Webster County Appendix B -List of Contractor QAQC Requirements-ARFQ DEP2100000019.pdf

PDF 454 KB Posted

Attached to
Addendum 6-Webster County Landfill Closure Construction
Solicitation number
ARFQ 0313 DEP2100000019 7
Issued by
Wetzel County, West Virginia

About this file

This is a Quality Assurance/Quality Control (QA/QC) Requirements document for Webster County related to a sanitary landfill closure project (Project No. 0101-17-0380-006). The document, dated September 13, 2019, outlines 25 specific contractor QA/QC requirements that must be fulfilled throughout the project lifecycle. The requirements span multiple construction phases and encompass laboratory testing of fill materials, field density testing, geosynthetic material certifications, grout testing, stone soundness testing, soil classification, piping certifications, hydrostatic testing, direct shear testing, geomembrane seam testing, and verification testing for daily cover, intermediate soil cover, and final site conditions. Submissions are required to either the Owner's Representative or the Engineer at various stages, with timing ranging from prior to work initiation through completion of specific construction activities.

The document does not contain pricing terms, set-asides, incumbent information, or funding details. Instead, it serves as a technical specification appendix that establishes the testing and certification standards contractors must meet to demonstrate compliance with project specifications. Contractors are responsible for ensuring all required QA/QC testing is performed by qualified laboratories and certified professionals, with results documented and submitted according to the prescribed schedule to maintain project quality standards throughout the sanitary landfill closure operations.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

List of Contractor QA/QC Requirements

Project No. 0101-17-0380-006 September 13, 2019

APPENDIX B

LIST OF CONTRACTOR QA/QC REQUIREMENTS

WEBSTER COUNTY SANITARY LANDFILL CLOSURE

Item No.

Specification

Section Requirement Submitted To Due

1 14.3 and 18.6 Laboratory Tests of Fill Materials to Identify Standard Proctor

Maximum Dry Density

Owner’s

Representative

Prior to Earthwork

2 14.3, 17.3.3,

17.3.4 and 19.4.7

Field Density Tests:

One Test Required per 2000 Cubic Yards of Fill Placed; One Test

Required per Lift per 500 Feet of Trench; Minimum of One Test per

Day

Owner’s

Representative

As Work Progresses

3 14.3 Geosynthetic Materials Manufacturer QA/QC Data Including

Quality Control Test Results and Certifications for Geotextiles, HDPE Drainage Net, VFPE Geomembrane

Owner Prior to Shipment of

Materials to Site

4 17.2.1 Grout Cylinders or Cubes Tested for Unconfined Compressive

Strength: 3 Specimens Made for Every 20 Cubic Yards Poured, Tested at 7 and 28 Days

Owner As Results Are

Available

5 17.2.3 and 18.7 Sodium Sulfate Soundness Test Results for Riprap Stone Owner Prior to Disturbance of Borrow Area or

Prior to Delivery of

Stone to Site 6

6 Various Gradation Results on All Purchased Stone for Road Surfacing, Underdrains, and Pipe Bedding

Owner Prior to Delivery to the Site

7 Various Suppliers’ Certification and/or Proof That HDPE and PVC Piping

Supplied is in Accordance with the Pipe Classes Specified

Owner Prior to Delivery of

Materials

Specification

Section Requirement Submitted To Due

8 18.6 Testing/Classification of Soils

- USCS Classification for Sediment Pond Embankment Soils

- Sieve Analysis for Other Soils

- Standard Proctor Maximum Dry Density

9 19.4.5 Hydrostatic Testing of Solid Piping Owner Upon Completion of

Test

10 20.3.1 Direct Shear Testing Between Intermediate Soil Cover Samples and

Selected Geonet Composite Sample

Engineer Prior to Ordering

Geonet and

Placement of

Intermediate Soil

Cover Layer

11 20.3.2 Direct Shear Testing Between Final Soil Cover Samples and

Selected Geonet Composite Sample

Engineer Prior to Ordering

Geonet

12 20.3.3 Geonet Composite Transmissivity Testing Using VFPE and Soil

Samples

Engineer Prior to Ordering

Geonet Composite

13 20.4.1 Daily Cover Verification Test Pits, One per Acre Engineer Prior to Placement of

Intermediate Cover

14 20.4.2 Intermediate Soil Cover Layer Compaction Tests, One Test per 2000

Cubic Yard of Fill Placed

Engineer As completed

15 20.4.6.1 VFPE Test Seams, Shear Seam Strength and Peel Tests Engineer Daily Prior to Field

Seaming

16 20.4.6.2 Non-Destructive Testing of VFPE Field Seams Engineer Daily When Seaming

VFPE

17 20.4.6.3 Destructive Testing of VFPE Field Seams Engineer Daily When Seaming

VFPE

21 23.3.2 and 23.3.3 Lime and Fertilizer Application Rates Based on Soil Analysis Engineer Prior to Seeding

22 21.0 Leachate Surface Impoundment QA/QC – See Section 21.0 Engineer As Required

Specification

Section Requirement Submitted To Due

23 22.0 Impoundment HDPE Geomembrane QA/QC – See Section 21.0 Engineer As Required

24 27.0 Leachate Loadout Vault and Detection Manhole QA/QC – See

Section 21.0

Engineer As Required

25 28.0 Leachate Loadout Control System QA/QC – See Section 21.0 Engineer As Required