WORK_DIRECTIVE_CHANGE.pdf

PDF 48 KB Posted

Attached to
106th and Westfield Water Main Extension
Solicitation number
IFB-2026-006
Issued by
Hamilton County, Indiana

About this file

This is a Work Directive Change form template issued by the City of Carmel, Indiana, Board of Public Works and Safety, designed to authorize modifications to ongoing construction contracts. The form provides a structured format for documenting changes to project scope, including sections for project identification, specification and drawing references, detailed descriptions of work modifications, and justification for the directive change. The form requires authorization from the Owner's Representative and approval from the Board of Public Works and Safety, which consists of Laura Campbell (Presiding Officer), James Barlow, Alan Potasnik, and Brad Pease (City Engineer). The directive change process includes provisions for adjusting the project completion date by adding, deducting, or leaving unchanged a specified number of days, with a corresponding Contract Change Order to be issued to the contractor covering the financial impact of the modifications. The form must be attested by Jacob Quinn, City Clerk, and dated appropriately for official documentation.

This Work Directive Change template is applicable to the City of Carmel's 106th and Westfield Water Main Extension project, a sealed competitive bidding procurement for construction services involving approximately 800 linear feet of water main installation. The template enables the City to manage project modifications efficiently during the May through June 2026 construction period, allowing flexibility in accommodating changes while maintaining proper authorization and documentation procedures. The form ensures that all directive changes are formally recorded, approved by appropriate City officials, and accompanied by corresponding financial adjustments through formal Contract Change Orders, supporting the City's contract administration and cost control objectives.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CITY OF CARMEL

TO: WORK DIRECTIVE CHANGE NO.______________

DATE: ______________________________________

PROJECT NAME:_____________________________

PROJECT NO.: _______________________________

Specification Reference

Drawing Reference:

DESCRIPTION OF WORK COVERED BY THIS DIRECTIVE CHANGE:

REASON FOR THIS ORDER:

AUTHORIZATION:

THIS WORK DIRECTIVE CHANGE AUTHORIZES THE WORK TO BE COMPLETED AS

OUTLINED. A Contract Change Order in the amount of $______________ will be issued to you in the near future to cover this Work Directive Change.

PROJECT COMPLETION DATE: ADD/DEDUCT/UNCHANGED ___________ DAYS.

By:_______________________________ Approved By:

Owner’s Representative

CITY OF CARMEL

BOARD OF PUBLIC

WORKS AND SAFETY

By:__________________________

Laura Campbell, Presiding Officer

By:__________________________ James Barlow, Member

By:__________________________ Alan Potasnik, Member

By:__________________________ Brad Pease, PE, City Engineer

DATE:_______________________

ATTEST:

DATE:_______________________

Jacob Quinn, Clerk

Version 2024-09-23

File details come from the government source that posted it. Updated .