Water Safety Plan Construction Requirements 2024.pdf
PDF 91 KB Posted
- Attached to
- Y1DA--503-25-107 Renovate for Prosthetics Lab design build | NCO 4 Construction West (VA-25-00072814)
- Solicitation number
- 36C24425R0090
About this file
This document details Water Safety Plan Requirements for Construction at the James E. Van Zandt VA Medical Center in 2024, providing comprehensive guidelines for water system installation, maintenance, and safety. The requirements cover multiple critical aspects including installer qualifications, temporary service connections, installation procedures, post-installation protocols, and specific temperature requirements for water systems. Key provisions mandate that contractors submit a site-specific water safety plan prior to construction, demonstrate relevant trade experience, ensure proper water line handling and installation, conduct infection control risk assessments, perform thorough system testing and disinfection, and adhere to strict temperature standards for different water uses, ranging from 124-140 degrees Fahrenheit for hot water systems to 60-100 degrees for emergency showers and eye wash stations.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Water Safety Plan Requirements for Construction - 2024 James E. Van Zandt VA Medical Center
1. Water Safety Plan: Establish and maintain a site-specific water safety plan. The intent of the Water Safety Plan is to include all water uses (potable and non-potable). Prior to start of work, prepare a plan detailing site-specific water safety measures and submit to the Contracting Officer Representative (COR) for review for compliance with contract requirements in accordance with the Master Specifications, Section 01 33 23, Shop
Drawings, Product Data, and Sample. Master specifications can be found at https://www.cfm.va.gov/TIL/spec.asp. At a minimum, the water safety plan shall address installer experience, license, and certifications, temporary service connections, delivery and storage of domestic water materials, installation procedures, post installation procedures, and a general knowledge in VA temperature requirements to make certain proper auxiliary equipment such as thermometers, anti-scald devices, and mixing valves are installed
2. The Water Safety Plan Submission:
a. Shall be submitted, reviewed, and approved prior to commencing construction.
b. Shall be resubmitted annually for review and approval in the event a contract extends more than a year from notice to proceed.
3. Installer Qualifications:
a. Tradesman skilled in the appropriate trade shall be provided.
b. Provide installers appropriate license.
c. Provide evidence of the successful completion of at least five projects of equal or greater size and complexity.
d. Provide additional qualifications or continuing education.
4. Temporary service connections, Pre-Construction, Delivery, and Storage:
a. Although the VA allows for use of domestic water during construction, it must be ensured that proper separation is in place at the point of connection via a backflow device.
https://www.cfm.va.gov/TIL/spec.asp
b. Water lines and equipment shall be capped and covered when delivered to the site and kept capped until installation. They shall be protected and cleaned (inside and outside) before placing in operation.
c. Existing equipment and piping being worked on by the contractor shall be under the custody and responsibility of the contractor and shall be protected as required for new work.
d. Reference Master Specifications 22 05 11 Delivery, Storage, and Handling.
5. Risk Assessment. Ensure the infection control risk assessment is conducted with
Facility stakeholders to address the potential impact of construction and maintenance of water systems on growth or transmission of waterborne pathogens and commissioning requirements.
6. Installation:
a. Reference Master Specifications 22 05 11 Cleanliness of Piping and Equipment Systems.
b. Ream all pipe ends to remove burrs and a clean smooth finish restored to full pipe inside diameter. Burrs can trap sediment and cause corrosion.
c. Aerators shall not be installed on faucets. Reference Master Specifications 22 40
00.
d. Dead legs are considered a length of pipe two pipe diameters from the branch, riser or main with one end open to the system and the other end terminating at a cap, blind flange or closed valve. All dead legs shall be removed within the project area whether specifically called out or not.
e. Carbon filters shall not be installed on the system.
f. Avoid running fire sprinkler piping above ductwork.
g. Grade all water lines to facilitate drainage. Provide drain valves at bottom of risers and all low points in system. Design domestic hot and cold water circulating lines with no traps.
h. Connect branch lines at the bottom of mains serving fixtures and pitch the lines down so that the main may be drained through the fixture. Connect branch lines to top of main serving only fixtures located on the floor above.
i. All water lines shall be insulated per the specifications.
j. Avoid running ice machine supply lines near source of heat such as the compressor.
k. All water line shutdowns shall be scheduled with the COR.
l. Remove unused piping (e.g., dead legs left as a result of removing equipment such as water heaters, sinks, or showers). To minimize stagnant water, the lines should be cut and capped where they tee into the main, if feasible, or at the last accessible point of flow.
m. Properly balance water circulation system.
7. Post installation:
a. Hydrostatically pressure test per Master Specifications 22 11 00. Once testing is complete the lines shall either be drained or have proper separation from the main domestic water connection.
b. Remove piping installed for leak testing.
c. Flush lines with clean potable water until dirty water does not appear at the points of outlet. This shall also include any parts of existing systems that have been altered, extended, or repaired.
d. Disinfect and sterilize the domestic water distribution system per procedures outlined in Master Specifications 22 11 00, International Plumbing Code (IPC) and American Water Association (AWA) C651. Newly installed water piping, equipment, and distribution system components that had been disinfected but not put into use within a week of the action must be disinfected again prior to building occupancy due to stagnation of water in the system.
e. Conduct Bacterial testing and water quality testing as required by the
COR/Engineer.
f. Once sterilization has occurred daily flushing of the system and every fixture (new and existing) must be conducted and documented until turnover of the project.
COR/Engineer will keep documentation of flushing and disinfection for at least 3 years.
g. Equipment must be commissioned to ensure operation meets the design intent and documentation retained for at least 5 years.
8. Temperature Requirements:
a. Tank type hot water heaters shall heat the water to a minimum of 140 degrees Fahrenheit.
b. Instantaneous or semi-instantaneous hot water heaters must heat the water to a minimum of 130 degrees Fahrenheit.
c. Circulation loops in the hot water system must be maintained throughout the system at 124 degrees Fahrenheit.
d. Cold water should be at or below 67 degrees Fahrenheit to the greatest extent possible.
e. Master thermostatic mixing valves shall be installed to temper water distribution from the hot water source and shall comply with the IPC and ASSE 1017.
f. General use showers and sinks, as well as immersion tubs, must not exceed a water discharge above 110 degrees Fahrenheit and have combination balanced-pressure/thermostatic valves meeting the IPC and ASSE 1016 (Tubs and showers) and ASSE 1070 (sinks and lavatories).
g. Emergency showers and eye wash stations must maintain temperatures between
60 degrees Fahrenheit and 100 degrees Fahrenheit and have anti scald protection meeting the IPC and ASSE 1071.
h. Verify temperatures with a calibrated thermometer.
File details come from the government source that posted it. Updated .