET
AutoCAD SHX Text
5 FEET
AutoCAD SHX Text Mirafi Filter Weave
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
DIAMETER
VARIES
12"MIN
COVER
NOTES - ALL ROADS:
1. THE OUTLETS OF ALL PIPE TO BE INSTALLED AND ALL EXISTING PIPE TO REMAIN SHALL BE CONSTRUCTED OR RECONSTRUCTED TO PROVIDE FOR A
MINIMUM OF A -1% DRAINAGE SLOPE AWAY FROM ALL CSP FOR A MINIMUM OF 50'. WHERE NECESSARY, CULVERTS SHALL HAVE A LEAD OFF DITCH OF SUFFICIENT LENGTH TO ASSURE AN ADEQUATE DRAINAGE OUTLET. PAYMENT FOR THE CONSTRUCTION OF LEAD OFF DITCHES UP TO 50' HAS
BEEN INCLUDED IN CULVERT PAY ITEMS.
2. CULVERTS NOTED TO BE SKEWED ON THE PLANS SHALL BE SKEWED AS STAKED BY THE ENGINEER.
3. ALL EXISTING PIPE LISTED FOR REMOVAL SHALL BE DISPOSED OFF GOVERNMENT PROPERTY. IN MULTIPLE PIPE INSTALLATIONS, THE ADJACENT
SIDES OF PIPE SHALL BE AT LEAST ONE-HALF THE NOMINAL PIPE DIAMETER APART OR 3', WHICHEVER IS LESS.
4. BACKFILL AROUND CULVERTS IS COMPACTION METHOD B, OF SPECIAL PROJECT SPECIFICATIONS SUB PARAGRAPH 209.11 - “ADJUST THE MOISTURE
CONTENT OF THE BACKFILL MATERIAL TO A MOISTURE CONTENT SUITABLE FOR COMPACTION. COMPACT EACH LAYER USING APPROPRIATE
COMPACTION EQUIPMENT UNTIL VISUAL DISPLACEMENT CEASES.”
5. ALL GROUND DISTURBED OUTSIDE OF THE ROADBED IS REQUIRED TO BE SEEDED AND MULCHED, UNLESS NOTED OTHERWISE.
6. PIPE INSTALLATIONS LISTED AS "DEEP FILL" HAVE 5' OR MORE OF COVER AND PAYMENT INCLUDES CONSIDERATION FOR ADDITIONAL EXCAVATION
WORK REQUIRED AT THESE LOCATIONS.
7. POLYMERIC COATED CORRUGATED STEEL PIPE MAY BE SUBSTITUTED FOR ALUMINUM COATED, TYPE 2 CORRUGATED STEEL PIPE AND WILL BE
CONSIDERED AS EQUAL FOR PAYMENT. WHERE POLYMERIC COATED PIPE IS USED, THICKNESS OF COATING SHALL BE 10 MILS INSIDE AND 10 MILS OUTSIDE. POLYMERIC COATED PIPE MAY NOT BE BANDED TO ALUMINUM COATED OR SOLID ALUMINUM PIPE. ALL EXPOSED METAL OR AREAS OF PIPE WHERE POLYMERIC OR ALUMINUM COATING IS DAMAGED SHALL BE PAINTED WITH A ZINC DUST-ZINC OXIDE POWDER CONFORMING TO FEDERAL SPECIFICATION TT-P-641 OR MIL-P-21085 AND A TWO COMPONENT EPOXY PAIN, "SCOTCH CLAD", 2M, PPG OR EQUAL. THIS WORK SHALL BE
CONSIDERED INCIDENTAL TO CULVERT PAY ITEMS.
8. 18" MINIMUM BANDING OR LARGER WILL BE REQUIRED TO ATTACH MULTIPLE SECTIONS OF PIPE 36-INCHES IN DIAMETER OR LARGER.
9. MASTIC SEALANT REQUIRED ON ALL PIPES LARGER THAN 48" REQUIRING BANDING. THE MASTIC SHALL CONFORM TO AASHTO M 243. PIPES
SMALLER THAN 48" SHALL BE SEALED WITH MASTIC IF ANY GAPS BETWEEN PIPES IS GREATER THAN 1.5"
TYPICAL CULVERT INSTALLATION
N.T.S.
DIAMETER
12" MIN
COVER
VARIES
24" MIN
2%MIN
TYPICAL CULVERT INSTALLATION DETAILS
COMPACTED FILL
PER FP-14 SECT 209.11
METHOD C,
REMOVE LARGE
LOOSE ROCKS
12"MIN
GRAVEL
PER PLAN
Ø
PIPE INSTALLATION
BEDDING PER
FP-14 209.09(b)
Ø/2
NOTES:
1. RIPRAP CLASS 2, PLACEMENT METHOD A IS REQUIRED. GRADATION SHALL BE AS REQUIRED IN
STANDARD SPECIFICATION TABLE 705-1, WHICH IS AS FOLLOWS:
PERCENT OF ROCK RANGE OF INTERMEDIATE
EQUAL OR SMALLER WEIGHT DIMENSIONS
BY COUNT, Dx (POUNDS) (INCHES) 100 270-750 15-21 85 110-270 11-15 50 42-110 8-11 15 10-42 6-8
2. GEOTEXTILES SHALL BE PLACED UNDER RIPRAP IN ALL INSTALLATIONS AND SHALL MEET THE REQUIREMENTS FOR TYPE IV-D OF SECTION 714.01 OF THE SPECIFICATIONS OF FP-14. GEOTEXTILE
SHALL BE NONWOVEN. PAYMENT FOR GEOTEXTILES IS INCIDENTAL, INCLUDED IN PAY ITEM
25101-1. IN NARROW CHANNELS, ADJUST ROCK TO FIT STREAMBANKS.
NOTES:
1. CULVERT SPECS
EXISTING EXISTING
DIAMETER SKEW TO REMOVE
STATION (INCHES) DEGREES REMAIN & DISPOSE
14+75 24 17 0 0 16+25 24 0 0 0
2. THERE ARE TWO OVER DRAINS PRESENT AT THIS SITE BY STATION 15+25. THESE WILL BE
SET ASIDE FOR GOVERNMENT USE.
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/22
/25
:4 4 F
KU
RA
MA
TA
F :\D
OC
UM
EN
TS
\L
OS
P
AD
RE
S\
PR
OJ
EC
TS
\C
ON
E
PE
AK
\L
PN
F_
CO
NE
PE
AK
_2
JB
ED
IT
S2
DW
G.
DW
G;
(R05) Pacific Southwest Region
FSR 20S05.3 -
Storm Damage
Los Padres National Forest
MONTEREY
RANGER DISTRICT
CULVERT & INLET
DETAILS
01/11/2025
B.COUPE
B.COUPE
F.K.
C-105 5 09
AutoCAD SHX Text
1.5:1MAX
AutoCAD SHX Text 1.5:1
AutoCAD SHX Text
%%UTYPICAL CULVERT INSTALLATION WITH INLET BASIN
AutoCAD SHX Text
1.5:1MAX
AutoCAD SHX Text
2% MIN.
AutoCAD SHX Text 1.5:1
AutoCAD SHX Text
1:1MAX
AutoCAD SHX Text
CAMBER SHALL BE A MINIMUM OF OF 1% OF THE PIPE LENGTH12 OF 1% OF THE PIPE LENGTH
AutoCAD SHX Text
CAMBER SHALL BE A MINIMUM OF OF 1% OF THE PIPE LENGTH12 OF 1% OF THE PIPE LENGTH
AutoCAD SHX Text
"SUBGRADE"
AutoCAD SHX Text
"SUBGRADE"
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/22
/25
:4 4 F
KU
RA
MA
TA
F :\D
OC
UM
EN
TS
\L
OS
P
AD
RE
S\
PR
OJ
EC
TS
\C
ON
E
PE
AK
\L
PN
F_
CO
NE
PE
AK
_2
JB
ED
IT
S2
DW
G.
DW
G;
(R05) Pacific Southwest Region
FSR 20S05.3 -
Storm Damage
Los Padres National Forest
MONTEREY
RANGER DISTRICT
DOWNDRAIN
DETAILS
01/11/2025
B.COUPE
B.COUPE
F.K.
C-106 6 09
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
NOTE
1. GALVENIZE ALL PIPE STAKES AND HARDWARE
AFTER FABRICATION.
2. APPROVED ALTERNATIVE PIPE ANCHOR
ASSEMBLIES MAY BE USED.
3. PLACE SLPE ANCHOR ASSEMBLIES ON 20' MAX
CENTERS ON SLOPES 20% OR GREATER
4. PLATE MATERIAL TO BE ASTM A36. GALVENIZE
AFTER FABRICATION.
STEEL PLATE
ANCHOR ASSEMBLY
12"
4 12 "
2 12"
1 78 "
1" R
3 4" 1 5 8
9 16 " 1
1 4
1 8
5 8
1 "
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/22
/25
:4 4 F
KU
RA
MA
TA
F :\D
OC
UM
EN
TS
\L
OS
P
AD
RE
S\
PR
OJ
EC
TS
\C
ON
E
PE
AK
\L
PN
F_
CO
NE
PE
AK
_2
JB
ED
IT
S2
DW
G.
DW
G;
(R05) Pacific Southwest Region
FSR 20S05.3 -
Storm Damage
Los Padres National Forest
MONTEREY
RANGER DISTRICT
PIPE ANCHOR
ASSEMBLY DETAILS
01/11/2025
J.BERRY
J. BERRY
F.K.
C-107 07 09
AutoCAD SHX Text
MEASURE LENGTH OF COUPLING BAND PARRALLEL TO THE CENTERLINE OF THE PIPE
AutoCAD SHX Text
38" CABLE CLAMP ONLY WHEN CABLE IS SPECIFIED
AutoCAD SHX Text
COUPLING BAND
AutoCAD SHX Text
COLLAR OF 2" PIPE OR EQUAL
AutoCAD SHX Text
STEEL PLATE
AutoCAD SHX Text 316"
AutoCAD SHX Text
8" X 1 " IRON PIPE 12" IRON PIPE STAKES, 2.72 IB/FT (MIN.)
AutoCAD SHX Text
14" STEEL PLATE THICKNESS
AutoCAD SHX Text
34" X 1" SLOTS
AutoCAD SHX Text
1 " X " SLOTS1932" X " SLOTS34" SLOTS
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/22
/25
:4 4 F
KU
RA
MA
TA
F :\D
OC
UM
EN
TS
\L
OS
P
AD
RE
S\
PR
OJ
EC
TS
\C
ON
E
PE
AK
\L
PN
F_
CO
NE
PE
AK
_2
JB
ED
IT
S2
DW
G.
DW
G;
(R05) Pacific Southwest Region
FSR 20S05.3 -
Storm Damage
Los Padres National Forest
MONTEREY
RANGER DISTRICT
DROP INLET DETAILS
01/11/2025
B.COUPE
B.COUPE
F.K.
C-108 8 09
AutoCAD SHX Text
FRONT VIEW
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text
SIDE VIEW
AutoCAD SHX Text
INLET TYPE A
AutoCAD SHX Text
FABRICATION DETAILS
AutoCAD SHX Text
INLET DIMENSION TABLE
AutoCAD SHX Text
OUTLET PIPE DIA.
AutoCAD SHX Text
INTLET DIA. THICKNESS
AutoCAD SHX Text 18"
AutoCAD SHX Text 36" - 0.109"
AutoCAD SHX Text 36"
AutoCAD SHX Text 40"
AutoCAD SHX Text 12"
AutoCAD SHX Text 18"
AutoCAD SHX Text 24"
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
GENERAL NOTES
AutoCAD SHX Text
1) GRATE FOR TYPE "B" INLET ASSEMBLY SHALL BE INSTALLED ON TYPE "A" INLET WHEN SPECIFIED.
AutoCAD SHX Text
2) DIMENSIONS A AND C APPLY TO BOTH TYPES OF INLETS. DIMENSIONS B, D, AND E APPLY TO TYPE "A."
AutoCAD SHX Text
3) OPENINGS MAY BE FIELD CUT. CUT OPENINGS INSIDE OF INLET WHEN INLET IS LOCATED SO THAT WATER APPROACHES FROM TWO DIRECTIONS. TOTAL AREA OF OPENINGS SHALL NOT BE LESS THAN SHOWN.
AutoCAD SHX Text
4) USE ROUND OR SQUARE WOOD COVER WHEN SPECIFIED
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text
INLET TYPE B
AutoCAD SHX Text
DETAIL A
AutoCAD SHX Text
LUG 3/4" X 1 1/2"
AutoCAD SHX Text
PUNCH 1" HOLE IN PIPE TO RECEIVE LUG
AutoCAD SHX Text
STANDARD END FINISH
AutoCAD SHX Text
1/4" CLEARANCE
AutoCAD SHX Text
PLAN
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text
MAKE FROM CONSTRUCTION GRADE LUMBER (ROUGH).
