WW System Capacity Improvements Basins 4 and 6_Project No S-679_BID SCHEDULE-PROTECTED.xlsx

XLSX spreadsheet 37 KB Posted

Attached to
Wastewater System Capacity Improvements Project (Rebid - Second Advertisement)
Solicitation number
S-KS0510-00017594
Issued by
Oregon

About this file

This is a bid schedule for the Wastewater System Capacity Improvements Project (Project No. S-679), a public improvement contract for the City of St. Helens, Oregon. The project encompasses sanitary sewer infrastructure construction and replacement across two operational basins (Basin 4 and Basin 6) designed to increase system capacity, improve reliability, and address conveyance deficiencies. Schedule A covers Basin 4 improvements and includes 45 base bid line items plus eight additive item groups (Add A1 through Add A8), each with multiple construction method options including microtunnel/jack and bore installation, horizontal directional drilling (HDD), and open-cut trench installation. Schedule B covers Basin 6 improvements and includes 58 base bid line items. Work across both schedules encompasses pipe installation (ranging from 6 inches to 36 inches in diameter), manhole construction at varying depths, service lateral connections, erosion control, traffic management, tree removal and replacement, pavement work, and closed-circuit television (CCTV) inspection of new and rehabilitated sewers. Quantities vary significantly by item type, with notable volumes including 5,026 linear feet of CCTV inspection in Basin 4 and 5,663 linear feet in Basin 6, plus extensive rock excavation and pipe installation across multiple depth categories.

All line items in both schedules are presented with unit costs and total prices currently set at $0.00, indicating this is a blank bid form awaiting contractor pricing submissions. The bid schedule includes asphalt and fuel escalation provisions designated as "TBD" (to be determined). A deductive item (D-1) provides a mobilization credit of one lump sum if both Schedule A and Schedule B are awarded to the same contractor, incentivizing comprehensive bidding. The total project bid is calculated as Schedule A plus Schedule B minus the deductive item. The document represents a rebidding effort for the project, as referenced in the related contract opportunity designation as a "Rebid - Second Advertisement," suggesting prior bidding rounds occurred without successful award.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID TAB

