CONTRACT_CHANGE_REQUEST.pdf
PDF 32 KB Posted
- Attached to
- 25-STR-01 106th St Bridge Repair
- Solicitation number
- IFB-2024-018
- Issued by
- Hamilton County, Indiana
About this file
This document is a Contract Change Request form from the City of Carmel, designed to facilitate modifications to an existing contract for the 25-STR-01 106th St Bridge Repair project. The form provides a standardized template for documenting proposed changes to the contract's scope of work, with sections for detailing the reason for the change, approximate cost adjustments, potential need for additional contract time, and required personnel.
The form allows for comprehensive documentation of contract modifications, including spaces to specify the scope of work changes, reasons for the adjustment, cost implications, potential timeline extensions, and personnel requirements. While the form is currently blank, it is specifically tailored for the 106th St Bridge Repair project, which involves replacing damaged beams, repairing vehicle collision damages, replacing ornamental railing, sidewalk, pier and end bent diaphragms, and other miscellaneous work items. The form is structured to facilitate clear communication and formal approval of contract changes between the contractor and the City of Carmel.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF CARMEL
TO: CONTRACT CHANGE REQUEST NO.:
DATE:
PROJECT NAME:
FROM:
IT IS REQUESTED THAT A CONTRACT CHANGE BE MADE TO THE ABOVE
REFERENCED CONTRACT.
1. SCOPE OF WORK (USE ADDITIONAL PAGES IF REQUIRED. ALSO LIST OTHER
CONTRACTS INVOLVED.)
2. REASON FOR CHANGE:
3. APPROXIMATE COST CHANGE TO CONTRACT PRICE: _____________________
4. WILL THE CONTRACT NEED ADDITIONAL CONTRACT TIME TO COMPLETE
THE CHANGE IN WORK SCOPE? _____ -YES _____ -NO _____ -(CALENDAR
DAYS)
5. WILL THE CONTRACTOR NEED ADDITIONAL PERSONNEL TO COMPLETE
THE CHANGE IN WORK SCOPE? _____ -YES _____ -NO
IF NO, TRADE(S): _____________________________________
NO. OF PERSONNEL: _________________________________
DURATION: ______________________________________
6. IDENTIFICATION OF ATTACHMENTS:
DATE: _______________________ DATE: ________________________
PREPARED
REVIEWED BY:____________ REVIEWED BY:____________________________
ENGINEER
Comments and Recommendation:
File details come from the government source that posted it. Updated .