127EAW25R0052 - Upper Golden Trout Bridge Replacement
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 127EAW25R0052
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Clipper Mills, California 95930, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The United States Department of Agriculture Forest Service is seeking a contractor to remove and replace the existing Upper Golden Trout Bridge located on Forest Route 22N24 in the Plumas National Forest. The project involves complete bridge removal, construction of a new 98'-10" composite steel girder bridge with concrete deck and approaches, and campground entrance reconstruction, all while implementing strict environmental protections for the foothill yellow-legged frog habitat. Contractors must provide all labor, tools, materials, and equipment necessary for the work, including a qualified biological monitor with specific permits and experience. The evaluation will be based on past performance, work plan, key personnel qualifications, performance schedule, and price. All Requests for Information were required to be submitted by August 18th, 2025, and the proposal due date was extended to September 3rd, 2025 at 1:00 PM PST following the release of official RFI responses.
This opportunity is designated as a Total Small Business Set-Aside under NAICS code 237310 (Highway, Street, and Bridge Construction), with no incumbent contractor identified in the solicitation materials. The project value is estimated between $1,000,000 and $5,000,000, with a contract performance period of 425 calendar days spanning from October 1, 2025 to November 30, 2026. The work will be performed in Clipper Mills, California at the bridge site approximately 3.4 miles from the intersection of Forest Routes 22N27 and 22N24. Key project components include 22 line items covering mobilization, structural excavation, concrete work, steel installation, drainage systems, and environmental restoration activities. The contractor will be required to comply with Davis-Bacon Act wage determinations and comprehensive fire prevention protocols during the forest construction period.
Notice text
2 versions
Update #2 · Latest ·
127EAW25R0052 - Upper Golden Trout Bridge Replacement - A00001
Plumas National Forest
This amendment is to post RFI responses and extend the proposal due date.
Proposal due date / time is hereby extended from 09/01/2025 to 09/03/2025, 1:00 PM PST.
Attached is "RFI Official Responses - 1" which are hereby incorporated into any subsequent contract award. Failure to use the revised documents and requirements revised within will result in your proposal being non-responsive.
///////////////////////////////////////////////////////////////////////////////////////////////////////
127EAW25R0052 - Upper Golden Trout Bridge Replacement
Plumas National Forest
FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $1,000,000 and $5,000,000
Set Aside: Total Small Business Set Aside
IMPORTANT NOTES:
See Section L, Paragraph L.2 for the Documents to Submit with Your Proposal
All Requests for Information (RFI's) shall be submitted to the Contracting Officer, Greg Cunningham, on the attached RFI form not later than 1300 hours PST, August 18th, 2025.
A FS organized pre-proposal site visit will NOT be held. The project locations are open to the public and can be viewed by each prospective offeror. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
Update #1 ·
127EAW25R0052 - Upper Golden Trout Bridge Replacement
Plumas National Forest
FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $1,000,000 and $5,000,000
Set Aside: Total Small Business Set Aside
IMPORTANT NOTES:
See Section L, Paragraph L.2 for the Documents to Submit with Your Proposal
All Requests for Information (RFI's) shall be submitted to the Contracting Officer, Greg Cunningham, on the attached RFI form not later than 1300 hours PST, August 18th, 2025.
A FS organized pre-proposal site visit will NOT be held. The project locations are open to the public and can be viewed by each prospective offeror. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
Files
Show all 11
Notice history
| Notice | Type | Posted |
|---|---|---|
| 127EAW25R0052 - Upper Golden Trout Bridge Replacement | Award Notice | |
| This notice | Solicitation | |
| 127EAW25R0052 - Upper Golden Trout Bridge Replacement | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Humbolt pacific crest trail bridge replacement | Forest Service | No set-aside | |
| Purchase of 2 or 3 Temporary Road Bridges | Forest Service | No set-aside | |
| GRSM 321788 - Oconaluftee River Trail | — | No set-aside | |
| GAOA Facilities, Barracks Inyo NF | Forest Service | Total Small Business | |
| Camptonville Housing Decommissioning | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity