This is a Work Directive Change form template issued by the City of Carmel Board of Public Works and Safety for the 106th and Westfield Water Main Extension project. The document serves as a blank template authorizing work modifications to the contracted project, which involves the installation of approximately 800 linear feet of 12-inch water main utilizing either open cut or horizontal directional drilling methods. Deliverables include High Density Polyethylene pipe installation, ductile iron water main, hydrant assemblies, tapping saddles and valves, water service connections, and site restoration work. The mandatory pre-bid conference is scheduled for Wednesday, April 8, 2026, at 9:00 a.m. in the Caucus Room on the 2nd Floor of City Hall, with sealed bids due by 9:00 a.m. on Wednesday, April 15, 2026. Project commencement is scheduled for May 2026 with substantial completion required by June 30, 2026. The form accommodates adjustments to project timelines by allowing designation of additional, deducted, or unchanged days in the project completion date.
The Work Directive Change template requires specification and drawing references, a detailed description of the work covered, and the reason for the order. A Contract Change Order will be issued to cover the authorized work, with the dollar amount to be determined and documented separately. Liquidated damages are assessed at $1,000 per day for delays beyond substantial and final completion dates. The successful contractor must provide 100 percent performance and payment bonds, maintain comprehensive general liability insurance with minimum limits of $6,000,000 general aggregate and $5,000,000 per occurrence, and submit a ten percent maintenance bond. The project is funded by the City of Carmel, and all work is governed by the latest editions of Indiana Department of Transportation Standard Drawings and Specifications, along with City of Carmel Standards for Construction and Utility Standard Specifications and Details (2023). The form requires approval by the City's Board of Public Works and Safety, including signatures from the Presiding Officer, Board Members, City Engineer, and Clerk.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF CARMEL
TO: WORK DIRECTIVE CHANGE NO.______________
DATE: ______________________________________
PROJECT NAME:_____________________________
PROJECT NO.: _______________________________
Specification Reference
Drawing Reference:
DESCRIPTION OF WORK COVERED BY THIS DIRECTIVE CHANGE:
REASON FOR THIS ORDER:
AUTHORIZATION:
THIS WORK DIRECTIVE CHANGE AUTHORIZES THE WORK TO BE COMPLETED AS
OUTLINED. A Contract Change Order in the amount of $______________ will be issued to you in the near future to cover this Work Directive Change.
PROJECT COMPLETION DATE: ADD/DEDUCT/UNCHANGED ___________ DAYS.
By:_______________________________ Approved By:
Owner’s Representative
CITY OF CARMEL
BOARD OF PUBLIC
WORKS AND SAFETY
By:__________________________
Laura Campbell, Presiding Officer
By:__________________________ James Barlow, Member
By:__________________________ Alan Potasnik, Member
By:__________________________ Brad Pease, PE, City Engineer
DATE:_______________________