WD_WA20260131_20260518.pdf

PDF 2 MB Posted

Attached to
Telecom lines replacement, Lake Roosevelt NRA Federal contract opportunity
Solicitation number
140P8326Q0042
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This is a General Decision document (WA20260131) issued by the U.S. Department of Labor's Wage and Hour Division on May 18, 2026, establishing prevailing wage rates for heavy construction projects in Stevens County, Washington. The determination applies to all contracts subject to the Davis-Bacon Act awarded in this geographic area.

The document lists prevailing wage rates and fringe benefits across multiple construction classifications, including electricians ($49.55/hour with $19.09 fringe), line construction workers ($64.17/hour with $24.54 fringe), tree trimmers ($22.60-$42.57/hour with $16.37-$17.97 fringe), power equipment operators across nine groups ranging from $41.17-$46.34/hour with $23.40 fringe, ironworkers ($43.40/hour with $32.77 fringe), traffic control flaggers ($34.03/hour with $16.90 fringe), laborers including nozzle persons ($52.31/hour with $17.01 fringe), painters ($41.24/hour with $14.70 fringe), cement masons ($40.89/hour with $18.64 fringe), truck drivers ($31.24-$31.62/hour with $16.84-$18.60 fringe), equipment operators/mechanics ($33.61-$45.93/hour with $13.62-$19.20 fringe), and carpenters ($39.31/hour with $3.42 fringe). The document identifies rate identifiers indicating whether rates are union-negotiated (four-letter codes beginning with non-numeric characters), weighted union averages (UAVG), survey-based rates (SU), or state-adopted rates (SA). Contractors must pay these prevailing wages plus applicable fringe benefits for all employees on Davis-Bacon covered contracts. The determination also references Executive Order requirements for paid sick leave and Executive Order 13658 minimum wage provisions effective May 11, 2026.

View the file

Other files for this federal contract opportunity

Other files attached to Telecom lines replacement, Lake Roosevelt NRA, newest first.
File Type Posted
Sol_140P8326Q0042_Amd_0002.pdf PDF
KF_Fiber_06242026_Site_Visit_Q_A_0002.pdf PDF
Stevens_Co_Permit_For_Work_In_Right_of_Way_-_EDITABLE_0002.pdf PDF
Sol_140P8326Q0042_Amd_0001.pdf PDF
06242026_Prebid_Site_Visit_Signin_Sheet_0001.pdf PDF
B08_Attachment_01_READ_ME_FIRST_-_FAQs.docx DOCX document
Sol_140P8326Q0042.pdf PDF
B08_Attachment_07_Price_Schedule_and_Forms_to_Submit_with_Quote.docx DOCX document
B08_KEY_PERSONNEL.docx DOCX document
B08_Relevant_Project_Experience_Questionnaire.docx DOCX document
Simplified_Construction_Attachment_2_Terms_Provisions_Clauses.docx DOCX document
A06_KF_Fiber_Route_Maps.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .