WORK_DIRECTIVE_CHANGE.pdf
PDF 48 KB Posted
- Attached to
- 25-STR-01 106th St Bridge Repair
- Solicitation number
- IFB-2024-018
- Issued by
- Hamilton County, Indiana
About this file
This document is a Work Directive Change form from the City of Carmel, specifically related to the 25-STR-01 106th St Bridge Repair project. The form is a template designed to authorize changes to an existing contract, with spaces to detail the specific work modifications, reasons for the change, and potential impacts on project completion date and contract value. The form requires signatures from the Owner's Representative and the City of Carmel Board of Public Works and Safety, including specific board members and the City Engineer.
While the form is a blank template and does not contain specific project details in this instance, it is part of the 106th St Bridge Repair project documentation. The related project description indicates a comprehensive bridge repair effort involving replacement of damaged beams, repair of collision-related damages, replacement of ornamental railing, sidewalk, pier and end bent diaphragms, and other miscellaneous scope items. The project is being managed through the City of Carmel's e-Procurement Portal, with bids to be accepted until 9:00 am on Wednesday, January 22, 2025, suggesting an upcoming infrastructure improvement initiative for Hamilton County, Indiana.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF CARMEL
TO: WORK DIRECTIVE CHANGE NO.______________
DATE: ______________________________________
PROJECT NAME:_____________________________
PROJECT NO.: _______________________________
Specification Reference
Drawing Reference:
DESCRIPTION OF WORK COVERED BY THIS DIRECTIVE CHANGE:
REASON FOR THIS ORDER:
AUTHORIZATION:
THIS WORK DIRECTIVE CHANGE AUTHORIZES THE WORK TO BE COMPLETED AS
OUTLINED. A Contract Change Order in the amount of $______________ will be issued to you in the near future to cover this Work Directive Change.
PROJECT COMPLETION DATE: ADD/DEDUCT/UNCHANGED ___________ DAYS.
By:_______________________________ Approved By:
Owner’s Representative
CITY OF CARMEL
BOARD OF PUBLIC
WORKS AND SAFETY
By:__________________________
Laura Campbell, Presiding Officer
By:__________________________ James Barlow, Member
By:__________________________ Alan Potasnik, Member
By:__________________________ Brad Pease, PE, City Engineer
DATE:_______________________
ATTEST:
DATE:_______________________
Jacob Quinn, Clerk
Version 2024-09-23
File details come from the government source that posted it. Updated .