AutoCAD SHX Text 2 X 6
AutoCAD SHX Text 12"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 12"
AutoCAD SHX Text
40" COVER
AutoCAD SHX Text
52" COVER
AutoCAD SHX Text 12"
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text 12"
AutoCAD SHX Text 12"
AutoCAD SHX Text
INLET C.M.P.
AutoCAD SHX Text 2 X 8
AutoCAD SHX Text
METAL MARKER*
AutoCAD SHX Text
INSTALLATION DETAIL
AutoCAD SHX Text
SLOPE
AutoCAD SHX Text
COMPACTED SELECT BACKFILL OR AS OTHERWISE SPECIFIED
AutoCAD SHX Text
TOP OF INLET SHALL BE FLUSH WITH EDGE OF SHOULDER
AutoCAD SHX Text
STEEPEN SLOPE AS NECESSARY
AutoCAD SHX Text
SLOPE VARIABLE CONSTRUCT AS STAKED
AutoCAD SHX Text
SLOPE AS STAKED
AutoCAD SHX Text
*INSTALL METAL MARKER POST. REFER R.5-SD-D14-1 WHEN SPECIFIED ELSEWHERE.
AutoCAD SHX Text
EDGE OF SHOULDER
AutoCAD SHX Text
PLAN
AutoCAD SHX Text
EDGE OF ROUND COVER 2" X 12"
AutoCAD SHX Text 3/16
AutoCAD SHX Text 3" X 2 1/2" X 3/8"
AutoCAD SHX Text
OPTIONAL SPLICE
AutoCAD SHX Text G
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text
SLOPE
AutoCAD SHX Text
COMPACTED SELECT BACKFILL OR AS OTHERWISE SPECIFIED
AutoCAD SHX Text
*INSTALL METAL MARKER POST. REFER R.5-SD- D14-1 WHEN SPECIFIED ELSEWHERE.
AutoCAD SHX Text
EDGE OF SHOULDER
AutoCAD SHX Text
INSTALLATION DETAIL
AutoCAD SHX Text
TOP OF INLET SHALL BE FLUSH WITH BOTTOM OF DITCH
AutoCAD SHX Text 1/2"
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
RETAINER BAR
ROCK WATER BAR.
OVERSIZED NATURAL FORD
MIXED WITH NATIVE MATERIAL
12" MINIMUM DEPTH
10° TO 45°
NOTE:
ON SLOPES GREATER THAN 10% INSTALL REINFORCED ARMORED GRADE
DIP. PLACE OVERSIZED ROCK IN AN EXCAVATED TRENCH TO MATCH
SURFACE FLUSH WITH THE DRIVING TREAD SURFACE. CONSTRUCT WATER
BAR USING RECTANGULAR SHAPED ROCKS WITH MINIMUM SIZE OF 18" IN
THE SMALLEST DIMENSION, BUTTED TOGETHER BUT NOT OVERLAPPED.
PLACE THE HEAVIEST ROCK AT THE DOWNHILL SIDE AND LAY ROCKS UNTIL
TIED INTO THE BANKS. BURY 23 OF EACH ROCK AT A 45° ANGLE. ADD A
RETAINER BAR OF ROCKS ANGLED IN THE OPPOSITE DIRECTION FROM
WATER BAR NEARLY TOUCHING DOWNHILL EDGE OF THE WATER BAR. FILL
THE SPACE BETWEEN THE WATER BAR AND RETAINER WITH A COMPACTED
MIXTURE OF NATURAL FORD AND NATIVE MATERIAL.
PAY ITEM 20426-1 ROCK WATER BAR INCLUDES PAYMENT FOR MATERIALS
AND LABOR REQUIRED TO EXCAVATE TRENCH AND PLACE ROCKS FOR
WATER BAR AND RETAINER BAR. PLACEMENT AND COMPACTION OF 50'
LENGTH NATURAL FORD MATERIAL IS INCLUDED IN PAY ITEM 30118.
6"±
ROCK WATER BAR DETAIL
NTS
TRAIL DOWN HILL
50' ±
8' MAX
FL
O
W
SILT FENCE
OR
HAY BALES
TOE OF HILL
DITCH
STRAW BALE SEDIMENT BARRIER
NOT TO SCALE
WIRE TIE AROUND HAY
BALES
RIPRAP
" O
R
LA
R G
ER
" O
R
LA
R G
ER
SILT BARRIER BAIL INSTALLATION
NOT TO SCALE
SILT FENCE SEDIMENT BARRIER
15'MAX
FROM RIPRAP
15'MAX
FROM RIPRAP
10'MAX
FROM TOE
EMBANKMENT
CHANNELIZED
FLAT
BOTTOM
DITCH
SCARPING
3" TRENCH MINIMUM
COMPACTED
SOIL 3"HX3"W
STAKERIPRAP
FLOW
OPTION: UTILIZE STRAW WATTLE (IN LIEU OF
STRAW HAY BALES) BY NORTH AMERICAN
GREEN OR EQUAL. PRODUCT MUST BE
CERTIFIED WEED FREE.
NOTCH MUST BE
LOWER THAN THE ROAD
FOR BOTH STRAW WATTLE AND HAY BALE
NOTE:
· EROSION CONTROL MEASURES (WHERE APPLICABLE) SHALL BE PLACED PRIOR TO EARTH MOVEMENT
PER CALIFORNIA STATE WATER BOARD. CONTRACTOR SHALL DUE PROPER DILIGENCE TO PREVENT THE
MUDDYING OF AFFECTED CREEKS.
· C.O.R. OR E.R. MAY REQUIRE ADDITIONAL MEASURES OF SEDIMENT CONTROL DURING CONSTRUCTION
ACTIVITIES TO PREVENT THE MUDDYING OF DRAINAGE STRUCTURES.
· PRIOR TO WORK STOPPAGE ANY GRADED DRAINAGE STRUCTURES DISCHARGING INTO A WATERWAY
MUST BE SEEDED TO REDUCE SEDIMENTATION.
· PLANS SHOWN ARE EXAMPLES ONLY, CONTRACTORS MAY SUBMIT THEIR PLANS FOR COR/ER
APPROVAL.
FLOW
SUPPORT MESH
CHANNELIZED AREA ONLY
WOOD OR STEEL POST
6' SPACING W/O MESH
10'' W/ MESH
GEO-
TEXTILE
6"
EMBEDMENT
30-40"
4"
PROVIDE SUFFICIENT LENGTH
TO PREVENT WATER FROM
FLOWING AROUND THE END
OF THE SILT FENCE
FOR SPACING
SEE DETAIL LEFT
SILT FENCE INSTALLATION IN DITCH
NOT TO SCALE
PLACE IN DRAINAGE DITCH OR CULVERT
OUTLET DURING CONSTRUCTION ADJACENT
TO CREEKS
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/22
/25
:4 4 F
KU
RA
MA
TA
F :\D
OC
UM
EN
TS
\L
OS
P
AD
RE
S\
PR
OJ
EC
TS
\C
ON
E
PE
AK
\L
PN
F_
CO
NE
PE
AK
_2
JB
ED
IT
S2
DW
G.
DW
G;
(R05) Pacific Southwest Region
FSR 20S05.3 -
Storm Damage
Los Padres National Forest
MONTEREY
RANGER DISTRICT
EROSION CONTROL
DETAILS
01/11/2025
B.COUPE
B.COUPE
F.K.
C-109 9 09
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
FOREST LOCATION MAP
PROJECT LOCATION MAP
TRAVEL DIRECTIONS:
SHEET OF
United States Department of Agriculture Forest Service
FSR 20S05.3 STORM DAMAGE REPAIR
FROM BRADLEY, CA HEAD NORTH ON TO US HWY 101 NORTH. GET OFF AT EXIT 252 JOLON ROAD TOWARDS FORT HUNTER-LIGGETT. STAY ON JOLON ROAD FOR 21.3 MILES, TURN LEFT ON TO MISSION ROAD AND STAY ON THIS ROADWAY FOR 4 MILES. TAKE A SHARP LEFT TO STAY ON MISSION ROAD, THIS TURNS INTO NACIMIENTO - FERGUSSON ROAD. STAY ON NACIMIENTO - FERGUSSON ROAD FOR
17 MILES. TURN RIGHT ON TO FSR 20S05.3 (CONE PEAK ROAD) AND CONTINUE FOR 3 MILES
GREAT DIVIDE DISTRICT OFFICE
22223 STATE HIGHWAY 13
GLIDDEN, WI 54527
RECOMMENDED BY:
APPROVED:
FOREST ENGINEER
DISTRICT RANGER DATE
DATE
DIRECTOR OF ENGINEERING DATE
FOREST SUPERVISOR DATE
RO FACILITIES PROGRAM MANAGER DATE
/22
/25
:4 4 F
KU
RA
MA
TA
F :\D
OC
UM
EN
TS
\L
OS
P
AD
RE
S\
PR
OJ
EC
TS
\C
ON
E
PE
AK
\L
PN
F_
CO
NE
PE
AK
_2
JB
ED
IT
S2
DW
G.
DW
G;
CALIFORNIA
MONTEREY COUNTY
(R05) SOUTTHWEST PACIFIC REGION
LOS PADRES NATIONAL FOREST
MONTEREY RANGER DISTRICT
INDEX OF SHEETS
SHEET SHEET TITLE DATE
G-101 COVERSHEET 01/11/25
C-102 SITE 1 SITE PLAN 01/11/25
C-103 SITE 3 SITE PLAN 01/11/25
C-104 SITE 4 SITE PLAN 01/11/25
C-105 SITE 5 & 6 SITE PLAN 01/11/25
C-106 SITE 7 SITE PLAN 01/11/25
C-107 SITE 1 STRUCTURE ALIGNMENT DETAILS 01/11/25
C-108 SITE 3 STRUCTURE ALIGNMENT DETAILS 01/11/25
C-109 SITE 4 STRUCTURE ALIGNMENT DETAILS 01/11/25
C-110 SITE 5 STRUCTURE ALIGNMENT DETAILS 01/11/25
C-111 SITE 6 STRUCTURE ALIGNMENT DETAILS 01/11/25
C-112 SITE 7 STRUCTURE ALIGNMENT DETAILS 01/11/25
C-113 ROLLING DIP & TOE DRAIN DETAILS 01/11/25
C-114 CULVERT & INLET DETAILS 01/11/25
C-115 ROADWAY DETAILS 01/11/25
C-116 EROSION CONTROL DETAILS 01/11/25
C-117 DOWN DRAIN DETAILS 01/11/25
C-18 PIPE ANCHOR ASSEMBLY DETAILS 01/11/25
C-19 DROP INLET DETAILS 1/11/2025
SITES 1,3-7
9+00
9+50
10+00
10+50
+0
+5
+0
+5
+0
BEGIN ROAD
RECONDITIONING.
ROAD ELEV. TO 3042
PROP. 1 - 60" X 92' CULVERT
MITER END TO CONFORM TO SLOPE.
ALIGN TO CENTERLINE
OF CREEK
10 C.Y. CLASS
2 RIP-RAP
OPTION:
200 C.Y. CLASS
2 RIP-RAP
FIELD ADJUSTMENT AS NEEDED
SITE #1
PROP. REINFORCED SOIL SLOPE
15'
BEGIN ROAD
RECONDITIONING.
ROAD ELEV. TO 3048
END ROAD
RECONDITIONING.
ROAD ELEV. TO 3044
87'
16.0'
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/22
/25
:4 4 F
KU
RA
MA
TA
F :\D
OC
UM
EN
TS
\L
OS
P
AD
RE
S\
PR
OJ
EC
TS
\C
ON
E
PE
AK
\L
PN
F_
CO
NE
PE
AK
_2
JB
ED
IT
S2
DW
G.
DW
G;
(R05) Pacific Southwest Region
FSR 20S05.3 -
Storm Damage
Los Padres National Forest
MONTEREY
RANGER DISTRICT
SITE 1 SITE PLAN
XX/XX/XXXX
B.COUPE
B.COUPE
F.K.
C-102 2 19
No known control points. Actual locations shall be located in the field and staked by
Contractor. Staking to be approved by COR prior to commencement of work.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
18+50
19+00
19+50
+0
+5
+0
21+50
BEGIN ROAD
RECONDITIONING.
PROP. REINFORCED
FILL SLOPE
16 C.Y. CLASS
2 RIP-RAP
END ROAD
RECONDITIONING.PROP. 18"x 30' OVERSIDE DRAIN
SITE #3
25.0' 16.0'
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/22
/25
:4 4 F
KU
RA
MA
TA
F :\D
OC
UM
EN
TS
\L
OS
P
AD
RE
S\
PR
OJ
EC
TS
\C
ON
E
PE
AK
\L
PN
F_
CO
NE
PE
AK
_2
JB
ED
IT
S2
DW
G.
DW
G;
(R05) Pacific Southwest Region
FSR 20S05.3 -
Storm Damage
Los Padres National Forest
MONTEREY
RANGER DISTRICT
SITE 3 SITE PLAN
XX/XX/XXXX
B.COUPE
B.COUPE
X.XXX
C-103 3 19
No known control points. Actual locations shall be located in the field and staked by
Contractor. Staking to be approved by COR prior to commencement of work.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
+0
+5
+0
33+50
34+00
34+50
BEGIN ROAD
RECONDITIONING.
PROP. REINFORCED
SOIL SLOPE
40 C.Y. CLASS
2 RIP-RAP
END ROAD
RECONDITIONING.
PROP. 36" X 84' CULVERT
WITH DOWN DRAIN
PROP DROP INLET 36"X60"
EXCAVATE BASIN TO ACCOMODATE
DROP INLET. FIELD
ADJUSTMENT AS NEEDED
EXCAVATE BASIN TO ACCOMODATE
DROP INLET. FIELD ADJUSTMENT AS NEEDED
SITE #4
.0
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/22
/25
:4 4 F
KU
RA
MA
TA
F :\D
OC
UM
EN
TS
\L
OS
P
AD
RE
S\
PR
OJ
EC
TS
\C
ON
E
PE
AK
\L
PN
F_
CO
NE
PE
AK
_2
JB
ED
IT
S2
DW
G.
DW
G;
(R05) Pacific Southwest Region
FSR 20S05.3 -
Storm Damage
Los Padres National Forest
MONTEREY
RANGER DISTRICT
SITE 4 SITE PLAN
XX/XX/XXXX
B.COUPE
B.COUPE
F.K.
C-104 4 19
No known control points. Actual locations shall be located in the field and staked by
Contractor. Staking to be approved by COR prior to commencement of work.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
+0
+5
+0
+5
+0
39+50
40+00
40+50
PROP. 18" x 20' OVERSIDE DRAIN
10 C.Y. CLASS
2 RIP-RAP
BEGIN ROAD
RECONDITIONING.
END ROAD
RECONDITIONING.
BEGIN ROAD
RECONDITIONING.
END ROAD
RECONDITIONING.
PROP. ROLLING DIP
PROP. 36" X 94' CULVERT
PROP DROP INLET 36"X60"
15 C.Y. CLASS
2 RIP-RAP
15 C.Y. CLASS
2 RIP-RAP
PROP. 36" X 94' CULVERT
PROP DROP INLET 36"X60"
SITE #5
SITE #6
EXCAVATE BASIN TO ACCOMODATE
DROP INLET. FIELD
ADJUSTMENT AS NEEDED
EXCAVATE BASIN TO ACCOMODATE
DROP INLET. FIELD
ADJUSTMENT AS NEEDED
25.0'
50'
.0
.0'
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/22
/25
:4 4 F
KU
RA
MA
TA
F :\D
OC
UM
EN
TS
\L
OS
P
AD
RE
S\
PR
OJ
EC
TS
\C
ON
E
PE
AK
\L
PN
F_
CO
NE
PE
AK
_2
JB
ED
IT
S2
DW
G.
DW
G;
(R05) Pacific Southwest Region
FSR 20S05.3 -
Storm Damage
Los Padres National Forest
MONTEREY
RANGER DISTRICT
SITE 5 & 6
SITE PLAN
XX/XX/XXXX
B.COUPE
B.COUPE
X.XXX
C-105 5 19
No known control points. Actual locations shall be located in the field and staked by
Contractor. Staking to be approved by COR prior to commencement of work.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
42+50
+0
+5
+0
44+50
45+00
45+50
END ROAD
RECONDITIONING.
BEGIN ROAD
RECONDITIONING.
PROP. 36" X 55' CULVERT
PROP DROP INLET 36"X48"
21 C.Y. CLASS
2 RIP-RAP
EXCAVATE BASIN TO ACCOMODATE
DROP INLET. FIELD
ADJUSTMENT AS NEEDED
SITE #7
16.0'
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/22
/25
:4 4 F
KU
RA
MA
TA
F :\D
OC
UM
EN
TS
\L
OS
P
AD
RE
S\
PR
OJ
EC
TS
\C
ON
E
PE
AK
\L
PN
F_
CO
NE
PE
AK
_2
JB
ED
IT
S2
DW
G.
DW
G;
(R05) Pacific Southwest Region
FSR 20S05.3 -
Storm Damage
Los Padres National Forest
MONTEREY
RANGER DISTRICT
SITE 7
SITE PLAN
XX/XX/XXXX
B.COUPE
B.COUPE
X.XXX
C-106 6 19
No known control points. Actual locations shall be located in the field and staked by
Contractor. Staking to be approved by COR prior to commencement of work.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AT
IO
N (F
EE
T)
11+04.06
EXCAVATION EXTENTS
ROADWAY ELEV.
3046 ft.
EXISTING
TOPOGRAPHY
MAINTAIN MIN. 1' COVER OVER CULVERT
PROP. CULVERT 1 60"X92 FT
MITER INLET TO CONFORM TO
SLOPE
10 C.Y RIP-RAP CLASS 2
ROAD BASE MAINTAIN MIN. 1 FT
PLACE 260 SY CLASS 1 NON WOVEN
GEOTEXTILE
ON PREPARED SURFACE PRIOR TO
INSTALLING RIPRAP
200 CY CLASS 2 RIPRAP- 2 FT THICK X 15 FT WIDE
OPTIONAL ITEM . PROVIDE U SHAPE, WITH CENTRLINE 1 FT
DEEPER THAN EDGE TO CREATE FLOWLINE
OPTIONAL ITEM
PROP. REINFORCED SOIL SLOPE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/22
/25
:4 4 F
KU
RA
MA
TA
F :\D
OC
UM
EN
TS
\L
OS
P
AD
RE
S\
PR
OJ
EC
TS
\C
ON
E
PE
AK
\L
PN
F_
CO
NE
PE
AK
_2
JB
ED
IT
S2
DW
G.
DW
G;
(R05) Pacific Southwest Region
FSR 20S05.3 -
Storm Damage
Los Padres National Forest
MONTEREY RAY
RANGER DISTRICT
SITE 1 STRUCTURES
ALIGNMENT PROFILE
01/11/2025
B.COUPE
B.COUPE
X.XXX
C-107 7 19
AutoCAD SHX Text SITE 1 CONSTRUCTION NOTES: 1. ALL OF THE MATERIALS THAT ARE ALL OF THE MATERIALS THAT ARE EXCAVATED FROM THE SLOPE WILL BE SALVAGED FOR THE CONSTRUCTION OF THE REINFORCED SOIL SLOPE. EXCAVATION MUST LEAVE IN 4 FT X 4 FT BENCHES FOR INTERLOCKING OF EXISTING AND NEW FILL. 2. THE NEW FILL KEY AT THE TOE OF THE THE NEW FILL KEY AT THE TOE OF THE SLOPE IS 3 FT X 3 FT. THERE WILL BE RIP-RAP PLACED IN FRONT OF THE KEY THAT WILL EXTEND OUT 3 FT AND RUN UP THE SLOPE TO ELEV. 3046 FT. BOTTOM ELEV. OF THE RIP-RAP & KEY IS 3008 FT. 3. THE BOTTOM LAYER OF THE REINFORCED THE BOTTOM LAYER OF THE REINFORCED SOIL SLOPE WILL BE AT ELEV. 3008 FT. PRIMARY GOEGRID REINFORCEMENTS ON PRIMARY GOEGRID REINFORCEMENTS ON THE SLOPE; MINIMUM (15 FT LONG, PLACED MINIMUM (15 FT LONG, PLACED IN 2 FT LIFTS) SECONDARY SECONDARY REINFORCEMENT MAY BE 6' LONG. ACTUAL LENGTHS TO BE DETERMINED BY CONTRACTOR DESIGN. DESIGN. 4. 1 - 60 IN X 92 FT CMP CULVERT WILL 1 - 60 IN X 92 FT CMP CULVERT WILL BE PLACED AT 11+11.
AutoCAD SHX Text REQUIRED MATERIALS: 1. HDPE DRAIN PIPE: Non-perforated and perforated, double walled, 4" diameter HDPE pipe. Use Hancor Hi-Q or equivalent. 2. GEOCOMPOSITE: Use Aquadrain 20H on foundation with the drainage surface facing up or equivalent. 3. HDPE FILTER FABRIC GEOTEXTILE: Use Mirafi monofilament (filterweave) or equivalent. 4. GEOGRID: Tensar UX1600 MSE or equivalent.or equivalent.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
CROSS SECTION OF OVERTOPPING REVETMENT
AT
IO
N (F
EE
T)
OFFSET (FEET)
19+62.37
0 10 20 30 40 50 60 70 80 90 1000-10-20-30-40-50
EXCAVATION EXTENTS
GEO-COMPOSITE
ON BACK SLOPE
ROADWAY ELEV.
3048 ft.
3 FT x 3 FT KEY
TRENCH AT TOE
PROP. REINFORCED SOIL SLOPE
SEE SLOPE DRAIN DETAILS
SLOPE 2% TO DAYLIGHT
MAINTAIN MIN. 1' COVER OVER GEOGRID
16 C.Y
RIP-RAP
CLASS 2
EXISTING
TOPOGRAPHY
PROP. OVER DRAIN W/30' FLUME
4" ROAD SURFACE COURSE AGGREGATE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/22
/25
:4 4 F
KU
RA
MA
TA
F :\D
OC
UM
EN
TS
\L
OS
P
AD
RE
S\
PR
OJ
EC
TS
\C
ON
E
PE
AK
\L
PN
F_
CO
NE
PE
AK
_2
JB
ED
IT
S2
DW
G.
DW
G;
(R05) Pacific Southwest Region
FSR 20S05.3 -
Storm Damage
Los Padres National Forest
MONTEREY RAY
RANGER DISTRICT
SITE 3 STRUCTURES
ALIGNMENT PROFILE
01/11/2025
B.COUPE
B.COUPE
X.XXX
C-108 8 19
AutoCAD SHX Text REQUIRED MATERIALS: 1. HDPE DRAIN PIPE: Non-perforated and perforated, double walled, 4" diameter HDPE pipe. Use Hancor Hi-Q or equivalent. 2. GEOCOMPOSITE: Use Aquadrain 20H on foundation with the drainage surface facing up or equivalent. 3. HDPE FILTER FABRIC GEOTEXTILE: Use Mirafi monofilament (filterweave) or equivalent. 4. GEOGRID: Tensar UX1600 MSE or equivalent.or equivalent.
AutoCAD SHX Text SITE 3 CONSTRUCTION NOTES: 1. ALL OFF THE MATERIALS THAT ARE EXCAVATED FROM THE SLOPE WILL BE ALL OFF THE MATERIALS THAT ARE EXCAVATED FROM THE SLOPE WILL BE SALVAGED FOR THE CONSTRUCTION OF THE REINFORCED SOIL SLOPE. EXCAVATION MUST LEAVE IN 3 FT X 3 FT BENCHES FOR INTERLOCKING OF EXISTING AND NEW FILL. 2. THE NEW FILL KEY AT THE TOE OF THE SLOPE IS 3 FT X 3 FT. THERE WILL THE NEW FILL KEY AT THE TOE OF THE SLOPE IS 3 FT X 3 FT. THERE WILL BE RIP-RAP PLACED IN FRONT OF THE KEY THAT WILL EXTEND OUT 4 FT AND GO UNTIL THE END OF THE OVER DRAIN. THE BOTTOM ELEV. OF THE RIP-RAP & KEY IS 3027 FT. 3. THE BOTTOM LAYER OF THE REINFORCED SOIL SLOPE WILL BE AT ELEV. 3030 THE BOTTOM LAYER OF THE REINFORCED SOIL SLOPE WILL BE AT ELEV. 3030 FT. 4. THERE ARE TWO REINFORCEMENTS ON THE SLOPE; GEOGRID (14 FT LONG, THERE ARE TWO REINFORCEMENTS ON THE SLOPE; GEOGRID (14 FT LONG, PLACED IN 2 FT LIFTS), AND GEOFABRIC (4 FT LONG, PLACED IN 1 FT LIFTS BETWEEN THE GEOGRID LAYERS. 5. THE SLOPE AT THE HEEL OF THE SLOPE WILL DAYLIGHT AT A 2% SLOPE AT THE SLOPE AT THE HEEL OF THE SLOPE WILL DAYLIGHT AT A 2% SLOPE AT STATIONS 19+50 & 19+85. 6. THE EXISTING OVER DRAIN AT THE SITE WILL BE PLACED AT 19+69. THE EXISTING OVER DRAIN AT THE SITE WILL BE PLACED AT 19+69. 7. COMPACTION WILL BE TO 95%.COMPACTION WILL BE TO 95%.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AT
IO
N (F
EE
T)
OFFSET (FEET)
0 10 20 30 40 50 60 70 80 900-10-20-30-40-50-60-70-80-90
EXCAVATION EXTENTS
3 FT X 3 FT BENCHES
GEO-COMPOSITE
ON BACK SLOPE
ROADWAY ELEV.
3080 ft.
PROP. REINFORCED SOIL
SLOPE 1 14:1 (H:V) OR FLATTER
SEE SLOPE DRAIN DETAILS
SLOPE 2% TO DAYLIGHT
MAINTAIN MIN. 2' OVER CULVERT AND GEOGRID
40 C.Y
RIP-RAP
CLASS 2
EXISTING
TOPOGRAPHY
PROP. CULVERT 36"X34 FT
WITH DOWN DRAIN
PROP. DROP INLET 36" X 60"
ROAD BASE MAINTAIN MIN. 1 FT
50 FT DOWNDRAIN
FIELD VERIFY LENGTH
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/22
/25
:4 4 F
KU
RA
MA
TA
F :\D
OC
UM
EN
TS
\L
OS
P
AD
RE
S\
PR
OJ
EC
TS
\C
ON
E
PE
AK
\L
PN
F_
CO
NE
PE
AK
_2
JB
ED
IT
S2
DW
G.
DW
G;
(R05) Pacific Southwest Region
FSR 20S05.3 -
Storm Damage
Los Padres National Forest
MONTEREY RAY
RANGER DISTRICT
SITE 4 STRUCTURES
ALIGNMENT PROFILE
01/11/2025
B.COUPE
B.COUPE
X.XXX
C-109 9 19
AutoCAD SHX Text REQUIRED MATERIALS: 1. HDPE DRAIN PIPE: Non-perforated and perforated, double walled, 4" diameter HDPE pipe. Use Hancor Hi-Q or equivalent. 2. GEOCOMPOSITE: Use Aquadrain 20H on foundation with the drainage surface facing up or equivalent. 3. HDPE FILTER FABRIC GEOTEXTILE: Use Mirafi monofilament (filterweave) or equivalent. 4. GEOGRID: Tensar UX1600 MSE or equivalent.or equivalent.
AutoCAD SHX Text SITE 4 CONSTRUCTION NOTES: 1. ALL OFF THE MATERIALS THAT ARE EXCAVATED FROM THE SLOPE WILL BE SALVAGED FOR THE CONSTRUCTION OF ALL OFF THE MATERIALS THAT ARE EXCAVATED FROM THE SLOPE WILL BE SALVAGED FOR THE CONSTRUCTION OF THE REINFORCED SOIL SLOPE. EXCAVATION MUST LEAVE IN 3 FT X 3 FT BENCHES FOR INTERLOCKING OF EXISTING AND NEW FILL. 2. THE NEW FILL KEY AT THE TOE OF THE SLOPE IS 3 FT X 3 FT. THERE WILL BE RIP-RAP PLACED IN FRONT OF THE NEW FILL KEY AT THE TOE OF THE SLOPE IS 3 FT X 3 FT. THERE WILL BE RIP-RAP PLACED IN FRONT OF THE KEY THAT WILL EXTEND OUT 3 FT. BOTTOM ELEV. OF THE RIP-RAP & KEY IS 3038 FT. 3. THE BOTTOM LAYER OF THE REINFORCED SOIL SLOPE WILL BE AT ELEV. 3040 FT. THE BOTTOM LAYER OF THE REINFORCED SOIL SLOPE WILL BE AT ELEV. 3040 FT. 4. THERE ARE TWO REINFORCEMENTS ON THE SLOPE; GEOGRID (17 FT LONG, PLACED IN 2 FT LIFTS), AND THERE ARE TWO REINFORCEMENTS ON THE SLOPE; GEOGRID (17 FT LONG, PLACED IN 2 FT LIFTS), AND GEOFABRIC (5 FT LONG, PLACED IN 1 FT LIFTS BETWEEN THE GEOGRID LAYERS. 5. THE SLOPE AT THE HEEL OF THE SLOPE WILL DAYLIGHT AT A 2% SLOPE AT STATIONS 32+75, 33+25, 34+00. THE SLOPE AT THE HEEL OF THE SLOPE WILL DAYLIGHT AT A 2% SLOPE AT STATIONS 32+75, 33+25, 34+00. LENGTH OF PIPE NEEDED IS AT EACH STATION IS 22 FT. 6. 2 - 36 IN X 84 FT CMP CULVERTS WILL BE PLACED AT 33+00 & 33+28. THE DROP INLET SIZE IS 36 IN X 60 2 - 36 IN X 84 FT CMP CULVERTS WILL BE PLACED AT 33+00 & 33+28. THE DROP INLET SIZE IS 36 IN X 60 IN. 7. COMPACTION WILL BE TO 95% OF T-180.COMPACTION WILL BE TO 95% OF T-180.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AT
IO
N (F
EE
T)
OFFSET (FEET)
0 10 20 30 40 50 60 70 800-10-20-30-40-50-60-70
EXCAVATION EXTENTS
3 FT X 3 FT BENCHES
GEO-COMPOSITE
ON BACK SLOPE
ROADWAY ELEV.
3086 ft.
3 FT x 3 FT KEY
TRENCH AT TOE
PROP. REINFORCED SOIL SLOP
1 14:1 (H:V) MAX SLOPE
SEE SLOPE DRAIN DETAILS
SLOPE 2% TO DAYLIGHT
10 C.Y
RIP-RAP
CLASS 2
EXISTING
TOPOGRAPHY
PROP. OVER DRAIN W/35' FLUME
4" SURFACE COURSE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/22
/25
:4 4 F
KU
RA
MA
TA
F :\D
OC
UM
EN
TS
\L
OS
P
AD
RE
S\
PR
OJ
EC
TS
\C
ON
E
PE
AK
\L
PN
F_
CO
NE
PE
AK
_2
JB
ED
IT
S2
DW
G.
