WORK_DIRECTIVE_CHANGE.pdf

PDF 48 KB Posted

Attached to
106th and Westfield Water Main Extension
Solicitation number
IFB-2026-006
Issued by
Hamilton County, Indiana

About this file

This is a Work Directive Change form issued by the City of Carmel Board of Public Works and Safety, an Indiana municipal entity responsible for managing public infrastructure projects. The form serves as an authorization document for modifications to contracted work on the 106th and Westfield Water Main Extension project, which involves the installation of approximately 800 linear feet of 12-inch water main. The directive captures changes to project scope, specifications, drawings, and justifications for work modifications, with corresponding adjustments to project completion timelines measured in days (add, deduct, or unchanged). The form requires approval from the City Engineer, Brad Pease, and authorization from the Board of Public Works and Safety, including signatures from Laura Campbell (Presiding Officer), James Barlow, and Alan Potasnik, with attestation by Jacob Quinn, Clerk.

The Work Directive Change establishes that a corresponding Contract Change Order will be issued in the future to address financial impacts of the authorized work modifications. This administrative document is essential for documenting and controlling project changes during construction execution, ensuring that all scope modifications, timeline adjustments, and cost impacts are formally recorded and approved by appropriate municipal authorities before implementation.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF CARMEL

TO: WORK DIRECTIVE CHANGE NO.______________

DATE: ______________________________________

PROJECT NAME:_____________________________

PROJECT NO.: _______________________________

Specification Reference

Drawing Reference:

DESCRIPTION OF WORK COVERED BY THIS DIRECTIVE CHANGE:

REASON FOR THIS ORDER:

AUTHORIZATION:

THIS WORK DIRECTIVE CHANGE AUTHORIZES THE WORK TO BE COMPLETED AS

OUTLINED. A Contract Change Order in the amount of $______________ will be issued to you in the near future to cover this Work Directive Change.

PROJECT COMPLETION DATE: ADD/DEDUCT/UNCHANGED ___________ DAYS.

By:_______________________________ Approved By:

Owner’s Representative

CITY OF CARMEL

BOARD OF PUBLIC

WORKS AND SAFETY

By:__________________________

Laura Campbell, Presiding Officer

By:__________________________ James Barlow, Member

By:__________________________ Alan Potasnik, Member

By:__________________________ Brad Pease, PE, City Engineer

DATE:_______________________

ATTEST:

DATE:_______________________

Jacob Quinn, Clerk

Version 2024-09-23

File details come from the government source that posted it. Updated .