This is a Project Documentation Checklist for the Wastewater System Capacity Improvements Project in the City of St. Helens, Oregon, specifically covering infrastructure construction and replacement within Basins 4 and 6 (Project No. S-679). The project aims to increase system capacity, improve reliability, and address conveyance deficiencies in the sanitary sewer collection system. The checklist establishes submission timelines across multiple project phases, beginning with bid opening requirements including bid bonds, firm offers, bid schedules, acknowledged addenda, and first-tier subcontractor disclosure forms. Documentation requirements continue through project award, with contractors required to submit contractor data certifications, certificates of insurance, performance bonds, and payment bonds (each equal to 100 percent of the awarded contract value) within ten business days of award. Additional pre-construction submissions include proof of St. Helens business licensing, filing of a $30,000 Public Works Bond with BOLI, prevailing wage agreements, designations of superintendent and emergency maintenance supervisors with 24-hour contact information, and project safety plans.

Throughout construction, contractors must maintain weekly certified payroll documentation, submit updated construction schedules as required, provide traffic control plans, and furnish American Iron & Steel certifications monthly. Submittals required prior to the start of construction include materials and equipment lists, product data and shop drawings, and project documentation for residents in the project area. The contract specifies submission of certificates of substantial completion at substantial completion, followed by certificates of final completion after punchlist items are resolved. The checklist explicitly notes that this list represents a minimum baseline and may be expanded at the engineer's direction, with contractors responsible for identifying and preparing all submittals required by the contract documents regardless of whether specifically enumerated in this list.

View the file

Other files

Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT DOCUMENTATION CHECKLIST

Project Wastewater System Capacity Improvements Project Basins 4 And 6

Project No S-679

Bid Forms, pg. 10 -18 At bid opening

Bid Forms, pg. 13 At bid opening

Bid Forms, pg. 14 Not later than 2 hours after bid opening

Bid Forms, Pg. 16 At bid opening

Bid Forms, Pg. 17-18 At bid opening

Supplementary Section 12 At bid opening

Supplementary Section 12 At bid opening

Supplementary Section 12 At bid opening

Supplementary Section 12 At bid opening

Supplementary Section 12 At bid opening

Public Improvement Contract , pg 21 Within 10 business days of project award

Public Improvement Contract , pg 21 Within 10 business days of project award

Public Improvement Contract, Exhibit J Within 10 business days of project award

Public Improvement Contract, Exhibit B Within 10 business days of project award

Public Improvement Contract, Exhibit C Within 10 business days of project award

Public Improvement Contract, Exhibit D Within 10 business days of project award

Public Improvement Contract, Exhibit D Within 10 business days of project award

Supplementary Section 12 Before contract award

Supplementary Section 12 Before contract award

Supplementary Section 12 Before contract award

Supplementary Section 12 Before contract award

Supplementary Section 12 Before contract award

Supplementary Section 12 Before contract award

Supplementary Section 12 Before contract award

Specification Section 01620.1.1 After contract award - before Notice to Proceed

Specification 00180.41, 01310 10 Days after Notice to Proceed

Specification 01210 Submit at Pre-Construction Meeting

Specification 01210 Submit at Pre-Construction Meeting

Specification 01300 Anytime prior to start of construction

Specification 02100 Anytime prior to start of construction

Specification 01300 Anytime prior to start of construction

Specification 01500 Anytime prior to start of construction

Specification 01210 Anytime prior to start of construction

(Refer to Contract Documents) Anytime prior to start of construction

(Refer to Contract Documents) Anytime prior to start of construction

Specification 01500 Anytime prior to start of construction

Specification 01500 Anytime prior to start of construction

(Refer to Contract Documents) Anytime prior to start of construction

(Refer to Contract Documents) Anytime prior to start of construction

Specification 00180.41, 01310 Whenever schedule falls behind by 10+ Days

(Refer to Contract Documents) During construction, as required

(Refer to Contract Documents) During construction, as required

Specification 01500 Submit Before or with Pay Requests

Specification 01600 Submit Monthly for Review

Exhibit E *

Specification 01320, 01700 Before Final Completion

Exhibit F After punchlist items are completed

Exhibit G After punchlist items are completed

Exhibit H After all documentation have been submitted & punchlist items are complete

Cost breakdown of lump sum bid items

Sworn Statement of Compliance

List of Contacted Disadvantaged Business Enterprises

Good Faith Efforts, Contract Administration and Contract Language (Prime Contractor)

DEQ - CWSRF Submittals

Certification Regarding Lobbying Activities

Disclosure of Lobbying Activities

Certification of Non-Segregated Facilities

Non-discrimination in Employment

Debarment and Suspension Requirements

Contractor’s Compliance Statement

Prime Contractor Statement of Qualifications

Good Faith Efforts, Contract Administration and Contract Language (Subcontractor)

Prevailing Wage Agreement

Certificate of Independent Price Determination

PRIOR TO START OF CONSTRUCTION

Materials and equipment list

St Helens business license

DURING CONSTRUCTION

Designation of Superintendent / Competent Person Designation with 24-hour contact information

Payment Bond in amount equal to 100% of awarded contract

Construction Schedule

Proof of filing $30,000 Public Works Bond with BOLI

Location of dump site

Designation of Emergency Maintenance Supervisor with 24-hour contact information

24-Hours - 7 Day Contact Information (Contractor / Subcontractor)

Product Data, including product literature, application, installation requirements, etc.

Shop drawings, schedules, and drawings

MSDS on all materials to be used on site

Documentation to be sent to residents in project area

Project Safety Plan

BID OPENING

Bid Bond (Surety Bond)

Reference When Required

Firm Offer (Bid) and Schedule of Prices and Bid Schedule

Acknowledged Addenda

First-Tier Subcontractor Disclosure Form

Documentation

PROJECT AWARD

Contractor Data, Certification, and Signature

Certificates of Insurance per Contract Requirements

Certification Statement for Corporation or Independent Contractor

Performance Bond in amount equal to 100% of awarded contract

PRIOR TO FINAL ACCEPTANCE

Maintain and submit redline drawings showing all changes

Exhibit F - Certificate of Compliance submitted by Contractor

Exhibit G - Release of Liens & Claims

Pre-Construction jobsite conditions (digital photo or video)

This project submittal list may be incomplete and may or may not list all submittals required on this project. This list shall be considered minimum and may be expanded during the course of the work at the direction of the Engineer. The Contractor shall be responsible for identifying, preparing, and submitting all submittals required by the Contract Documents, regardless of whether such submittals are specifically included in this list. Work is considered substantially complete when, in accordance with the Contract Documents, the Owner can occupy or utilize the work for its intended use.

Exhibit H - Certificate of Final Completion issued by City

AT SUBSTANTIAL COMPLETION

Exhibit E - Certificate of Substantial Completion

Pay Requests

Required Testing

Traffic Control Plan

Weekly certified payroll

WEEKLY BASIS

Updated Construction Schedule, as required

Other required submittals as stated elsewhere in Contract Documents

MONTHLY BASIS

Submit American Iron & Steel (AIS) certifications

Project Documentation Tracker/ Engineering Department/ City of St. Helens 4/13/2026, 5:14 PM