2. Schedule of Items.docx

DOCX document 19 KB Posted

Attached to
127EAW25R0052 - Upper Golden Trout Bridge Replacement
Solicitation number
127EAW25R0052
Issued by

About this file

The document is a Schedule of Items for the Upper Golden Trout Bridge Replacement project, detailing a comprehensive construction contract with the U.S. Forest Service. The solicitation (No. 127EAW25R0052) is a total small business set-aside for a bridge replacement in Plumas National Forest, with a project value between $1,000,000 and $5,000,000. The detailed schedule includes 22 line items covering critical construction activities such as mobilization, structural excavation, concrete work, steel bridge railing installation, drainage systems, and environmental restoration tasks like seeding and biological monitoring.

Key contract details include a requirement for contractors to submit pricing for all items, field verification of quantities, and a deadline of August 18th, 2025 for submitting Request for Information (RFIs) to the Contracting Officer, Greg Cunningham. The project involves significant infrastructure work including removal of an existing bridge, foundation and structural fill, riprap placement, culvert installation, and bridge superstructure fabrication and installation. No pre-proposal site visit is planned, with prospective offerors expected to independently view the project location.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I—THE SCHEDULE

SECTION B-- SCHEDULE OF ITEMS

B.1 SCHEDULE OF ITEMS - (BASE CONSTRUCTION)

PROJECT: UPPER GOLDEN TROUT BRIDGE REPLACEMENT

Item
Construction Items
Qty
UNIT
Unit Price
Total Price
15101
MOBILIZATION
1
LS
$___________
$___________
15221
CONSTRUCTION SURVEY AND STAKING
1
LS
$___________
$___________
15401
CONTRACTOR TESTING
1
LS
$___________
$___________
15713
SOIL EROSION & POLLUTION
1
LS
$___________
$___________
20302
REMOVAL OF EXISTING BRIDGE, DISPOSAL METHOD A
1
EA
$___________
$___________
20401
UNCLASSIFIED BORROW, COMPACTION PLACEMENT 2, TOLERANCE A
230
CUYD
$___________
$___________
20421
DRAINAGE EXCAVATION, DRAINAGE SWALE
1
EA
$___________
$___________
20701
EARTHWORK GEOSYNTHETICS, TYPE IV REINFORCEMENT GEOGRID
890
SQYD
$___________
$___________
20802
FOUNDATION FILL, GEOGRID REINFORCED FILL
335
CUYD
$___________
$___________
20803
STRUCTURAL BACKFILL
305
CUYD
$___________
$___________
20806
STRUCTURAL EXCAVATION
1
LS
$___________
$___________
25101
PLACED RIPRAP, CLASS 2, ACCEPTANCE METHOD B
20
CUYD
$___________
$___________
25107
GROUTED RIPRAP, CLASS 4
280
CUYD
$___________
$___________
30208
CRUSHED AGGREGATE, SURFACING, COMPACTION METHOD 2
95
CUYD
$___________
$___________
55201A
STRUCTURAL CONCRETE, CLASS A(AE), ABUTMENTS
110
CUYD
$___________
$___________
55201B
STRUCTURAL CONCRETE, CLASS A(AE), DECH & BACKWALLS
50
CUYD
$___________
$___________
55401
REINFORCING STEEL, GRADE 60, ABUTMENTS, DECK & BACKWALLS
21170
LBS
$___________
$___________
55502
STRUCTURAL STEEL, BRIDGE SUPERSTRUCTURE, FURNISH, FABRICATE, TRANSPORT, AND INSTALL
81500
LBS
$___________
$___________
55601
TYPE T-101 STEEL BRIDGE RAILING
207
LF
$___________
$___________
60201
18' PIPE CULVERT, STEEL GAUGE 16, COMPACTION METHOD 6
48
LF
$___________
$___________
61702
TERMINAL SECTION, TYPE I, CLASS A
4
EA
$___________
$___________
61706
GUARDRAIL TRANSITION SECTION, TYPE I, CLASS A
50
LF
$___________
$___________
62504
SEEDING, DRY METHOD WITH MULCH
1
LS
$___________
$___________
BIOLOGICAL MONTORING
1
LS
$___________
$___________
COMBINED TOTAL:
$___________

B.2 SCHEDULE NOTES

* QUANITIES ARE ESTIMATED, CONTRACTOR SHALL FIELD VERIFY TO SATISFY ALL REQUIREMENTS OF THE DRAWINGS, STATEMENT OF WORK, AND SPECIFICATIONS.

* One award will be made from this solicitation, contractors must submit pricing for all items.

NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price.

Company Name:
POC & Title:
Email:
Phone Number:
UEI Number:
Tax ID: