Exhibit C Specifications.pdf
PDF 132 KB Posted
- Attached to
- Winburn Dr Sewer Main Replacement
- Solicitation number
- PE-66090-NONST-2026-000000017
- Issued by
- Fulton County, Georgia
About this file
This document is an Invitation to Bid (ITB 2026-1894) from the City of East Point, Georgia for a Winburn Drive Water Main Replacement project. The solicitation seeks bids for all materials, labor, and equipment required to upgrade the city's water infrastructure, specifically involving the installation of a new water main along Winburn Drive. The project aims to provide quality drinking water to residents, increase water capacity and pressure for firefighting activities, and reduce water service disruptions.
The bid requires potential vendors to have a minimum of 3 years of field experience, with preference given to those with experience in government-sponsored projects. Bidders must demonstrate expertise in water infrastructure work and submit detailed documentation of their relevant project experience. The selected vendor will be expected to emphasize their capability to meet project schedules and highlight the qualifications of the principal personnel who will perform the work. While specific pricing details are not provided in this exhibit, the document outlines the minimum requirements and specifications for potential bidders to prepare their proposals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Winburn Dr Technical Specs (Updated).pdf | ||
| Addendum 2.pdf | ||
| Exhibit L Standard Contract.pdf | ||
| ITB Base Document.pdf | ||
| Winburn Dr Project Manual 7_3_2025.pdf | ||
| Addendum 6.pdf | ||
| Addendum.pdf | ||
| Exhibit A Project Overview.pdf | ||
| Addendum 4.pdf | ||
| Addendum 5.pdf | ||
| ITB General Instructions.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB 2026-1894 Winburn Dr Water Main Replacement
Exhibit “C”
Winburn Dr Water Main Replacement
Minimum Requirements and Specifications
A. Minimum Requirements
The Minimum Eligibility Requirements for this solicitation are listed below. Bidder shall submit detailed verifiable information affirmatively documenting compliance with each minimum requirement.
The Selected Vendor shall have a Minimum of 3 years of field . Experience working on government sponsored projects is a plus. In addition, the Selected Vendor must be able to demonstrate a broad range of knowledge and expertise in providing all of the services requested herein.
Selected Vendor shall exhibit considerable relevant experience with this type of work, and should emphasize experience, capability to meet a required schedule, and capability of the particular Principal and personnel who will actually perform the work.
Relevant experience shall be documented by a list of related projects and/or contracts which have been awarded to the Selected Vendor over the years by various parties.
B. Specifications
The City of East Point will be receiving separate sealed Bids for all material, labor and equipment for the Winburn Drive. This includes the following, with all related accessories as shown on the Construction Drawings and called for in the Contract Documents and Technical Specifications:
This project is an upgrade and improvement to East Point’s Water Infrastructure with the installation of a water main along Winburn Dr. The project will provide quality drinking water to residents, increase capacity and water pressure to aid in firefighting activities, and provide continual clean drinking water with less water service disruptions.
File details come from the government source that posted it. Updated .