FIELD_ORDER.pdf

PDF 34 KB Posted

Attached to
25-STR-01 106th St Bridge Repair
Solicitation number
IFB-2024-018
Issued by
Hamilton County, Indiana

About this file

This document is a blank Field Order form from the City of Carmel, designed to document minor changes or interpretations of contract documents without altering the Contract Price or Contract Time. The form provides a structured template for the City's engineering or project management team to issue instructions or clarifications during a project, specifically related to the 25-STR-01 106th St Bridge Repair project. The form requires details such as a field order number, project name, project number, a description of the changes, and any attachments, with space for approval by the Owner's Representative.

The form instructs contractors that if they believe a proposed change will impact the Contract Price or Contract Time, they must submit an itemized proposal to the Engineer immediately and before proceeding with the work. If the proposal is deemed satisfactory, the Field Order may be superseded by a formal Change Order. While this specific form is blank and contains no filled-in details, it is part of the documentation process for the 106th St Bridge Repair project, which involves replacing damaged beams, repairing vehicle collision damages, replacing ornamental railing, sidewalk, pier and end bent diaphragms, and other miscellaneous scope items.

View the file

Other files

File Type Posted
25-STR-01_106th_St_Bridge_Repair_(Addendum_#5_Revision).pdf PDF
24-STR-07_Contract_Plans.pdf PDF
NON_COLLUSION_AFFIDAVIT.pdf PDF
SAMPLE_OF_MOU_FOR_E-VERIFY.pdf PDF
SCREENSHOT_INSTRUCTIONS.docx DOCX document
EXHIBIT_D_E-VERIFY.PDF PDF
PERFORMANCE_BOND_(1).pdf PDF
PAYMENT_BOND_(1).pdf PDF
RIGHT_OF_ENTRY.pdf PDF
CONTRACT_CHANGE_ORDER.pdf PDF
General_Conditions.pdf PDF
WORK_DIRECTIVE_CHANGE.pdf PDF
REQUEST_FOR_PROPOSAL_CHANGE.pdf PDF
SAMPLE_AGREEMENT.pdf PDF
MAINTENANCE_BOND_(3).pdf PDF
CONTRACT_CHANGE_REQUEST.pdf PDF
SUBCONTRACTORS_LIST.pdf PDF
MANUFACTURERS_LIST.pdf PDF
Technical_Specifications.pdf PDF
6._Comprehensive_Set_of_Technical_Specifications_2021-04-28_(V2.7).docx DOCX document
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF CARMEL

OWNER: CITY OF CARMEL

FIELD ORDER NUMBER

DATE:

PROJECT NAME:

PROJECT NO:

You are hereby directed to execute promptly this Field Order which interprets the Contract Documents or orders minor changes in the Work without change in Contract Price or Contract Time.

If you consider that a change in Contract Price or Contract Time is required, please submit your itemized proposal to the ENGINEER immediately and before proceeding with this Work. If your proposal is found to be satisfactory and in proper order, this Field Order will in that event be superseded by a Change Order.

Description:

Attachments:

ENGINEER:

Approved By: _______________________________________ Owners Representative

Date: ___________________________________

File details come from the government source that posted it. Updated .