Winburn Dr Technical Specs (Updated).pdf
PDF 1 MB Posted
- Attached to
- Winburn Dr Sewer Main Replacement
- Solicitation number
- PE-66090-NONST-2026-000000017
- Issued by
- Fulton County, Georgia
About this file
This document is a comprehensive technical specification for water distribution equipment and piping for the Winburn Drive project, prepared in compliance with American Water Works Association (AWWA) standards and Georgia Department of Transportation regulations. The specification covers detailed requirements for water distribution infrastructure, including ductile iron and polyvinyl chloride pipes, gate valves, butterfly valves, fire hydrants, water meters, service connections, valve boxes, and related appurtenances. The document provides extensive technical requirements for materials, manufacturing standards, testing procedures, installation methods, and performance specifications for each component of the water distribution system.
The specification outlines precise technical requirements for materials, including specific grades of ductile iron, PVC, and polyethylene pipes, with stringent standards for pressure ratings, coating, joint types, and manufacturing tolerances. Pricing and procurement details are not explicitly stated, but the document indicates that all materials must meet specific AWWA, ASTM, and local regulatory standards. Manufacturers must provide detailed product certifications, and all equipment must undergo rigorous testing and inspection. The specification emphasizes quality control, with requirements for pressure testing, leakage measurement, sterilization of potable water mains, and comprehensive documentation of materials and installation processes. The technical depth suggests a professional-grade infrastructure project with high engineering and quality standards.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 6.pdf | ||
| Addendum.pdf | ||
| Exhibit A Project Overview.pdf | ||
| Exhibit C Specifications.pdf | ||
| Addendum 2.pdf | ||
| Exhibit L Standard Contract.pdf | ||
| ITB Base Document.pdf | ||
| Winburn Dr Project Manual 7_3_2025.pdf | ||
| Addendum 4.pdf | ||
| Addendum 5.pdf | ||
| ITB General Instructions.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Winburn Drive 02 41 00-1
1415.2413 DEMOLITION
SECTION 02 41 00
DEMOLITION
PART 1 GENERAL
1.01 RELATED DOCUMENTS
Construction Plans and general provisions of Contract, including General and
Supplementary Conditions and Division 1 Specification sections, apply to work of this section.
1.02 DESCRIPTION OF WORK
A. Extent of demolition work is indicated on the Construction Plans.
B. Demolition includes all operations necessary for demolition of the existing structures, foundations and utilities as shown.
C. Remove debris, rubbish and other materials resulting from demolition operations from the site. Transport and legally dispose of materials off site.
1.03 SUBMITTALS
A. Schedule: Submit schedule indicating proposed methods and sequence of operations for demolition work to Owner's Representative for review prior to commencement of work. Include coordination for shut-off, capping, and continuation of utility services as required, together with details for dust and noise control protection. The procedures shall provide for safe conduct of the work, careful removal and disposition of materials specified to be salvaged, protection of property which is to remain undisturbed, coordination with other work in progress, and timely disconnection of utility services. The submittal shall include a detailed description of the methods and equipment to be used for each operation, and the sequence of operation.
B. Provide detailed sequence of demolition and removal work to ensure uninterrupted progress of Owner's on-site operations.
C. Coordinate with Owner's continuing occupation of portions of existing building/site, with Owner's partial occupancy of completed new addition/site.
1.04 JOB CONDITIONS
A. Occupancy: Owner will be continuously occupying areas of the building/site immediately adjacent to areas of selective demolition. Conduct selective demolition work in manner that will minimize need for disruption of Owner's normal operations. Provide minimum of 72 hours advance notice to Owner of
Winburn Drive 02 41 00-2 demolition activities which will severely impact Owner's normal operations.
B. Condition of Structures: Owner assumes no responsibility for actual condition of items or structures to be demolished.
C. Conditions existing at time of commencement of contract will be maintained by
Owner insofar as practicable. However, variations within structure may occur by
Owner's removal and salvage operations prior to start of selective demolition work.
D. Partial Demolition and Removal: Items indicated to be removed but of salvable value to Contractor may be removed from structure as work progresses. Transport salvaged items from site as they are removed.
E. Storage or sale of removed items on site will not be permitted.
F. Protection: Provide temporary barricades and other forms of protection as required to protect Owner's personnel and general public from injury due to selective demolition work.
G. Provide protective measures as required to provide free and safe passage of
Owner's personnel and general public to and from occupied portions of building/site.
H. Erect temporary covered passageways as required by authorities having jurisdiction.
I. Provide interior and exterior shoring, bracing, or support to prevent movement, settlement, or collapse of structure or element to be demolished, and adjacent facilities or work to remain.
J. Protect from damage existing finish work that is to remain in place and becomes exposed during demolition operations.
K. Protect floors with suitable coverings when necessary.
L. Construct temporary insulated solid dustproof partitions where required to separate areas where noisy or extensive dirt or dust operations are performed.
Equip partitions with dustproof doors and security locks if required.
M. Provide temporary weather protection during interval between demolition and removal of existing construction on exterior surfaces, and installation of new construction to insure that no water leakage or damage occurs to structure or interior areas of existing building.
N. Remove protections at completion of work.
O. Damages: Promptly repair damages caused to adjacent facilities by demolition work at no cost to Owner.
P. Traffic: Conduct selective demolition operations and debris removal in a manner to ensure minimum interference with roads, streets, walks, and other adjacent occupied or used facilities.
Q. Do not close, block or otherwise obstruct streets, walks or other occupied or used facilities without written permission from authorities having jurisdiction. Provide
Winburn Drive 02 41 00-3 alternate routes around closed or obstructed traffic ways if required by governing regulations.
R. Explosives: Use of explosives will not be permitted unless otherwise noted.
S. Utility Services: Maintain existing utilities indicated to remain, keep in service, and protect against damage during demolition operations.
T. Do not interrupt existing utilities serving occupied or used facilities, except when authorized in writing by authorities having jurisdiction. Provide temporary services during interruptions to existing utilities, as acceptable to governing authorities.
U. Environmental Controls: Use water sprinkling, temporary enclosures, and other suitable methods to limit dust and dirt rising and scattering in air to lowest practical level. Comply with governing regulations pertaining to environmental protection.
V. Do not use water when it may create hazardous or objectionable conditions such as ice, flooding, and pollution.
W. NESHAP Compliance: The Contractor is responsible for being aware of and complying with the National Emission Standard for Hazardous Air Pollutants
(NESHAP) Section 112 of the Federal Clean Air Act regarding asbestos.
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION
3.01 INSPECTION
Prior to commencement of demolition work, inspect areas in which work will be performed. Photograph existing conditions to structure surfaces, equipment or to surrounding properties which could be misconstrued as damage resulting from selective demolition work; file with Owner's Representative prior to starting work.
3.02 PREPARATION
A. Provide interior and exterior shoring, bracing, or support to prevent movement, settlement or collapse of structures to be demolished and adjacent facilities to remain.
B. Cease operations and notify the Owner's Representative immediately if safety of structure appears to be endangered. Take precautions to support structure until determination is made for continuing operations.
C. Cover and protect furniture, equipment and fixtures to remain from soiling or damage when demolition work is performed in rooms or areas from which such
Winburn Drive 02 41 00-4 item have not been removed.
D. Erect and maintain dust-proof partitions and closures as required to prevent spread of dust or fumes to occupied portions of the building.
E. Where selective demolition occurs immediately adjacent to occupied portions of the building, construct dust-proof partitions of minimum 4" studs, 5/8" drywall
(joints taped) on occupied side 1/2" fire-retardant plywood on demolition side, and fill partition cavity with sound-deadening insulation.
F. Provide weatherproof closures for exterior openings resulting from demolition work.
G. Locate, identify, stub off and disconnect utility services that are not indicated to remain.
H. Provide by-pass connections as necessary to maintain continuity of service to occupied areas of building. Provide minimum of 72 hours advance notice to
Owner if shut-down of service is necessary during change-over.
3.03 DEMOLITION
A. Perform selective demolition work in a systematic manner. Use such methods as required to complete work indicated on the Plans in accordance with demolition schedule and governing regulations.
B. Demolish concrete and masonry in small sections. Cut concrete and masonry at junctures with construction to remain using power-driven masonry saw or hand tools; do not use power-driven impact tools.
C. Locate demolition equipment throughout structure and promptly remove debris to avoid imposing excessive loads on supporting walls, floors or framing.
D. All existing structures shall be completely removed where denoted on the Plans.
All foundations and slabs shall be broken up and removed from the site.
Sidewalks, curbs, gutters, streets and street light bases shall be completely removed. It is not anticipated that piling will be encountered under any of the structures to be removed; however, where piling are encountered they shall be removed to a point three feet below existing ground.
E. When approved in writing by the Engineer and when authorized by the proper authorities, the Contractor may dispose of such debris by burning on the Project site provided all requirements set forth by the governing authorities are met. The authorization to burn shall not relieve the Contractor in any way from damages which result from the Contractor's operations. On easements through private property, the Contractor shall not burn on the site unless written consent is also secured from the property owner, in addition to authorization from the proper authorities.
F. Demolish foundation walls to a depth of not less than 12" below existing ground surface. Demolish and remove below-grade wood or metal construction. Break up below-grade concrete slabs.
Winburn Drive 02 41 00-5
G. For interior slabs on grade, use removal methods that will not crack or structurally disturb adjacent slabs or partitions. Use power saw where possible.
H. Completely fill below-grade areas and voids resulting from demolition work.
Provide fill consisting of approved earth, gravel or sand, free of trash and debris, stones over 6" diameter, roots or other organic matter.
I. If anticipated mechanical, electrical or structural elements which conflict with intended function or design are encountered, investigate and measure both nature and extent of the conflict. Submit report to Owner's Representative in written, accurate detail. Pending receipt of directive form Owner's Representative rearrange selective demolition schedule as necessary to continue overall job progress without delay.
3.04 SALVAGE MATERIALS
A. Salvage Items: Where indicated on the Plans as "Salvage-Deliver to Owner", carefully remove indicated items, clean, store and turn over to Owner and obtain receipt.
B. Historic artifacts, including cornerstones and their contents, commemorative plaques and tables, antiques, and other articles of historic significance remain the property of the Owner. Notify Owner's Representative if such items are encountered and obtain acceptance regarding method of removal and salvage for
Owner.
3.05 DISPOSAL OF DEMOLISHED MATERIALS
A. Remove debris, rubbish and other materials resulting from demolition operations from the site. Transport and legally dispose of materials off site.
B. If hazardous materials are encountered during demolition operations, comply with applicable regulations, laws, and ordinances concerning removal, handling and protection against exposure or environmental pollution.
1. Burning of removed materials is not permitted on project site.
3.06 DEMOLITION AND REPAIR
A. Upon completion of demolition work, remove tools, equipment and demolished materials from site. Remove protections and leave interior areas broom clean.
B. Repair demolition performed in excess of that required. Return structures and surfaces to remain to condition existing prior to commencement of selective demolition work. Repair adjacent construction or surfaces soiled or damaged by selective demolition work.
END OF SECTION
Winburn Drive 31 23 16 -1
1415.2413 TRENCH EXCAVATION AND BACKFILL
SECTION 31 23 16
TRENCH EXCAVATION AND BACKFILL
PART 1 GENERAL
1.01 SCOPE
A. The work under this Section consists of furnishing all labor, equipment and materials and performing all operations in connection with the trench excavation and backfill required to install the site utilities, including all pipelines, electrical conduits, and duct banks as shown on the plans and as specified.
B. Excavation shall include the removal of any tree stumps, brush, debris or other obstacles which remain after the clearing and grubbing operations, which may obstruct the work, and the excavation and removal of all earth, rock or other materials to the extent necessary to install the pipe and appurtenances in conformance with the lines and grades shown on the plans and as specified.
C. Backfill shall include the filling and compaction of the trenches and excavations up to the surrounding ground surface or road grade at crossing.
D. The trench is divided into five specific areas:
1. Foundation: The area beneath the bedding, sometimes also referenced to as trench stabilization.
2. Bedding: The area above the trench bottom (or foundation) and below the bottom of the barrel of the pipe.
3. Haunching: The area above the bottom of the barrel of the pipe up to a specified height above the bottom of the barrel of the pipe.
4. Initial Backfill: The area above the haunching material and below a plane
12-inches above the top of the barrel of the pipe.
5. Final Backfill: The area above a plane 12-inches above the top of the barrel of the pipe.
E. The choice of method, means, techniques and equipment rests with the Contractor.
The Contractor shall select the method and equipment for trench excavation and backfill depending upon the type of material to be excavated and backfilled, the depth of excavation, the amount of space available for operation of equipment, storage of excavated material, proximity of man-made improvements to be protected, available easement or right-of-way and prevailing practice in the area.
1.02 RELATED SECTIONS
A. Geotechnical report: Section 00 31 32 (If Provided in bidding documents)
B. Site Clearing: Section 31 10 00.
Winburn Drive 31 23 16 -2
C. Earth Moving 30 20 00.
1.03 GENERAL
A. The elevations shown on the Drawings as existing are taken from the best existing data and are intended to give reasonably accurate information about the existing elevations. They are not precise and the Contractor shall become satisfied as to the exact quantities of excavation and fill required.
B. Earthwork operations shall be performed in a safe and proper manner with appropriate precautions being taken against all hazards.
C. All excavated and filled areas for structures, trenches, fills, topsoil areas, embankments, and channels shall be maintained by the Contractor in good condition at all times until final acceptance by the Owner. All damage caused by erosion or other construction operations shall be repaired by the Contractor using material of the same type as the damaged material.
D. The Contractor shall control grading in a manner to prevent surface water from running into excavations. Obstruction of surface drainage shall be avoided and means shall be provided whereby storm water can be uninterrupted in existing gutters, other surface drains, or temporary drains. Free access must be provided to all fire hydrants and meters.
E. Tests for compaction and density shall be conducted by the Engineer or by an independent testing laboratory selected in accordance with Section 01 45 29 of these
Specifications.
1. The soils testing laboratory is responsible for the following:
a. Field compaction testing shall be based on using the maximum dry density determined by the Standard Proctor Compaction Test in accordance with ASTM D 698.
b. Determination of in-place backfill density shall be done in accordance with ASTM D 1556, �Density and unit weight of Soil In Place by the
Sand-Cone Method�, ASTM D 2937, �Density of Soil In Place by the
Drive-Cylinder Method� or ASTM D 2922, �Density of Soil and
Soil-Aggregate In Place by Nuclear Methods (Shallow Depth)�.
c. Test frequency for trenches and confined areas of 1 test per two foot vertical lift for every 100 linear feet.
d. Inspecting and testing stripped site, subgrades and proposed fill materials.
2. Contractor's duties relative to testing include:
a. Notifying laboratory of conditions requiring testing.
b. Coordinating with laboratory for field testing.
c. Providing representative fill soil samples to the laboratory for test purposes. Provide 50 pound samples of each fill soil.
Winburn Drive 31 23 16 -3
3. Inspection
a. Earthwork operations, suitability of excavated materials for fill and backfill, and placing and compaction of fill and backfill is subject to inspection. Engineer will observe earthwork operations.
b. Foundations and shallow spread footing foundations are required to be inspected by an engineer to verify suitable bearing and construction.
F. All earthwork operations shall comply with the requirements of OSHA Construction
Standards, Part 1926, Subpart P, Excavations, Trenching, and Shoring, and Subpart O, Motor Vehicles, Mechanized Equipment, and Marine Operations, and shall be conducted in a manner acceptable to the Engineer.
G. It is understood and agreed that the Contractor has made a thorough investigation of the surface and subsurface conditions of the site and any special construction problems which might arise as a result of nearby watercourses and floodplains. The Contractor shall be responsible for providing all services, labor, equipment, and materials necessary or convenient to the Contractor for completing the work within the time specified in these Contract Documents.
H. Safety
Perform all trench excavation and backfilling activities in accordance with the
Occupational Safety and Health Act of 1970 (PL 91-596), as amended. The Contractor shall pay particular attention to the Safety and Health Regulations Part 1926, Subpart
P �Excavation, Trenching & Shoring� as described in OSHA publication 2226.
PART 2 PRODUCTS
2.01 SOILS CLASSIFICATIONS
Bedding materials listed here include a number of processed materials plus the soil types defined according to the Unified Soil Classification System (USCS) in ASTM D 2487, Standard Method for Classification of Soils for Engineering Purposes. (See below for description of soil classification). These materials are grouped into five broad categories according to their suitability for this application:
A. Class I - Angular, 1/4 to 1 1/2 inches (6 to 40 mm) graded stone, including such as coral, slag, cinders, crushed shells and crushed stone. Note - The size range and resulting high voids ratio of Class I material make it suitable for use to dewater trenches during pipe installation. This permeable characteristic dictates that its use be limited to locations where pipe support will not be lost by migration of other embedment materials into the Class I material. When such migration is possible, the material's minimum size range should be reduced to finer than 1/4 inch (6 mm) and the gradation properly designed to limit the size of the voids.
B. Class II - Coarse sands and gravels with maximum particle size of 1 1/2 inch (40 mm), including variously graded sands and gravels containing small percentages of
Winburn Drive 31 23 16 -4 fines, generally granular and non-cohesive, either wet or dry. Soil Types GW, GP, SW and SP are included in this class. Note - Sands and gravels which are clean or borderline between clean and with fines should be included. Coarse-grained soils with less than 12% but more than 5% fines are neglected in ASTM D2487 and the
USCS and should be included. The gradation of Class II material influences its density and pipe support strength when loosely placed. The gradation of Class II material influences its density and pipe support strength when loosely placed. The gradation of Class II material may be critical to the pipe support and stability of the foundation and embedment if the material is imported and is not native to the trench excavation. A gradation other than well graded, such as uniformly graded or gap graded, may permit loss of support by migration into void spaces of a finer grained natural material from the trench wall and foundation.
C. Class III - Fine sand and clayey (clay filled) gravels, including fine sands, sand-clay mixtures and gravel-clay mixtures. Soil Types SM, GC, SM, and SC are included in this class.
D. Class IV - Silt, silty clays and clays, including inorganic clays and silts of not to high plasticity and liquid limits. Soil Types MH, ML, CH, and CL are included in this class. Note- Caution should be used in the design and selection of the degree and method of compaction for Class IV soils because of the difficulty in properly controlling the moisture content under field conditions. Some Class IV soils with medium to high plasticity and with liquid limits greater than 50% (CH, MH, CH-MH) exhibit reduced strength when wet and should only be used for bedding, haunching and initial backfill in arid locations where the pipe embedment will not be saturated by ground water, rainfall and/or exfiltration from the pipeline system.
Class IV soils with low to medium plasticity and with liquid limits lower than 50%
(CL, ML, CL-ML) also require careful consideration in design and installation to control moisture content but need not be restricted in use to arid locations.
E. Class V - This class includes the organic soils OL, OH, and PT as well as soils containing frozen earth, debris, rocks larger than 1 1/2 inch (40 mm) in diameter, and other foreign materials. These materials are not recommended for bedding, haunching or initial backfill.
DESCRIPTION OF EMBEDMENT MATERIAL CLASSIFICATIONS
SOIL CLASS
SOIL
TYPE DESCRIPTION MATERIAL CLASSIFICATION
Class I Soils * --- Manufactured angular, granular material, 3/4 to 1 1/2 inches (6 to 40
mm) size, including materials having regional significance such as crushed stone, or rock, broken coral, crushed slag, cinders, or crushed shells.
Class II Soil ** GW Well-graded gravels and gravel-sand mixtures, little or no fines. 50% or more retained on No. 4 sieve. More than 95% retained on No.
200 sieve. Clean.
GP Poorly graded gravels and gravel-sand mixtures, little or no fines.
Winburn Drive 31 23 16 -5
SOIL CLASS
SOIL
TYPE DESCRIPTION MATERIAL CLASSIFICATION
50% or more retained on No. 4 sieve. More than 95% retained on No. 200 sieve. Clean.
SW Well-graded sands and gravely sands, little or no fines. More than 50% passes No. 4 sieve. More than 95% retained on No. 200 sieve.
Clean.
SP Poorly graded sands and gravelly sand, little or no fines. More than 50% passes No. 4 sieve. More than 95% retained on No. 200 sieve.
Clean.
Class III Soil *** GM Silty gravels, gravel-sand-silt mixtures. 50% or more retained on No.
200 sieve.
GC Clayey gravels, gravel-sand-clay mixtures. 50% or more retained on No. 4 sieve. More than 50% retained on No. 200 sieve.
SM Silty sands, sand-silt mixtures. More than 50% passes No. 4 sieve.
More than 50% retained on No. 200 sieve.
SC Clayey sands, sand-clay mixtures. More than 50% passes No. 4 sieve. More than 50% retained on No. 200 sieve.
Class IV Soils ML Inorganic silts, very fine sands, rock flour, silty or clayey fine sands.
Liquid limit 50% or less. 50% or more passes No. 200 sieve.
CL Inorganic clays of low to medium plasticity, gravelly clays, sandy clays, silty clays, lean clays. Liquid limit 50% or less. 50% or more passes No. 200 sieve.
MH Inorganic silts, micaceous or diatomaceous fine sands or silts, elastic silts. Liquid limit greater than 50%. 50% or more passes No.
200 sieve.
CH Inorganic clays of high plasticity, fat clays. Liquid limit greater than 50%. 50% or more passes No. 200 sieve.
Class V Soils OL Organic silts and organic silty clays of low plasticity. Liquid limit 50% or less. 50% or less. 50% or more passes No. 200 sieve.
Winburn Drive 31 23 16 -6
SOIL CLASS
SOIL
TYPE DESCRIPTION MATERIAL CLASSIFICATION
OH Organic clays of medium to high plasticity. Liquid limit 50% or less.
50% or more passes No. 200 sieve.
PT Peat, muck and other highly organic soils.
* Soils defined as Class I materials are not defined in ASTM D2487.
** In accordance with ASTM D2487, less than 5% pass No. 200 sieve.
*** In accordance with ASTM D2487, more than 12% pass No. 200 sieve. Soils with 5% to 12% pass No. 200 sieve fall in borderline classification, e.g. GP-GC.
2.02 PIPE BEDDING CLASSES
A. Class A Bedding shall consist of a continuous concrete cradle as determined by the
Engineer.
B. Class B Bedding: The pipe shall be bedded with No. 57 stone bedding material placed on the trench foundation. The bedding shall have a minimum thickness beneath the pipe of 4 inches or one-eighth of the outside diameter of the pipe, whichever is greater, and shall extend up the side to the springline. Initial backfill from the pipe horizontal centerline to a level not less than 12 inches above the top of the pipe and shall be bedding material or carefully placed native soil, compacted to 90% of Standard Proctor Density. The final backfill of the soil to ground surface shall be compacted to the specified density.
C. Class C Bedding: The pipe shall be bedded in No. 57 stone bedding material placed on the trench foundation. The bedding shall have a minimum thickness beneath the pipe of 4 inches or one-eighth of the outside diameter of the pipe, whichever is greater, and shall extend up the sides of the pipe one-sixth the outside diameter of the pipe. Initial backfill between the top of haunching and a point 12 inches above the top of pipe shall be compacted to 90% of Standard Proctor Density. The final backfill of the soil to ground surface shall be compacted to the specified density.
D. Crushed stone utilized for bedding and haunching shall meet the requirements of the
Georgia Department of Transportation Specification 800.01, Group I (limestone, marble or dolomite) or Group II (quartzite, granite or gneiss). Stone size shall be between No. 57 and No. 4, inclusive.
2.03 TRENCH FOUNDATION MATERIALS
When unsuitable material is encountered and extends more than 6 inches below the pipe.
Crushed stone shall be utilized for trench foundation (trench stabilization) and shall meet the requirements of the Georgia Department of Transportation Specification 800.01, Group I
(limestone, marble or dolomite) or Group II (quartzite, granite or gneiss). Stone size shall be between No. 57 and No. 4, inclusive or Class I material.
Winburn Drive 31 23 16 -7
2.04 FILTER FABRIC
A. Filter fabric associated with bedding shall be a UV stabilized, spunbonded, continuous filament, needle punched, polypropylene, nonwoven geotextile.
B. The fabric shall have an equivalent open size (EOS or AOS) of 120 - 70. The fabric shall also conform to the minimum property values listed in the following table:
Fabric Property Unit Test Procedure Minimum Value
Grab Strength lbs. ASTM D 4632 160
Grab Elongation % ASTM D 4632 >50
Tear Strength lbs. ASTM D 4533 60
Puncture Resistance lbs. ASTM D 4833 115
Permittivity sec-1 ASTM D 4491 1.5
Water Flow Rate gpm/ft2 ASTM D 4491 100
UV Resistance (500 hrs) % ASTM D 4355 >80
C. If ordered by the Engineer, the filter fabric manufacturer shall furnish the services of a competent factory representative to supervise and/or inspect the installation of pipe.
This service will be furnished for a minimum of 10 days during initial pipe installation.
D. Filter fabric shall be Mirafi 160N, DuPont SF 65, or equal.
2.05 BEDDING AND HAUNCHING MATERIALS
A. Crushed stone utilized for bedding and hunching shall meet the requirements of the
Georgia Department of Transportation Specification 800.01, Group I (limestone, marble or dolomite) or Group II (quartzite, granite or gneiss). Stone size shall be between No. 57 and No. 4, inclusive.
B. Earth materials shall be suitable materials selected from the trench excavation.
Suitable materials shall be clean and free of rock larger than 2-inches at its largest dimension, organics, cinders, stumps, limbs, frozen earth or mud, man-made wastes and other unsuitable materials. Should the material excavated from the trench be saturated, the saturated material may be used as earth material, provided it is allowed to dry properly and it is capable of meeting the specified compaction requirements.
When necessary, earth bedding and haunching materials shall be moistened to facilitate compaction by tamping.
2.06 INITIAL BACKFILL
A. Initial backfill material shall be earth materials or crushed stone as specified for bedding and haunching materials. Soil shall be tamped to 90% of Standard Proctor
Density (ASTM D698).
B. Earth materials utilized for initial backfill shall be suitable materials selected from
Winburn Drive 31 23 16 -8 materials excavated from the trench. Suitable materials shall be clean and free of rock larger than 2-inches at its largest dimension, organics, cinders, stumps, limbs, frozen earth or mud, man-made wastes and other unsuitable materials. Should the material excavated from the trench be saturated, the saturated material may be used as earth material, provided it is allowed to dry properly and it is capable of meeting the specified compaction requirements. When necessary, initial backfill materials shall be moistened to facilitate compaction by tamping. If materials excavated from the trench are not suitable for use as initial backfill material, provide select material conforming to the requirements of this Section.
2.07 FINAL BACKFILL
A. Final backfill material shall be general excavated earth materials, shall not contain rock larger than 2-inches at its greatest diameter, cinders, stumps, limbs, man-made wastes and other unsuitable materials. If materials excavated from the trench are not suitable for use as final backfill material, provide select material conforming to the requirements of this Section.
B. In areas not used for streets or driveways, carefully refill in layers not exceeding 8 inches in thickness and thoroughly tamp with hand tamps to one foot above the top of the pipe. Finish filling by machine without tamping. As trench settles, bring back to grade by adding more material. Maintain trenches in safe condition at all times.
Restore all special grassing and shrubbery, fences, etc., to original condition. The remaining backfill shall be thoroughly compacted in 8 inch layers to at least 95%
(percent) of the Standard Proctor Density (ASTM D698).
C. In streets, roadways and driveways, carefully refill in layers not exceeding 8 inches in thickness and thoroughly tamp with hand tamps to one foot above the top of the pipe. The remaining backfill shall be thoroughly compacted in 8 inch layers to at least 98% (percent) of the Standard Proctor Density (ASTM D698).
D. Backfilling and tamping work in state highway right-of-ways and streets under jurisdiction of the State Highway Department will be in accordance with the State of Georgia Department of Transportation "Policy and Procedure for
Accommodation of Utilities".
2.08 CONCRETE
Concrete for bedding, haunching, initial backfill or encasement shall have a compressive strength of not less than 3,000 psi, with not less than 5.5 bags of cement per cubic yard and a slump between 3 and 5-inches. Ready-mixed concrete shall be mixed and transported in accordance with ASTM C 94. Reinforcing steel shall conform to the requirements of ASTM
A 615, Grade 60.
2.09 FLOWABLE FILL
Flowable fill, where required for trench backfill, shall meet the requirements of Georgia
Winburn Drive 31 23 16 -9
Department of Transportation Standard Specifications, Section 600 for Excavatable or Non-
Excavatable type.
PART 3 EXECUTION
3.01 EXAMINATION
A. Identify required lines, levels, contours, and datum locations.
B. Locate, identify, and protect utilities that remain and protect from damage. The contractor is required to contact the Utilities Protection Center, Inc. in the State of
Georgia call 811 prior to any excavation or construction. Additional information is available at www.gaupc.com. The contractor shall first, Call Before You Dig.
Second, Wait the Required Amount of Time. Third, Respect the Marks and Lastly, Dig With Care.
C. Notify utility company to remove and relocate utilities.
3.02 TRENCH EXCAVATION
A. Notify of unexpected subsurface conditions and discontinue affected Work in area until notified to resume work.
B. Slope banks of excavations deeper than 4 feet to angle of repose or less until shored.
C. Do not interfere with 45 degree bearing splay of foundations.
D. Cut trenches O.D of pipe plus two feet minimum or O.D. of pipe plus four feet maximum wide enough to allow installation and inspection of utilities.
E. Hand trim excavations. Remove loose matter.
F. Remove large stones and other hard matter which could damage piping or impede consistent backfilling or compaction.
G. Remove lumped subsoil, boulders, and rock up to 1/3 cu yd (0.25 cu m) measured by volume.
H. Remove excavated material that is unsuitable for re-use from site.
I. Stockpile excavated material to be re-used in areas designated on site.
J. Remove excess excavated material from site.
K. In areas not used for streets and in unpaved streets, maximum trench width shall be the pipe diameter plus 24 inches. Protect all trees, shrubs and structures. Protect all fences and replace those damaged/removed with like kind. Keep work and equipment within easement limits. Repair and replace any damage.
L. Paved streets shall have a maximum trench width of pipe diameter plus 24 inches.
Shore and brace trench walls as necessary to prevent damage to existing paving.
Do not cut existing sidewalk, or curb and gutter without approval by the Engineer.
Winburn Drive 31 23 16 -10
Use rubber tired equipment only on streets. Repair and replace all damage. Saw cut all pavements for smooth edge on replacement.
3.03 DEWATERING REQUIREMENT
A. The Contractor may use any dewatering method he deems feasible so long as it results in working in the dry and stable soil conditions.
B. The Contractor shall conform and meet all conditions, obtain necessary permits and requirements of the regulatory agencies that have jurisdiction.
C. It is the intent of these specifications that an adequate dewatering system be installed to lower and control the groundwater in order to permit excavation, construction, grading and the placement of fill materials, all to be performed under dry conditions. The dewatering system shall be adequate to pre-drain the water-bearing strata above and below the bottom of the excavation.
D. The Contractor shall be solely responsible for the arrangement, location and depths of dewatering system necessary to accomplish the work described under this section of the specifications. The dewatering shall be accomplished in a manner that will reduce the hydrostatic head below any excavation to the extent that the water level in the construction area are a minimum of two (2) feet below the prevailing excavation surface and any surface to be compacted; will prevent the loss of fines, seepage, boils, quick conditions, or softening of the foundation strata; will maintain stability of the sides and bottom of the excavation; and will result in all construction operations being performed in the dry.
E. The Contractor shall promptly dispose of all water removed from the excavations in such a manner as will not endanger public health, damage public or private property, or affect adversely any portion of the work under construction or completed by him or any other Contractor. Contractor shall obtain written permission from the Owner for any property involved before digging ditches or constructing water courses for the removal of water.
F. The disposal of water from the dewatering system shall meet the requirements of all regulatory agencies having jurisdiction.
G. If the dewatering requirements are not satisfied due to inadequacy or failure of the dewatering system, then loosening of the foundation strata, or instability of the slopes, or damage to the foundations or structures may occur. The supply of all labor and materials, and the performance of all work necessary to carry out additional work for reinstatement of the structures of foundation soil resulting from such inadequacy or failure shall be undertaken by the Contractor subject to the approval of the Engineer, and at no additional expense to the Owner.
3.04 ROCK EXCAVATION
A. Definition of Mass Rock (only for payment purposes where payment is on a unit quantity basis): Any material which cannot be excavated with a single-tooth ripper
Winburn Drive 31 23 16 -11 drawn by a crawler tractor having a minimum draw bar pull rated at not less than
56,000 pounds (comparable to Caterpillar D 8K or comparable to Caterpillar 973 front-end loader, and occupying an original volume of at least one cubic yard). The
Engineer shall be the sole determinate as to the limits to which the material is classified as rock.
B. Definition of Trench Rock (only for payment purposes where payment is on a unit quantity basis): Any material which cannot be excavated with a backhoe having a bucket curling force rated at not less than 25,700 pounds (Caterpillar Model 225 or equivalent), and occupying an original volume of at least one-half (1/2) cubic yards.
C. Excavation: Where rock is encountered within excavation for structures, it shall be excavated to the lines and grades indicated on the Drawings or as otherwise directed by the Engineer. The Contractor shall be responsible for obtaining any blasting permits required.
D. Blasting: Blasting operations shall be conducted in accordance with all existing ordinances and regulations. All structures shall be protected from the effects of the blast. Blasting shall be performed and supervised by qualified and licensed workers.
Dispose of excavated rock in accordance with applicable federal, state, county and local regulations. All blasting within 750 ft of an inhabited structure and or roadway must be siesmic monitored for ground and air vibrations. Peak Particle Velocity shall be measured at nearest structure and shall be 0.5 inch per second or less during blasts. Shots must be covered with at least 6 feet of earthen and synthetic cover
(blasting mats). Bore hole diameter must not exceed 4� in diameter. Blast hole cannot exceed 20 feet of solid rock with single delay detonator (in terms, if drill depth exceeds more than 20 feet in depth, decking must be done, accomplish by using multiple detonators in the blast hole. The blast holes must be stemmed with gravel, 89/57 stone. Pre-blast inspections are required. Inspections shall be via an engineer that includes inspection of structure, and pictures of any existing damage or cracks that structure may have prior to blasting.
E. If excess excavation is made or the material becomes disturbed so as to require removal below final subgrade elevations or beyond the prescribed limits, the resulting space shall be refilled with concrete in accordance with Section 2.08 of this Specification
F. Measurement for Payment
All rock excavation shall be paid for as an incidental part of the item on which the work is done except where a separate, unqualified item for rock excavation is indicated in the BID FORM or where rock excavation is ORDERED as an EXTRA by the OWNER, by WRITTEN ORDER. Where payment for rock excavation is established by the BID FORM or ORDERED as an EXTRA by the OWNER, CONTRACTOR shall be paid only for the quantity of rock removed, measured as follows:
1. For all masonry structures such as buildings, tanks, vaults, catch basins, manholes and the like, the horizontal rock measurement shall be made to include 2-1/2 feet from the outside face of finished vertical sidewall of such
Winburn Drive 31 23 16 -12 structure and the vertical rock measurement shall be made from the top elevation of the rock, before disturbed or removed, to the elevation of the under or lower side of the bottom concrete slab of the structure. Any projection below the bottom slab of any structure required for sump, well, or other pertinent construction shall be measured separately.
2. For installation of pipe lines and fittings the horizontal rock measurement shall be the nominal outside diameter of the pertinent pipe plus 16-inches, except, however, that no horizontal measurement shall be considered to be less than
48-inches; the vertical rock measurement shall be made from the top elevation of the rock, before disturbance or removal, to an elevation of 9-inches below the bottom outside surface of the pipe for pipe having a diameter of 8-inches through 24-inches, and to an elevation of 12-inches below the bottom outside surface of the pipe for all pipe having a diameter greater than 24-inches.
G. Excess Rock Excavation
If rock excavated beyond the limits of payment indicated on the Drawings, specified, or authorized in writing by the OWNER, the excess excavation whether resulting from overbreakage or other causes, shall be backfilled, by and at the expense of the
CONTRACTOR.
H. Shattered Rock
If rock below normal depth is shattered due to drilling or blasting operations and such shattered rock is unfit for foundations, the shattered rock shall be removed and the excavation shall be backfilled as described above in EXCESS ROCK
EXCAVATION. All such removal and backfilling shall be done at the expense of the
CONTRACTOR.
3.05 SHEETING, BRACING AND SHORING
A. Trench Shield: A trench shield or box may be used to support the trench walls. The use of a trench shield does not necessarily preclude the additional use of bracing and sheeting. When trench shields are used, care must be taken to avoid disturbing the alignment and grade of the pipe or disrupting the haunching of the pipe as the shield is moved. When the bottom of the trench shield extends below the top of the pipe, the trench shield will be raised in 6-inch increments with specified backfilling occurring simultaneously. At no time shall the trench shield be �dragged� with the bottom of the shield extending below the top of the pipe or utility.
B. Remove bracing and sheeting in units when backfill reaches the point necessary to protect the utility and adjacent property. Leave sheeting in place when in the opinion of the Engineer it cannot be safely removed or is within three feet of an existing structure, utility, or pipeline. Cut off any sheeting left in place at least two feet below the surface.
C. Sheet piling within three feet of an existing structure or utility shall remain in place, unless otherwise directed by the Engineer.
Winburn Drive 31 23 16 -13
3.06 TRENCH FOUNDATION AND STABILIZATION
A. The bottom of the trench shall provide a foundation to support the utility and its specified bedding. The trench bottom shall be graded to support the utility and bedding uniformly throughout its length and width.
B. If, after dewatering as specified above, the trench bottom is spongy, or if the trench bottom does not provide firm, stable footing and the material at the bottom of the trench will still not adequately support the utility, the trench will be determined to be unsuitable.
C. If in the opinion of the Engineer the undisturbed material at the trench bottom constitutes an unstable pipe foundation, then the Contractor shall replace such unstable materials with crushed stone.
D. If the crushed stone does not provide adequate foundation, then the trench shall be excavated to a depth of at least two feet below the specified trench bottom. The over excavation shall be filled with No. 4 foundation stone to the bottom of the bedding stone or the over excavation shall be lined with filter fabric, with the fabric being supported along the sides of the trench to a point above the top of the utility.
The trench shall then be filled with No. 57 foundation stone to the top of the pipe and the filter fabric shall be overlapped above the pipe and stone.
3.07 BEDDING AND HAUNCHING
A. Prior to placement of bedding material, the trench bottom shall be free of any water, loose rocks, boulders or large dirt clods.
B. Bedding material shall be placed to provide uniform support along the bottom of the pipe and to maintain the pipe at the proper elevation. The initial layer of bedding placed to receive the pipe shall be brought to the grade and dimensions indicated on the Drawings. All bedding shall extend the full width of the trench bottom. The pipe shall be placed and brought to grade by tamping the bedding material or by removal of the excess amount of the bedding material under the pipe. Adjustment to grade line shall be made by scraping away or filling with bedding material. Wedging or blocking up of pipe shall not be permitted. Applying pressure to the top of the pipe, such as with a backhoe bucket, to lower the pipe to the proper elevation or grade shall not be permitted. Each pipe section shall have a uniform bearing on the bedding for the length of the pipe, except at joints.
C. At each joint, excavate bell holes of ample depth and width to permit the joint to be assembled properly and to relieve the pipe bell of any load.
D. After the pipe section is properly placed, add the haunching material to the specified depth. The haunching material shall be shovel sliced, tamped, vigorously chinked or otherwise consolidated to provide uniform support for the pipe barrel and to fill completely the voids under the pipe, including the bell hole. Prior to placement of the haunching material, the bedding shall be clean and free of any water, loose rocks, boulders or dirt clods.
Winburn Drive 31 23 16 -14
E. Gravity Pipelines and Accessories: Lay PVC (plastic pipe) gravity sewer pipe with minimum Class B bedding. Lay all other gravity sewer pipelines with Class C bedding, unless shown or specified otherwise. All trenches under paving, concrete, etc. shall be placed in Class B bedding only.
F. Bedding for storm drain piping shall be as specified in Section 33 40 00 Storm
Drainage Piping.
G. Manholes: Excavate to a minimum of 12-inches below the planned elevation of the base of the manhole. Place and compact crushed stone bedding material to the required grade before constructing the manhole.
H. Pressure Mains
Bedding and haunching for pressure pipe shall be with Class II or III soils compacted to 90% of standard proctor density. All trenches under paving, concrete, etc. shall be placed in Class B bedding only.
I. Excessive Width and Depth
3. If the trench is excavated in excess of the pipe diameter plus two feet, provide the next higher bedding type.
4. If the trench is excavated to excessive depth, provide foundation stone to the bottom of the bedding material.
J. Compaction: Bedding and haunching materials under pipe, manholes and accessories shall be compacted to a minimum of 95 percent of the maximum dry density, unless shown or specified otherwise.
3.08 CONCRETE ENCASEMENT FOR PIPELINES
Where concrete encasement is shown on the Drawings for pipelines not under structures, excavate the trench to provide a minimum of 6-inches clearance from the bell of the pipe.
Lay the pipe to line and grade on concrete blocks. In lieu of bedding, haunching and initial backfill, place concrete to the full width of the trench and to a height of not less than
6-inches above the pipe bell. Do not backfill the trench for a period of at least 24 hours after concrete is placed.
3.09 CONCRETE ENCASEMENT FOR ELECTRICAL DUCT BANKS
A. Install top of duct bank minimum 18-inches below finished grade with plastic warning tape 12-inches below finished grade.
B. Terminate conduit in end bell at manhole entries.
C. Stagger conduit joints in concrete encasement 6-inches minimum.
D. Provide minimum 3-inch concrete cover at bottom, top, and sides of duct bank. Use suitable separators and chairs installed not greater than four feet on center to provide conduit spacing as indicated. Securely anchor conduit to prevent movement during concrete placement.
Winburn Drive 31 23 16 -15
E. Where duct bank passes beneath footings or slabs, excavate to provide a minimum of 6-inches clearance between the conduits and the structure. Backfill to the base of the structure with concrete.
3.10 INITIAL BACKFILL
A. Fill up to subgrade elevations unless otherwise indicated.
B. Employ a placement method that does not disturb or damage other work.
C. Systematically fill to allow maximum time for natural settlement. Do not fill over porous, wet, frozen or spongy subgrade surfaces.
D. Maintain optimum moisture content of fill materials to attain required compaction density.
E. Granular Fill: Place and compact materials in equal continuous layers not exceeding 6 inches compacted depth.
F. Soil Fill: Place and compact material in equal continuous layers not exceeding 8 inches compacted depth.
G. Correct areas that are over-excavated.
1. Thrust bearing surfaces: Fill with concrete.
2. Other areas: Use general fill, flush to required elevation, compacted to minimum 98 percent of standard proctor dry density.
H. Compaction Density Unless Otherwise Specified or Indicated:
1. Under paving, slabs-on-grade, and similar construction: 98 percent of standard proctor density.
2. At other locations: 95 percent of standard proctor density.
3.11 FINAL BACKFILL
A. Backfill to contours and elevations indicated using suitable materials.
B. Employ a placement method that does not disturb or damage other work.
C. Systematically fill to allow maximum time for natural settlement. Do not fill over porous, wet, frozen or spongy subgrade surfaces.
D. Maintain optimum moisture content of fill materials to attain required compaction density.
E. Granular Fill: Place and compact materials in equal continuous layers not exceeding 6 inches compacted depth.
F. Soil Fill: Place and compact material in equal continuous layers not exceeding 8 inches compacted depth.
G. Slope grade away from building minimum 2 inches in 10 ft, unless noted otherwise.
Winburn Drive 31 23 16 -16
Make gradual grade changes. Blend slope into level areas.
H. Compaction Density Unless Otherwise Specified or Indicated:
1. Under paving, slabs-on-grade, and similar construction: 98 percent of standard proctor density.
2. At other locations: 95 percent of standard proctor density.
I. Reshape and re-compact fills subjected to vehicular traffic.
3.12 TOLERANCES
A. Top Surface of General Backfilling: Plus or minus 1 inch from required elevations.
B. Top Surface of Backfilling Under Paved Areas: Plus or minus 1 inch from required elevations.
3.13 CLEAN-UP
A. Leave unused materials in a neat, compact stockpile.
B. Remove unused stockpiled materials,…