This document is a Specifications and Scope of Services for Orange County Utilities (OCU) in Florida, detailing the procurement of Control Panels and Supervisory Control and Data Acquisition (SCADA) remote terminal units for pump stations. The solicitation covers the fabrication and delivery of duplex and triplex SCADA and pump station control panels, with specifications for both 240-volt and 480-volt configurations, supporting motor installations ranging from 5HP to 88HP. The panels must be UL 508A Labeled and meet specific technical requirements including pilot lights, phase monitors, alarm strobes, and emergency breakers. The contract requires delivery within 90 days of issued Delivery Order, with the bid submission deadline set for May 29, 2025, and questions accepted until May 8, 2025.

The procurement will be conducted exclusively through Orange County's OpenGov e-Procurement Platform, with electronic submissions mandatory and no alternative submission methods permitted. Contractors must be authorized dealers or distributors with the ability to service and maintain the equipment. The panels must comply with numerous industry standards including NFPA-70, UL, NEMA/ICEA, IEEE, and ASTM regulations. The County reserves the right to request equipment upgrades or modifications, with pricing adjustments calculated on a dollar-for-dollar basis comparing original and replacement component list prices. The contract emphasizes high-quality workmanship, with the County retaining the right to inspect and reject materials that do not meet specified standards.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Y25-184 Specifications/ Scope of Services | Page 1 of 5

SPECIFICATIONS / SCOPE OF SERVICES

The Contractor shall provide the fabrication and delivery of Control Panels and Supervisory Control and Data Acquisition (SCADA) remote terminal units (RTU) to be used on the Orange County Utilities (OCU) Pump Stations for the Field Services Division. The Work consists of furnishing all labor, equipment, and materials in accordance to County standards specifically developed for duplex and triplex SCADA and pump station control panels as specified herein.

PUMP STATION CONTROL PANELS

Fabrication of pump station Pump Control Panels as specified.

Control Panel Drawings are included as Attachments.
Panel Specifications are included as Technical Specification 13430.

Panels shall be supplied for 240 Volt, 3 Phase, 4 Wire, 60 Hertz or 480 Volt, 3 Phase, 4 Wire, 60 Hertz pump station applications. On the 480V panels, the control transformer shall be 2KVA- Square D 9070T200001.

Each panel shall be designed for use with a range of horsepower ratings with a specified maximum horsepower rating up to 5HP, 7.5HP, 10HP, 15HP, 20HP and 25HP for 240-volt motor installations. The same requirements apply for 5HP, 7.5HP, 10HP, 15HP, 20HP, 25HP, 30HP, 47HP, 60HP and 88HP motor installations for 480-volt applications.

Panels shall be UL 508A Labelled.

All pilot lights shall be IDEC AP22M Series with the following part numbers:

24 VAC – RED – IDEC AP22M-2Q4R

24 VAC – RED – IDEC AP22M-2Q4A

C – RED – IDEC AP22M-2Q4R

Phase Monitors shall be MPE Inc. model 001-DVM-118-ORCO.

Alarm strobe shall be Federal Signal model 141ST - 120R.

Alarm strobe shall be mounted on top of the alarm back box using a 12” long ½” aluminum nipple that allows the strobe to extend a minimum of 8” above the top of the control panel.

The overhead interior light mounted in the control panel shall be 18” LED.

All Control panels require an emergency breaker. If the main breaker is larger than 200 amps, the emergency breaker shall be Square D - JGL36200 - 200 AMP 3 Phase 600 volt breaker and the generator receptacle shall be Crouse Hinds AR2042- S22 installed with an AJA 1 angled adapter for 480 volt and Crouse Hinds AR2042 installed with an AJA 1 angled adapter for 240 volt. If the main breaker is greater than 200 AMPS there shall be a relay installed that prevents the Lag pump for Duplex panels and Lag Lag pump for Triplex panels from operating while the Emergency Breaker is on.

PUMP STATION SCADA PANELS.

Fabrication of pump station Duplex and Triplex SCADA Panels as specified.

Panel Drawings are included as Attachment VI.

Panel Specifications are included as Appendix 13431.

SCADA panels shall include the built-in monitoring of AC Fail, battery fail and input wiring fault.

The Contractor shall refer to Technical Specification 13431 for requirements regarding the SCADA/RTU panels.

GENERAL

Panels shall be fabricated in strict accordance with the plans and specifications included.

The Contractor shall furnish all labor, equipment, tools, services and incidentals to complete all work required by these specifications and as shown on the drawings.

The Contractor shall comply with all Municipal, County, State, Federal, and other codes which are applicable to this Project.

WORK UNDER THIS CONTRACT

The scope of these specifications is to ensure the delivery of a complete unit ready for operation. Omission of any essential detail from these specifications does not relieve the Contractor from furnishing a complete unit, and shall be regarded as meaning that only the best general practice is to prevail and that only material and workmanship of the best quality is to be used. Interpretation of these Specifications shall be made upon that basis.

The Contractor shall furnish all labor, materials, equipment, tools, services, and incidentals to complete all work required by these specifications and as shown on the Drawings, at a rate of progress which will ensure completion of the Work within the Contract Time stipulated.
The Contractor shall comply with all Municipal, County, State, Federal, and other codes which are applicable to this Project.

MATERIALS AND EQUIPMENT

All equipment shall be new or current manufacture in production at the time of bid opening and carry standard warranties. Bids shall be considered only on eEquipment which canshall, on short notice AH Hernandez Fernandez, Alina We should state what the timeline for service and maintenance should be. AH Hernandez Fernandez, Alina Additionally, you could also add this as an affirmation under the Bid Response Form section. , be serviced and maintained by the Contractor.

At the time of bid opening, the Bidder shall be an authorized dealer, distributor, and/or representative of the manufacturer for the brand/model being bid. For the purposes of this solicitation, dealer, distributor, and/or representative means a firm or person that owns, operates, or maintains a store, warehouse, or other establishment in which materials, supplies, parts, articles, or equipment of the general character described in the specifications are bought, kept in stock and sold commercially or to the public in the usual course of business. AH Hernandez Fernandez, Alina This is submission requirement. Perhaps you can make this an affirmation of the Bid Response Form section. But the scope of services should not make mention of bid submission requirements.

All materials, equipment, skills, tools and labor that is reasonably and properly inferable and necessary for the proper completion of the Work in compliance with the requirements stated or implied by these Specifications and/or Drawings shall be furnished by the Contractor without additional compensation, whether specifically indicated in the Contract Documents or not.

All workmanship and materials shall be of the highest quality. The equipment shall be the product of manufacturers who are experienced and skilled in the field with an established record of research and development. No equipment will be considered unless the manufacturer has designed and manufactured equipment of comparable type and size and has demonstrated sufficient experience in such design and manufacture.

The Bidder Contractor shall maintain a normal supply of repair parts and be equipped with personnel and facilities to provide such services if necessary to keep the equipment in operation with a minimum of delay. Failure to meet these requirements, in the County’s sole opinion, may be a cause for rejection. AH Hernandez Fernandez, Alina I suggest deleting this sentence, again, this is speaking to submission requirements as the dept makes reference to rejection of the bid. Delete this sentence.

Perhaps this can be added as an affirmation in the Bid Response Form section.

CODES AND REGULATIONS AH Hernandez Fernandez, Alina Jenna, there are a lot of acronyms which have not been defined.

The Contractor shall strictly comply with all Federal, State and local building and safety codes.

NFPA-70 Compliance: The Contractor shallC comply with NFPA-70 requirements as applicable to construction, installation and color-coding of electrical wires and cables.

UL Compliance: The Contractor shall comply Comply with applicable requirements of UL Std. 83, "Thermoplastic Insulated Wires and Cables" and Std. 486A, "Wire Connectors and Soldering for Use with Copper Conductors".

UL Compliance: PThe Contractor shall provide wiring/cabling and connector products, which are UL, listed and labeled.

NEMA/ICEA Compliance: The Contractor shall comply Comply with NEMA/ICEA Std. Pub/No's WC5, Thermoplastic Insulated Wires and Cable for the "Transmission and Distribution of Electrical Energy", and WC30, "Color Coding of Wires and Cables", pertaining to electrical power type wires and cables.

IEEE Compliance: The Contractor shall comply Comply with applicable requirements of IEEE Standards 82, "Test Procedures for Impulse Voltage Tests on Insulated Conductors", and Standard. 241, "IEEE Recommended Practice for Electric Power Systems in Commercial Buildings" pertaining to wiring.