SCHEDULE OF PRICES

ST. HELENS WASTEWATER CAPACITY IMPROVMENTS
PROJECT NO. S-679
SCHEDULE A -BASIN 4
ITEM #ITEM DESCRIPTIONUNITAMOUNTUNIT COSTTOTAL
BASE BID
A-1Mobilization, Bonds, Insurance, and DemobilizationL.S.1$0.00
A-2Temporary Work Zone Traffic ControlL.S.1$0.00
A-3Erosion and Sediment ControlL.S.1$0.00
A-4Construction Staking and SurveyL.S.1$0.00
A-5As-Built SurveyL.S.1$0.00
A-6Trench Safety SystemL.S.1$0.00
A-7Rock Excavation, Haul, and DisposalC.Y.144$0.00
A-86" PVC Storm Pipe, Open Cut Trench, 0-5 feet deepL.F.10$0.00
A-910" PVC Sanitary Sewer Pipe, Open Cut Trench, 0-5 feet deepL.F.33$0.00
A-1012" N-12 HDPE Storm Pipe, Open Cut Trench 0-5 feet deepL.F.150$0.00
A-1112" PVC Storm Pipe, Open Cut Trench ,10.1 -15 feet deepL.F.25$0.00
A-1212” PVC Sanitary Sewer Pipe, Open Cut Trench, 10.1 -15 feet deepL.F.137$0.00
A-1315” PVC Sanitary Sewer Pipe, Open Cut Trench, 5.1 – 10 feet deepL.F.836$0.00
A-1418” PVC Sanitary Sewer Pipe, Open Cut Trench, 5.1- 10 feet deepL.F.974$0.00
A-1518” PVC Sanitary Sewer Pipe, Open Cut Trench, 10.1 – 15 feet deepL.F.36$0.00
A-1624"x18” CMP Arch Storm Pipe, Open Cut TrenchL.F.10$0.00
A-17Trench Foundation Over-excavation and Subgrade StabilizationC.Y60$0.00
A-18New 48” Flat Top Manhole, 0 – 6 feet deep,EA5$0.00
A-19New 48” Manhole, 6.1 – 10 feet deep,EA5$0.00
A-20New 60” Manhole, 0 – 10 feet deepEA1$0.00
A-21New 60” Manhole, 10.1 – 15 feet deepEA1$0.00
A-22New 60” Manhole, 15.1 – 20 feet deepEA1$0.00
A-23New 60" Manhole, 20.1 - 25 feet deepEA3$0.00
A-24New 60" Manhole, 25.1 - 30 feet deepEA3$0.00
A-25New 84" Manhole, 0 - 10 feet deepEA1$0.00
A-26Install Inside Drop in ManholeEA5$0.00
A-27Construct Sanitary Sewer CleanoutEA1$0.00
A-28Rechannel Existing ManholeEA3$0.00
A-29Remove Existing ManholeEA9$0.00
A-30Abandon ManholeEA1$0.00
A-314”and 6” Sanitary Service Laterals, New, > 5 feet of service lineL.F.99$0.00
A-32Reconnect Sanitary Service Laterals, 0 - 5 feet from mainEA20$0.00
A-33Fill Sewer Pipe with CLSMC.Y.17$0.00
A-34Sewer BypassL.S.1$0.00
A-35Post Construction: CCTV of New or Rehabilitated Sewer and Storm MainsL.F.5,026$0.00
A-36Concrete Pavement, not ODOT Highway (sy)S.Y.54$0.00
A-37Tree Removal (6" Diameter and Greater)EA10$0.00
A-38Installation of New TreeEA10$0.00
A-39Temporary Removal and Reinstallation of FenceL.F.210$0.00
A-40Remove and Replace Existing Retaining Wall (lf)L.F.31$0.00
A-41Remove and Relocate Exist ShedEA2$0.00
A-42Remove and Replace Gravel Surface (sq. ft)S.F.1,079$0.00
A-43Longitudinal Pavement Markings - Paint - 4" wideL.F.120$0.00
A-44Asphalt EscalationTNTBD-
A-45Fuel EscalationGLTBD-
SUB-TOTAL SCHEDULE A BASE BID$0.00
ADDITIVE ITEMS SCHEDULE A -BASIN 4
ADD A1 - STA D3+99 TO STA D7+72 (MANHOLE MT1 TO MT2) (Select one option and leave others blank.)
OPTION 1 - MICROTUNNEL/JACK & BORE INSTALLATION
Add A1-1Launch/Receiving ShaftsL.S.1$0.00
Add A1-228” HDPE Sanitary Sewer Pipe, Trenchless InstallationL.F.372$0.00
Add A1-3Steel CasingL.F.300$0.00
OPTION 2 - HDD INSTALLATION
Add A1-4Launch/Receiving ShaftsL.S.1$0.00
Add A1-530” HDPE Sanitary Sewer Pipe, HDD Trenchless InstallationL.F.372$0.00
Add A1-6Additional Manhole DepthV.F.11$0.00
OPTION 3 - OPEN-CUT INSTALLATION
Add A1-7Trench Safety SystemL.S.1$0.00
Add A1-8Rock Excavation, Haul, and DisposalC.Y.1,210$0.00
Add A1-9Additional Rock Excavation for Deep TrenchC.Y.650$0.00
Add A1-108" DI Storm Pipe, Open Cut Trench ,0 -5 feet deepL.F.30$0.00
Add A1-1127” PVC Sanitary Sewer Pipe, Open Cut Trench, 5.1 – 10 feet deepL.F.31$0.00
Add A1-1227” PVC Sanitary Sewer Pipe, Open Cut Trench, 10.1 – 15 feet deepL.F.30$0.00
Add A1-1327” PVC Sanitary Sewer Pipe, Open Cut Trench, 25.1 – 30 feet deepL.F.311$0.00
Add A1-14Post Construction: CCTV of New or Rehabilitated Sewer and Storm MainsL.F.30$0.00
Add A1-15Longitudinal Pavement Markings - Paint - 4" wideL.F.325$0.00
Add A1-16Extra Asphalt Grinding and Hot Mix Asphaltic Concrete (HMAC) Inlay Wearing Course, Level 3, ½-inch ACP Mixture, 2-inch ThickS.F.45$0.00
SUBTOTAL ADD A1 BID$0.00
ADD A2 - STA D7+72 TO STA D10+60 (MANHOLE MT2 TO MT3) (Select one option and leave others blank.)
OPTION 1 - MICROTUNNEL/JACK & BORE INSTALLATION
Add A2-1Launch/Receiving ShaftsL.S.1$0.00
Add A2-228” HDPE Sanitary Sewer Pipe, Trenchless InstallationL.F.288$0.00
Add A2-3Steel CasingL.F.248$0.00
OPTION 2 - HDD INSTALLATION (Can not use if HDD was not selected in Add 1.1.)
Add A2-4Launch/Receiving ShaftsL.S.1$0.00
Add A2-530” HDPE Sanitary Sewer Pipe, HDD Trenchless InstallationL.F.288$0.00
Add A2-6Additional Manhole DepthV.F.8$0.00
OPTION 3 - OPEN-CUT INSTALLATION
Add A2-7Trench Safety SystemL.S.1$0.00
Add A2-8Rock Excavation, Haul, and DisposalC.Y.870$0.00
Add A2-9Additional Rock Excavation for Deep TrenchC.Y.470$0.00
Add A2-1012" N-12 HDPE Storm Pipe, Open Cut Trench, 0 - 5 feet deepL.F.30$0.00
Add A2-1127” PVC Sanitary Sewer Pipe, Open Cut Trench, 20.1 – 25 feet deepL.F.35$0.00
Add A2-1227” PVC Sanitary Sewer Pipe, Open Cut Trench, 25.1 – 30 feet deepL.F.253$0.00
Add A2-13Post Construction: CCTV of New or Rehabilitated Sewer and Storm MainsL.F.30$0.00
Add A2-14Longitudinal Pavement Markings - Paint - 4" wideL.F.301$0.00
SUBTOTAL ADD A2 BID$0.00
ADD A3 - STA D10+60 TO STA D13+86 (MANHOLE MT3 TO MT4) (Select one option and leave others blank.)
OPTION 1 - MICROTUNNEL/JACK & BORE INSTALLATION
Add A3-1Launch/Receiving ShaftsL.S.1$0.00
Add A3-228” HDPE Sanitary Sewer Pipe, Trenchless InstallationL.F.327$0.00
Add A3-3Steel CasingL.F.297$0.00
OPTION 2 - HDD INSTALLATION (Can not use if HDD was not selected in Add 1.2.)
Add A3-4Launch/Receiving ShaftsL.S.1$0.00
