17-Major Equipment_Manufacturers and Suppliers List Form.pdf
PDF 69 KB Posted
- Solicitation number
- S-KS0510-00017594
- Issued by
- Oregon
About this file
This is a Major Equipment, Manufacturers, and Suppliers List Form required for the Wastewater System Capacity Improvements Project in the City of St. Helens, Oregon. The form serves as a standardized template for bidders and contractors to identify all major equipment, materials, manufacturers, and suppliers proposed for use on the project, establishing the basis for design and construction quality. The document provides ten numbered line items for bidders to list equipment or material descriptions, corresponding manufacturer information, model numbers, supplier or distributor details, and any relevant notes. Bidders are instructed to attach additional sheets as necessary if more than ten items require documentation.
The form establishes that all listed equipment and suppliers represent the contractor's intended furnishings for the project, with a certification statement signed by an authorized representative. The document explicitly acknowledges that any substitutions after bid award may require prior written approval and are subject to additional review, testing, or potential cost implications. This mechanism ensures that the owner maintains control over construction quality and material specifications throughout project execution, preventing unauthorized changes that could impact project performance or budget.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAJOR EQUIPMENT, MANUFACTURERS, AND SUPPLIERS LIST
Project Name: __________________________________________________________________
Bidder/Contractor Name: _______________________________________________________
Date: ___________________________________________________________________________
The Bidder shall list all major equipment, materials, manufacturers, and suppliers proposed for use on this project. This list is intended to establish the basis of design and construction quality.
Substitutions after bid award may be subject to approval in accordance with the Contract Documents.
Item No.
Equipment / Material Description
Manufacturer Model No. Supplier / Distributor
Notes
(Attach additional sheets as necessary.)
Certification The undersigned certifies that the above-listed equipment and suppliers are those intended to be furnished for this project. The undersigned acknowledges that any substitutions may require prior written approval and may be subject to additional review, testing, or cost implications.
Authorized Signature: ________________________________
Name (Printed): ______________________________________
Title: ________________________________________________
Company: ___________________________________________
File details come from the government source that posted it. Updated .