ASTM Compliance: The Contractor shall comply Comply with applicable requirements of ASTM B1, 2, 3, 8, and D-573. Provide copper conductors with conductivity of not less than 98% at 20°C (68°F.)
FOIST Compliance: The Contractor shall Ccomply with Federal Specifications J C 30, "Electrical Cable and Wire (Power, Fixed, Installation)", and W-S-610, "Splice Conductor."
Listing and Labeling: Provide products specified in this Section that are listed and labeled.

The Terms "Listed" and "Labeled": As defined in the "National Electrical Code", Article 100.

Listing and Labeling Agency Qualifications: A "Nationally Recognized Testing Laboratory" (NTRL) as defined in OSHA Regulation 1910.7. AH Hernandez Fernandez, Alina Jenna, could we merge these into one requirement? It seems to me that they’re all related.

MINIMUM STANDARD OF PERFORMANCE

The contract performance shall be quality based, in which the County will assess the construction of control and SCADA panels by its compliance with specifications and workmanship as specified in the Scope of Work.

The Contractor shall comply with all response times specified trough this scope of workservice.

ROUTINE ORDERS

The County’s Representative or designer will e-mail a copy of the Delivery Order to the Contractor. The Work shall commence as soon as possible after issuance of the Delivery Order. The Delivery Order will state the panel type, delivery location and a delivery due date. Selected due date shall be within thirty (90) days of Delivery Order. After issuance of a Delivery Order, no changes in the scope of Work will be permitted unless initiated by the requesting division, and documented by a written Change Order.

FINAL INSPECTION

Tests of electrical and mechanical equipment and appliances shall be conducted in accordance with recognized test codes of the ANSI, ASME, or the IEE, and in compliance with Appendix C, Panel Factory Test.

B.

C. All materials and equipment furnished by the Contractor shall be subject to the inspection, review and acceptance of the County’s Representative or designee and meet the requirements as outlined in the Orange County Utilities Standards and Construction Specifications Manual. If in the testing of any material or equipment it is ascertained by the County/Professional that the material or equipment does not comply with the Contract, the Contractor shall be notified thereof, and the Contractor will be directed to refrain from delivering said material or equipment, or to remove it promptly from the site. Work not accepted by the County shall be replaced with acceptable material, without cost to the County.

D.

E. Should the County’s Representative or designee determine that the Work is incomplete or defective, they will promptly notify the Contractor in writing, listing the incomplete and defective items, to the best of County’s Representative or Designee’s knowledge at that time. The Contractor shall take immediate steps to remedy the stated deficiencies and send a second written notification to the County’s Representative or designee that the deficiencies have been remedied and Work is completed.

EQUIPMENT INFORMATION / IMPROVEMENTS

The Contractor shall keep abreast of all equipment changes and product improvements and will continually explore new and better methods of higher technology that will enhance the County’s preventive maintenance service agreement capabilities and enhancements to its operations. The Contractor shall notify the County of these changes, improvements, methods, as they occur, so that the County may enhance their operations and maintenance programs.

The County may request an upgrade to any part of a SCADA panel, including but not limited to internal components, subcomponents, and/or the cabinet as a means to correct product changes or replacements, changes to codes, laws or ordnances governing the panels and any of the components contained within and/or to incorporate design variations. When a change is required, the County will request from the vendor a construction drawing detailing and quoting the upgrade. The upgrade will be quoted by the Ccontractor as follows:

An upgrade consisting of the replacement of an existing (as originally designed) component of a panel will be quoted by listing the specification and list price of the original component to be changed vs versus the specification and list price of the replacement component. The price increase to the original panel cost will be on a dollar per dollar basis equal to the difference between the two (2) list prices. AH Hernandez Fernandez, Alina What does this mean? I’m not sure what their intent is with this language.

Also, would we not issue an amendment to add whatever the addition is? I suggest revising this language.

An upgrade consisting of the addition of a component not originally contemplated in the design of a panel will be quoted by listing the added component specification and-or description and its list price. The price increase to the original panel price will be on a dollar per dollar basis of the given list price. AH Hernandez Fernandez, Alina What does this mean? I’m not sure what their intent is with this language.

Also, would we not issue an amendment to add whatever the addition is? I suggest revising this language.

This subpart only applies to new, as quoted panels specified in the this contract bid Fee Sschedule. If approved, the price increase difference of the control or SCADA panel upgrade will be paid under the appropriate line item in the bid Fee Sschedule.