Add A3-530” HDPE Sanitary Sewer Pipe, HDD Trenchless InstallationL.F.327$0.00
Add A3-6Additional Manhole DepthV.F.3$0.00
OPTION 3 - OPEN-CUT INSTALLATION
Add A3-7Trench Safety SystemL.S.1$0.00
Add A3-8Rock Excavation, Haul, and DisposalC.Y.950$0.00
Add A3-9Additional Rock Excavation for Deep TrenchC.Y.510$0.00
Add A3-1010" N-12 HDPE Storm Pipe, Open Cut Trench, 5.1 - 10 feet deepL.F.30$0.00
Add A3-1127” PVC Sanitary Sewer Pipe, Open Cut Trench, 20.1 – 25 feet deepL.F.265$0.00
Add A3-1227” PVC Sanitary Sewer Pipe, Open Cut Trench, 25.1 – 30 feet deepL.F.62$0.00
Add A3-13Post Construction: CCTV of New or Rehabilitated Sewer and Storm MainsL.F.30$0.00
Add A3-14Longitudinal Pavement Markings - Paint - 4" wideL.F.327$0.00
SUBTOTAL ADD A3 BID$0.00
ADD A4 - STA D13+86 TO STA D17+71 (MANHOLE MT4 TO MT5) (Select one option and leave others blank.)
OPTION 1 - MICROTUNNEL/JACK & BORE INSTALLATION
Add A4-1Launch/Receiving ShaftsL.S.1$0.00
Add A4-228” HDPE Sanitary Sewer Pipe, Trenchless InstallationL.F.385$0.00
Add A4-3Steel CasingL.F.348$0.00
OPTION 2 - HDD INSTALLATION (Can not use if HDD was not selected in Add 1.3.)
Add A4-4Launch/Receiving ShaftsL.S.1$0.00
Add A4-530” HDPE Sanitary Sewer Pipe, HDD Trenchless InstallationL.F.385$0.00
OPTION 3 - OPEN-CUT INSTALLATION
Add A4-6Trench Safety SystemL.S.1$0.00
Add A4-7Rock Excavation, Haul, and DisposalC.Y.1,200$0.00
Add A4-8Additional Rock Excavation for Deep TrenchC.Y.650$0.00
Add A4-927” PVC Sanitary Sewer Pipe, Open Cut Trench, 20.1 – 25 feet deepL.F.145$0.00
Add A4-1027” PVC Sanitary Sewer Pipe, Open Cut Trench, 25.1 – 30 feet deepL.F.240$0.00
SUBTOTAL ADD A4 BID$0.00
ADD A5 - STA D17+71 TO STA D20+99 (MANHOLE MT5 TO MT6) (Select one option and leave others blank.)
OPTION 1 - MICROTUNNEL/JACK & BORE INSTALLATION
Add A5-1Launch/Receiving ShaftsL.S.1$0.00
Add A5-224” PVC Sanitary Sewer Pipe, Trenchless InstallationL.F.328$0.00
Add A5-3Steel CasingL.F.299$0.00
OPTION 2 - OPEN-CUT INSTALLATION
Add A5-4Trench Safety SystemL.S.1$0.00
Add A5-5Rock Excavation, Haul, and DisposalC.Y.810$0.00
Add A5-6Additional Rock Excavation for Deep TrenchC.Y.540$0.00
Add A5-724” PVC Sanitary Sewer Pipe, Open Cut Trench, 20.1 – 25 feet deepL.F.249$0.00
Add A5-824” PVC Sanitary Sewer Pipe, Open Cut Trench, 25.1 – 30 feet deepL.F.79$0.00
Add A5-9Extra Asphalt Grinding and Hot Mix Asphaltic Concrete (HMAC) Inlay Wearing Course, Level 3, ½-inch ACP Mixture, 2-inch ThickS.F.165$0.00
SUBTOTAL ADD A5 BID$0.00
ADD A6 - STA D20+99 TO STA D24+52 (MANHOLE MT6 TO MT7) (Select one option and leave others blank.)
OPTION 1 - MICROTUNNEL/JACK & BORE INSTALLATION
Add A6-1Launch/Receiving ShaftsL.S.1$0.00
Add A6-224” PVC Sanitary Sewer Pipe, Trenchless InstallationL.F.352$0.00
Add A6-3Steel CasingL.F.298$0.00
Add A6-4Extra Asphalt Grinding and Hot Mix Asphaltic Concrete (HMAC) Inlay Wearing Course, Level 3, ½-inch ACP Mixture, 2-inch ThickS.F.118$0.00
OPTION 2 - OPEN-CUT INSTALLATION
Add A6-5Trench Safety SystemL.S.1$0.00
Add A6-6Rock Excavation, Haul, and DisposalC.Y.970$0.00
Add A6-7Additional Rock Excavation for Deep TrenchC.Y.650$0.00
Add A6-824” PVC Sanitary Sewer Pipe, Open Cut Trench, 20.1 – 25 feet deepL.F.305$0.00
Add A6-924” PVC Sanitary Sewer Pipe, Open Cut Trench, 25.1 – 30 feet deepL.F.47$0.00
Add A6-10Longitudinal Pavement Markings - Paint - 4" wideL.F.22$0.00
Add A6-11Extra Asphalt Grinding and Hot Mix Asphaltic Concrete (HMAC) Inlay Wearing Course, Level 3, ½-inch ACP Mixture, 2-inch ThickS.F.66$0.00
SUBTOTAL ADD A6 BID$0.00
ADD A7 - STA D24+52 TO STA D28+13 (MANHOLE MT7 TO MT8) (Select one option and leave others blank.)
OPTION 1 - MICROTUNNEL/JACK & BORE INSTALLATION
Add A7-1Launch/Receiving ShaftsL.S.1$0.00
Add A7-224” PVC Sanitary Sewer Pipe, Trenchless InstallationL.F.361$0.00
Add A7-3Steel CasingL.F.323$0.00
Add A7-4Extra Asphalt Grinding and Hot Mix Asphaltic Concrete (HMAC) Inlay Wearing Course, Level 3, ½-inch ACP Mixture, 2-inch ThickS.F.36$0.00
OPTION 2 - OPEN-CUT INSTALLATION
Add A7-5Trench Safety SystemL.S.1$0.00
Add A7-6Rock Excavation, Haul, and DisposalC.Y.860$0.00
Add A7-7Additional Rock Excavation for Deep TrenchC.Y.580$0.00
Add A7-824” PVC Sanitary Sewer Pipe, Open Cut Trench, 15.1 – 20 feet deepL.F.273$0.00
Add A7-924” PVC Sanitary Sewer Pipe, Open Cut Trench, 20.1 – 25 feet deepL.F.88$0.00
Add A7-10Pavement Bar, Type ABS.F.24$0.00
Add A7-11Extra Asphalt Grinding and Hot Mix Asphaltic Concrete (HMAC) Inlay Wearing Course, Level 3, ½-inch ACP Mixture, 2-inch ThickS.F.165$0.00
SUBTOTAL ADD A7 BID$0.00
ADD A8 - STA D28+13 TO STA D32+14 (MANHOLE MT8 TO M13A) (Select one option and leave others blank.)
OPTION 1 - MICROTUNNEL/JACK & BORE INSTALLATION
Add A8-1Launch/Receiving ShaftsL.S.1$0.00
Add A8-224” PVC Sanitary Sewer Pipe, Trenchless InstallationL.F.401$0.00
Add A8-3Steel CasingL.F.349$0.00
OPTION 2 - OPEN-CUT INSTALLATION
Add A8-4Trench Safety SystemL.S.1$0.00
Add A8-5Rock Excavation, Haul, and DisposalC.Y.780$0.00
Add A8-6Additional Rock Excavation for Deep TrenchC.Y.520$0.00
Add A8-712" PVC Storm Pipe, Open Cut Trench, 5.1 - 10 feet deepL.F.90$0.00
Add A8-824” PVC Sanitary Sewer Pipe, Open Cut Trench, 15.1 – 20 feet deepL.F.401$0.00
Add A8-9Post Construction: CCTV of New or Rehabilitated Sewer and Storm MainsL.F.90$0.00
Add A8-10Extra Asphalt Grinding and Hot Mix Asphaltic Concrete (HMAC) Inlay Wearing Course, Level 3, ½-inch ACP Mixture, 2-inch ThickS.F.374$0.00
SUBTOTAL ADD A8 BID$0.00
TOTAL SCHEDULE A BID (Base Bid + Add A1 thru Add A8)$0.00
*Abbreviations: LS: Lump sum LF: Linear Feet EA: Each CY: Cubic Yard TN: Ton SY: Square Yard SF: Square Foot GL: Gallon VF: Vertical Foot

SCHEDULE B -BASIN 6

ITEM #ITEM DESCRIPTIONUNITAMOUNTUNIT COSTTOTAL
BASE BID
B-1Mobilization, Bonds, Insurance, and DemobilizationL.S.1$0.00
B-2Temporary Work Zone Traffic ControlL.S.1$0.00
B-3Erosion and Sediment ControlL.S.1$0.00
B-4Construction Staking and SurveyL.S.1$0.00
B-5As-Built SurveyL.S.1$0.00
B-6Trench Safety SystemL.S.1$0.00
B-7Rock Excavation, Haul, and DisposalC.Y.1,935$0.00
B-810" PVC Sanitary Sewer Pipe, Open Cut Trench, 5.1 - 10 feet deepL.F.5$0.00
B-912" Ductile Iron Storm Pipe, Open Cut TrenchL.F.50$0.00
B-1012” PVC Sanitary Sewer Pipe, Open Cut Trench, 5.1 - 10 feet deepL.F.928$0.00
B-1115" PVC Sanitary Sewer Pipe, Open Cut Trench, 5.1 - 10 feet deepL.F.504$0.00
B-1218” PVC Sanitary Sewer Pipe, Open Cut Trench, 5.1 - 10 feet deepL.F.752$0.00
B-1318” PVC Sanitary Sewer Pipe, Open Cut Trench, 10.1 - 15 feet deepL.F.60$0.00
B-1427” PVC Sanitary Sewer Pipe, Open Cut Trench, 5.1 - 10 feet deepL.F.2,118$0.00
B-1527” PVC Sanitary Sewer Pipe, Open Cut Trench, 10.1 - 15 feet deepL.F.511$0.00
B-16Launch/Receiving ShaftsL.S.1$0.00
B-1728” HDPE Sanitary Sewer Pipe, Trenchless InstallationL.F.181$0.00
B-18Steel CasingL.F.171$0.00
B-1928" HDPE Sanitary Sewer Pipe (HWY 30), Open Cut Trench, 10.1 - 15 feet deepL.F.298$0.00
B-2028" HDPE Sanitary Sewer Pipe (HWY 30), Open Cut Trench, 15.1 - 20 feet deepL.F.233$0.00
B-2136" Concrete Storm Pipe, Open Cut TrenchL.F.22$0.00
B-22Trench Foundation Over-excavation and Subgrade StabilizationC.Y.40$0.00
B-23New 48” Manhole, 6 – 10 feet deep,EA5$0.00
B-24New 60” Flat Top Manhole, 0 – 6 feet deep,EA4$0.00
B-25New 60” Manhole, 6.1 – 10 feet deepEA7$0.00
B-26New 60” Manhole, 10.1 – 15 feet deepEA4$0.00
B-27New 60” Manhole, 15.1 – 20 feet deepEA2$0.00
B-28New 72” Manhole, 0 – 10 feet deepEA2$0.00
B-29Install Inside Drop in ManholeEA2$0.00
B-30Construct Sanitary Sewer CleanoutEA1$0.00
B-31Rechannel Existing ManholeEA7$0.00
B-32Remove Existing ManholeEA10$0.00
B-33Abandon ManholeEA1$0.00
B-34Groundwater Monitoring Well AbandonmentEA1$0.00
B-354” and 6" Sanitary Service Laterals, New, > 5 feet of service lineL.F.20$0.00
B-36Reconnect Sanitary Service Laterals, 0 - 5 feet from mainEA13$0.00
B-37Fill Sewer Pipe with CLSMC.Y.78$0.00
B-38Sewer Bypass, Basin 6L.S.1$0.00
B-39Post Construction: CCTV of New or Rehabilitated Sewer MainsL.F.5,663$0.00
B-40Concrete Pavement, not ODOT HighwayS.Y.108$0.00
B-41Concrete Pavement, ODOT Highway 30S.Y.1,229$0.00
B-42Concrete Curb/GutterL.F.260$0.00
B-43Construct Concrete ADA RampEA2$0.00
B-44Tree Removal (6" Diameter and Greater)EA17$0.00
B-45Installation of New TreeEA4$0.00
B-46Temporary Removal and Reinstallation of FenceL.F.56$0.00
B-47Remove and Reinstall sign and landscaping bouldersL.S.1$0.00
B-48Remove and Reinstall Concrete BarriersL.S.2$0.00
B-49Remove Landscape Log BorderEA2$0.00
B-50Remove and Replace Fire Hydrant AssemblyEA1$0.00
B-51Remove and Replace Water Meter BoxEA2$0.00
B-52Longitudinal Pavement Markings - Paint - 4" wideL.F.733$0.00
B-53Methyl Methactrylate or Plural Component, Extruded or Sprayed, Surface, Non-Profiled - 4"L.F.1,144$0.00
B-54Pavement Legend, Type AB: ArrowsEA1$0.00
B-55Pavement Bar, Type ABS.F.88$0.00
B-56Extra Asphalt Grinding and Hot Mix Asphaltic Concrete (HMAC) Inlay Wearing Course, Level 3, 1/2" ACP, 2" ThickS.F.1,000$0.00
B-57Asphalt EscalationTNTBD-
B-58Fuel EscalationGLTBD-
TOTAL SCHEDULE B BID$0.00
*Abbreviations: LS: Lump sum LF: Linear Feet EA: Each CY: Cubic Yard TN: Ton SY: Square Yard SF: Square Foot GL: Gallon

DEDUCTIVE ITEM

ITEM #ITEM DESCRIPTIONUNITAMOUNTUNIT COSTTOTAL
DEDUCT
D-1Deduction: Mobilization Credit if Both Schedule A and Schedule B are AwardedL.S.1$0.00
TOTAL DEDUCT$0.00
*Abbreviations: LS: Lump sum

TOTAL BID = SCHEDULE A + SCHEDULE B - DEDUCTIVE ITEM $0.00

&"Times New Roman,Regular"&10City of St. Helens, Oregon | Public Improvement Contract | Project No P-525 ADDENDUM NO 1 &"Times New Roman,Regular"&10P-525 REVIDED Bid Schedule Page &P