Exhibit A Project Overview.pdf
PDF 118 KB Posted
- Attached to
- Winburn Dr Sewer Main Replacement
- Solicitation number
- PE-66090-NONST-2026-000000017
- Issued by
- Fulton County, Georgia
About this file
This document is an Invitation to Bid (ITB 2026-1894) issued by the City of East Point, Georgia for the Winburn Drive Water Main Replacement project. The city is seeking bids for all materials, labor, and equipment required to install a new water main along Winburn Drive. The project is a critical infrastructure upgrade designed to improve the city's water system by providing high-quality drinking water to residents, increasing water capacity and pressure for firefighting purposes, and reducing water service disruptions.
The water main replacement project represents an investment in East Point's municipal water infrastructure, focusing on enhancing water delivery reliability and performance. While specific budget details are not provided in this exhibit, the project aims to modernize the existing water system, potentially improving overall service quality and emergency response capabilities. The bid document (Exhibit "A") serves as a project overview, inviting qualified contractors to submit proposals for the comprehensive water main installation and infrastructure improvement initiative.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Winburn Dr Technical Specs (Updated).pdf | ||
| Addendum 2.pdf | ||
| Exhibit L Standard Contract.pdf | ||
| ITB Base Document.pdf | ||
| Winburn Dr Project Manual 7_3_2025.pdf | ||
| Addendum 6.pdf | ||
| Addendum.pdf | ||
| Exhibit C Specifications.pdf | ||
| Addendum 4.pdf | ||
| Addendum 5.pdf | ||
| ITB General Instructions.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB 2026-1894 Winburn Dr Water Main Replacement
Exhibit “A”
Project Overview
The City of East Point will be receiving Bids for all material, labor and equipment for the Winburn Drive.
This project is an upgrade and improvement to East Point’s Water Infrastructure with the installation of a water main along Winburn Dr. The project will provide quality drinking water to residents, increase capacity and water pressure to aid in firefighting activities, and provide continual clean drinking water with less water service disruptions.
File details come from the government source that posted it. Updated .