Webster County Appendix C - List of Required Submittals-ARFQ DEP2100000019.pdf

PDF 454 KB Posted

Attached to
Addendum 6-Webster County Landfill Closure Construction
Solicitation number
ARFQ 0313 DEP2100000019 7
Issued by
Wetzel County, West Virginia

About this file

This is a List of Required Submittals document for Webster County's Landfill Closure project (Project No. 0101-17-0380-006), dated September 13, 2019. The document specifies 35 submittal items that contractors must provide to the Owner and Engineer at various project phases. Required submittals encompass pre-work documentation including proposed subcontractors, health and safety plans, right-of-entry agreements for borrow areas, utility notifications, and permit acquisitions. Technical submissions include survey notes establishing a 50-foot grid over the cap area with elevation measurements, as-built drawings, soils laboratory testing results, and geosynthetic materials certifications for geotextile, HDPE drainage net, and VFPE membrane. Additional submittals address specialized elements such as grout mix designs with unconfined compressive strength data, blasting plans and materials notifications, water handling plans, geonet composite selections, VFPE flexible membrane cap documentation with QA/QC programs and manufacturer certifications, leachate surface impoundment requirements, impoundment HDPE geomembrane specifications, leachate loadout vault and detection manhole details, and leachate loadout control system information. Submission deadlines range from prior to commencing work through project closeout, with certain items required at preconstruction meetings, as work is completed, and prior to final inspection.

The document does not contain information regarding pricing terms, budget allocations, funding sources, set-asides, incumbent contractors, or contract award dates. No renewal options or contract term duration are specified in this submittal requirements document.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

List of Required Submittals

Project No. 0101-17-0380-006 September 13, 2019

APPENDIX C

LIST OF REQUIRED SUBMITTALS

WEBSTER COUNTY LANDFILL CLOSURE

Item No.

Specification

Section Requirement Submitted To Due

1 N/A List of Proposed Subcontractors Owner Prior to Commencing

Work

2 2.7 Contractor’s Health and Safety Plan Owner Prior to Commencing

Work

3 3.0, 17.2.3 and 18.10 Copies of Signed Right-of-Entry Agreements for Off-site Borrow

Areas and Proposed Routes of Access

Owner and

Landowner

Prior to Disturbance of Borrow Area

4 5.0 Miss Utility Notification/Notification of Other Utilities Owner Prior to Commencing

Work

5 5.0 Written Cost Estimate for Utility Relocations (if required) Owner Prior to Arranging for

Utility Relocation

6 11.0, 17.2.3,

18.10 and 18.11

NEPA Compliance for Off-Site Borrow and Waste Areas Owner Prior to Disturbing

Off-Site Borrow and/or Waste Areas

7 11.0, 17.2.3 and

18.10

NPDES Stormwater Construction Permit for Off-Site Borrow Areas Owner Prior to Disturbance of Off-Site Borrow

Area

8 11.0 Copies of Other Permits, Licenses, and Approvals Required for the

Project

Owner Prior to

Commencement of

Work Element

9 12.0 Certified Payroll with Each Application for Payment Owner Each Application for

Payment

Specification

Section Requirement Submitted To Due

10 13.1 and 13.3 Survey Notes and Records Including Establishment of a 50-foot

Grid Over the Cap Area and Elevations of: (a) Existing Ground

Surface After Daily Cover is Smooth Graded, (b) Top of 12-inch

Intermediate Cover Layer, and (c) Top of 2-foot Final Soil Cover

Layer

Owner As Completed During the Work

11 13.1 and 13.3 Surveyed Locations and Elevations for the Leachate Cutoff Drain, Leachate Transmission Line, Leachate Seep Collector Drains, Drainage Channels, Edge of Cap, Gas Vents, Cleanouts, Fences, Gates, Drainage Berms, Culverts, Leachate Tanks, Leachate Pump

Station, Electric Line, and Valves

Owner As Work is

Completed

12 13.1 and 13.3 Existing Ground Line Cross Sections, Baseline A Owner Prior to Beginning

Any Excavation and

Fill

13 13.1 and 13.3 Final Cross Sections, Baseline A Owner Immediately After

Completion of

Excavation and Fill

14 13.3 As-Built Drawings Owner Prior to Final

Inspection

15 14.3 Nam/Qualifications of Testing Laboratory(ies) Owner Prior to Work

16 14.3 Copies of Soils Laboratory Testing Owner Prior to Placement of

Material

17 14.3 Copies of Geosynthetic Materials Quality Control Tests and

Material Certifications for Geotextile, HDPE Drainage Net, VFPE

Membrane

Owner Prior to Shipment of

Material

18 14.3 Written Statement of Origin, Composition, and Manufacturer of All

Materials Used in the Work

Owner Prior to Delivery of

Materials

19 14.3 Certifications and Supporting Test Data That Products Comply with

Specifications

Owner Prior to Delivery of

Materials

Specification

Section Requirement Submitted To Due

20 16.6 Plan for Temporary Access Roads Owner At the

Preconstruction

Meeting

21 17.2.1 Mix Design with Corresponding Unconfined Compressive Strengths for Grout

Owner Prior to Delivery of

Materials

22 18.10 Grading, Operation, and Reclamation Plan for Both On-Site and

Off-Site Borrow Areas

Owner Prior to Disturbance

23 18.14 and 26.0 Notification of Intent to Conduct Blasting, Blasting Materials, and

Blasting Plan

Engineer 10 Days Prior to

Beginning Drilling

24 18.8 Water Handling Plan Owner Prior to

Implementation of

Plan

25 18.9 Owner Approval of Proposed Borrow Areas Owner Prior to Disturbing

Borrow Area

26 20.3.3 and 20.4.3 Geonet composite Selection and Corresponding Test Data Engineer Prior to Ordering

Geonet Composite

27 20.3.4 VFPE Flexible Membrane Cap Manufacturer and Supporting

Documentation

Owner Prior to Ordering

28 20.3.4 VFPE Information Including QA/QC Program, List of Experience, Resin Certification, Quality Control Certificates, and Panel Layout

Drawings

Engineer 10 Days Prior to

Shipment of VFPE

29 20.3.5 VFPE Warranty Owner Prior to Project

Closeout

31 20.4.6.1 Tensiometer Calibration Engineer Prior to Use of

Tensiometer

32 21.0 Required Submittals for Leachate Surface Impoundment. See

Specification Section 21.0.

Engineer As Required

33 22.0 Required Submittals for Impoundment HDPE Geomembrane. See

Specification Section 22.0.

Engineer As Required

Specification

Section Requirement Submitted To Due

34 27.0 Required Submittals for Leachate Loadout Vault and Detection

Manhole. See Specification Section 27.0.

Engineer As Required

35 28.0 Required Submittals for Leachate Loadout Control System See

Specification Section 28.0.

Engineer As Required

File details come from the government source that posted it. Updated .