Woodside_Drainage_Improvements_Phases_1_and_2_Survey_Plans_SIGNED.pdf
PDF 2 MB Posted
- Solicitation number
- IFB2026001
- Issued by
- Polk County, Lake Harbor CDP, Florida
About this file
This is a Survey Plans document signed on March 6, 2023, for the Woodside Drainage Improvements Phases 1 and 2 project involving the City of Kissimmee and the Toho Water Authority in Florida. The document contains topographic survey sheets and technical plans prepared by Richard D. Brown, referenced as work order W104492. The survey plans include multiple sheets (TH01 through TH05) dated July 5, 2023, and consist of seven revised topographic update sheets that provide the baseline survey data necessary for the design and construction phases of the drainage and utility infrastructure improvements.
The survey plans serve as the foundational technical documentation for the two-phased Woodside project, which encompasses drainage improvements beginning at Heron Ditch east of Dyer Boulevard and extending west through Kissimmee Gateway Airport to Shingle Creek, along with concurrent utility relocations by the Toho Water Authority. These plans establish the existing site conditions and topography required to support the construction of 72-inch storm sewers, ditch regrading and armoring, and relocation of multiple water and sanitary force mains. The project is funded through a combination of sources including Community Development Block Grant - Mitigation (CDBG-MIT) Program funds from the U.S. Department of Housing and Urban Development, American Rescue Plan Act (ARPA) funds, and local sources, with the Toho Water Authority portions funded through an inter-local agreement with the City of Kissimmee.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3/6/2023
./W104492_TH02 .pdf
./W104492_TH02 .pdf ./W104492_TH02 .pdf ./W104492_TH02 .pdf ./W104492_TH02 .pdf ./W104492_TH02 .pdf ./W104492_TH02 .pdf ./W104492_TH02 .pdf ./W104492_TH02 .pdf ./W104492_TH02 .pdf ./W104492_TH02 .pdf ./W104492_TH02 .pdf ./W104492_TH02 .pdf ./W104492_TH05 .pdf ./W104492_TH05 .pdf ./W104492_TH05 .pdf ./W104492_TH05 .pdf ./W104492_TH05 .pdf ./W104492_TH05 .pdf ./W104492_TH05 .pdf ./W104492_TH05 .pdf ./W104492_TH05 .pdf ./W104492_TH05 .pdf ./W104492_TH05 .pdf ./W104492_TH05 .pdf ./W104492_TH05 .pdf ./W104492_TH05 .pdf ./W104492_TH05 .pdf ./W104492_TH05 .pdf ./W104492_TH05 .pdf ./W104492_TH05 .pdf ./W104492_TH05 .pdf ./W104492_TH01 .pdf ./W104492_TH01 .pdf ./W104492_TH01 .pdf ./W104492_TH01 .pdf ./W104492_TH01 .pdf ./W104492_TH01 .pdf ./W104492_TH01 .pdf ./W104492_TH01 .pdf ./W104492_TH01 .pdf ./W104492_TH01 .pdf ./W104492_TH01 .pdf ./W104492_TH01 .pdf ./W104492_TH01 .pdf ./W104492_TH01 .pdf
./W104492_TH02 .pdf ./W104492_TH02 .pdf ./W104492_TH02 .pdf ./W104492_TH02 .pdf ./W104492_TH02 .pdf ./W104492_TH02 .pdf ./W104492_TH02 .pdf ./W104492_TH02 .pdf ./W104492_TH02 .pdf ./W104492_TH03 .pdf ./W104492_TH03 .pdf ./W104492_TH03 .pdf ./W104492_TH03 .pdf ./W104492_TH03 .pdf ./W104492_TH03 .pdf ./W104492_TH03 .pdf ./W104492_TH03 .pdf ./W104492_TH03 .pdf ./W104492_TH03 .pdf ./W104492_TH03 .pdf ./W104492_TH03 .pdf ./W104492_TH03 .pdf ./W104492_TH03 .pdf
| Sheets and Views |
| 18-056-TOPO UPDATE-REV-SHEET 1 |
| 18-056-TOPO UPDATE-REV-SHEET 2 |
| 18-056-TOPO UPDATE-REV-SHEET 3 |
| 18-056-TOPO UPDATE-REV-SHEET 4 |
| 18-056-TOPO UPDATE-REV-SHEET 5 |
| 18-056-TOPO UPDATE-REV-SHEET 6 |
| 18-056-TOPO UPDATE-REV-SHEET 7 |
| 2023-07-05T08:25:14-0400 | |
| Richard D Brown |
File details come from the government source that posted it. Updated .