413557_Woodside_Utility_Relocates_Phase_2_Issued_for_Bid_Drawings_SIGNED.pdf
PDF 34 MB Posted
- Solicitation number
- IFB2026001
- Issued by
- Polk County, Lake Harbor CDP, Florida
About this file
This file contains issued-for-bid construction drawings for the Toho Water Authority Woodside Utility Relocations Phase 2 project, prepared by Black & Veatch Corporation in July 2025. The project involves relocating water mains, reclaimed water mains, and sanitary force mains across three primary corridors: Hoagland Boulevard, Kissimmee Trail, and Dyer Boulevard in the Woodside area of Kissimmee, Florida. Specific utility relocations include a 16-inch water main on Hoagland Boulevard, a 30-inch force main restraint along Kissimmee Trail (293 linear feet and 425 linear feet across two sections), and a 12-inch water main with 30-inch reclaimed water main on Dyer Boulevard. The drawings are organized into thirteen sheets covering general notes, civil utility relocation plans and profiles, detail sheets, and striping specifications. Construction extends from station 124+00.00 to 142+00.00, with significant work involving pipe installation, line stops, bypass piping, thrust collar installation, and pavement restoration along existing roadways and within right-of-way limits.
The contract documents establish comprehensive requirements for contractor responsibilities including field verification of existing utilities, coordination with Sunshine One Call per Florida law, maintenance of emergency vehicle access, protection of existing improvements, and compliance with all regulatory permits and OSHA excavation safety standards. Minimum pipe cover of 36 inches is required under asphalt, with all pipe restraint work performed per mechanical joint restraint systems and detailed thrust restraint tables provided. Contractors must obtain FDEP permits and clearance before placing mains in service and submit detailed record drawings with certified as-built surveys upon project completion. The project is funded by the Toho Water Authority through an inter-local agreement with the City of Kissimmee and is coordinated with the concurrent City of Kissimmee Woodside Drainage Improvements Phase 2 project, which receives CDBG-MIT, ARPA, and local funding.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BLACK & VEATCH PROJECT 413557
TOHO WOODSIDE
UTILITY RELOCATIONS - PHASE 2
TOHO WATER AUTHORITY
JULY 2025
DRAWING INDEX
GENERAL
1 G-00 COVER SHEET, DRAWING INDEX AND LOCATION MAP
2 G-01 GENERAL NOTES AND LEGEND
3 G-02 GENERAL NOTES
4 G-03 KEY MAP
CIVIL
5 C-01 HOAGLAND BLVD - UTILITY RELOCATION - PLAN AND PROFILE
6 C-02 KISSIMMEE TRAIL - 30" FORCE MAIN RESTRAIN - PLAN AND PROFILE
7 C-03 KISSIMMEE TRAIL - 30" FORCE MAIN RESTRAIN - PLAN AND PROFILE
8 C-04 DYER BLVD - UTILITY RELOCATION - PLAN AND PROFILE
9 C-05 DETAILS
10 C-06 DETAILS
11 C-07 DETAILS
12 C-08 DETAILS
13 C-09 DETAILS
SHEET NO. DRAWING NO. DRAWING TITLE
VICINITY MAP
LOCATION OF PROJECT
NTS
BEGIN PROJECT
STA. 124+00.00
END PROJECT
STA. 142+00.00
LOCATION OF PROJECT
PREPARED FOR:
TOHO WATER AUTHORITY
951 MARTIN LUTHER KING BLVD.
KISSIMMEE, FL 34741
www.tohowater.com
PREPARED BY:
BLACK & VEATCH CORPORATION
201 SOUTH ORANGE AVENUE, SUITE 500
ORLANDO, FL 32801
KISSIMMEE
GATEWAY
AIRPORT
US 192
TION
APPROVED:
DESIGNED:
DETAILED:
CHECKED:
DATE:
REVISIONS AND RECORD OF ISSUE
OF
PROJECT NO.:
43211/20(SCALE BAR IS 4" AT FULL SCALE)
Certificate No. 8132 Black & Veatch Corporation
D
FI
LE
PL
O
TT
ED
4 5321
A
B
C
D
201 South Orange Avenue, Suite 500 Orlando, Florida 32801
FD
C :\P
W _W
O R
KI
N
G \B
VW
_A
M
ER
IC
AS
_2 \D
6\
G -X
X
PH
.D
W G
6/
/2
3:
:3
PM
UTILITY RELOCATIONS
PHASE 2
413557
ISSUED
FOR BID
JULY 2025
G-00
GENERAL
COVER SHEET
JNH
KTH
MM
OL
lyt90159 Snapshot
GENERAL CONSTRUCTION NOTES
1. ALL CONSTRUCTION CONNECTING TO THE TOHO PUBLIC UTILITIES SYSTEM SHALL CONFORM TO THE CONTRACT DOCUMENTS.
2. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE. THE CONTRACTOR SHALL FIELD VERIFY THE EXISTENCE AN LOCATION OF ALL ABOVE GROUND AND UNDERGROUND UTILITIES. CONTRACTOR SHALL CONTACT SUNSHINE ONE CALL PER STATE LAW PRIOR TO EXCAVATION.
ALL EXISTING UTILITIES SHALL REMAIN AND ARE TO BE PROTECTED AND SUPPORT AS NEEDED FOR WATER MAIN, RECLAIM WATER MAIN AND
FORCE MAIN INSTALLATION.
3. THE CONTRACTOR SHALL PROTECT EXISTING SERVICE CONNECTIONS DURING CONSTRUCTION AND SHALL COORDINATE THE RELOCATION OF SERVICES WITH TOHO PROJECT REPRESENTATIVE. THE CONTRACTOR WILL RELOCATE EXISTING SERVICES AS NECESSARY AND AS DIRECTED BY
TOHO PERSONNEL.
4. SEE DETAIL SHEET FOR SEPARATION REQUIREMENTS BETWEEN WATER MAINS, RECLAIM WATER MAINS, SEWER MAINS, AND OTHER PIPELINES AND
MAINS. NO CONCRETE ENCASEMENT OF PIPES WILL BE PERMITTED.
5. WHEN USING SCALED DATA CONSIDER THAT THESE PLANS MAY HAVE BEEN ALTERED IN SIZE DURING REPRODUCTION.
6. LOCATIONS AND DIMENSIONS OF EXISTING RIGHT-OF-WAYS AND EASEMENTS ARE BASED ON BEST AVAILABLE INFORMATION. CONTRACTOR SHALL VERIFY AND STAKE THE LIMITS OF THE RIGHT-OF-WAYS AND EASEMENTS IN ORDER TO AVOID ENCROACHMENTS BEFORE CONSTRUCTION.
7. WHEN OBTAINING DATA AND INFORMATION FROM THE PLANS, NUMERICAL FIGURES SHALL BE USED IN PREFERENCE TO SCALED DIMENSIONS AND
LARGER SCALE DRAWINGS IN PREFERENCE TO SMALLER SCALE DRAWINGS.
8. PIPE LENGTHS SHOWN ON PLANS ARE APPROXIMATE. ACTUAL LENGTHS ARE TO BE DETERMINED DURING CONSTRUCTION.
9. ALL STATIONS AND OFFSETS REFER TO THE BASELINE OF STATIONING.
10. MAINTAIN EMERGENCY VEHICLE ACCESS TO ALL BUSINESSES AND RESIDENCES AT ALL TIMES.
11. LOCAL RESIDENTIAL ACCESS SHALL BE MAINTAINED AT ALL TIMES. PROVIDE WRITTEN NOTIFICATION TO RESIDENTS SEVEN (7) DAYS PRIOR TO IMPLEMENTING ANY ROADWAY OR DRIVEWAY CLOSURE. A SECOND NOTICE WILL BE GIVEN 24 HOURS IN ADVANCE OF CLOSURE.
12. SUPPORT AND PROTECT ALL EXISTING UTILITIES. CONTRACTOR SHALL CONTACT UTILITY OWNERS FOR LOCATION OF ALL EXISTING FACILITIES.
CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING WITH UTILITY OWNERS AND BE RESPONSIBLE FOR PROVIDING TEMPORARY SUPPORT
FOR UTILITY POLES AND ALL OTHER UTILITIES.
13. THE CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN EXCAVATING IN PROXIMITY OF WATER MAINS, WASTEWATER FORCE MAINS, GRAVITY MAINS, AND RECLAIMED WATER MAINS. MAIN LOCATIONS SHOWN ON PLANS ARE NOT EXACT OR GUARANTEED. CONTRACTOR IS
RESPONSIBLE FOR FIELD VERIFYING EXISTING UTILITY LOCATIONS.
14. ALL WATER MAINS, RECLAIM WATER MAINS AND FORCE MAINS SHALL BE CONSTRUCTED AS SHOWN ON THE PLANS. A MINIMUM COVER OF 36 INCHES SHALL BE MAINTAINED ON ALL MAINS UNDER ASPHALT, WHERE IT IS NOT OTHERWISE SPECIFIED ON PLANS OR DIRECTED BY THE ENGINEER. ALL DIRECTION CHANGES IN THE PIPE BOTH HORIZONTAL AND VERTICAL SHALL BE BY JOINT DEFLECTION UNLESS OTHERWISE NOTED OR DIRECTED BY THE ENGINEER. JOINT DEFLECTION SHALL NOT EXCEED 25% OF THE MANUFACTURER'S RECOMMENDED DEFLECTION.
15. ALL PIPE SHALL BE RESTRAINED IN ACCORDANCE WITH THE RESTRAINT TABLES SHOWN ON THE DETAIL SHEETS. ALL FITTINGS AND PIPE SHALL BE MECHANICAL JOINT RESTRAINED. NO THRUST BLOCKS SHALL BE PERMITTED UNLESS SHOWN. (RESTRAIN EXISTING PIPE JOINTS IN ACCORDANCE
WITH THE RESTRAINT TABLES).
16. COMPLETE ALL CONSTRUCTION WITHIN RIGHT OF WAY LIMITS AND EASEMENT LIMITS.
17. PIPE SIZES SHOWN ON PLANS ARE MINIMUM NOMINAL INSIDE DIAMETER.
18. ALL CONNECTIONS TO EXISTING MAINS SHALL BE MADE BY THE CONTRACTOR ONLY AFTER THE PROPOSED CONNECTION PROCEDURE AND WORK SCHEDULE HAVE BEEN REVIEWED AND ACCEPTED BY THE OWNER. THE CONTRACTOR SHALL SUBMIT A WRITTEN REQUEST TO THE OWNER A MINIMUM OF FIVE (5) WORKING DAYS PRIOR TO SCHEDULING ANY CONNECTIONS. ALL CONNECTIONS TO TO BE COMPLETED IN THE PRESENCE OF AUTHORIZED TOHO PERSONNEL. THE REQUEST SHALL REFERENCE THE PROFESSIONAL LAND SURVEYOR CERTIFIED COMPLETED AS-BUILT
RECORD DRAWINGS PREVIOUSLY SUBMITTED AND SHALL OUTLINE THE FOLLOWING:
a. POINTS OF CONNECTION, FITTINGS TO BE USED, METHODS OF FLUSHING AND DISINFECTION AND VERIFICATION OF RESTRAINT ON
EXISTING PIPE.
b. ESTIMATED CONSTRUCTION TIME FOR THE CONNECTIONS.
THE OWNER SHALL REVIEW THE SUBMITTAL WITHIN FIVE (5) WORKING DAYS AFTER RECEIVING IT AND INFORM THE CONTRACTOR REGARDING APPROVAL OR DENIAL OF THE REQUEST. IF THE OWNER REJECTS THE REQUEST, THE CONTRACTOR SHALL RESUBMIT THE REQUEST MODIFYING IT IN A MANNER ACCEPTABLE TO THE OWNER. ALL CONNECTIONS SHALL ONLY BE MADE ON THE AGREED UPON DATE AND TIME. SHOULD THE CONTRACTOR NOT INITIATE AND COMPLETE THE CONNECTION WORK IN THE AGREED UPON MANNER, THEY SHALL BE REQUIRED TO RESCHEDULE
THE CONNECTION BY FOLLOWING THE PROCEDURE OUTLINED ABOVE.
19. THE CONTRACTOR SHALL NOT OPERATE ANY VALVES IN THE SYSTEM WITHOUT THE PRESENCE AND AUTHORIZATION OF TOHO PERSONNEL.
20. MAINS SHALL NOT BE PLACED IN SERVICE UNTIL CLEARANCE IS RECEIVED FROM FDEP.
21. PROTECT EXISTING IMPROVEMENTS TO THE MAXIMUM EXTENT POSSIBLE.
22. RESTORE ALL EXISTING IMPROVEMENTS AND DISTURBED AREAS TO ORIGINAL OR BETTER CONDITION. PAVEMENT TO BE RESTORED IN ACCORDANCE WITH THE PAVEMENT RESTORATION DETAILS SHOWN ON THE CONSTRUCTION DETAIL SHEETS. CONTRACTOR TO PROVIDE OWN
SURVEY AS NEEDED TO MATCH EXISTING CONDITIONS.
23. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SATISFYING ALL REQUIREMENTS OF REGULATORY AGENCY PERMITS FOR CONSTRUCTION
ACTIVITIES AND RELATED ACTIVITIES.
24. BENCHMARK LOCATIONS AND ELEVATION ARE SHOWN IN THE PLANS AS REPRESENTED BY SURVEYOR AT THE TIME OF SURVEY. CONTRACTOR SHALL INSTALL HIS OWN TEMPORARY BENCHMARKS AS DEEMED NECESSARY. ANY DISCREPANCIES SHALL BE IMMEDIATELY BROUGHT TO THE
ATTENTION OF THE TOHO INSPECTOR.
25. IMMEDIATELY AT ONSET OF CONSTRUCTION, CONTRACTOR SHALL FIELD VERIFY HORIZONTAL AND VERTICAL LOCATIONS OF ALL EXISTING UTILITIES CRITICAL TO COMPLETING THE PROJECT (INCLUDING RECLAIM WATER, SEWER, POWER, TELEPHONE, GAS, AND CABLE TV) AND SHALL EVALUATE POTENTIAL CONFLICTS IN A WRITTEN REPORT. ANY CONFLICTS SHALL BE REPORTED TO ENGINEER/OWNER IMMEDIATELY UPON DISCOVERY AND DETAILED IN THE REPORT. CONTRACTOR SHALL ASSUME ALL EXISTING UTILITIES SHALL REMAIN AND WILL BE SUPPORTED BY
THE CONTRACTOR DURING CONSTRUCTION.
26. NO VALVE BOXES, METERS, PORTIONS OF MANHOLES, OR OTHER APPURTENANCES OF ANY KIND RELATING TO ANY UNDERGROUND UTILITIES SHALL BE LOCATED IN ANY PORTION OF A CURB-AND-GUTTER OR SIDEWALK SECTION. CONTRACTOR SHALL ADVISE ENGINEER IMMEDIATELY UPON
DISCOVERY OF A POTENTIAL CONFLICT.
27. WHERE REQUIRED, AT NO ADDITIONAL COST TO TOHO, THE CONTRACTOR SHALL USE TEMPORARY SHEETING OR TRENCH BOXES TO MINIMIZE THE SIZE OF EXCAVATIONS AND PROTECT EXISTING ROADWAYS, UTILITIES, STORM WATER SYSTEMS AND OTHER FACILITIES. CONTRACTOR TO COMPLY WITH OSHA TRENCH SAFETY REQUIREMENTS AT ALL TIMES. TOHO PERSONNEL ARE AUTHORIZED TO SHUT DOWN ANY UNSAFE OPERATIONS IF WITNESSED, WITHOUT REPERCUSSION OR LIABILITY FOR DELAY, OR COST IMPACT.
28. THE CONTRACTOR SHALL RECOGNIZE AND ABIDE BY ALL OSHA EXCAVATION SAFETY STANDARDS, INCLUDING THE FLORIDA TRENCH SAFETY ACT (90-96,LAWS OF FLORIDA). ANY MATERIAL, CONSTRUCTION METHODS, OR MATERIAL COST TO COMPLY WITH THESE LAWS SHALL BE INCIDENTAL TO
THE CONTRACT.
29. ALL COMPACTION SHALL BE 98% OF AASHTO T-180 WITHIN 2FT OF ROADWAY OR UNDER ROADS OR DRIVEWAYS. 95% IS ACCEPTABLE ELSEWHERE.
30. CONTRACTOR SHALL MAINTAIN DRAINAGE IN DITCHES AND SWALES AT ALL TIMES. THIS INCLUDES ALL TURBIDITY BARRIERS, SYNTHETIC HAY BAILS, ADDITIONAL FILL MATERIAL, BYPASS PUMPING AND SWALE RESTORATION INCLUDING SODDING. ALL DITCH WORK SHALL MEET THE TEMPORARY EROSION AND SEDIMENT CONTROL REQUIREMENT OF INDEX 102 AND INDEX 103 OF THE LATEST FDOT DESIGN STANDARDS. PAYMENT FOR DITCH AND SWALE MAINTENANCE SHALL BE INCLUDED IN THE PRICE OF THE PIPE AND NO SEPARATE PAYMENT WILL BE CONSIDERED.
31. PRIOR TO THE CONNECTION TO ANY EXISTING MAIN, THE PROPOSED WATER MAIN SHALL BE FLUSHED, BACTERIOLOGICALLY TESTED, DISINFECTED, ENGINEER APPROVED PRESSURE TESTING, AND HAVE FDEP CLEARANCE. REFER TO FDEP PERMIT FOR ANY ADDITIONAL
REQUIREMENTS. ALL CONNECTIONS SHALL BE MADE IN THE PRESENCE OF TOHO PERSONNEL.
32. THE CONTRACTOR SHALL INSTALL TEMPORARY WATER TIGHT BULKHEADS, APPROVED BY THE ENGINEER, WITHIN THE END OF THE NEW
PIPELINE,WHENEVER PIPE LAYING OPERATIONS ARE NOT TAKING PLACE.
33. ALL EXISTING TRAFFIC SIGNS WITHIN THE PROPOSED CONSTRUCTION LIMITS ARE TO BE PROTECTED. CAUTION SHOULD BE EXERCISED WHILE RELOCATING EXISTING SIGNS WHERE DIRECTED. IF THE SIGNS ARE DAMAGED BEYOND USE, AS DETERMINED BY THE ENGINEER, THE DAMAGED
SIGNS SHALL BE REPLACED AT THE CONTRACTORS EXPENSE.
34. ALL TOHO MAINS SHALL REMAIN IN SERVICE BY WAY OF TEMPORARY PIPING AND CONNECTIONS AS NEEDED TO ACCOMMODATE MAIN RELOCATION
WORK.
35. CONTRACTOR SHALL PROVIDE ALL TEMPORARY FILL AND STORM PIPING NECESSARY TO INSTALL NEW CONSTRUCTION. RESTORE ALL DISTURBED
AREAS TO PRE EXISTING CONDITIONS OR BETTER.
36. CONTRACTOR SHALL PROVIDE SILT FENCE IN ALL WORK ZONES TO PREVENT SILT AND DEBRIS FROM LEAVING THE RIGHT-OF-WAY OR ENTERING
ACTIVE STORM WATER DITCHES AND SWALES.
37. CONTRACTOR SHALL MAINTAIN STORM WATER FLOW, INCLUDING DRAINAGE DITCHES AND SWALES TO ALLOW FOR PROPER EXISTING DRAINAGE PATTERNS TO BE MAINTAINED AND TO ALLOW FOR UTILITY RELOCATIONS TO OCCUR IN DRY CONDITIONS PER PROPOSED SPECIFICATIONS.
LEGEND
BTV(B)
S(D)
BFOC(D)
= BURIED ELECTRIC-QUALITY LEVEL B
= BURIED CABLE TV-QUALITY LEVEL B
= BURIED SANITARY FORCE MAIN-QUALITY LEVEL B
= BURIED FIBER OPTIC CABLE-QUALITY LEVEL B
NPW(B) = BURIED NON-POTABLE WATER-QUALITY LEVEL B
BE(D)
BT(D) = BURIED TELEPHONE-QUALITY LEVEL B
= BURIED ELECTRIC STREET LIGHT-QUALITY LEVEL B
= BURIED UNKNOWN UTILITY
NPW(C) = BURIED NON-POTABLE WATER-QUALITY LEVEL C
W(D) = BURIED WATER LINE-QUALITY LEVEL D
W(A)
= BURIED ELECTRIC-QUALITY LEVEL ABE(A)
BT(A) = BURIED TELEPHONE-QUALITY LEVEL A
= BURIED WATER LINE-QUALITY LEVEL A
OFOC = BURIED MISC FIBER OPTIC CABLE
BFOC(A) = BURIED FIBER OPTIC CABLE-QUALITY LEVEL A
OE = OVERHEAD ELECTRIC
BTV(C) = BURIED CABLE TV-QUALITY LEVEL C
OTV = BURIED MISC TELEPHONE
SS(D) = BURIED SANITARY SEWER
SD = BURIED STORM DRAIN SEWER
FD
C :\P
W _W
O R
KI
N
G \B
VW
_A
M
ER
IC
AS
_2 \D
6\
G -X
X
PH
.D
W G
6/
/2
3:
:3
PHASE 2
413557
ISSUED
FOR BID
JUNE 2025
G-01
GENERAL
GENERAL NOTES AND
LEGEND
JNH
KTH
MM
OL
TION
APPROVED:
DESIGNED:
DETAILED:
CHECKED:
DATE:
REVISIONS AND RECORD OF ISSUE
OF
PROJECT NO.:
43211/20(SCALE BAR IS 4" AT FULL SCALE)
Certificate No. 8132 Black & Veatch Corporation
D
FI
LE
PL
O
TT
ED
4 5321
A
B
C
D
201 South Orange Avenue, Suite 500 Orlando, Florida 32801
R/W = EXISTING RIGHT-OF-WAY
X X X = EXISTING FENCE LINE
WATER MAIN NOTES
WATER - TESTING:
1. WATER LINE SHALL BE INSTALLED, CLEANED, FLUSHED, PIGGED, DISINFECTED AND BACTERIOLOGICALLY TESTED AND CLEARED FOR SERVICE IN ACCORDANCE WITH THE LATEST AWWA STANDARDS AND FDEP RULES AND REGULATIONS.
2. ALL WATER DISTRIBUTION SYSTEMS SHALL BE FLUSHED CLEAN OF ALL DELETERIOUS MATERIAL PRIOR TO ANY TESTING BY USE OF A SWAB (IE. "PIG"). SWAB SHALL BE SIZED LARGER THAN THE PIPE BEING SWABBED.
3. WATER LINE SHALL BE PRESSURE TESTED IN ACCORDANCE WITH AWWA-C600 (DUCTILE IRON PIPE) AND AWWA-C605/M23 (PVC PIPE) SPECIFICATIONS AT 150 PSI AND WITNESSED BY TOHO PERSONNEL. SCHEDULE TEST A MINIMUM OF 48 HOURS IN ADVANCE. NO LEAKAGE IS PERMITTED. TESTING SHALL BE VALVE TO VALVE. NO TESTING THROUGH VALVES WILL BE
ALLOWED.
4. ALL WATER MAINS SHALL BE DISINFECTED IN ACCORDANCE WITH THE LATEST VERSION OF AWWA C651 AND WITNESSED BY
TOHO PERSONNEL.
5. ALL BACTERIOLOGICAL SAMPLES SHALL BE TAKEN BY TOHO PERSONNEL. FIRE HYDRANTS ARE NOT TO BE USED FOR
BACTERIAL SAMPLE POINTS.
WATER MATERIALS:
1. PVC PIPE FOUR (4) INCHES THROUGH TWELVE (12) INCHES SHALL BE AWWA C-900, LATEST EDITION. FOURTEEN (14) INCHES
THROUGH THIRTY-SEZ (36) INCHES SHALL BE AWWA C-905, LATEST EDITION.
2. DIP PIPE: FOUR (4) INCHES THROUGH FIFTY-FOUR (54) INCHES SHALL BE ANSI/AWWA A21.51/C151 WITH A MINIMUM WORKING
PRESSURE CLASS 150 PIPE.
ANY FITTING REQUIRED SHALL BE MECHANICAL JOINT DUCTILE IRON CONFORMING TO ANSI/AWWA A21.10/C110, 250 PSI MINIMUM PRESSURE RATING, OR DUCTILE IRON COMPACT FITTINGS IN ACCORDANCE WITH ANSI/AWWA A21.53/C153.
JOINTS FOR DUCTILE IRON PIPE SHALL BE PUSH-ON OR MECHANICAL JOINTS CONFORMING TO ANSI/AWW A21.11/C111. ABOVE GROUND JOINTS SHALL BE FLANGED WITH T5 CADMIUM PLATED BOLTS, NUTS AND WASHERS. FLANGED JOINTS SHALL
CONFORM TO ANSI STANDARD B 16.1-125 LB.
WHERE DUCTILE IRON PIPE AND FITTINGS ARE TO BE BELOW GROUND OR INSTALLED IN A CASING PIPE THE COATING SHALL
BE A MINIMUM 1.0 MIL THICK IN ACCORDANCE WITH ANSI/AWWA A21.51/C151.
ALL DUCTILE IRON PIPE AND FITTINGS SHALL HAVE AN INTERIOR PROTECTIVE LINING OF CEMENT-MORTAR WITH A SEAL COAT
OF ASPHALTIC MATERIAL IN ACCORDANCE WITH ANSI/AWWA A21.4/C104.
THE PIPE SHALL BE POLYETHYLENE ENCASE (8 MIL) WHERE SHOWN ON THE PLANS, IN ACCORDANCE WITH ANSWI/AWWA A21.51/C105.
3. VALVES SHALL BE RESILIENT WEDGE GATE VALVES.
4. VALVES SHALL BE LOCATED AT NOT MORE THAN FIVE-HUNDRED (500 FOOT INTERVALS IN COMMERCIAL, INDUSTRIAL AND HIGH DENSITY RESIDENTIAL AREAS AND AT NOT MORE THAN ONE-THOUSAND (1,000) FOOT INTERVALS IN ALL OTHER AREAS.
APPROPRIATE VALVING SHALL ALSO BE PROVIDED AT THE DOWNSTREAM SIDES OF TEES AND CROSSES AND BOTH SIDES OF DIRECTIONAL BORE OR JACK AND BORE. THIS SHALL INCLUDE ALL SIDES OF TEES AND CROSSES WITHIN LOOPED SYSTEMS, WHERE FLOW IS POTENTIALLY MULTIDIRECTIONAL.
RECLAIMED WATER MAIN NOTES
RECLAIMED WATER - TESTING:
1. RECLAIMED WATER LINE SHALL BE INSTALLED, CLEANED, FLUSHED, PIGGED AND CLEARED FOR SERVICE IN ACCORDANCE
WITH THE LATEST AWWA STANDARDS AND FDEP RULES AND REGULATIONS.
2. ALL RECLAIMED WATER DISTRIBUTION SYSTEMS SHALL BE FLUSHED CLEAN OF ALL DELETERIOUS MATERIAL PRIOR TO TESTING BY USE OF A SWAB (IE. "PIG"). SWAB SHALL BE SIZED LARGER THAN THE PIPE BEINGS SWABBED.
3. RECLAIMED WATER LINE SHALL BE PRESSURE TESTED IN ACCORDANCE WITH AWWA-C600 (DUCTILE IRON PIPE) AND AWWA-C605/M23 (PVC PIPE) SPECIFICATIONS AT 150 PSI AND WITNESSED BY TOHO PERSONNEL. SCHEDULE TEST A MINIMUM OF 48 HOURS IN ADVANCE. NO LEAKAGE IS PERMITTED. TESTING SHALL BE VALVE TO VALVE, NO TESTING THROUGH VALVES
WILL BE ALLOWED.
RECLAIMED WATER - MATERIALS:
1. DIP PIPE: 4 INCHES THROUGH 54 INCHES SHALL BE ANSI/AWWA A21.51/C151 WITH A MINIMUM WORKING PRESSURE CLASS 150
PIPE.
A. ANY FITTINGS REQUIRED SHALL BE MECHANICAL JOINT DUCTILE IRON CONFORMING TO ANSI/AWWA A21.20/C110 OR C153, 250 PSI MINIMUM PRESSURE RATING.
B. JOINTS FOR DUCTILE IRON PIPE SHALL BE PUSH-ON OR MECHANICAL JOINTS CONFORMING TO ANSI/AWWA A21.11/C111.
ABOVE GROUND JOINTS SHALL BE FLANGED WITH T5 CADMIUM PLATED BOLTS, NUTS, AND WASHERS. FLANGED JOINTS
SHALL CONFORM TO ANSI STANDARDS B 16.1-125 LB.
C. ALL DUCTILE IRON PIPE AND FITTINGS SHALL HAVE AN INTERIOR PROTECTIVE LINING OF CEMENT-MORTAR WITH A SEAL COAT OF ASPHALTIC MATERIAL IN ACCORDANCE WITH ANSI/AWWA A21.51/C151 STATED IN SPECIFICATION.
D. ALL DIP PIPE SHALL BE RESTRAINED PER PIPE RESTRAINT TABLE.
2. DUCTILE IRON PIPE AND FITTINGS WITHIN 10 FEET OF GAS MAINS SHALL HAVE AN 8-MIL POLYETHYLENE WRAP IN
ACCORDANCE WITH ANSI/ASTM D1248.
3. THE PIPE SHALL BE POLYETHYLENE ENCASED (8mil) WHERE SHOWN ON THE DRAWINGS, IN ACCORDANCE WITH ANSI/AWWA A21.51/C105.
FORCE MAIN NOTES
FORCE MAIN - MATERIALS:
1. ALL FORCE MAIN PIPES SHALL BE PVC, DR 18 PER AWWA STANDARD C905 UNLESS OTHERWISE INDICATED ON THE DRAWINGS.
2. ALL FITTINGS SHALL BE MANUFACTURED OF DUCTILE IRON, CONFORMING TO ANSI/AWWA A21/C110.10. FITTINGS SHALL BE
PRESSURE RATED TO 250 PSI, MINIMUM.
3. INTERIOR LINING SHALL BE MINIMUM 40 MILS DRY FILM THICKNESS (60 MILS NOMINAL) OF CERAMIC EPOXY LINING, AS MANUFACTURED UNDER THE NAME OF "PROTECTO 401", OR APPROVED EQUAL. EXTERIOR COATING FOR BURIED PIPE AND FITTINGS SHALL BE 1.0 MIL THICK IN ACCORDANCE WITH ANSI/AWWA A21.51/C151. PAINT COLOR TO BE IN ACCORDANCE WITH
LOCAL UTILITY REQUIREMENTS.
4. MECHANICAL AND PUSH-ON JOINTS FOR DUCTILE IRON PIPE AND FITTINGS SHALL BE RUBBER GASKETED, CONFORMING TO ANSI/AWWA C111/A21.11. LUBRICANTS OTHER THAN THAT FURNISHED BY THE PIPE MANUFACTURER WITH THE PIPE SHALL
NOT BE USED.
FORCE MAIN NOTES (CONT'D)
FORCE MAIN - MATERIALS (CONT'D):
6. ALL FITTINGS SHALL BE RESTRAINED IN ACCORDANCE WITH DIPRA, "THRUST RESTRAINT DESIGNED FOR DUCTILE IRON PIPE". PIPE JOINTS SHALL BE RESTRAINED UPSTREAM AND DOWNSTREAM OF FITTINGS IN ACCORDANCE WITH THE MANUFACTURER'S REQUIREMENTS OR THE TABLE SHOWN IN THE DRAWINGS, WHICHEVER IS GREATER. DUCTILE IRON RESTRAINED JOINTS SHALL BE AMERICAN FAST GRIP GASKET, FLEX-RING, FIELD FLEX RING, LOK-RING, US PIPE TR-FLEX, EBAA MEGALUG, OR EQUAL. PVC PIPE JOINTS SHALL BE RESTRAINED USING MECHANICAL DEVICES, UNI-FLANGE BLOCK BUSTER SERIES 1390 OR
ENGINEER APPROVED EQUAL.
7. INTERIOR LINING FOR VALVES 4 INCH AND LARGER SHALL BE MINIMUM 40 MILS DRY FILM THICKNESS (60 MILS NOMINAL) OF CERAMIC EPOXY LINING, AS MANUFACTURED UNDER THE NAME OF "PROTECTO 401", OR EQUAL. EXTERIOR COATING FOR BURIED VALVES SHALL BE RUST INHIBITING EPOXY PRIMER, FOLLOWED BY A COAL TAR EPOXY, TOTAL MINIMUM DRY FILM THICKNESS OF 16 MILS, APPLIED AT THE FACTORY.
EXTERIOR COATING OF EXPOSED VALVES SHALL BE FACTORY APPLIED RUST INHIBITING EPOXY PRIMER, MINIMUM 3 MILS DRY FILM THICKNESS. AFTER INSTALLATION, EXTERIOR SURFACE SHALL BE PAINTED WITH TWO COATES TNEMEC SERIES 2 TNEME-GLOSS, GLIDDEN LIFE MASTER PRO HIGH PERFORMANCE ACRYLIC NO. 6900 SERIES, OR EQUAL, AT 4 MILS MINIMUM DRY FILM THICKNESS PER COAT. PAINT COLOR TO BE IN
ACCORDANCE WITH LOCAL UTILITY REQUIREMENTS.
8. AIR RELEASE VALVES SHALL BE SELECTED FROM TOHO'S APPROVED LIST OF MATERIALS AND
MANUFACTURERS.
9. ALL BURIED VALVES SHALL BE PROVIDED WITH ADJUSTABLE VALVE BOXES APPROXIMATELY 5 INCHES IN DIAMETER WITH A MINIMUM THICKNESS OF 3/16 INCH CAST IRON. BOXES SHALL BE OF SUFFICIENT LENGTH TO OPERATE ALL VALVES BURIED IN THE GROUND, CONSISTING OF BASE, CENTER SECTION, AND TOP SECTION WITH COVER. VALVE BOXES LOCATED IN UNPAVED AREAS SHALL BE SLIP TYPE DESIGN TO PERMIT MOVEMENT OF THE TOP SECTION WITHOUT TRANSMITTING FORCES ONTO THE VALVE BODY.
VALVE BOXES CAST INTO CONCRETE OR ASPHALT SURFACING SHALL HAVE BRASS COVERS. ALL VALVE BOX COVERS SHALL BE INTERNALLY CHAINED TO VALVE BOXES WITH AN APPROXIMATELY 18 INCH
GALVANIZED CHAIN. VALVE BOX COVERS SHALL BE CAST WITH THE INSCRIPTION "SEWER".
10. PVC PIPE SHALL BE COLOR CODED GREEN (FORCE MAINS), WITH 2" LETTERING ("SEWER FORCE MAIN") ON
TWO SIDES OF THE PIPE IN AT LEAST THREE AREAS PER PIPE SECTION.
11. THRUST BLOCKS ARE NOT ALLOWED FOR TOHO MAINTAINED INFRASTRUCTURES UNLESS SPECIFIED IN THE
DRAWINGS.
NOTE:
1. CONTRACTOR SHALL REFERENCE WOODSIDE DRAINAGE IMPROVEMENTS PHASE 1 100% PLANS' DRAWINGS SHEET NUMBER 11 FOR POTENTIAL PETROLEUM CONTAMINATED SOIL AND ARSENIC CONTAMINATED SOIL.
= BURIED UTILITY TO BE REMOVED
= BURIED UTILITY TO BE GROUT FILLED AND ABANDONED IN PLACE
= PROPOSED WATER MAIN
= PROPOSED RECLAIMED WATER MAIN
EXISTING ASPHALT
ROAD WORK TO BE REPLACED
TRAFFIC STRIPING AND MARKING
LIMITS OF CONSTRUCTION
= PROPOSED FORCE MAIN
= RESTRAINED EXISTING WATER MAIN
= RESTRAINED EXISTING RECLAIMED WATER MAIN
= RESTRAINED EXISTING FORCE MAIN
SOD RESTORATION
SIDEWALK RESTORATION
CURB AND GUTTER RESTORATION
JULY
EROSION CONTROL NOTES
1. SODDING OF DETENTION POND SIDE SLOPES SHOULD BE ACCOMPLISHED WITHIN 48 HOURS OF THE COMPLETION OF
GRADING TO MINIMIZE EROSION POTENTIAL.
2. CONTRACTOR IS RESPONSIBLE TO SUBMIT EROSION CONTROL PLAN TO THE COUNTY ENGINEER FOR APPROVAL PRIOR TO
THE SCHEDULING OF PRE-CONSTRUCTION CONFERENCE.
3. CONTRACTOR IS ULTIMATELY RESPONSIBLE FOR ALL EROSION PROTECTION COSTS, INCLUDING ANY COSTS ASSOCIATED
WITH COMPLIANCE ISSUES AND ENFORCEMENT ACTIONS.
4. DURING CONSTRUCTION, THE CONTRACTOR SHALL TAKE ALL REASONABLE MEASURES TO ENSURE AGAINST POLLUTING, SILTING OR DISTURBING TO SUCH AN EXTENT AS TO CAUSE AN INCREASE IN TURBIDITY TO THE EXISTING PONDS AND WETLAND/CONSERVATION AREAS ON OUR OFF-SITE. SUCH MEASURES SHALL BE APPROVED BY THE PROJECT ENGINEER AND MAY INCLUDE, BUT NOT BE LIMITED TO, CONSTRUCTION OF TEMPORARY EROSION CONTROL STRUCTURES SUCH AS
SEDIMENT BASINS, SEDIMENT CHECKS, OR SILT BARRIERS.
5. A TWO FEET STRIP OF SOD SHALL BE PLACED BEHIND BACK OF CURB OR AS OTHERWISE DETAILED IN THE APPROPRIATE
SECTION. A TEMPORARY SOD STRIP OF 4' MINIMUM SHALL BE USED DURING CONSTRUCTION.
6. CONTRACTOR IS RESPONSIBLE FOR PREPARING AND ADHERING TO A STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IN ACCORDANCE TO THE REQUIREMENTS OF THE NPDES CONSTRUCTION GENERIC PERMIT (CGP). REFER TO PART
4 OF THE CGP, 62-621.300(4)(A), FOR ADDITIONAL INFORMATION.
7. ALL PERMANENT EROSION CONTROL MEASURES SHALL BE COMPLETED WITHIN 7 DAYS OF ANY AREAS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE EITHER TEMPORARILY OR PERMANENTLY CEASED (PART 5.4). ALL TEMPORARY EROSION CONTROL SHALL BE MAINTAINED UNTIL PERMANENT MEASURES ARE COMPLETED AND ESTABLISHED.
8. DISCHARGE OF GROUNDWATER FROM DEWATERING OPERATIONS REQUIRES APPROVAL FROM FDEP AND THE APPLICABLE WATER MANAGEMENT DISTRICT. THE CONTRACTOR SHALL OBTAIN AN FDEP GENERIC PERMIT FOR THE DISCHARGE OF GROUND WATER FROM DEWATERING OPERATIONS PURSUANT TO THE REQUIREMENTS OF 62-621.300(2)(A) AND 62-620 F.A.C.
AND FLORIDA STATUTES CHAPTER 403. DISCHARGES DIRECTED TO THE COUNTY'S MS4 REQUIRE AN OSCEOLA COUNTY RIGHT-OF-WAY UTILIZATION PERMIT FOR DEWATERING PRIOR TO THE START OF ANY DISCHARGES. TO OBTAIN RIGHT-OF-WAY APPROVAL, COPIES OF THE FEDP PERMIT, NOI, DOCUMENTATION SHOWING DEWATERING AT THE SITE IS NOT WITHIN 500 FT OF KNOWN CONTAMINATION, AND A DEWATERING PLAN SHALL BE SUBMITTED TO OSCEOLA COUNTY PUBLIC WORKS DEVELOPMENT ENGINEERING PERMITTING SECTION. ANALYTICAL SAMPLING OF GROUNDWATER MAY BE REQUESTED BY OSCEOLA COUNTY ON A CASE BY CASE BASIS TO CONFIRM SITE CONTAMINATION STATUS.
FD
C :\P
W _W
O R
KI
N
G \B
VW
_A
M
ER
IC
AS
_2 \D
6\
G -X
X
PH
.D
W G
6/
/2
3:
:3
PHASE 2
413557
ISSUED
FOR BID
JUNE 2025
G-02
GENERAL
GENERAL NOTES
JNH
KTH
MM
OL
TOHO WATER AUTHORITY NOTES
GENERAL NOTES:
1. CONSTRUCT UTILITIES IN ACCORDANCE TO TOHO APPROVED PLANS AND SHOP DRAWINGS. ANY DEVIATION FROM THE
APPROVED PLANS SHALL BE APPROVED BY THE ENGINEER AND TOHO.
2. A PRECONSTRUCTION MEETING WITH THE TOHO’S STAFF IS REQUIRED PRIOR TO INITIATING CONSTRUCTION.
3. ALL REQUIRED PERMITS SHALL BE OBTAINED PRIOR TO INITIATING CONSTRUCTION.
4. A MINIMUM 12 FOOT WIDE ACCESS ROAD SHALL BE PROVIDED FOR ALL TOHO OWNED UTILITIES, WHICH ARE LOCATED OUTSIDE OF ROADWAYS. THE TOP 8" OF THE ACCESS ROAD SHALL BE STABILIZED TO A FLORIDA BEARING VALUE OF 75 PSI, AND COMPACTED TO 98% OF AASHTO T-180.
5. PIPE DEFLECTION CANNOT EXCEED 25% OF THE PIPE MANUFACTURER’S RECOMMENDATION.
6. REFERENCE TOHO’S STANDARDS, SPECIFICATIONS AND DETAILS, LATEST EDITION FOR ISSUES NOT SPECIFICALLY
ADDRESSED BELOW OR ON THE TOHO ACCEPTED CONSTRUCTION PLANS.
PERMITS, PLANS, SHOP DRAWINGS:
1. PERMITS OR LETTERS OF DETERMINATION FROM FDEP SHALL BE OBTAINED FOR THE SANITARY SEWER COLLECTION
SYSTEM AND WATER DISTRIBUTION SYSTEM PRIOR TO COMMENCEMENT OF CONSTRUCTION.
2. A MINIMUM OF ONE SET OF SHOP DRAWINGS SHALL BE SUBMITTED TO TOHO FOR REVIEW AND APPROVAL PRIOR TO
CONSTRUCTION.
3. INSTALLATION OF MATERIALS AND/OR STRUCTURES PRIOR TO SHOP DRAWING APPROVAL IS DONE AT THE CONTRACTOR’S
OWN RISK.
MAINTENANCE OF TRAFFIC (MOT) NOTES:
1. THE CONTRACTOR SHALL FURNISH, ERECT, AND MAINTAIN ALL NECESSARY TRAFFIC CONTROL AND SAFETY DEVICES IN
ACCORDANCE WITH THE LATEST EDITION TO THE "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (2009)" AND THE LATEST EDITION TO THE FLORIDA DEPARTMENT OF TRANSPORTATION ROADWAY DESIGN STANDARDS. ALL DEVICES SHALL
BE INCLUDED IN PRICE BID FOR MAINTENANCE OF TRAFFIC.
2. ACCESS FOR LOCAL TRAFFIC WITH DESTINATIONS WITHIN THE PROJECT LIMITS SHALL BE MAINTAINED. IF DURING CONSTRUCTION, ACCESS FOR LOCAL TRAFFIC IS CHANGED, THEN THE CONTRACTOR SHALL NOTIFY THE OWNER A MINIMUM
OF THREE WORKING DAYS IN ADVANCE.
3. ACCESS TO ALL DRIVEWAYS SHALL BE MAINTAINED. COMMERCIAL DRIVEWAY MAINTENANCE SHALL BE PROVIDED AS DIRECTED BY THE PROJECT ENGINEER AND OSCEOLA COUNTY. COST TO BE INCLUDED IN THE PRICE BID FOR
MAINTENANCE OF TRAFFIC.
4. CONTRACTOR SHALL SUBMIT A FLORIDA LICENSED PROFESSIONAL ENGINEERS SIGNED AND SEAL MAINTENANCE OF TRAFFIC PLAN TO OSCEOLA COUNTY, CITY OF KISSIMMEE PUBLIC WORKS AND/OR FDOT FOR APPROVAL AT LEAST TWO WEEKS PRIOR TO STARTING CONSTRUCTION. THE HOURS OF OPERATION FOR WORKS WITHIN THE OSCEOLA COUNTY RIGHT-OF-WAY ARE BASED ON LOCATION OF WORK, TRAFFIC COUNT, AND WILL BE CLARIFIED BY THE OSCEOLA COUNT
RIGHT-OF-WAY UTILIZATION PERMIT.
TION
APPROVED:
DESIGNED:
DETAILED:
CHECKED:
DATE:
REVISIONS AND RECORD OF ISSUE
OF
PROJECT NO.:
43211/20(SCALE BAR IS 4" AT FULL SCALE)
Certificate No. 8132 Black & Veatch Corporation
D
FI
LE
PL
O
TT
ED
4 5321
A
B
C
D
201 South Orange Avenue, Suite 500 Orlando, Florida 32801
ALL RECORD DRAWINGS SUBMITTED TO TOHO, AS PART OF THE PROJECT ACCEPTANCE SHALL COMPLY WITH THE
REQUIREMENTS:
1. EACH SHEET OF THE RECORD DRAWING SHALL BE SIGNED AND SEALED BY THE ENGINEER, THE COVER SHEET SHALL BE
SIGNED AND SEALED AND SHALL INCLUDE THE FOLLOWING CERTIFICATION STATEMENT
"i CERTIFY THAT THESE RECORD DRAWINGS HAVE BEEN REVIEWED BY ME OR BY INDIVIDUALS UNDER MY DIRECT SUPERVISION AND THAT THESE RECORD DRAWINGS INCORPORATE THE INFORMATION CONTAINED IN THE CERTIFIED AS-BUILT SURVEY PREPARED BY [SURVEY COMPANY NAME] DATED [DATE SIGNED AND SEALED], JOB NUMBER [SURVEY COMPANY JOB NUMBER]. TO THE BEST OF MY KNOWLEDGE AND BELIEF THESE RECORD DRAWINGS SUBSTANTIALLY REFLECT ALL WATER, THAT APPLIES, AS CONSTRUCTED. THE ACCURACY OF THESE RECORD DRAWINGS IS RELIANT ON THE
ACCURACY APPLIED BY THE SURVEYOR THAT PREPARED THE CERTIFIED AS-BUILT SURVEY."
2. THE ENTIRE WATER SYSTEMS SHALL BE SHOWN ON A SINGLE MASTER PLAN SHEET.
3. THE CONTRACTOR SHALL BE RESPONSIBLE FOR RECORDING INFORMATION ONTO THE TOHO ACCEPTED PLANS
CONCURRENTLY WITH THE CONSTRUCTION PROGRESS IN THE FIELD.
4. THE 1/4 SECTION, TOWNSHIP AND RANGE OF THE BEGINNING POINT OF CONSTRUCTION SHALL BE DISPLAYED ON THE
LOWER RIGHT HAND CORNER OF THE COVER SHEET AS _1/4, S_, T_, R_.
5. THE RECORD DRAWINGS SUBMITTAL NUMBER SHALL BE DISPLAYED ON THE LOWER RIGHT-HAND CORNER OF THE COVER, AS "SUBMITTAL SET _".
6. ALL PRIVATELY MAINTAINED UTILITIES SHALL BE CLEARLY OUTLINED IN A SEPARATE PRIVATE UTILITIES STATEMENT ON EACH SHEET OF THE RECORD DRAWINGS. PRIVATE UTILITIES SHALL ALSO BE MARKED ON THE RECORD DRAWINGS AS
"PRIVATE".
7. RECORD DRAWINGS SHALL BE LEGIBLY MARKED TO RECORD ACTUAL CONSTRUCTION.
8. RECORD DRAWINGS SHALL SHOW ACTUAL LOCATION AND ELEVATIONS OF WATER, FORCE MAIN AND REUSE MAIN PIPING, FITTINGS AND RELATED APPURTENANCES ASSET TABLE. ALL CHANGES TO PIPING LOCATION INCLUDING HORIZONTAL AND VERTICAL LOCATIONS OF UTILITIES AND APPURTENANCES SHALL BE CLEARLY SHOWN AND REFERENCED TO PERMANENT
SURFACE IMPROVEMENTS OR ANY STRUCTURE WITHIN 20 FEET OF THE INSTALL.
9. RECORD DRAWINGS SHALL SHOW ACTUAL INSTALLED PIPE MATERIAL, CLASS, NOMINAL SIZE, ETC. PRESSURE PIPE LOCATIONS AND ELEVATIONS SHALL BE SHOWN AT A MAXIMUM OF 100 FOOT INTERVALS WITH FINISHED GRADE ALSO SHOWN AT EACH LOCATION. SLEEVES AND CASING PIPES SHALL BE SHOWN INCLUDING LOCATIONS, ELEVATIONS, LENGTH, SIZE AND TYPE OF PIPE MATERIAL.
10. RECORD DRAWINGS SHALL CLEARLY SHOW ALL DETAILS NOT ON THE ORIGINAL PLANS BUT CONSTRUCTED IN THE FIELD.
ALL EQUIPMENT AND PIPING RELOCATION SHALL BE CLEARLY SHOWN.
11. LOCATION OF ALL MANHOLES, HYDRANTS, FITTINGS, VALVES, AND VALVE BOXES SHALL BE SHOWN AT ITS CORRECT
LOCATION ON RECORD DRAWINGS.
12. PLAN AND PROFILE ARE REQUIRED FOR ALL MAINS. RECORD DRAWINGS OF PLAN AND PROFILE DRAWINGS SHALL SHOW
ELEVATIONS OF ALL PIPING AT ALL CROSSINGS AND BORINGS.
13. RECORD DRAWINGS SHALL BE SUBMITTED WITH CHANGES CONFORMING TO ALL ITEMS IN THIS SECTION NOTED ON THE
ACCEPTED PLANS.
14. PLANS SIMPLY STAMPED RECORD DRAWINGS AND LACKING INFORMATION REQUESTED, SHALL BE RETURNED TO THE CONTRACTOR. THE PROJECT ACCEPTANCE CERTIFICATE SHALL NOT BE ISSUED UNTIL CORRECT RECORD DRAWINGS AND
ALL SUPPORTING INFORMATION HAVE BEEN SUBMITTED AND APPROVED.
15. RECORD DRAWINGS SHALL PROVIDE THE CONTRACTOR'S BUSINESS ADDRESS AND CONTACT INFORMATION THAT IS
CURRENT AT THE TIME OF SUBMIT.
JULY
022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
S
TELR
TELR
TELRTELR
TELR
CO
CO
TCB
S
S
TRANS
SS
(D
)W (A
OTV
OEOTV
TRANS
N
PW
(B
SS(D
SS(D) SS(D) SS(D) SS(D)
ST
A
2+
.7
(O
FF
: 7
3' R
T)
" F M
R
O
TA
TE
D
H
O R
IZ
B
EN
D
N -1
.0
E-
.0
S
TELR
TELR
TELRTELR
TELR
CO
CO
TCB
S
S
FD
C :\P
W _W
O R
KI
N
G \B
VW
_A
M
ER
IC
AS
_2 \D
6\
G -X
X
PH
.D
W G
6/
/2
3:
:5
PHASE 2
413557
ISSUED
FOR BID
JUNE 2025
G-03
GENERAL
KEY MAP
JNH
KTH
MM
OL
N H
OAGLA
ND BLV
D
COMMERCE BLVD
AR
M
ST
R
O N
G B
LV
D
KISSIMMEE GATEWAY
AIRPORT
TION
APPROVED:
DESIGNED:
DETAILED:
CHECKED:
DATE:
REVISIONS AND RECORD OF ISSUE
OF
PROJECT NO.:
43211/20(SCALE BAR IS 4" AT FULL SCALE)
Certificate No. 8132 Black & Veatch Corporation
D
FI
LE
PL
O
TT
ED
4 5321
A
B
C
D
201 South Orange Avenue, Suite 500 Orlando, Florida 32801
C-02 C-03 C -0
C-0
D
YE
R B
LV
D
KISSIMMEE TRAIL
JULY
AutoCAD SHX Text
RWM
AutoCAD SHX Text
RWM
0+00 0+25 0+50 0+75 1+00 1+25 1+50 1+75 2+00
EG EG EG
EG
1.
EG
1.
EG
1.
EG
0.
EG
9.
ST
A
9+
.5
5° H
O R
IZ
B
EN
D
C L
EL
3.
ST
A
9+
.2
5° V
ER
T
BE
N
D C
L
EL
6.
ST
A
9+
.7
" S
TE
EL
P
IP
E
(B Y
O
TH
ER
S)
ST
A
8+
.9
5° V
ER
T
BE
N
D C
L
EL
1.
ST
A
8+
.7
5° V
ER
T
BE
N
D C
L
EL
6.
ST
A
9+
.9
5° V
ER
T
BE
N
D C
L
EL
6.
ST
A
9+
.7
5° V
ER
T
BE
N
D C
L
EL
1.
EG
0.
EG
9.
EG
0.
EG
0.
209+00208+75208+50208+25208+00 209+25 209+50 209+75 210+00
ST
A
9+
.9
3-
IN
C
H A
R V
ST
A
1+
.6
" R
C P
SD
ST
A
8+
.7
5° V
ER
T
BE
N
D C
L
EL
4.
ST
A
8+
.2
5°
V
ER
T
BE
N D
C L
EL
6.
ST
A
9+
.4
5° V
ER
T
BE
N
D C
L
EL
6.
ST
A
9+
.8
5° V
ER
T
BE
N
D C
L
EL
4.
ST
A
8+
.0
"X 8"
TE
E C
L
EL
4.
ST
A
8+
.5
G
AT
E
VA
LV
E
ST
A
9+
.2
5° V
ER
T
BE
N
D C
L
EL
6.
ST
A
0+
.6
5° H
O R
IZ
B
EN
D
(R O
TA
TE
D
C L
EL
2.
ST
A
0+
.3
EX
IS
T
T
EE
C L
EL
2.
ST
A
9+
.0
2"
B
LO
W O
FF
A
SS
EM
BL
Y
ST
A
8+
.3
3-
IN
C
H A
R V
FC
COCO
XXX
X X
X
HOAGLAND BOULEVARD
ASPH
ALT
D
ITC
H
2' CONC CURB
2' CONC CURB
ASPHALT
70.0' RIGHT OF WAY
C .L.F
CONTROL POINT
SET NAIL & DISK
LB 966
EL.=80.33'
N 1442077.046 E 512798.017
CONTROL POINT
FND. NAIL & DISK
LB 966
EL.=80.25'
N 1441982.194 E 512722.819
SIDEWALK
SIDEWALK ECB
R/W
R/W
R/W
R/W
R/W R/W R/W R/W R/W
R/W
R/W
R/W
R/W
PARCEL 811 SD
SD
SD
SD
SD
SD
SD
SD
D
R /W
R /W
R /W
R /W
R/W R/W R/W
R/W
R /W
R /W
STORM MANHOLE
TOP=79.68'
NE INV.=71.06
SE INV.=66.60
NW INV.=66.60
RPZ
BT(D) BT(D) BT(D) BT(D)
BT(D)
BT(D) BT(D) BT(D) BT(D) BT(D) BT(D) BT(D) BT(D)
BFOC(D)
BFOC(D)
BFOC(D)
BFOC(D)
BFOC(D) BFOC(D) BFOC(D) BFOC(D) BFOC(D) BFOC(D) BFOC(D) BFOC(D)
BFOC(D) BFOC(D) BFOC(D) BFOC(D) BFOC(D) BFOC(D) BFOC(D) BFOC(D) BFOC(D) BFOC(D) BFOC(D) BFOC(D)
W(D) W(D) W(D) W(D) W(D) W(D) W(D) W(D) W(D) W(D) W(D) W(D) W(D) W(D)
W (D
)BFOC(D)
BFOC(D)
BFOC(D)
BFOC(D) BFOC(D) BFOC(D) BFOC(D)
S(D
S(D
S(D) S(D) S(D) S(D) S(D) S(D) S(D) S(D)
S(D
S(D
S(D
S(D
OTV OTV OTV OTV OTV OTV OTV OTV OTV OTV OTV OTV
OFOC OFOC OFOC OFOC
W(D) W(D) W(D) W(D) W(D) W(D) W(D) W(D) W(D) W(D) W(D) W(D) W(D) W(D)
RV
HH
BFOC(D)
BFOC(D)
BFOC(D)
BFOC(D)
BFOC(D)
BFOC(D)
BFOC(D) BFOC(D) BFO
C
(D
BFO
C
(D
BFO
C
(D
BFO
C
(D
BFO
C
(D
BFO
C
(D
S(D
S(D
S(D
S(D) S(D)
S(D) S(D)
S(D)
208+00 209+00
210+00
STA 208+88.53
16" - GATE VALVE
109+00
110+00
STA 209+19.93 (OFF: 28'RT)
16" - 45° VERT BEND
N-1441970.36 E-512802.57
STA 209+24.71 (OFF: 28'RT)
16" - 45° VERT BEND
N-1441974.35 E-512805.48
STA 209+12.52 (OFF: 60'RT)
20" - 45° HORIZ BEND
N-1441943.15 E-512826.05
STA 209+03.26 (OFF:74'RT)
20" - 45° VERT BEND
N-1441928.45 E-512828.93
STA 209+10.25 (OFF: 64'RT)
20" - 45° VERT BEND
N-1441939.54 E-512826.80
STA 208+90.73 (OFF: 10'LT)
16" - 45° VERT BEND
N-1441970.77 E-512753.50
STA 208+95.20 (OFF: 10'LT)
16" - 45° VERT BEND
N-1441974.26 E-512756.20
STA 209+07.41 (OFF: 10'LT)
16" - 45° VERT BEND
N-1441983.80 E-512763.57
STA 209+11.88 (OFF: 10'LT)
16" - 45° VERT BEND
N-1441987.29 E-512766.27
STA 208+84.09 (OFF: 10'LT)
16"X8" - TEE
N-1441965.64 E-512749.42
STA 110+20.65 (OFF: 77'RT)
20" - 45° HORIZ BEND
N-1441924.53 E-512829.36
(ROTATED)
STA 110+19.33 (OFF: 77'RT)
EXIST 20" - TEE
N-1441915.86 E-512822.73
STA 0+90.20 (OFF: 29'RT)
16" - 45° VERT BEND
N-1441947.03 E-512785.56
STA 0+95.11 (OFF: 28'RT)
16" - 45° VERT BEND
N-1441950.99 E-512788.45
STA 209+08.90
AIR RELEASE VALVE
N 1441937.41 E 512827.22
TOHO-18
C-06
022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
M
AT
C H
L
IN
E
- S
TA
+0
FO
R C
O N
TI
N
U
AT
IO
N
S
EE
D W
G C
-0
M
ATC
H
LIN
E - STA 136+00
FO
R C
O N
TIN
U
ATIO
N
SEE D
W
G C
-03
4'2'1' 02'
VERTICAL SCALE 1"=2'
40'20' 10' 20'0
HORIZONTAL SCALE 1"=20'
PROFILE GRADE LINE ℄
HOAGLAND BLVD
EXISTING 16" PVC WM
NOTE 3
INSTALL 16" DIP WM (SEE NOTE 1)
NOTE 2
NOTE 2
72" STEEL PIPE (BY OTHERS)
FD
C :\P
W _W
O R
KI
N
G \B
VW
_A
M
ER
IC
AS
_2 \D
2\
C -X
X_ U
TI
LI
TY
R
EL
O
C
AT
IO
N
P H
2.
D
W G
7/
/2
1:
:5
PHASE 2
413557
ISSUED
FOR BID
JUNE 2025
C-01
HOAGLAND BLVD
CIVIL
UTILITY RELOCATION
PLAN AND PROFILE
JNH
KTH
MM
OL
KEY PLAN
EXISTING RIGHT-OF-WAY (TYP)
EXISTING 8" RWM TO REMAIN
EXISTING
RIGHT-OF-WAY (TYP)
C-02 C-03 C -0
NOTES:
1. CONTRACTOR TO REMOVE EXISTING PIPES. AS NEED TO
ACCOMMODATE FOR PROPOSED STORM WATER IMPROVEMENTS
2. INSTALL 16" LINE STOP W/ APPROXIMATELY 46 LF OF 16" HDPE
BYPASS PIPING.
3. INSTALL 20" X 16" LINESTOP W/ APPROXIMATELY 80 LF OF 16" HDPE
BYPASS. CONTRACTOR TO REMOVE EXISTING PLUG AND CONNECT
BYPASS PIPE TO EXISTING PIPE. WITH 20" X 16" REDUCER.
4.
EOLA
FDOT
6.
7.
8. 08.
ITION
36" MIN (TYP)
EXISTING 16" PVC RCWM
NOTE 6NOTE 7
APPROXIMATE STATION OF
ROAD RESTORATION 201+5.00
(SEE NOTE 5)
APPROXIMATE STATION OF
ROAD RESTORATION 216+5.00
(SEE NOTE 5)
TION
APPROVED:
DESIGNED:
DETAILED:
CHECKED:
DATE:
REVISIONS AND RECORD OF ISSUE
OF
PROJECT NO.:
43211/20(SCALE BAR IS 4" AT FULL SCALE)
D
FI
LE
PL
O
TT
ED
Certificate No. 8132 201 South Orange Avenue, Suite 500
Orlando, Florida 32801
Black & Veatch Corporation
INSTALL 16" DIP RWM (SEE NOTE 1)
36" MIN EXISTING 20" DIP FM
C-0
EXISTING 54" RCP
LIMITS OF CONSTRUCTION (TYP)
LIMITS OF CONSTRUCTION (TYP)
NOTE 8
SEE NOTE 11
NOTE 8
NOTE 8
NOTE 9
ABANDONED 6" PVC
TO BE REMOVED
INSTALL 20" PVC DR18 FM
(SEE NOTE 1)
NOTE 8
NOTE
NOTE 8
3" ARV
2" BLOW OFF
ASSEMBLY
3" ARV
SAMPLE POINT
SAMPLE POINT
8" GATE VALVE
NOTE 12
CONNECT TO
EXISTING 8" RWM
SEE NOTE 11
CONTRACTOR TO REMOVE AND REINSTALL STOP SIGN.
CONTRACTOR TO REMOVE AND REINSTALL BOLLARD.
CONTRACTOR TO INSTALL THRUST COLLAR PER DETAIL ON C-0
ABANDONED 6" PVC FM TO BE REMOVED AT HOAGLAND
BOULEVARD AS NEEDED TO INSTALL STORMWATER PIPE.
CONTRACTOR SHALL CAP BOTH ENDS OF 6" FORCE MAIN TO
REMAIN.
CONTRACTOR TO INSTALL TEMPORARY WALKING TRAIL AND
REMOVE AFTER FORCEMAIN BYPASS IS REMOVED.
INSTALL 16" LINE STOP W/ APPROXIMATELY 80 LF OF 16" HDPE
BYPASS PIPING.
EXISTING ADA RAMP TO BE RESTORED TO ITS ORIGINAL COND
OR BETTER.
CONTRACTOR SHALL RESTORE 1,500 FT OF ROAD PER OSCE
COUNTY DETAIL ON SHEET C-07 AND ROAD MARKINGS PER
STANDARDS ON SHEET C-09.
5.
9.
10.
11.
.57
8.
E 1
TRANS
FC
ASPHALT
XX
X
X
XXXXXXXXXXXXXXXXXXX
TCB
C.L.F.
X X
X X
XXXXXXX
EXISTING LIFT
STATION #6
R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W R/W
S
ASPHALT
DRAINAGE R/W
KISSIMMEE COMMERCE/INDUSTRIAL CENTER
P.B. 5, PGS. 107-108
SANITARY MANHOLE24" PVC W INV.=57.4824" DIP S INV.=57.3315" PVC E INV.=63.12
COLLECTION BOXTOP OF BOX=79.29
SANITARY MANHOLETOP EL.=79.28'15" PVC MANHOLECLEANOUT TOP=77.66
BE(D)
BE(D)
BE(D)
BE(D)
BE(D) BE(D) BE(D) BE(D) BE(D) BE(D) BE(D) BE(D)
BE(A) BE(A) BE(A) BE(A) BE(A) BE(A) BE(A)BT(D) BT(D) BT(D) BT(D) BT(D)
BT(D)
BT(D)
BT(D) BT(D) BT(D) BT(D) BT(D) BT(D) BT(D)
S(D) S(D) S(D) S(D) S(D) S(D) S(D) S(D) S(D)
S(D) S(D) S(D) S(D) S(D) S(D) S(D) S(D) S(D) S(D) S(D) S(D) S(D) S(D)
SS(D) SS(D) SS(D) SS(D) SS(D) SS(D) SS(D) SS(D) SS(D) SS(D) SS(D) SS(D) SS(D)
S(D) S(D)
S(D ) S(D) S(D)
S(D
S(D
TEST HOLE #5
GROUND EL.=78.5'
30" OTHER (SANITARY)
TOP EL.=75.0'
BFOC(D) BFOC(D) BFOC(D) BFOC(D) BFOC(D) BFOC(D) BFOC(D) BFOC(D) BFOC(D)
BF
O
C (D
BF
O C
(D
BF
O
C (D
BF
O C
(D
S( D
S(D) S(D) S(
D
133+00 134+00 135+00
136+00
STA 133+43.61 (OFF: 17'LT)
30" FM - 45° HORIZ BEND
N-1440966.28 E-514926.51
STA 133+66.73 (OFF: 40'RT)
30" FM - 45° HORIZ BEND
N-1440943.01 E-514949.24
M
ATC
H
LIN
E - STA 136+00
FO
R C
O N
TIN
U
ATIO
N
SEE D
W
G C
-03
022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
M
AT
C H
L
IN
E
- S
TA
+0
FO
R C
O N
TI
N
U
AT
IO
N
S
EE
D W
G C
-0
M
ATC
H
LIN
E - STA 136+00
FO
R C
O N
TIN
U
ATIO
N
SEE D
W
G C
-03
132+50 132+75 133+00 133+25 133+50 133+75 134+00 134+25 134+50 134+75 135+00 135+25 135+50 135+75 136+00
EG
9.
EG
9.
EG
9.
EG
9.
EG
9.
EG
9.
EG
9.
EG
9.
EG
9.
EG
8.
EG
6.
EG
6.
EG
5.
EG
3.
INSTALL 293 LF OF 30" PVC DR18 FM
ST
A
3+
.6
" F M
° H O
R
IZ
B
EN
D C
L
EL
4.
ST
A
3+
.7
" F M
° H O
R
IZ
B
EN
D C
L
EL
4.
4'2'1' 02'
VERTICAL SCALE 1"=2'
40'20' 10' 20'0
HORIZONTAL SCALE 1"=20'
TION
APPROVED:
DESIGNED:
DETAILED:
CHECKED:
DATE:
REVISIONS AND RECORD OF ISSUE
OF
PROJECT NO.:
43211/20(SCALE BAR IS 4" AT FULL SCALE)
D
FI
LE
PL
O
TT
ED
Certificate No. 8132 201 South Orange Avenue, Suite 500
Orlando, Florida 32801
Black & Veatch Corporation
FD
C :\P
W _W
O R
KI
N
G \B
VW
_A
M
ER
IC
AS
_2 \D
2\
C -X
X_ U
TI
LI
TY
R
EL
O
C
AT
IO
N
P H
2.
D
W G
7/ 2/
:1
0:
P M
PHASE 2
413557
ISSUED
FOR BID
JUNE 2025
C-02
KISSIMMEE TRAIL
CIVIL
30" FORCE MAIN
PIPE RESTRAIN
PLAN AND PROFILE
JNH
KTH
MM
OL
EXISTING FENCE LINE (TYP)
PROFILE GRADE LINE ℄ OF PVC
EXISTING 30" HDPE FM
(TO REMAIN)
EXISTING RIGHT-OF-WAY (TYP)
EXISTING 15" PVC SS
TO REMAIN
EXISTING FENCE LINE (TYP)
EXISTING 30" DIP FM
INSTALL 30" PVC DR18 FM
EXISTING BURIED
ELECTRICAL LINES
NOTES:
1. CONTRACTOR TO REMOVE EXISTING PIPES. 30" DIP FM AS
NEEDED TO INSTALL PROPOSED PIPE.
2. CONTRACTOR TO BYPASS EXISTING FORCE MAIN FROM
EXISTING LINE STOP WITH 110 LINEAR FEET OF 16" HDPE
PIPE TO THE EXISTING LS-6 WETWELL.
3. CONTRACTOR TO REMOVE EXISTING PLUG AND CONNECT TO
EXISTING PLUG VALVE.
C-0
C-02 C-03 C -0
LIMITS OF CONSTRUCTION (TYP)
" M
IN
EXISTING 30" LINE STOP
(SEE NOTE 2)
EXISTING 30" X 16" TEE
EXISTING 30" PLUG VALVE
(NOTE 3)
3' M
IN
3' M
IN
NOTE 1
EXISTING FENCE TO BE
REMOVED AND REPLACED
EXISTING FENCE TO BE
REMOVED AND REPLACED
PROPOSED 16" ABOVE GROUND BYPASS
JULY
TO REMAIN
EDGE OF ROCK±
TOP OF BANK±
BLOCKS 17-30
WEST KISSIMMEE
P.B. A, PG. 12
TRANS
ASPHALT
X X
X X
X X
X X
X X
X X
X X
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
ASPHALT
KISSIMMEE COMMERCE/INDUSTRIAL CENTER
P.B. 5, PGS. 107-108
BE(D)
BE(D)
BE(D)
BE(D)
BE(D)
BE(D)
BE(D)
BE(D)
BE(D)
BE(A)
BE(A)
BE(A)
BE(A)
BE(A)
BE(A)
BE(A)
BE(A)
BE(A)
BT(D)
BT(D)
BT(D)
BT(D)
BT(D)
BT(D)
BT(D)
BT(D)
BT(D)
BT(D)
S(D) S(D)
S(D) S(D)
S(D) S(D)
S(D) S(D)
S(D) S(D)
S(D) S(D)
S(D) S(D)
S(D) S(D)
S(D) S(D)
S(D) S(D)
SS(D)
SS(D)
SS(D)
SS(D)
SS(D)
SS(D)
SS(D)
SS(D)
SS(D)
SS(D)
136+00
137+00
138+00
M
AT
C H
L
IN
E
- S
TA
+0
FO
R C
O N
TI
N
U
AT
IO
N
S
EE
D W
G C
-0
022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS 022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
© 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS © 2022 Microsoft Corporation © 2022 Maxar ©CNES (2022) Distribution Airbus DS
M
AT
C H
L
IN
E
- S
TA
+0
FO
R C
O N
TI
N
U
AT
IO
N
S
EE
D W
G C
-0
M
ATC
H
LIN
E - STA 136+00
FO
R C
O N
TIN
U
ATIO
N
SEE D
W
G C
-03
136+00 136+25 136+50 136+75 137+00 137+25 137+50 137+75 138+00 138+25 138+50 138+75 139+00 139+25 139+50 139+75 140+00 140+25 140+50 140+65
EG
8.
EG
8.
EG
8.
EG
8.
EG
8.
EG
8.
EG
8.
EG
8.
EG
8.
EG
8.
EG
8.
EG
9.
EG
9.
EG
9.
EG
9.
EG
8.
EG
8.
EG
8.
EG
ST
A
0+
.3
" F M
TE
E C
L
EL
3.
ST
A
0+
.5
" F M
° V
ER
T
BE
N D
C L
EL
4.
ST
A
0+
.9
" F M
° V
ER
T
BE
N D
C L
EL
3.
INSTALL 425 LF OF 30" PVC DR18 FM
X X
X
X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X X
XXXX C.L.F
ASPHALT
ASPHALT
2' C
O N
C C
U R
B
DITCH±
EDGE OF ROCK±
TOP OF BANK±
TCB
TCB
POND±
8"
PA
LM
8"
PA
LM
8"
PA
LM
8"
PA
LMSD SD
SD
SD
SD
D
R/W
R/W
R/W
R/W
R/W
R/W
R/W
R/W
GRATE INLET
DS2 (SEE DETAIL SHEET 6)
TOP=79.86'
INV = 72.86
GRATE INLET DS3
(SEE DETAIL SHEET 6)
TOP=80.40'
RIP RAP
INV=71.85'
"R
C P
"R
C P
84"RCP
ST
O
R M
M
AN
H O
LE
D
M H
(S
EE
D
ET
AI
L
SH
EE
T
6)
TO
P=
.3
8'
IN
V.
E
1.
IN
V.
S W
1.
IN
V.
N W
1.
INV=71.76' INV=70.55'
"R
CP
TRANS
BE(D)
BE(D)
BE(D)
BE
(D
BE
(D
BE
(D
BE
(D
BE(A)
BE(A)
BE(A)
BE
(D
BE
(D
BE
(D
BE
(D
BE
(D
BE
(D
W
(A
BT
(A
BT
(D
BT(D)
BT(D)
BT(D)
BT(D)
BT
(D
BT
(D
BT
(D
BF
O
C (A
BF
O C
(A
BF
O
C (A
BF
O C
(A
BF
O
C (A
TRANS
S(D) S(D)
S(D) S(D)
S(D) S(D)
S(D) S(D)
S(D) S(D)
S(D) S(D)
SS(D)
SS(D)
SS(D)
SS(D)
SS(D)
TEST HOLE #6
GROUND EL.=78.9'
30" DUCTILE IRON (SANITARY)
TOP EL.=73.9'
TEST HOLE #7
GROUND EL.=79.0'
30" DUCTILE IRON (SANITARY)
TOP EL.=73.8'
TEST HOLE #8
GROUND EL.=79.4'
30" OTHER (SANITARY)
TOP EL.=74.2'
BF
O
C (D
BF
O C
(D
BF
O
C (D
BF
O C
(D
BF
O
C (D
BF
O C
(D
BF
O
C (D
139+00
140+00
STA 140+57.51 (OFF: 112RT)
30" FM - 45° VERT BEND
N-1440941.51 E-515608.06
STA 140+66.96 (OFF: 112RT)
30" FM - 45° VERT BEND
N-1440941.50 E-515617.51
CPP
FC
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X
AS
PH
AL
T
2' C
O N
C C
U R
B
2' C
O N
C C
U R
B
TCB
TCB
8"
PA
LM
8"
PA
LM
8"
PA
LM
8"
PA
LM
SD
SD
SD
D
R/W
R/W
R /W
SI
D
EW
AL
K
84"R
CP
ST
O
R M
M
AN
H O
LE
D
M H
(S
EE
D
ET
AI
L
SH
EE
T
6)
TO
P=
.3
8'
IN
V.
E
1.
IN
V.
S W
1.
IN
V.
N W
1.
50" FIBER GLASS PIPE
G R
AT
E
IN
LE
T
TO
P=
.9 4'
"R
CP
SA
N
IT
AR
Y M
AN
H
O
LE
TO
P
EL
.3
9'
" P
VC
E
IN
V.
=6
6.
8"
P
VC
S
IN
V.
=6
6.
P
VC
W
IN
V.
=6
5.
ARV
S
TRANS
BE
(D
BE
(D
BE
(D
BE
(D
BE
(D
BE
(D
BE
(D
BE
(D
BE
(D
BE
(D
BE
(A
SS
(D
SS
(D
SS
(D
SS
(D
SS
(D
SS
(D
W (A
W
(A
W (A
W
(A
W (A
W
(A
W (A
W
(A
BT
(A
BT
(A
BT
(A
BT
(D
BT
(D
BT
(D
BT
(D
BT
(D
BT
(D
BF
O
C (A
BF
O C
(A
BF
O
C (A
BF
O C
(A
BF
O
C (A
BF
O
C( A)
BF
O
C( A)
O E
O E
OE
OE
TRANS
S( D
S(
D
S( D
S(
D
S(D) S(D)
S(D)
S(D) S(D)
S(D)
SS(D)
SS(D)
BF
O
C (D
BF
O C
(D
BF
O
C (D
BF
O C
(D
BF
O
C (D
140+00
STA 140+57.51 (OFF: 112RT)
30" FM - 45° VERT BEND
N-1440941.51 E-515608.06
STA 140+66.96 (OFF: 112RT)
30" FM - 45° VERT BEND
N-1440941.50 E-515617.51
4'2'1' 02'
VERTICAL SCALE 1"=2'
40'20' 10' 20'0
HORIZONTAL SCALE 1"=20'
TION
APPROVED:
DESIGNED:
DETAILED:
CHECKED:
DATE:
REVISIONS AND RECORD OF ISSUE
OF
PROJECT NO.:
43211/20(SCALE BAR IS 4" AT FULL SCALE)
D
FI
LE
PL
O
TT
ED
Certificate No. 8132 201 South Orange Avenue, Suite 500
Orlando, Florida 32801
Black & Veatch Corporation
FD
C :\P
W _W
O R
KI
N
G \B
VW
_A
M
ER
IC
AS
_2 \D
2\
C -X
X_ U
TI
LI
TY
R
EL
O
C
AT
IO
N
P H
2.
D
W G
7/ 2/
:1
1:
P M
PHASE 2
413557
ISSUED
FOR BID
JUNE 2025
C-03
KISSIMMEE TRAIL
CIVIL
30" FORCE MAIN PIPE
RESTRAIN PLAN AND
PROFILE
JNH
KTH
MM
OL
EXISTING FENCE LINE (TYP)
PROFILE GRADE
LINE ℄ OF PVC
EXISTING RIGHT-OF-WAY (TYP)
EXISTING 15" PVC SS
TO REMAIN
EXISTING FENCE LINE (TYP)
EXISTING 30" DIP FM
INSTALL 30" PVC DR18 FM
EXISTING BURIED
ELECTRICAL LINES
NOTES:
1.…