Appendix_H-8_IFT_DO_Points_List_and_Wiring_Check-off_Worksheet.xls
XLS spreadsheet 41 KB Posted
- Solicitation number
- Y25-184
- Issued by
- Orange County, Orlando City, Florida
About this file
This document is an Appendix H-8 Digital Output (DO) Points List and Wiring Check-off Worksheet for a Pump Station Control and SCADA Communication Panels project issued by Orange County, Florida. The solicitation (Y25-184) is seeking sealed electronic offers for pump station control panels, with responses due by 4:00 pm EST on Thursday, May 29, 2025. Potential bidders are required to submit responses exclusively through the OpenGov e-Procurement Platform, with a specified question submission deadline of Thursday, May 8, 2025 at 5:00 pm EST. The worksheet details 16 digital output points, including pump start/stop controls, alarm silence, RVSS reset functions, and several spare digital output channels.
The procurement process mandates electronic submission through OpenGov, with free account registration required at https://procurement.opengov.com/login. Technical support is available via chat, email, and phone, with support hours from Monday to Friday, 7am to 10pm EST. Respondents are prohibited from direct contact with the initiating division and must submit all questions through the OpenGov question and answer module. Modifications, clarifications, and supplemental instructions will be issued as written addenda, which become part of the contract documents. The solicitation emphasizes the county's administrative efficiency and provides specific guidelines for question submission and technical support to ensure a structured and transparent bidding process.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DO List
| APPENDIX H-8 | ||||||||||
| Item | Type | Reference # | Description | Functional Status | Address | Checked | Date | OCU | Contractor | |
| (DWG Line #) | Active (1) | Inactive (0) | ||||||||
| 1 | DO | 335 | Health Bit | PLC OK | PLC FAULT | Q:0.0 | ||||
| 2 | DO | 337 | PUMP 1 START / STOP | Start | Stop | Q:0.1 | ||||
| 3 | DO | 339 | PUMP 2 START / STOP | Start | Stop | Q:0.2 | ||||
| 4 | DO | 343 | PUMP 3 START / STOP | Start | Stop | Q:0.3 | ||||
| 5 | DO | 345 | ALARM SILENCE | On | Off | Q:0.4 | ||||
| 6 | DO | 347 | Pump 1 Start/Stop Relay (For Systems with Simocode) | Start | Stop | Q:0.5 | ||||
| 7 | DO | 351 | Pump 2 Start/Stop Relay (For Systems with Simocode) | Start | Stop | Q:0.6 | ||||
| 8 | DO | 353 | Pump 3 Start/Stop Relay (For Systems with Simocode) | Start | Stop | Q:0.7 | ||||
| 9 | DO | 376 | Simocode Enable / Disable | Enabled | Disabled | Q:1.0 | ||||
| 10 | DO | 378 | Pump 1 RVSS Reset | On | Off | Q:1.1 | ||||
| 11 | DO | 380 | Pump 2 RVSS Reset | On | Off | Q:1.2 | ||||
| 12 | DO | 382 | Pump 3 RVSS Reset | On | Off | Q:1.3 | ||||
| 13 | DO | 384 | SPARE DO | Q:1.4 | ||||||
| 14 | DO | 386 | SPARE DO | Q:1.5 | ||||||
| 15 | DO | 388 | SPARE DO | Q:1.6 | ||||||
| 16 | DO | 390 | SPARE DO | Q:1.7 | ||||||
| Comments: |
&C&"Arial,Bold"&12OCU TWO PUMPS PS IO LIST and Wiring Interconnect Check-off Sheet &L&F&C&A, Page &P or &N&R&D
File details come from the government source that posted it. Updated .