DW
G;
(R05) Pacific Southwest Region
FSR 20S05.3 -
Storm Damage
Los Padres National Forest
MONTEREY RAY
RANGER DISTRICT
SITE 5 STRUCTURE
ALIGNMENT PROFILE
01/11/2025
B.COUPE
B.COUPE
X.XXX
C-110 10 19
AutoCAD SHX Text REQUIRED MATERIALS: 1. HDPE DRAIN PIPE: Non-perforated and perforated, double walled, 4" diameter HDPE pipe. Use Hancor Hi-Q or equivalent. 2. GEOCOMPOSITE: Use Aquadrain 20H on foundation with the drainage surface facing up or equivalent. 3. HDPE FILTER FABRIC GEOTEXTILE: Use Mirafi monofilament (filterweave) or equivalent. 4. GEOGRID: Tensar UX1600 MSE or equivalent.or equivalent.
AutoCAD SHX Text SITE 5 CONSTRUCTION NOTES: 1. ALL OFF THE MATERIALS THAT ARE EXCAVATED FROM ALL OFF THE MATERIALS THAT ARE EXCAVATED FROM THE SLOPE WILL BE SALVAGED FOR THE CONSTRUCTION OF THE REINFORCED SOIL SLOPE. EXCAVATION MUST LEAVE IN 3 FT X 3 FT BENCHES FOR INTERLOCKING OF EXISTING AND NEW FILL. 2. THE NEW FILL KEY AT THE TOE OF THE SLOPE IS 3 THE NEW FILL KEY AT THE TOE OF THE SLOPE IS 3 FT X 3 FT. THERE WILL BE RIP-RAP PLACED IN FRONT OF THE KEY THAT WILL EXTEND OUT 3 FT. BOTTOM ELEV. OF THE RIP-RAP & KEY IS 3059 FT. 3. THE BOTTOM LAYER OF THE REINFORCED SOIL SLOPE THE BOTTOM LAYER OF THE REINFORCED SOIL SLOPE WILL BE AT ELEV. 3065FT. 4. THERE ARE TWO REINFORCEMENTS ON THE SLOPE; THERE ARE TWO REINFORCEMENTS ON THE SLOPE; GEOGRID (14 FT LONG, PLACED IN 2 FT LIFTS), AND GEOFABRIC (5 FT LONG, PLACED IN 1 FT LIFTS BETWEEN THE GEOGRID LAYERS. 5. THE SLOPE AT THE HEEL OF THE SLOPE WILL THE SLOPE AT THE HEEL OF THE SLOPE WILL DAYLIGHT AT A 2% SLOPE AT STATION 37+85 6. REMOVE EXISTING OVERDRAIN AND SAFE TO PLACED REMOVE EXISTING OVERDRAIN AND SAFE TO PLACED AT 37+85. 7. COMPACTION WILL BE TO 95%.COMPACTION WILL BE TO 95%.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AT
IO
N (F
EE
T)
OFFSET (FEET)
39+25.96
0 10 20 30 40 50 60 70 80 90 100 110 1200-10-20-30-40-50-60-70-80-90-100-110-120
EXCAVATION EXTENTS
3 FT X 3 FT BENCHES
GEO-COMPOSITE
ON BACK SLOPE
ROADWAY ELEV.
3092 ft.
3 FT x 3 FT KEY
TRENCH AT TOE
PROP. REINFORCED SOIL
SLOPE 1 14" : 1 (H:V) MAX SLOPE
SEE SLOPE DRAIN DETAILS
SLOPE 2% TO DAYLIGHT
30 C.Y
RIP-RAP
CLASS 2
EXISTING
TOPOGRAPHY
PROP. CULVERT 36"X34 FT
PROP. DROP INLET 36" X 60"
SEE SLOPE DRAIN DETAILS
SLOPE 2% TO DAYLIGHT
4" SURFACE COURSE AGGREGATE
MAINTAIN MIN. 2 FT COVER OVER
REINFORCEMENT AND CULVERT
INSTALL 2-60 FT DOWN
DRAINS. FIELD VERIFY
LENGTH
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
/22
/25
:4 4 F
KU
RA
MA
TA
F :\D
OC
UM
EN
TS
\L
OS
P
AD
RE
S\
PR
OJ
EC
TS
\C
ON
E
PE
AK
\L
PN
F_
CO
NE
PE
AK
_2
JB
ED
IT
S2
DW
G.
DW
G;
(R05) Pacific Southwest Region
FSR 20S05.3 -
Storm Damage
Los Padres National Forest
MONTEREY RAY
RANGER DISTRICT
SITE 6 STRUCTURE
ALIGNMENT PROFILE
01/11/2025
B.COUPE
B.COUPE
X.XXX
C-111 11 19
AutoCAD SHX Text REQUIRED MATERIALS: 1. DRAIN PIPE: HDPE perforated, double walled, 4" diameter HDPE pipe. Use Hancor Hi-Q or equivalent. FOR TH NON PERFORATED SECTION DAYLIGHTING OUT FACE OF RSS, USE GALVANIZED STEEL OR STAINLESS STEEL 2. GEOCOMPOSITE: Use Aquadrain 20H on foundation with the drainage surface facing up or equivalent. 3. HDPE FILTER FABRIC GEOTEXTILE: Use Mirafi monofilament (filterweave) or equivalent. 4. GEOGRID: Tensar UX1600 MSE or AS or AS REQUIRED BY DESIGN.
AutoCAD SHX Text SITE 6 CONSTRUCTION NOTES: 1. ALL OFF THE MATERIALS THAT ARE EXCAVATED FROM THE SLOPE WILL BE ALL OFF THE MATERIALS THAT ARE EXCAVATED FROM THE SLOPE WILL BE SALVAGED FOR THE CONSTRUCTION OF THE REINFORCED SOIL SLOPE. EXCAVATION MUST LEAVE IN 3 FT X 3 FT BENCHES FOR INTERLOCKING OF EXISTING AND NEW FILL. 2. THE NEW FILL KEY AT THE TOE OF THE SLOPE IS 3 FT X 3 FT. THERE WILL BE THE NEW FILL KEY AT THE TOE OF THE SLOPE IS 3 FT X 3 FT. THERE WILL BE RIP-RAP PLACED IN FRONT OF THE KEY THAT WILL EXTEND OUT 3 FT. BOTTOM ELEV. OF THE RIP-RAP & KEY IS 3050 FT. 3. THE BOTTOM LAYER OF THE REINFORCED SOIL SLOPE WILL BE AT ELEV. 3060 FT. THE BOTTOM LAYER OF THE REINFORCED SOIL SLOPE WILL BE AT ELEV. 3060 FT. 4.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .