36C24425R0090_1.docx
DOCX document 121 KB Posted
- Attached to
- Y1DA--503-25-107 Renovate for Prosthetics Lab design build | NCO 4 Construction West (VA-25-00072814)
- Solicitation number
- 36C24425R0090
About this file
This is a Request for Proposal (RFP) for a design-build construction project to renovate the Prosthetic Lab at the Altoona VA Medical Center. The solicitation is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) with a North American Industry Classification System (NAICS) code of 236220 and a size standard of $45.0 Million. The project's magnitude is between $250,000 and $500,000, with a total performance period of 270 calendar days (180 days for design and 90 days for construction).
Key procurement details include a site visit scheduled for May 29, 2025, at 7:30 AM, and Request for Information (RFI) submissions due by June 9, 2025, at 10 AM Eastern Time. The RFP follows a two-phase design-build procurement process, with a maximum of three offerors advancing to Phase II. The solicitation requires performance and payment bonds, and the contractor must be verified as an SDVOSB on both SAM.gov and VetCert. The final proposal is due by June 30, 2025, at 10 AM EST, to be submitted via email to the designated VA contracting specialist.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24425R0090
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C24425R0090 X 05-08-2025 503-25-107 00244 Department of Veterans Affairs Network Contracting Office 4
See attached delivery schedule
Jeffrey Pruett 412-228-2661 503-25-107 Renovate Prosthetic Lab - Design Build
This is a design build solicitation under FAR Part 36.301. All qualified offerors may submit for Phase I. After Phase I evaluation is completed, the Government will notify only the top offerors via email with instructions for Phase II submission; however, Phase II information is also included in this solicitation. Non-Selected Phase I offerors shall be notified that their offer was not selected for the Phase II of the solicitation
Set-Aside: 100% set-aside for Service-Disabled Veteran-Owned Small Business (SDVOSB). SDVOSB status must be verified at both SAM.gov (https://sam.gov/content/home) and VetCert (https://veterans.certify.sba.gov/).
NAICS: The North American Industry Classification System (NAICS) code is 236220 with a size standard of $45.0 Million.
The magnitude of construction is between $250,000.00 and $500,000.00
Wage Determination PA20250077 dated 03/14/20245 applies to this solicitation and any resultant contract. The Contractor shall be responsible for the correct title and classification of workers and compliance with applicable wage/hour laws.
The Period of Performance is 270 calendar days from the Notice to Proceed. The awarded contractor will have 180 calendar days to complete the design portion and 90 calendar days to complete the construction portion.
A site visit will be held on 5/29/2025 at 07:30AM. All parties will meet FMS Building 2 at the Altoona VAMC:
2907 Pleasant Valley Blvd Altoona PA 16602.
"RFI's" must be submitted to Jeffrey.Pruett@va.gov by 6/9/2025 at 10AM Eastern Time. RFI's for Phase 1 will not be accepted after this date and time.
Payment bond, and performance bond are required
Offerors MUST sign and submit VAAR Clause 852.219-75 with their proposal
"RFP" Must be submitted by 10AM EST on 6/30/2025 via Email only to Jeffrey.Pruett@va.gov
X 52.211-10 X
10AM
EDT
06-30-2025 x
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
00244
Network Contracting Office 4
Austin Payment Center
PO Box 149971 Austin
TX
78714-9971
(877) 353-9791
(512) 460-5429
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| A.3 PRICE/COST SCHEDULE | 6 |
| ITEM INFORMATION | 6 |
| A.4 DELIVERY SCHEDULE | 6 |
| INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS | 6 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 8 |
| 2.1 PARTNERING | 24 |
| 2.2 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023) | 24 |
| 2.3 52.216-1 TYPE OF CONTRACT (APR 1984) | 25 |
| 2.4 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) | 25 |
| 2.5 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) | 25 |
| 2.6 52.228-1 BID GUARANTEE (SEP 1996) | 26 |
| 2.7 52.233-2 SERVICE OF PROTEST (SEP 2006) | 27 |
| 2.8 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 27 |
| 2.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 28 |
| 2.10 VAAR 852.223-70 INSTRUCTIONS TO OFFERORS—SUSTAINABLE ACQUISITION PLAN (SEP 2019) | 28 |
| 2.11 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 28 |
| REPRESENTATIONS AND CERTIFICATIONS | 30 |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025) (DEVIATION FEB 2025) | 30 |
| 3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021) | 34 |
| 3.3 52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—REPRESENTATION AND DISCLOSURES (DEC 2023) | 36 |
| 3.4 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 38 |
| 3.5 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021) | 39 |
| 3.6 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) | 41 |
| GENERAL CONDITIONS | 42 |
| 4.1 52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—PROHIBITION (DEC 2023) | 42 |
| 4.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984) | 46 |
| 4.3 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JAN 2025) | 46 |
| 4.4 52.222-42 STATEMENT OF EQUIVALENT RATES FOR FEDERAL HIRES (MAY 2014) | 50 |
| 4.5 52.223-20 AEROSOLS (MAY 2024) | 50 |
| 4.6 52.223-21 FOAMS (MAY 2024) | 51 |
| 4.7 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022) | 51 |
| 4.8 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 56 |
| 4.9 SUPPLEMENTAL INSURANCE REQUIREMENTS | 56 |
| 4.10 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022) | 60 |
| 4.11 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 60 |
| 4.12 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (MAY 2020) | 60 |
| 4.13 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION) | 60 |
| 4.14 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) | 63 |
| 4.15 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008) | 65 |
| 4.16 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 65 |
| 4.17 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS– CPM) (NOV 2018) | 65 |
| 4.18 VAAR 852.232-71 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (INCLUDING NAS– CPM) (NOV 2018) | 68 |
| 4.19 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 72 |
| 4.20 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 73 |
| 4.21 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) | 73 |
| 4.22 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020) | 73 |
| 4.23 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 75 |
| DESIGN BUILD SPECIFICATIONS | 76 |
| 4.24 SCHEDULE OF PAYMENTS FOR DESIGN SERVICES | 76 |
| 4.25 OWNERSHIP OF ORIGINAL DOCUMENTS | 76 |
| 4.26 RETENTION OF REVIEW DOCUMENTS | 76 |
| 4.27 CONTRACT DRAWINGS AND SPECIFICATIONS GOVERNMENT FURNISHED PLANNING INFORMATION | 76 |
| 4.28 COORDINATION WITH MEDICAL CENTER | 77 |
| 4.29 RESPONSIBILITY OF THE DESIGN-BUILD CONTRACTOR | 77 |
| ATTACHMENT 1 - RELEASE OF CLAIMS | 77 |
| ATTACHMENTS | 79 |
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
| __________________ |
| __________________ |
This is a design-build project. The contractor shall furnish all Management, Supervision, Labor, Transportation, Equipment and Materials and perform work to include demolition, general construction, alterations, mechanical and electrical work, and certain other items as required to execute the Renovate Prosthetic Lab project at the Altoona VAMC. In addition to contractor's construction and construction management requirements, they must retain a certified AE firm to design the project in accordance with the scope of work. Interim design reviews will be conducted by the VA and design approved before the construction may begin.
Period of Performance is 270 days (180 days for design and 90 for construction)
PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction PRODUCT/SERVICE CODE: Z1DA - Maintenance of Hospitals and Infirmaries
| GRAND TOTAL |
| __________________ |
A.4 DELIVERY SCHEDULE
| ITEM NUMBER |
| SHIPPING INFORMATION |
| QUANTITY |
| DELIVERY DATE |
1.00
Page 1 of Page 1 of
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
(a) Phase I Proposal information and contract forms may be obtained by general (prime) contractors interested in submitting a proposal direct to the Department of Veterans Affairs and by suppliers and subcontractors for their use in preparing sub-bids for general (prime) contractors from the System for Award Management (SAM) Contract Opportunities website at https://sam.gov under solicitation number 36C24425R0090. By registering at SAM, prime contractors, suppliers and subcontractors will have access to download Scope of Work, solicitation and amendments.
(b) PHASE II ONLY Offerors shall submit a Proposal Guarantee. This is only required for the Phase II part of solicitation. A proposal guarantee is required in an amount not less than 20 percent of the bid price but shall not exceed $3,000,000.00. Bid Bond is to be executed on a SF 24. Failure to furnish the required bid guarantee on the proper form and amount, by the time set for the opening of bids, will require rejection of the bid in all cases except those listed in FAR 28.101-4, and may be cause for rejection even then.
(c) The bidder to whom award is made will be required to furnish two (2) bonds, a Payment Bond to be executed on the SF 25A and a Performance Bond to be executed on the proper SF 25, each in the penal sum as noted in the General Conditions of the Specification. Copies of the SF 25 and SF 25A can be obtained upon application to the issuing office
(d) In accordance with FAR 36.204 the magnitude of construction is between $250,000.00 and $500,000.00.
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
PART I – General A Scope
1. This Request for Proposal (RFP) is issued as a Two-Phase Design-Build procurement (Reference FAR 36.3). Proposals will be evaluated in Phase I to determine which offerors will submit proposals for Phase II. A maximum of three (3) offerors will proceed to Phase II unless the contracting officer determines that a number greater than three (3) is in the Government’s interest and is consistent with the purposes and objectives of this Two-Phase Design Build Project. The Phase II RFP, in the form of an amendment to this original solicitation, will be issued only to those successful offerors determined to be most highly qualified from Phase I. One (1) contract will be awarded using competitive negotiation procedures.
2. This is a Design-Build project to Renovate Prosthetic lab, which is located on the Altoona VAMC Campus at 2907 Pleasant Valley Blvd, Altoona PA 16602 The attached Scope of Work (SOW) fully describes the requirement.
B Source Selection Procedures
1. Source Selection Overview: In accordance with FAR 15.3, the objective of source selection is to select the proposal that represents the best value. A contracting officer is designated as the source selection authority (SSA) unless the agency head appoints another individual. The SSA establishes an evaluation team that includes appropriate contracting, legal, and technical expertise to ensure a comprehensive evaluation of offers. The award decision is based on evaluation factors and significant sub-factors that are tailored to the acquisition. The factors represent the key areas of importance and emphasis to be considered in the source selection decision; and support meaningful comparison and discrimination between and among competing proposals.
2. Evaluation: The proposal evaluation is an assessment of the proposal and the offeror’s ability to perform the prospective contract successfully. The technical, price, and source selection boards will evaluate competitive proposals and then assess their qualities solely on the factors and sub-factors specified in the solicitation. Evaluations may be conducted using any rating method or combination of methods, including color or adjectival ratings, numerical weights, and ordinal rankings. The relative strengths, deficiencies, significant weaknesses, and risks supporting proposal evaluation shall be documented in the contract file.
3. Past Performance: Past performance information is one indicator of an offeror’s ability to perform the contract successfully. The currency and relevance of the information, source of the information, context of the data, and general trends in contractor’s performance shall be considered. Those deemed less than satisfactory will be eliminated. Relative information at Altoona VAMC, including previous final CPARS ratings and/or personal working knowledge that is relative, shall also be considered. Relative information at Altoona VAMC, including previous (within the past 5 years) final CPARS ratings and/or personal working knowledge considered relative by the VA’s, shall also be considered. This comparative assessment of past performance information is separate from the responsibility determination required under FAR Subpart 9.1.
4. Tradeoff Source Selection: If tradeoffs are to be performed by the Source Selection Evaluation Board, the source selection records shall include an assessment of each offeror’s ability to accomplish the technical requirements; and a summary, matrix, or quantitative ranking, along with appropriate supporting narrative, of each technical proposal using the evaluation factors.
5. SSA’s Final Decision: The SSA’s decision shall be based on a comparative assessment of proposals against all source selection criteria in the solicitation. While the SSA may use reports and analyses prepared by others, the source selection decision shall represent the SSA’s independent judgment. The source selection decision shall be documented, and the documentation shall include the rationale for any business judgments and tradeoffs made or relied on by the SSA, including benefits associated with additional costs. Although the rationale for the selection decision must be documented, that documentation need not quantify the tradeoffs that led to the decision.
C Source Selection for this procurement:
1. Phase I:
a Phase I of this procurement will result in a narrowing of offerors to a maximum of three (3) firms (unless the contracting officer determines that a number greater than three (3) is in the Government’s interest and is consistent with the purposes and objectives of this two-phase design build project) based on the following technical evaluation factors listed in Equal order of importance:
1. Technical Experience
(a) Sub-factor 1A: Project Experience
(b) Sub-factor 1B: Personnel Experience
2. Technical Approach
3. Past Performance
2. Phase II:
a The Phase I successful offerors will receive a Phase II Request for Proposal (RFP). During Phase II, a pre-proposal conference and site visit will be held at Altoona VAMC. The Phase I factors are not to be resubmitted in Phase II; however, the cumulative rating from the Phase I factors carries through to Phase II and is as equal in importance to Phase II, Factor 4 for proposal evaluation. Phase II evaluation technical factors (Factors 4 – 6) are listed below in Equal order of importance. The Phase I and Phase II technical evaluation factors, when combined, are weighted greater than price.
4. Technical Solution
5. Construction Management:
(a) Sub-factor 5A: Ability to Staff Project
(b) Sub-factor 5B: Management Approach
(c) Sub-factor 5C: Capability to Perform
6. Schedule
7. Price
3. The Government reserves the right to reject any or all proposals at any time prior to award; to negotiate with any or all offerors; to award the contract to other than the offeror submitting the lowest total price; and to award to the offeror submitting the highest technically rated or the lowest total price proposal; and to award to the offeror submitting the proposal determined to be the most advantageous best value to the Government. Offerors are advised an award may be made in Phase II without discussion or any contact concerning the proposals received. Offerors should not assume that they would be contacted or afforded an opportunity to qualify, discuss, or revise their proposals. However, the Government reserves the right to clarify certain aspects of proposals or conduct discussions providing an opportunity for the offeror to revise its proposal.
PART IA – Pre-Proposal Conference
· A pre-proposal conference will be held on a date to be determined at the Altoona VAMC
· A site walk through will be conducted. Please be advised that there will only be one site visit per phase I offerors. Offerors are highly encouraged to attend the site visit. There may be a second site visit available for Phase II offerors, as determined by the Contracting Officer.
PART IB – Selection Criteria A General: Phase I Proposals will be evaluated to determine the most highly qualified offerors to advance to Phase II. A responsibility determination will be made in accordance with FAR Part 9.1, Responsible Prospective Contractors. Phase II Proposals will be evaluated, and award will be made on the basis of both price and technical considerations most advantageous to the VA as per FAR Part 15.101(a), tradeoff, as the Government may consider award to other than the lowest priced offeror or other than the highest technically rated offeror if it is in the best interest of the Government.
B TECHNICAL EVALUATION FACTORS, PHASE I & PHASE II: The basis of evaluation for the Phase I & Phase II technical evaluation factors is located within Part III, Section C with each evaluation factor. The Phase I factors are not to be resubmitted in Phase II; however, the cumulative rating from the Phase I factors carries through to Phase II and is greater in importance to Phase II, Factors 4-6 for proposal evaluation. Phase II evaluation technical factors (Factors 4 – 6) are listed below in equal order of importance. The Phase I and Phase II technical evaluation factors, when combined, are more heavily weighted than price. Offerors are advised the Tradeoff process is determined to be in the best interest of the Government and award may be made to other than the lowest priced offeror or other than the highest technically rated offeror (Reference FAR 15.101-1).
C Phase II Non-Technical Factor 7, Price
1. Offerors are advised the Tradeoff process (Reference FAR 15.101-1) is determined to be in the best interest of the Government and award may be made to other than the lowest priced offeror or other than the highest technically rated offeror a The Government reserves the right to make price/technical trade-offs that are in the best interest and advantageous to the Government in accordance with FAR 15.101, Tradeoff.
b Price will be evaluated on the basis of its realism, and/or reasonableness, and acceptability to the Government subject to availability of funds. Pricing shall be entered onto the Offer Schedule located within the SF1442.
c Analysis will be performed using one or more of the following techniques to ensure a fair and reasonable price:
1. Comparison of proposed prices received in response to the RFP.
2. Comparison of proposed prices with the Independent Government Cost Estimate
3. Comparison of proposed prices with available historical information.
4. Comparison of market survey results
PART II – RESPONSIBILITIES
A Design-Build (DB) Team:
1. The DB team includes all Joint Ventures (J/V) partners (if applicable), consultants, and subcontractors to the one firm. The DB team shall provide Architectural and Engineering disciplines for the preparation of construction documents, and construction contractor capabilities for construction of the project. When submitting proposal qualifications, it is important to include information for the DB team
2. The RFP documents are intended to define existing conditions, certain required items, and design parameters to be included in the project. It is the DB Team’s responsibility to complete the documents and construction in a manner consistent with the intent of the RFP documents within the required time period (contract length).
PART III – PROPOSAL REQUIREMENTS
A General
1. Phase I proposals shall be based on solicitation documents issued for RFP Solicitation Number 36C24425R0090. Proposals will be in the format stipulated in Part III, C 1.
a Phase I proposals shall be received by the date and time specified in the RFP. Proposals that are received after this time shall be late and may not be considered. There will be no public opening of the proposals.
b Where to submit: All proposals will be submitted electronically to the Contract Specialist: Jeffrey.pruett@va.gov c Phase I will be evaluated for technical qualifications only. Offeror shall separately tab each section (see Table 1 provided in Section C1). Each section must therefore be labeled with the offeror's organization, business address, and correct VA Project Number. Offerors shall affix their names and return addresses on their envelope/packaging. See Section C1 for submission requirements Phase II proposals shall be based on solicitation documents issued to the Phase I offerors determined to be the most highly qualified ONLY. Proposals will be in the format stipulated in Phase II, Section A.
The due date, time, and submission address of Phase II proposals will be given within the Phase II RFP, issued only to qualified offerors.
Note: Phase II evaluation will request technical and price proposals. Offeror shall separately tab each section (See Table 2 provided in Phase II, Section A1).
B Proposal Revisions (FAR 52.215-1)
1. If determined to be necessary, proposal revisions may be requested from the offerors determined to be in the competitive range. The Contracting Officer will identify those offerors in accordance with the selection criteria identified in the request for proposal. Revised proposals will be due at a time and place to be determined.
2. Please be advised that the Government intends to evaluate Phase I & Phase II and award a contract from Phase II proposals without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.
C PHASE I – TECHNICAL PROPOSAL SUBMISSION REQUIREMENTS
1. The Phase I proposal shall address the evaluation factors listed at Part III, C 2-4. Pay close attention to page limitations set within the technical factors, as submission beyond the limit will not be evaluated. Offeror will submit a PDF document named “PHASE I TECHNICAL PROPOSAL”. Evaluation will be based upon the criteria in Part I, Section B. Table 1 provides a checklist that should be included in the front of the technical proposal.
PHASE I TECHNICAL PROPOSAL SUBMITTAL CHECKLIST
RFP: 36C24425R0090
Project Title: 503-25-107, Renovate Prosthetic Lab DB
| INTRO PAGE |
| First page MUST clearly indicate: |
Name and Address of Offeror Business Arrangement (Joint Venture or Teaming Arrangements clearly identified) must include copy of small business joint venture agreement.
Contact Name and Phone Number Email Address DUNS Number CAGE Code Tax Identification Number
| TAB 1 |
| Factor 1,Technical Experience, Sub-factor 1A: Project Experience (with supporting documentation per RFP) |
| TAB 2 |
| Factor 1, Technical Experience, Sub-factor 1B: Personnel Experience (with supporting documentation per RFP) |
| TAB 3 |
| Factor 2, Technical Approach (with supporting documentation per the RFP) |
| TAB 4 |
| Factor 3, Past Performance (with supporting documentation per RFP) If Offeror has PPIRS reports, printed copies of these reports shall be included in this section. |
Table 1: Phase I Technical Proposal Submittal Checklist
2. Phase I, Factor 1, Technical Experience – Factor 1 consists of two sub-factors: 1A, Project Experience and 1B, Personnel Experience. The evaluation of sub-factors 1A and 1B are in equal order of importance to the determination of Factor 1 rating a Sub-factor 1A: Project Experience:
1. Submission Requirements: Submit a maximum of five (5) completed construction projects within the last seven (7) years by a Design Build contract and/or contract similar in size and scope to this project. (Design Build as defined by the VA, see article A1.2). The offeror shall demonstrate their experience on relevant Design/Build and projects that are similar in size, scope, and complexity to the RFP. Scoring will be more favorable if all criteria are met. Indicate the number of design/build projects construction contractor and AE have completed together. Page limitation: One page (in 12-point Times New Roman font) for each project. In describing project design and construction experience, provide the following information:
· Project title, location and brief description including the building use (Medical Facility, Major Building Renovation, etc.) and contracting method (design build, design bid construct, CM at risk etc.).
· Project owner, owner’s point of contact and telephone number of owner’s contact person.
· Project Design Architect and Engineers (consultants if utilized) and name and telephone number of contact person(s).
· Project Prime Contractor and Major Subcontractors and name and telephone number of contact person(s). Note each firm and managing persons (project manager/superintendent/foreman as the case may be) also proposed for this solicitation.
· Project Statistics including start and completion dates (original vs. actual) for design and construction; cost (original vs. actual with brief explanation of what is included in the cost); square footage; foundation type; number of levels; and any awards (prizes) received.
b Sub-factor 1B: Project Personnel Experience (Specialized experience and technical competence)
1. Submission Requirements: The offeror shall demonstrate the relevant experience of key project personnel who will be assigned to this project. Page limitation: One page (in 12-point Times New Roman font) for each person.
· Biographical data shall include the following:
· Name of individual.
· Company of employment.
· Company position title.
· Years with the company.
· Describe work experience with projects that were completed by the design build process, where medical facilities and the company (by name) they worked for when involved in the project.
· An indication of which (if any) projects submitted under Technical Experience (above) the individual participated in and what the individual’s responsibility was for that project.
· Supply this biographical data for key personnel for at least the following: (Note if one individual is proposed for more than one position listed):
· Overall Senior Project Manager
· Design Project Manager
· Construction Project Manager.
· Architect/Engineer Field Representative.
· Construction Superintendent
· Quality Control Manager c Basis of evaluation: The basis of evaluation will include the offeror’s experience in performing relevant construction projects as defined in the solicitation submittal requirements. The assessment of the offeror’s relevant experience will be used as a means of evaluating the capability of the offeror to successfully meet the requirements of the RFP. Proposals that fail to provide required and complete information will be rated lower. Relevant projects where the Prime and Sub-contractors have previously worked together will receive a higher rating. Relevant projects that demonstrate design build experience will receive a higher rating. Offerors providing more successful projects (maximum 10) of similar size and scope will be more favorably rated.
3. Phase I, Factor 2, Technical Approach a Submission Requirements: Provide a brief narrative (page limitation: two pages (in 12-point Times New Roman font) for brief narrative) describing the offeror’s method to manage the project to achieve design and construction objectives as described in the RFP. Include at a minimum all aspects covered in the scope of work. The following shall be included in the narrative:
1. Design Approach: Describe the means and methods to be implemented for an efficient, effective design.
2. Construction Approach: Describe the techniques and methods for this Construction Project to include coordination with the design packages, projected project timelines, and coordination of work.
b Basis of Evaluation: The basis of evaluation will include the offeror’s proposed technical approach for this design build project as defined in the solicitation submittal requirements. The assessment of the offeror’s method to manage the project shall be used as a means of evaluating the offeror’s ability to successfully meet the requirements of the RFP.
4. Phase I, Factor 3, Past Performance (Client Satisfaction) a Submission Requirements: Offerors shall provide no more than up to three (3) references from current/past clients of the contractor (within the past five (5) years) for projects similar in size and scope. References shall complete the attached past performance questionnaire and return directly to the Contracting Officer as indicated in the questionnaire. Unless offeror obtains confirmation of submission of past performance questionnaires from his/her clients, offerors should ensure their quote contains full contact information for at least two (2) references. Past performance questionnaires shall be received by the due date/time stated in the RFP. The contact's responses will be scored based on the following elements with projects participated in by the Prime (Construction Contractor and Architect firm) being weighted more heavily than projects participated in by consultants, sub-contractors and individuals.
1. In addition to the above, the VA may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS) using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/ affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror. The VA may use personal knowledge of projects, as well. While the VA may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the offeror.
b Basis of Evaluation: The basis of evaluation will be the degree to which past performance evaluations and all other past performance information reviewed by the Government (e.g., CPARS, FAPIIS, eSRS, performance recognition documents, and information obtained from any other source) reflect a trend of satisfactory performance considering 1) a pattern of successful completion of tasks; 2) a pattern of deliverables that are timely and of good quality; 3) a pattern of cooperativeness and teamwork with the Government at all levels (task managers, contracting officers, auditors, etc.); 4) tasks that are identical to, similar to, or related to the task at hand; and 5) fiscal responsibility of Government funds. If the offeror lacks a record of relevant or available past performance history or there is no expectation of either successful or unsuccessful performance based on the offeror’s past performance record, the past performance evaluation will be given a neutral rating.
D
PHASE II
FOR SUCCESSFUL OFFERORS FROM PHASE I
Successful Phase I offers will be notified to submit the Phase II Technical and Price Proposals. An amendment will be issued from this solicitation ONLY to those three (3) (or otherwise noted) successful offerors from phase I to submit phase II information.
DO NOT SUBMIT PHASE II FACTORS WITH PHASE I!!
PHASE II – TECHNICAL AND PRICE SUBMISSION REQUIREMENTS - FOR SUCCESSFUL OFFERORS FROM PHASE I ONLY A Phase II, Technical Proposal Requirements: The Phase II Proposal shall address the evaluation factors listed C4.A.1 - 4. Offeror is required to prepare and submit a PDF of the following technical evaluation factors in a separate PDF “PHASE II TECHNICAL PROPOSAL”. Evaluation scores will be based upon the criteria in Part IA, section B.
Table 2 provides a checklist that should be included in the front of the technical proposal.
PHASE II, TECHNICAL PROPOSAL SUBMITTAL CHECKLIST
RFP: 36C24425R0090
| INTRO PAGE |
| First page MUST clearly indicate: |
Name and Address of Offeror Business Arrangement (Joint Venture or Teaming Arrangements clearly identified) must include copy of small business joint venture agreement.
Contact Name and Phone Number Email Address DUNS Number
| TAB 1 |
| Factor 4, Technical Solution (with supporting documentation per RFP) |
| TAB 2 |
| Factor 5, Construction Management, Sub-factor 5A: Ability to Staff (with supporting documentation per RFP) |
| TAB 3 |
| Factor 5, Construction Management, Sub-factor 5B: Management Approach(with supporting documentation per RFP) |
| TAB 4 |
| Factor 5, Construction Management, Sub-factor 5C: Capability to Perform |
| TAB 5 |
| Factor 6, Schedule (with supporting documentation per RFP) |
Table 2: Phase II Technical Proposal Submittal Checklist
1. Phase II, Factor 4, Technical Solution:
a Submission Requirements: Provide detailed narrative not to exceed 40 double-sided pages of conceptual design addressing requirements of the RFP (12-pt Times New Roman font, Single spaced). The evaluation of the conceptual facilities design will be based on the criteria set forth in the project program contained in the RFP. Complying with and exceeding project program requirements by providing HVAC, plumbing, electrical, mechanical, and architectural systems that provide quality of life, energy savings, and sustainability will be most highly rated. Offerors are strongly encouraged to highlight the latest technological advancements in heat pump solutions, such as closed-loop, water-to-water geothermal heating and cooling systems. Include in the discussion, but do not limit to the following:
1. Conceptual drawings shall be provided to supplement the narrative.
2. Design approach, with emphasis on efficient and sustainable operation, electrical and mechanical design, appropriate equipment sizing, and DDC controls integration.
3. HAZMAT identification, abatement, and physical building modifications.
(a) Indicate how disruptions to occupants will be minimized and how process will work to correct.
4. Training for VAMC engineering personnel
5. Warranties b Basis of Evaluation: Phase II, Factor 4, Technical Solution: The basis of evaluation will include the narrative and conceptual drawings considering the extent to which the Offeror demonstrates a clear understanding of the architectural and engineering requirements of the project. The Government will evaluate the effectiveness of the construction and design team’s technical solution to determine the likelihood that the work will be performed in accordance with the technical requirements of the RFP.
2. Phase II, Factor 5, Construction Management: Factor 5 consists of three Sub factors: 5A: Ability to Staff Project; 5B: Management Approach; and 5C, Capability to Perform. The evaluation of sub factors 5A, 5B, & 5C are of equal importance to the determination of Factor 5 rating.
a Sub factor 5A: Ability to Staff Project:
1. Submission Requirements:
Demonstrate the ability to staff the project for the scope of work required; describe how the Design-Build Team will be structured, i.e., how many firms are involved and the responsibility of each firm for this Project. Indicate the extent to which resources and personnel will be drawn from various sources: in-house, subcontractor, and/or separate consultant firms. Describe D/B management approach, including but not limited to management of multiple designers and subs/trades working in parallel on several different facilities at one time.
Project Personnel Experience (Specialized experience and technical competence proposed in Phase I). The offeror shall demonstrate the relevant experience of Phase I proposed key project personnel who will be assigned to this Project.
Position that the individual will hold in regard to this Contract/Project team, description of duties and what percentage of the individual’s time would be committed to the project during both the design and construction phases.
Describe job related educational experience including degrees, certificates, etc., and granting institutions.
2. Sub-factor 5B, Management Approach:
(a) Submission Requirements: The offeror shall demonstrate the following, relevant to the subject procurement.
· Project Delivery Approach - Include statements concerning:
· Elements for Successful Partnering: Communication, Commitment and Conflict Resolution.
· Proposed Design Period Peer Review technical/administrative by VA & RFP AE)
· Project Organizational Chart and Narrative - Include team members submitted under Project Personnel Experience above. Clearly describe the prime responsible firm (or firms if a J/V) and individuals as well as the roles and responsibilities of individuals proposed as consultants and sub-contractors. Provide a list of all consultants and all proposed major subcontractors, including telephone number, address, and name of contact.
· Offeror shall clarify its intended uses of the portions of the site indicated to be available to the contractor elsewhere in this RFP for materials staging, temporary trailer offices, employee parking, and other activities as shown in the design solution material.
3. Sub factor 5C, Capability to Perform:
(a) Submission Requirements:
i Provide the offeror's total bonding capacity (from offeror’s surety), current available bonding capacity and expected available capacity in 2021.
ii Provide the offeror's current workload and availability of staff proposed in Phase I, Factor 2 Project Personnel Experience to manage the project. Include project schedules for current and pending projects, as well as the anticipated impact of this Project on those schedules and staffing plans.
(b) Basis of Evaluation: The basis of evaluation will include the assessment of the offeror’s ability to staff, offeror’s management approach, and offeror’s capability to perform the project as defined in the solicitation submittal requirements. The assessment of the firm and proposed personnel’s experience will be used as a means of evaluating the relative capability of the offeror’s personnel to successfully meet the requirements of the RFP.
3. Phase II, Factor 6, Schedule:
a Submission Requirements:
1. The progress schedule will be in a time scaled bar graph format. The horizontal axis will be scaled for time beginning with the Notice to Proceed and concluding with contract completion. The vertical axis will show the milestones and major portions of the contract work. All schedule items on the critical path will show a start date and a completion date. The detailed schedule, will indicate specific tasks with dates for each step of the process including, refer to Specification Section 01 32 16.17 Bar Chart Design Period: The design period sub periods (i.e., first and second reviews, other meetings, internal QUALITY ASSURANCE /QUALITY CONTROL plan reviews, etc.).
Construction Period: Mobilization; Demolition method and sequencing; Demolition; Preparing areas for construction; Utility installation; Procurement and installation of equipment; Timing of relocation of existing equipment; Site utilities, Tests and final inspection. Indicate each Phase.
General Project Delivery Schedule and Narrative - Show relationships between construction document development/completion (including required review activities) and construction activities for (at a minimum, utility relocation, excavation, substructure, structure, exterior façade, interior finishes, building systems, and site development.
2. Schedule shall indicate all elements of the design and construction timeline, from notice to proceed (NTP) (in order to establish a common baseline among all offerors, assume NTP date of July 18th, 2025) to contract completion, including but not limited to preconstruction meetings and submittals, design, and any SHPO permits and approvals, utilities, demolition, material lead times, utility installations, abatement, testing/adjusting/balancing, commissioning, construction and post-construction submittals, close-out.
3. The offeror shall specify how much allowance has been made for bad weather in the schedule, the days of the week and the hours of construction operations during each phase of the work, and the percentage of contract completion that will be achieved at the end of each month of the contract.
4. Short Schedules - The offeror will provide a written commitment as to the time frame (number of days after receipt of the notice to proceed) within which the offeror will guarantee completion. The maximum anticipated completion of this project (including design and construction of the entire project) is indicated in the Scope of Work. Shorter schedules (must include required Government review times), if obtainable, may receive more favorable scoring. The offeror’s schedule will establish the contract completion date and will be incorporated into the award. The assessment of liquidated damages will be based on that date.
b Basis of Evaluation: The basis of evaluation will include the bar graph detailed schedule considering the extent to which the offeror demonstrates a clear understanding of the architectural and engineering requirements for the construction period and general project delivery. The Government will evaluate the likelihood that the work will be performed in accordance with the stated schedule given the technical requirements of the RFP.
4. Phase II, Non-Technical Factor 7, Price a Submission Requirements: The offeror is required to prepare and submit the following price documents in as a PDF labeled “PRICE PROPOSAL The price proposal shall be submitted as a separate file from the technical proposal. The price proposal shall be tabbed using Table 3: Price Proposal Binder Submittal Checklist. Table 3 provides a checklist that should be included in the front of the technical proposal.
PRICE PROPOSAL SUBMITTAL CHECKLIST
RFP: 36C24425R0090
| INTRO PAGE |
| First page of TAB 1 MUST clearly indicate: |
Name and Address of Proposer Business Arrangement (Joint Venture or Teaming Arrangements clearly identified) Contact Name and Phone Number Email Address DUNS Number
| TAB 1 |
| First page of TAB 1 MUST contain requirements identified in: |
FAR 52.215-1, Instruction to Offerors-Competitive Acquisition Signed VAAR 852.219-75, Notice on Limitations of Subcontracting
| TAB 2 |
| Executed Solicitation, Offer and Award Forms (SF1442) including supplemental pages with pricing complete on the Offer Schedule. Offeror shall complete Blocks 14 – 20C. Signed acknowledgement of all solicitation amendments. |
| TAB 3 |
| Executed Bid Guarantee (SF-24) |
| TAB 4 |
| Printed copy of “Representations and Certifications” as submitted on https://www.sam.gov/portal/public/SAM of the offeror |
Table 3: Phase II Price Proposal Submittal Checklist b Basis of Evaluation: Phase II, Factor 7, Price: Price will be evaluated on the basis of its realism, and/or reasonableness, and acceptability to the Government subject to availability of funds. Pricing shall be entered onto the Offer Schedule located within the SF1442. Analysis will be performed using one or more of the below techniques to ensure a fair and reasonable price:
1. Comparison of proposed prices received in response to the RFP.
2. Comparison of proposed prices with the Independent Government Cost Estimate.
3. Comparison of proposed prices with available historical information
2.1 PARTNERING
(a) In order to most effectively accomplish this contract, the Government proposes to form a cohesive partnership with the Contractor and its subcontractors. This partnership would strive to draw on the strengths of each organization in an effort to achieve a quality project, done right the first time, within the budget and on schedule.
(b) This partnership will be totally voluntary. The focus of partnering is to build cooperative relationships with the private sector and avoid or minimize disputes and to nurture a more collaborative ethic characterized by trust, cooperation and teamwork. Partnering is defined as the creation of a relationship between the owner and contractor that promotes mutual and beneficial goals. It is a non-contractual, but formally structured agreement between the parties. The ultimate goal is the elimination of the "us" versus "them" thinking, and formation of a "we" mentality for the benefit of the project.
(c) Any cost associated with effectuating this partnership will be agreed to by both parties and will be shared equally with no change in contract price.
2.2 52.201-1 ACQUISITION 360: VOLUNTARY SURVEY (SEP 2023)
(a) All actual and potential offerors are encouraged to provide feedback on the preaward and debriefing processes, as applicable. Feedback may be provided to agencies up to 45 days after award. The feedback is anonymous, unless the participant self-identifies in the survey. Actual and potential offerors can participate in the survey by selecting the following link: https:// www.acquisition.gov/360.
(b) The Contracting Officer will not review the information provided until after contract award and will not consider it in the award decision. The survey is voluntary and does not convey any protections, rights, or grounds for protest. It creates a way for actual and potential offerors to provide the Government constructive feedback about the preaward and debriefing processes, as applicable, used for a specific acquisition.
(End of Clause)
2.3 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.4 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage…