Duct Work AS_BUILTS reference drawings.pdf

PDF 10 MB Posted

Attached to
Y1DA--503-25-107 Renovate for Prosthetics Lab design build | NCO 4 Construction West (VA-25-00072814)
Solicitation number
36C24425R0090
Issued by

About this file

These are mechanical ductwork record documents for Building 1 through Building 32 at the James E. Van Zandt Veterans Administration Medical Center in Bel Air, Maryland. The detailed HVAC drawings, dated 29 June 2022, outline comprehensive duct cleaning and fire damper testing requirements across multiple buildings and floors. Key specifications include:

The project involves cleaning all existing supply, return, exhaust, and outside air ductwork, with contractors required to test all fire and smoke dampers, create final reporting documentation, and identify any access door damages. Work is to be performed with strict occupancy considerations, with specific time restrictions for different buildings and floors (e.g., work in Building 1's pharmacy areas limited to 3:00 PM to 10:00 PM, Monday through Friday). Electrical safety protocols mandate de-energizing fire/smoke dampers, implementing lockout/tagout procedures, and shutting down equipment prior to cleaning and testing. The documents provide detailed mechanical legends, floor plans, and notes for Buildings 1-32, with specific scoping for each building's unique HVAC infrastructure.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. THE MECHANICAL CONTRACT DRAWINGS ARE DIAGRAMMATIC AND ARE INTENDED TO INDICATE SCOPE AND THE GENERAL ARRANGEMENT OF THE SYSTEMS. WHERE APPLICABLE THE FOLLOWING NOTES SHALL APPLY TO ALL MECHANICAL

SYSTEMS.

2. THE CONTRACTOR SHALL FULLY COORDINATE THE MECHANICAL WORK WITHIN ITSELF AND WITH THE WORK OF ALL

OTHER TRADES TO PROVIDE COMPLETE AND OPERABLE SYSTEMS WITHOUT INTERFERENCES.

3. PROVIDE APPROVED FIRE STOPPING MATERIAL AROUND ALL DUCTWORK PENETRATIONS (NEW AND EXISTING) THROUGH FIRE RATED FLOORS AND WALLS. PROVIDE FIRE DAMPERS AT ALL DUCT PENETRATIONS THROUGH FLOORS AND FIRE

RATED WALLS AND FIRE/SMOKE DAMPERS AT ALL PENETRATIONS THROUGH SHAFT ENCLOSURES.

4. PROVIDE ACCESS PANELS WHERE REQUIRED FOR ADEQUATE ACCESS TO ALL CONCEALED EQUIPMENT, DAMPERS AND

CONTROLS.

5. ALL DUCT SIZES REFER TO INTERNAL FREE AREA. REFER TO DRAWINGS AND SPECIFICATIONS FOR INTERNAL INSULATION

AND SOUND LINING PRIOR TO FABRICATION.

6. ALL DUCTWORK SHALL BE CONSTRUCTED OF RIGID SHEET METAL UNLESS OTHERWISE NOTED.

7. PATCH AND SEAL ALL REMAINING OPENINGS (NEW AND EXISTING) THROUGH FLOORS, CEILINGS, AND WALLS RESULTING FROM DEMOLITION OR NEW WORK WITH MATERIALS AND FINISHES TO MATCH EXISTING CONSTRUCTION AND FIRE

RATING.

8. AS AN INTEGRAL PART OF THESE DOCUMENTS, THE CONTRACTOR SHALL REFER TO THE SPECIFICATIONS FOR

ADDITIONAL INFORMATION.

9. CONTRACTOR SHALL USE CARE WHEN PERFORMING SELECTIVE DEMOLITION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO BUILDING FINISHES, EQUIPMENT, FURNITURE, STRUCTURE, AND MECHANICAL/ELECTRICAL SYSTEMS AND EQUIPMENT. SHOULD ANY DAMAGE OCCUR THE CONTRACTOR SHALL RESTORE DAMAGED AREA/ITEMS TO ORIGINAL

CONDITION TO MEET THE OWNER'S SATISFACTION.

10. CONTRACTOR SHALL NOTIFY AND COORDINATE WITH THE OWNER ANY UTILITY OUTAGES. OWNER SHALL BE GIVEN A

MINIMUM OF 1 WEEKS NOTICE FOR ANY OUTAGES.

11. HVAC SHALL BE MAINTAINED TO ALL AREAS OUTSIDE OF THE CURRENT PHASE OF THE RENOVATED AREA AT ALL TIMES.

PROVIDE TEMPORARY CONNECTIONS AS REQUIRED TO COORDINATE OUTAGES WITH THE OWNER A MINIMUM OF 1 WEEK

IN ADVANCE.

12. DEMOLITION AND NEW WORK THAT WILL RESULT IN DOWN TIME OF SERVICES (HVAC, PLUMBING, ELECTRICAL, ETC.)

SHALL BE PERFORMED AT PREMIUM TIME AS REQUIRED TO MINIMIZE DOWN TIME TO ADJACENT SPACES. COORDINATE

ALL OUTAGES WITH OWNER.

13. SCHEDULE ALL WORK IN OCCUPIED SPACES WITH OWNER AT LEAST TWO (2) WEEKS PRIOR TO CONSTRUCTION.

14. CONTRACTOR SHALL REMOVE, REINSTALL AND/OR RELOCATE ANY EXISTING CONDUIT, PIPING SYSTEMS, DUCTWORK, TELECOMMUNICATIONS WIRING, HANGERS/SUPPORTS, ETC. AS REQUIRED TO ACCOMPLISH THE MECHANICAL WORK

INDICATED.

15. REFER TO SPECIFICATIONS FOR DUCT CLEANING AND FIRE / SMOKE DAMPER TESTING REQUIREMENTS.

16. COORDINATE SMOKE DAMPER TESTING WITH EXISTING FIRE ALARM SYSTEM.

MECHANICAL GENERAL NOTES MECHANICAL LEGEND

AD

F/SD

FD

MOD

12x20

D

R

OED

Ø

CHANGE IN DUCT ELEVATION

(R-RISE, D-DROP)

EXHAUST DUCT UP

(DASHED LINES FOR DOWN)

RETURN DUCT UP

(DASHED LINES FOR DOWN)

SUPPLY AIR & OUTSIDE AIR DUCT UP

(DASHED LINES FOR DOWN)

COMBINATION FIRE/SMOKE DAMPER WITH

SMOKE DETECTORS AND ACCESS PANEL

FLEXIBLE DUCT

DOUBLE THICKNESS TURNING VANES

EXISTING DUCTWORK

DUCTWORK TO BE REMOVED

OPEN ENDED DUCT

NEW DUCTWORK

DUCT TRANSITION ROUND TO RECTANGULAR

DUCT TRANSITION

DUCT SIZE (FIRST FIGURE IS SIDE SHOWN)

LINEAR SLOT DIFFUSER

BALANCING DAMPER

MOTOR OPERATED DAMPER

FIRE DAMPER WITH ACCESS PANEL

ACCESS DOOR

LIMIT OF DEMOLITION

CONNECT TO EXISTING

ABOVE FINISHED FLOOR AFF

AIR HANDLING UNIT AHU

AUTOMATIC TEMPERATURE CONTROLS ATC

BUILDING AUTOMATION SYSTEM BAS

BRITISH THERMAL UNIT BTU

BRITISH THERMAL UNITS PER HOUR BTUH

CAPACITY CAP

CUBIC FEET PER MINUTE CFM

CONNECT TO EXISTING CX

DIAMETER DIA

DOWN DN

DIFFERENTIAL PRESSURE SENSOR DPS

DRAWING(S) DWG

EXHAUST AIR EA

EXHAUST FAN EF

ENERGY MANAGEMENT CONTROL SYSTEM EMCS

EXTERNAL STATIC PRESSURE ESP

EXISTING TO REMAIN EX

FEET PER MINUTE FPM

FEET FT

HEIGHT H

INCH(ES) IN

LENGTH L

POUNDS LBS

MAXIMUM MAX

THOUSAND BRITISH THERMAL UNITS PER HOUR MBH

MINIMUM MIN

OUTSIDE AIR OA

OPEN END DUCT OED

POUNDS PER SQUARE INCH PSI

QUANTITY QTY

RETURN AIR RA

RETURN AIR FAN RAF

ROOF TOP UNIT RTU

REMOVE EXISTING RX

SUPPLY AIR SA

STATIC PRESSURE SP

TESTING AND BALANCING TAB

TOTAL STATIC PRESSURE TSP

TYPICAL TYP

UNLESS OTHERWISE NOTED UON

VARIABLE AIR VOLUME VAV

WIDTH W

MECHANICAL ABBREVIATIONS

· BUILDING 1

7TH FLOOR

§ ALL WORK PERTAINING TO THE 7TH FLOOR TO BE DONE BETWEEN 4:30 PM AND 6:00 AM, MONDAY THROUGH

FRIDAY.

4TH, 5TH AND 6TH FLOORS

§ ALL WORK PERTAINING TO 4TH, 5TH, 6TH FLOOR COMMUNITY LIVING CENTER AREAS TO BE DONE BETWEEN 2 PM

AND 9 PM, MONDAY THROUGH FRIDAY, PROVIDED THE OUTSIDE AIR TEMP IS REASONABLE ENOUGH TO SHUT

DOWN THE AHU'S SERVING THESE FLOORS.

3RD FLOOR

§ ALL WORK PERTAINING TO THE 3RD FLOOR TO BE DONE BETWEEN 4:30 PM AND 6:00 AM, MONDAY THROUGH

FRIDAY.

2ND FLOOR

§ ALL WORK PERTAINING TO THE 2ND FLOOR TO BE DONE BETWEEN 4:30 PM AND 6:00 AM, MONDAY THROUGH

FRIDAY.

1ST FLOOR

§ ALL WORK PERTAINING TO THE 1ST FLOOR TO BE DONE BETWEEN 4:30 PM AND 6:00 AM, MONDAY THROUGH

FRIDAY.

§ 1ST FLOOR PHARMACY AREAS (INCLUDING ROOMS 1F10, 1F10A-E, 1F44, AND 1F50) TO BE DONE BETWEEN 3:00 PM TO 10:00 PM, MONDAY THROUGH FRIDAY. NO ONE IS ALLOWED IN THE PHARMACY AREA AFTER 10PM. PHARMACY

COMPOUNDING AREA WITHIN PHARMACY WILL NOT BE CLEANED.

§ ALL WORK IN URGENT CARE CENTER AREAS ARE TO BE DONE BETWEEN 10:00 PM AND 6:00 AM, MONDAY

THROUGH FRIDAY.

BASEMENT

§ ALL WORK PERTAINING TO THE BASEMENT TO BE DONE BETWEEN 4:30 PM TO 6:00 AM, MONDAY THROUGH

FRIDAY.

§ ALL WORK PERTAINING TO BB15C PHARMACY CACHE AND BB15E PANDEMIC TO BE DONE BETWEEN 8:00 AM AND

4:30 AM, MONDAY THROUGH FRIDAY, AND WILL REQUIRE A COORDINATED ESCORT.

· BUILDING 2

§ ALL WORK TO BE DONE BETWEEN 4:30 PM TO 6:00 AM, MONDAY THROUGH FRIDAY.

· BUILDING 6

§ ALL WORK TO BE DONE BETWEEN 4:30 PM TO 6:00 AM, MONDAY THROUGH FRIDAY, AND WILL REQUIRE A

COORDINATED POLICE ESCORT.

· BUILDING 7

§ ALL WORK TO BE DONE BETWEEN 8:00 AM TO 4:30 PM, MONDAY THROUGH FRIDAY, AND WILL REQUIRE A

COORDINATED POLICE ESCORT.

· BUILDING 11 & 20

§ ALL WORK TO BE DONE BETWEEN 8:00 AM TO 4:30 PM, MONDAY THROUGH FRIDAY, AND WILL REQUIRE A

COORDINATED ESCORT.

· BUILDING 15

§ ALL WORK TO BE DONE BETWEEN 8:00 AM TO 4:30 PM, MONDAY THROUGH FRIDAY, AND WILL REQUIRE A

COORDINATED ESCORT.

· BUILDING 32

§ ALL WORK TO BE DONE BETWEEN 4:30 PM TO 6:00 AM, MONDAY THROUGH FRIDAY.

CONSTRUCTION HOURS PER BUILDING / AREA

GALV STEEL WALL SLEEVE

GALV STEEL BLADES WITH

INTERLOCKING JOINTS IN

GALV STEEL FRAME

REPLACEABLE FUSIBLE

LINK HOOK TO CINCH

DUCT

MIN 12"x12" DUCT

ACCESS PANEL

1 1/2"x1 1/2"x1/8" GALV STEEL

CONTINUOUS MOUNTING

ANGLE, BOLT TO WALL SLEEVE

WALL

FIRE STOP MATERIAL

WITH INCOMBUSTIBLE

US GYPSUM FIRE

PROOF MINERAL WOOL

"THERMOFIBER" SAFING

DUCT

STANDING "S" SLIP

(BREAKAWAY)

CONNECTION

NOTES: 1. FIRE DAMPERS TO HAVE BREAKAWAY JOINT BETWEEN COLLARS AND DUCT.

(COLLARS SHALL BE INTEGRAL WITH FIRE DAMPERS FRAME).

2. FIRE DAMPER SHALL BE U.L. LABELED.

3. GALVANIZED SLEEVE AND FRAME CONSTRUCTION SHALL BE MINIMUM 20

GA. SHOULD DUCT BE HEAVIER THAN 20 GAUGE, PROVIDE SLEEVE AND

FRAME TO MATCH DUCT CONSTRUCTION.

NO SCALE

HORIZONTAL DUCT FIRE DAMPER DETAIL1

BKM# 20069.01

Project Title

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

Drawing Title Date

Project No.

Drawing No.

Dwg. Of

Approved: Associate Director for Operations:

Approved: Director, Medical Center:

Drawn:Building No: Checked:

Location:

Additions:

Revisions:

1 5 6 7 8

21 3 4 5 6 7 8

A B

C D

E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot

DELLC

JOB No.

JAMES E. VAN ZANDT

VETERANS

ADMINISTRATION

MEDICAL CENTER

2 3 4

Consultants:Date

Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009

ARCHITECTURE

PLANNING

ENGINEERING

I CERTIFY THAT THESE DOCUMENT WERE PREPARED OR

APPROVED BY ME, AND THAT I AM A DULY LICENSED

ARCHITECT UNDER THE LAWS OF THE STATE OF

PENNSYLVANIA, LICENSE NUMBER ,

EXPIRATION DATE .

BURDETTE KOEHLER MURPHY

MECHANICAL / ELECTRICAL

CONSULTINTING ENGINEERING

6300 BLAIR HILL LANE SUITE 400

BALTIMORE, MARYLAND 21209

410.323.0600 - FAX 410.377.2543

& ASSOCIATES, INC.

COST ESTIMATING

12917 - 30TH AVENUE

PLATTSMOUTH, NEBRASKA 68048

402.298.8260 - FAX 402.298.8290

BUILDING COST CONSULTANTS

CLEAN ALL DUCTS AND

TEST DAMPERS

12/15/2020

503-19-101

200501D

AR

L:

G :\2

.0 1\

D ra w in gs \A ca d\

AS

B

U

IL

T\ M

\H

Pl ot te d

By : S ve tla na Y ur id its ki y | 5

/1 7/

:1

PM

RECORD DOCUMENTS - 29 JUNE 2022

THESE RECORD DOCUMENTS HAVE BEEN PREPARED ON THE BASIS OF INFORMATION FURNISHED

BY OTHERS. THE ARCHITECT / ENGINEER WILL NOT BE RESPONSIBLE FOR ERRORS OR OMISSIONS

WHICH HAVE BEEN INCORPORATED INTO THIS OR ANY OTHER DOCUMENT AS A RESULT.

As-Builts 06/29/2022

BJB ERS H1

MECHANICAL LEGEND,

ABBREVIATIONS, GENERAL

NOTES, AND DETAILS

1G12

EX

2x

FD

SPRINKLER PIPING

RELOCATED IN LIEU

OF CABLE TRAY

1G06

EX 36x20

EX

6x

FD

AD

2B29Q

EX 12x12

EX

2x

EX

2x

RX 30x26

EX

x6

FD 1FD

EX 30x26

6A06

EX 10x6

EX 24x14

FD

AD

EX 22x85

5A15 5A15A

AD

FD

EX 16" SUPPLY RISER

RX 6"Ø

5A03

FD

AD

EX 14" SUPPLY RISER

5A07A 5A07 5A08 5A08A

AD

FD

EX 14" SUPPLY RISER

RX 6"Ø

EX 14" SUPPLY RISER

AD FDFD

RX 7"Ø

7"Ø7"Ø

EX 14" SUPPLY RISER

AD

RX 7"Ø

6A10

EX 22x8

EX

0x

FD

AD

FD

ACCESS DOOR

RELOCATED TO

SIDE OF DUCT

3C28B

3C28

3C28B

EX 24

x1

EX 24

x1

4EX

0x

EX 48x14

SUPPLY UP

EX 50x14 RETURN UP

EX 10x6

FDFD

DRAWING NOTES:

GENERAL NOTES:

1. REMOVE EXISTING PORTION OF DUCTWORK TO POINTS INDICATED.

2. EXISTING CABLE TRAY TO BE REROUTED AROUND FIRE DAMPER ACCESS.

3. REMOVE EXISTING 12x12 ACCESS DOOR IN DUCTWORK.

4. EXISTING DOWN LIGHT TO BE RELOCATED AWAY FROM EXISTING FIRE DAMPER ACCESS DOOR.

5. EXISTING CONDUITS TO BE REROUTED AROUND EXISTING FIRE DAMPER ACCESS DOOR.

6. REMOVE EXISTING FIRE DAMPER.

1. REFER TO H1 FOR MECHANICAL LEGEND, ABBREVIATIONS AND GENERAL NOTES.

BKM# 20069.01

Project Title

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

Drawing Title Date

Project No.

Drawing No.

Dwg. Of

Approved: Associate Director for Operations:

Approved: Director, Medical Center:

Drawn:Building No: Checked:

Location:

Additions:

Revisions:

1 5 6 7 8

21 3 4 5 6 7 8

A B

C D

E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot

DELLC

JOB No.

JAMES E. VAN ZANDT

VETERANS

ADMINISTRATION

MEDICAL CENTER

2 3 4

Consultants:Date

Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009

ARCHITECTURE

PLANNING

ENGINEERING

I CERTIFY THAT THESE DOCUMENT WERE PREPARED OR

APPROVED BY ME, AND THAT I AM A DULY LICENSED

ARCHITECT UNDER THE LAWS OF THE STATE OF

PENNSYLVANIA, LICENSE NUMBER ,

EXPIRATION DATE .

BURDETTE KOEHLER MURPHY

MECHANICAL / ELECTRICAL

CONSULTINTING ENGINEERING

6300 BLAIR HILL LANE SUITE 400

BALTIMORE, MARYLAND 21209

410.323.0600 - FAX 410.377.2543

& ASSOCIATES, INC.

COST ESTIMATING

12917 - 30TH AVENUE

PLATTSMOUTH, NEBRASKA 68048

402.298.8260 - FAX 402.298.8290

BUILDING COST CONSULTANTS

CLEAN ALL DUCTS AND

TEST DAMPERS

12/15/2020

503-19-101

200501D

PROJECT NORTH

TRUE NORTH

AR

L:

G :\2

.0 1\

D ra w in gs \A ca d\

AS

B

U

IL

T\ M

\1 -1

-H

Pl ot te d

By : S ve tla na Y ur id its ki y | 5

/1 7/

:5

PM

RECORD DOCUMENTS - 29 JUNE 2022

THESE RECORD DOCUMENTS HAVE BEEN PREPARED ON THE BASIS OF INFORMATION FURNISHED

BY OTHERS. THE ARCHITECT / ENGINEER WILL NOT BE RESPONSIBLE FOR ERRORS OR OMISSIONS

WHICH HAVE BEEN INCORPORATED INTO THIS OR ANY OTHER DOCUMENT AS A RESULT.

As-Builts 06/29/2022

BJB ERS 1-1/2/3/5/6-H1

BUILDING 1 PART PLANS

FIRE DAMPER CORRECTIVE

ACTIONS - DEMOLITION

SCALE: 1/4" = 1'-0"1

PART FIRST FLOOR PLAN

ROOM 1G12 - DEMOLITION

SCALE: 1/4" = 1'-0"2

PART FIRST FLOOR PLAN

ROOM 1G06 - DEMOLITION

SCALE: 1/4" = 1'-0"3

PART SECOND FLOOR PLAN

ROOM 2B29Q - DEMOLITION

SCALE: 1/4" = 1'-0"4

PART THIRD FLOOR PLAN

ROOMS 3C28 & 3C28B - DEMOLITION

SCALE: 1/4" = 1'-0"7

PART FIFTH FLOOR PLAN

ROOM 5B07 & 5B08 - DEMOLITION

SCALE: 1/4" = 1'-0"6

PART FIFTH FLOOR PLAN

ROOM 5A03 - DEMOLITION

SCALE: 1/4" = 1'-0"5

PART FIFTH FLOOR PLAN

ROOM 5A15 - DEMOLITION

SCALE: 1/4" = 1'-0"8

PART SIXTH FLOOR PLAN

ROOM 6A10 - DEMOLITION

SCALE: 1/4" = 1'-0"9

PART SIXTH FLOOR PLAN

ROOM 6A06 - DEMOLITION

1G12

EX

2x

FD

22x12

AD

SPRINKLER PIPING

RELOCATED IN LIEU

OF CABLE TRAY

1G06

EX 36x20

EX

6x

FD

AD

2B29Q

EX 12x12

EX

2x

EX

2x x2

EX

x6

FD

FD

EX 30x26

8x

AD

AD

6A06

EX 24x14

FD

AD

EX 22x89

5A15 5A15A

FD

EX 16" SUPPLY RISER

AD

6"Ø

8x8

5A03

FD

AD

EX 14" SUPPLY RISER

5A07A 5A07 5A08 5A08A

FD

EX 14" SUPPLY RISER EX 14" SUPPLY RISER

AD

7"Ø 7"Ø7"Ø

EX 14" SUPPLY RISER

AD

7"Ø

FDFD

AD

6"Ø

8x8

1 1

6A10

EX 22x8

EX

0x

FD

AD

ACCESS DOOR

RELOCATED TO

SIDE OF DUCT

3C28B

3C28

3C28B

EX 24

x1

EX 24

x1

4EX

0x

EX 48x14

SUPPLY UP

EX 50x14 RETURN UP

EX 10x6

FDFD

AD AD

BKM# 20069.01

Project Title

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

Drawing Title Date

Project No.

Drawing No.

Dwg. Of

Approved: Associate Director for Operations:

Approved: Director, Medical Center:

Drawn:Building No: Checked:

Location:

Additions:

Revisions:

1 5 6 7 8

21 3 4 5 6 7 8

A B

C D

E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot

DELLC

JOB No.

JAMES E. VAN ZANDT

VETERANS

ADMINISTRATION

MEDICAL CENTER

2 3 4

Consultants:Date

Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009

ARCHITECTURE

PLANNING

ENGINEERING

I CERTIFY THAT THESE DOCUMENT WERE PREPARED OR

APPROVED BY ME, AND THAT I AM A DULY LICENSED

ARCHITECT UNDER THE LAWS OF THE STATE OF

PENNSYLVANIA, LICENSE NUMBER ,

EXPIRATION DATE .

BURDETTE KOEHLER MURPHY

MECHANICAL / ELECTRICAL

CONSULTINTING ENGINEERING

6300 BLAIR HILL LANE SUITE 400

BALTIMORE, MARYLAND 21209

410.323.0600 - FAX 410.377.2543

& ASSOCIATES, INC.

COST ESTIMATING

12917 - 30TH AVENUE

PLATTSMOUTH, NEBRASKA 68048

402.298.8260 - FAX 402.298.8290

BUILDING COST CONSULTANTS

CLEAN ALL DUCTS AND

TEST DAMPERS

12/15/2020

503-19-101

200501D

PROJECT NORTH

TRUE NORTH

AR

L:

G :\2

.0 1\

D ra w in gs \A ca d\

AS

B

U

IL

T\ M

\1 -1

-H

Pl ot te d

By : S ve tla na Y ur id its ki y | 5

/1 7/

:5

PM

RECORD DOCUMENTS - 29 JUNE 2022

THESE RECORD DOCUMENTS HAVE BEEN PREPARED ON THE BASIS OF INFORMATION FURNISHED

BY OTHERS. THE ARCHITECT / ENGINEER WILL NOT BE RESPONSIBLE FOR ERRORS OR OMISSIONS

WHICH HAVE BEEN INCORPORATED INTO THIS OR ANY OTHER DOCUMENT AS A RESULT.

As-Builts 06/29/2022

BJB ERS 1-1/2/3/5/6-H2

BUILDING 1 PART PLANS

FIRE DAMPER CORRECTIVE

ACTIONS - NEW WORK

SCALE: 1/4" = 1'-0"1

PART FIRST FLOOR PLAN

ROOM 1G12 - NEW WORK

SCALE: 1/4" = 1'-0"2

PART FIRST FLOOR PLAN

ROOM 1G06 - NEW WORK

SCALE: 1/4" = 1'-0"3

PART SECOND FLOOR PLAN

ROOM 2B29Q - NEW WORK

SCALE: 1/4" = 1'-0"4

PART THIRD FLOOR PLAN

ROOMS 3C28 & 3C28B - NEW WORK

SCALE: 1/4" = 1'-0"7

PART FIFTH FLOOR PLAN

ROOM 5B07 & 5B08 - NEW WORK

SCALE: 1/4" = 1'-0"6

PART FIFTH FLOOR PLAN

ROOM 5A03 - NEW WORK

SCALE: 1/4" = 1'-0"5

PART FIFTH FLOOR PLAN

ROOM 5A15 - NEW WORK

SCALE: 1/4" = 1'-0"8

PART SIXTH FLOOR PLAN

ROOM 6A10 - NEW WORK

SCALE: 1/4" = 1'-0"9

PART SIXTH FLOOR PLAN

ROOM 6A06 - NEW WORK

DRAWING NOTES:

GENERAL NOTES:

1. TEST EXISTING FIRE DAMPER(S). SHOULD ANY DAMPER PROVE DEFECTIVE, REPLACE AS

NECESSARY.

2. PROVIDE NEW SECTION OF DUCTWORK WITH 12x12 FIRE DAMPER ACCESS DOOR IN BOTTOM OF

DUCT.

3. REROUTE CABLE TRAY AROUND FIRE DAMPER ACCESS.

4. PROVIDE NEW 18x18 ACCESS DOOR IN BOTTOM OF DUCTWORK.

5. PROVIDE NEW FIRE DAMPER IN NEW SECTION OF DUCTWORK.

6. PROVIDE TWO (2) NEW 8x8 FIRE DAMPER ACCESS DOORS IN THE SIDE OF STACKED 12x12

DUCTS EXITING SHAFT.

7. PROVIDE NEW SECTION OF DUCTWORK WITH 6x6 FIRE DAMPER ACCESS DOOR IN BOTTOM OF

DUCT.

8. RELOCATE EXISTING DOWN LIGHT AWAY FROM EXISTING FIRE DAMPER ACCESS DOOR.

9. REROUTE EXISTING CONDUITS AROUND EXISTING FIRE DAMPER ACCESS DOOR.

1. REFER TO H1 FOR MECHANICAL LEGEND, ABBREVIATIONS AND GENERAL NOTES.

2. CONTRACTOR SHALL REPAIR / REPLACE ANY INSULATION DAMAGED / REMOVED FROM DUCTWORK AND

DAMPERS AS PART THE WORK IN THE AREAS INDICATED ON THIS DRAWING.

1E17

1E20

1E21 1E23

1E22

1E18

1E15 1E05

1E16

1G14A 1A171A17A

1A02

1A04 1A10B

1A10A

WAITING

1A01

1A16

1A38 1A39 1A40

1A41

1A15

1A14

1A131A221A23 1A37B

1A36

1A31

1A35

1A34

1A33

1A32 1A25

1A24 1A21 1A11

1A26

1A271A281A291A30

STAIR

F1

1A12A

1A12

1A09D 1A09C 1A09B 1A09A 1A07

1A051E19

1A08 1A10

1A37A

1A37

1E05A

1A06

CORRIDOR

1A1

CORRIDOR

1A2

CORRIDOR

1A4

1D01

1D02

1D051D07

1D06 1D04

1D091D11

1D12 1D10

1D17 1D15

1D18 1D16

1D24 1D23

1D21

1D14

1D14A

1D20

STAIR

D1

1D26

1D27

1D19

1D281D291D25

1D30

1D32

1D33

1D35

1D31

1D34

1D36

1D39

1D37

1D13

WAITING

1B01

1B02

1B03

1B04

1B05

1B07

1B06 1B01A

1B081B08E

1B08A

1B08B

1B08C

1B09A

1B09B

1B09C

1B09H1B08D

1B09G

1B09

1B09F 1B09E 1B09D

1C28 1C29

1C04

1C07

1C09

1C11 1C25

1C23 1C22

1C19

1C12

1C14

1C26 1C24 1C21 1C20 1C18 1C17 1C16

1C15

1C13

1C10

1C08

1C06

1C05

1C03

1C02

1C01A

1C01A2

1C01A1

1C30 1C31

1D38

1D22

WAITING

1D08

1C00

1D10A

1D03

STAIR

B1

STAIR

H1

CORRIDOR

1B2

CORRIDOR

1C1

1C27

CORRIDOR

1D1

CORRIDOR

1D2

ELEV 1B10

1C01

1D27A

STAFF CORRIDOR

1D3

B108-1

B118-1

B100-1

FDFDFD FD

28x12 26x12

28x12 x1 x8 x8

10x8 x8 x1

24x14

10x10 x1

30x14 x8

12x12

10x1012x12

10x10 x1 x1

12x6 x6

6x6

4"Ø

8" Ø

26x16 24x14 x1 x6 12x6 x1

10x8 14x12 12x12

12x4

8x x1

SCALE: 1/" = 1'-0"1 PART FIRST FLOOR PLAN - HVAC

BKM# 20069.01

Project Title

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

Drawing Title Date

Project No.

Drawing No.

Dwg. Of

Approved: Associate Director for Operations:

Approved: Director, Medical Center:

Drawn:Building No: Checked:

Location:

Additions:

Revisions:

1 5 6 7 8

21 3 4 5 6 7 8

A B

C D

E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot

DELLC

JOB No.

JAMES E. VAN ZANDT

VETERANS

ADMINISTRATION

MEDICAL CENTER

2 3 4

Consultants:Date

Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009

ARCHITECTURE

PLANNING

ENGINEERING

I CERTIFY THAT THESE DOCUMENT WERE PREPARED OR

APPROVED BY ME, AND THAT I AM A DULY LICENSED

ARCHITECT UNDER THE LAWS OF THE STATE OF

PENNSYLVANIA, LICENSE NUMBER ,

EXPIRATION DATE .

BURDETTE KOEHLER MURPHY

MECHANICAL / ELECTRICAL

CONSULTINTING ENGINEERING

6300 BLAIR HILL LANE SUITE 400

BALTIMORE, MARYLAND 21209

410.323.0600 - FAX 410.377.2543

& ASSOCIATES, INC.

COST ESTIMATING

12917 - 30TH AVENUE

PLATTSMOUTH, NEBRASKA 68048

402.298.8260 - FAX 402.298.8290

BUILDING COST CONSULTANTS

CLEAN ALL DUCTS AND

TEST DAMPERS

12/15/2020

503-19-101

200501D

SCALE: 1/16" = 1'-0"

8'-0"16'-0"0 32'-0"

PROJECT NORTH

TRUE NORTH

AR

L:

G :\2

.0 1\

D ra w in gs \A ca d\

AS

B

U

IL

T\ M

\1 -1

-H

- 1

ST

F

LR

P

LN

Pl ot te d

By : S ve tla na Y ur id its ki y | 6

/2 9/

:5

PM

KEY PLAN

RECORD DOCUMENTS - 29 JUNE 2022

THESE RECORD DOCUMENTS HAVE BEEN PREPARED ON THE BASIS OF INFORMATION FURNISHED

BY OTHERS. THE ARCHITECT / ENGINEER WILL NOT BE RESPONSIBLE FOR ERRORS OR OMISSIONS

WHICH HAVE BEEN INCORPORATED INTO THIS OR ANY OTHER DOCUMENT AS A RESULT.

As-Builts 06/29/2022

BKM BKM 1-1-H2

BUILDING 1 - PART

1ST FLOOR PLAN - HVAC

GENERAL NOTES:

1. ALL DUCTWORK SHOWN ON THIS FLOOR SHALL BE EXISTING TO REMAIN. DUCTWORK IS

SHOWN ONLY TO DEMONSTRATE APPROXIMATE SCOPE OF DUCT CLEANING

REQUIREMENTS. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN FIELD.

2. CLEAN ALL SUPPLY, RETURN, EXHAUST, AND OUTSIDE AIR DUCTWORK IN ACCORDANCE

WITH SPECIFICATIONS.

3. ALL DIFFUSERS SHALL BE CLEANED BEFORE BEING REPLACED IN CEILING.

4. FIRE AND SMOKE DAMPERS SHOWN ON THIS PLAN SHALL NOT BE CONSIDERED TO BE A

COMPLETE INVENTORY OF ALL EXISTING DAMPERS.

5. CONTRACTOR SHALL TEST ALL FIRE AND SMOKE DAMPERS ON ALL FLOORS, WHETHER

INDICATED ON DRAWINGS OR NOT. CONTRACTOR SHALL INDICATE ANY INACCESSIBLE

DAMPERS IN THE TESTING PROCEDURE DOCUMENTATION. CONTRACTOR SHALL

CREATE A FINAL REPORT NOTING WHETHER DAMPERS WERE FOUND OR NOT.

6. CONTRACTOR SHALL PROVIDE AS-BUILT DRAWINGS OF EXACT LOCATIONS OF FIRE AND

SMOKE DAMPERS UPON COMPLETION OF PROJECT.

7. CONTRACTOR SHALL IDENTIFY ANY DAMAGES TO EXISTING ACCESS DOORS WHILE

SURVEYING THE FIRE DAMPERS AND INCLUDE THESE DAMAGES IN FINAL REPORT.

8. THE FACILITY WILL BE OCCUPIED AND OPERATING DURING THE DURATION OF THE

PROJECT. REFER TO SHEET H1 FOR ALLOWABLE WORK HOURS FOR EACH BUILDING.

ELECTRICAL NOTES:

1. ALL ELECTRICAL FED FIRE/SMOKE DAMPERS IN AREA OF WORK SHALL BE DE-ENERGIZED BEFORE

PERFORMING ANY CLEANING OR WORK.

2. MOTORS (EQUIPMENT) FEEDING DUCTS SHALL BE SHUTDOWN PRIOR TO CLEANING AND TESTING.

3. LOCKOUT/TAGOUT PROCEDURES SHALL BE STRICTLY ENFORCED.

4. RE-ENERGIZED DAMPERS ONCE WORK ON SECTION IS COMPLETE.

REFER TO 1-1-H1 FOR CONTINUATION

AutoCAD SHX Text F.D.

F5

2A21 2A21B 2A21A1

2A18

2A20

2A20C

2A06

2A17

2A16 2A15 2A12

2A13

2A11

2A08

2A10

2A07

2A09

STAIR

A2

2A05 2A04A

2A03B1

2A03B 2B01

2A03A

2A03C

2C03

FOOD SERVICE

KITCHEN

2A04

2A11A

2A02

2A01 2B02 2B04

2B05

2B07

STAIR

C2

2C01

2C08A1

2C09

2C10

2C16A

2C12

2C16

2C17

2C18 2C21

2C08A

2C19

2C20

2C08

2C02

2B06C

2B06B 2B06A 2B06R 2B06P 2B06O

2B08 2B09 2B10

2B06N1

2B39 2B40

2B06N

STAIR

D2

STAIR

B2

2B41 2B42

2B53 2B55 2B56

2B56A

2B52

2B542B50

2B44 2B512B432B112B06S 2B06Q

2B06J2B06G 2B06D

2B06L

2B06K2B06H2B06F2B06E

2B47

2B45 2B46 2B49

2B482B30D2

2B30D1

2B30D

2B30C

2B30B

2B29B2B29C

2B29D2B29E2B29F

2B29

2B30

2B30A

2B29A 2B29H

CHEMISTRY

2B29G

2B29I

2B29K

2B29M

2B29Q

2B29R

2B29P

2B29S 2B29O 2B29U

2B38A

2B36

2B38

2B35

2B37

2B29T2B29N

2B29L

2B29J

STAIR

E2

2B29W

2A19

2A04B

2A14

LOADING DOCK /

CORRIDOR

2A3

2A03

2C05

2C06

2C04

2C11

2C13

P6

2A17A

2A20A

2A21A

CORRIDOR

2A2

CORRIDOR

2A1

CORRIDOR

2B1

2B03

CORRIDOR

2B3

CORRIDOR

2B2

2B29V

CORRIDOR

2B4

CORRIDOR

2B5

CORRIDOR

2C1

CORRIDOR

2C3

CORRIDOR

2C2

2B06

ROOF BELOW

2A20B

P3

P2

S4

P7

ELEV.

STAIR

G2

2D01A

2D01 2D02

2D01B

2D01C

2D07

2D06 2D09 2D13A

2D13

2D13B

2D13C

CORRIDOR

2D

CORRIDOR

2D1

90 x 34

40x12 90x32 RA 24 x1

12x12

16x12 x1 x1 x1

12x814x10

8"Ø

48x30

RA UP 34

x2 x1

20x12

16x10

16x16

16x16 x1

26x1630x18 x8 x8 x8 x1 x1

14x12

16x12

12x12

32x12 x1 x1 x1

8x12

8x8

12x12

64x24

16x12 x1

32x188x x8

12x10 6x10

10x12

10"Ø

"Ø x1

10x10 x6

8x68x

8x

8x8

6" Ø

36x14 x1

10x10 8"Ø

10x10 8"Ø

10x6

8x8 x1

30x1230x8 x8

10x4

10"Ø

8" Ø

8"Ø8" Ø

18x12

12x6 6x6 x1

20x12 18x12

8x x8 x8

12x4

8" Ø x1 x1

10x4

12x6 x1

"Ø

10"Ø x1 x6

8x

8x6 x1

8x88x10 8x6 8"

Ø

8"Ø x1 x1

"Ø

8x8

6"Ø

8"Ø8"Ø

14x8

14x88x

8x

8x

90x32

12x6

12x6 12x6 8x4

8x4 x8 x8 x1

10x6

16x10

16x10 x1

20x412x6 20x4

20x4

12x10

12x10 x1 x1 x1 x8

EF

38x22 12x10 8x6 x2 x2

14x12

30x26

18x14

8x x2

EX 1-EF29A

EX 1-EF30

EX 1-GRH1

EX 1-GIH1

EX 1-EF28

EX 1-EF29

EX 1-EF-1A

EX 1-EF-1B

LOCATION

OF RTU-1A

AND RTU-1B

x1

DN TO EA

HOOD

22x10 x1

8x

14x12

10x10 x1

SCALE: 1/16" = 1'-0"1 PART SECOND FLOOR PLAN - HVAC

BKM# 20069.01

Project Title

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

Drawing Title Date

Project No.

Drawing No.

Dwg. Of

Approved: Associate Director for Operations:

Approved: Director, Medical Center:

Drawn:Building No: Checked:

Location:

Additions:

Revisions:

1 5 6 7 8

21 3 4 5 6 7 8

A B

C D

E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot

DELLC

JOB No.

JAMES E. VAN ZANDT

VETERANS

ADMINISTRATION

MEDICAL CENTER

2 3 4

Consultants:Date

Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009

ARCHITECTURE

PLANNING

ENGINEERING

I CERTIFY THAT THESE DOCUMENT WERE PREPARED OR

APPROVED BY ME, AND THAT I AM A DULY LICENSED

ARCHITECT UNDER THE LAWS OF THE STATE OF

PENNSYLVANIA, LICENSE NUMBER ,

EXPIRATION DATE .

BURDETTE KOEHLER MURPHY

MECHANICAL / ELECTRICAL

CONSULTINTING ENGINEERING

6300 BLAIR HILL LANE SUITE 400

BALTIMORE, MARYLAND 21209

410.323.0600 - FAX 410.377.2543

& ASSOCIATES, INC.

COST ESTIMATING

12917 - 30TH AVENUE

PLATTSMOUTH, NEBRASKA 68048

402.298.8260 - FAX 402.298.8290

BUILDING COST CONSULTANTS

CLEAN ALL DUCTS AND

TEST DAMPERS

12/15/2020

503-19-101

200501D

SCALE: 1/16" = 1'-0"

8'-0"16'-0"0 32'-0"

PROJECT NORTH

TRUE NORTH

AR

L:

G :\2

.0 1\

D ra w in gs \A ca d\

AS

B

U

IL

T\ M

\1 -2

-H

- 2 N

D F

LR

P

LN

Pl ot te d By

: S ve tla na

Y ur id its ki y

| 6 /2

7/

:1

AM

KEY PLAN

RECORD DOCUMENTS - 29 JUNE 2022

THESE RECORD DOCUMENTS HAVE BEEN PREPARED ON THE BASIS OF INFORMATION FURNISHED

BY OTHERS. THE ARCHITECT / ENGINEER WILL NOT BE RESPONSIBLE FOR ERRORS OR OMISSIONS

WHICH HAVE BEEN INCORPORATED INTO THIS OR ANY OTHER DOCUMENT AS A RESULT.

As-Builts 06/29/2022

BKM SY 1-2-H1

BUILDING 1 - PART

2ND FLOOR PLAN - HVAC

GENERAL NOTES:

1. ALL DUCTWORK SHOWN ON THIS FLOOR SHALL BE EXISTING TO REMAIN. DUCTWORK IS

SHOWN ONLY TO DEMONSTRATE APPROXIMATE SCOPE OF DUCT CLEANING

REQUIREMENTS. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN FIELD.

2. CLEAN ALL SUPPLY, RETURN, EXHAUST, AND OUTSIDE AIR DUCTWORK IN ACCORDANCE

WITH SPECIFICATIONS.

3. ALL DIFFUSERS SHALL BE CLEANED BEFORE BEING REPLACED IN CEILING.

4. FIRE AND SMOKE DAMPERS SHOWN ON THIS PLAN SHALL NOT BE CONSIDERED TO BE A

COMPLETE INVENTORY OF ALL EXISTING DAMPERS.

5. CONTRACTOR SHALL TEST ALL FIRE AND SMOKE DAMPERS ON ALL FLOORS, WHETHER

INDICATED ON DRAWINGS OR NOT. CONTRACTOR SHALL INDICATE ANY INACCESSIBLE

DAMPERS IN THE TESTING PROCEDURE DOCUMENTATION. CONTRACTOR SHALL

CREATE A FINAL REPORT NOTING WHETHER DAMPERS WERE FOUND OR NOT.

6. CONTRACTOR SHALL PROVIDE AS-BUILT DRAWINGS OF EXACT LOCATIONS OF FIRE AND

SMOKE DAMPERS UPON COMPLETION OF PROJECT.

7. CONTRACTOR SHALL IDENTIFY ANY DAMAGES TO EXISTING ACCESS DOORS WHILE

SURVEYING THE FIRE DAMPERS AND INCLUDE THESE DAMAGES IN FINAL REPORT.

8. THE FACILITY WILL BE OCCUPIED AND OPERATING DURING THE DURATION OF THE

PROJECT. REFER TO SHEET H1 FOR ALLOWABLE WORK HOURS FOR EACH BUILDING.

ELECTRICAL NOTES:

1. ALL ELECTRICAL FED FIRE/SMOKE DAMPERS IN AREA OF WORK SHALL BE DE-ENERGIZED BEFORE

PERFORMING ANY CLEANING OR WORK.

2. MOTORS (EQUIPMENT) FEEDING DUCTS SHALL BE SHUTDOWN PRIOR TO CLEANING AND TESTING.

3. LOCKOUT/TAGOUT PROCEDURES SHALL BE STRICTLY ENFORCED.

4. RE-ENERGIZED DAMPERS ONCE WORK ON SECTION IS COMPLETE.

DRAWING NOTES:

1. REFER TO PART PLAN 3 ON DRAWINGS 1-1/2/3/5/6-H1 & H2 FOR ADDITIONAL CORRECTIVE

ACTIONS ASSOCIATED WITH FIRE DAMPERS IN THIS AREA.

REFER TO 1-2-H2 FOR CONTINUATION

ADDITIONAL HVAC SCOPE:

1. ROOM 2B01: CAP EXISTING OPEN ENDED SUPPLY DUCTS ABOVE CEILING IN THIS

AREA (2 LOCATIONS). DUCT OPENINGS ARE ROUGHLY 24x24. CONTRACTOR TO

VERIFY EXACT SIZES.

2D03

ELEV.

STAIR

G2

2D01A

2D01 2D02

2D01B

2D01C

2D07

2D06 2D09 2D13A

2D03B 2D03A

2D03C

2D03

2D05

2D13

2D13B

2D13C

2D30

2D28

2D26

2D15

2D14

2D16

2D112D08

2D27

2D29

2D24

2D17

2D19

2D20 2D23

2D21F 2D21E 2D21C

2D21A

2D21D

2D21B 2D21

STAIR

H2

CORRIDOR

2D

CORRIDOR

2D1

8ø

32x188x x8

12x10 6x10

10x12

10"Ø

"Ø x1 x1 x1

"Ø x1

14x12 12x12 10x10 8"Ø

10x106x10

10x10 x6

8x68x

8x

8x8

6" Ø x1 x1

8" Ø

8"Ø 10x10 8"Ø

8"Ø8"Ø

8"Ø 8"Ø

36x14 x1 x1

24x12 14x12 12x10 10x6

18x8

10x10 8"Ø

10x10 8"Ø

10x6

8x8 x1

30x1230x8 x8 x8

14x8 x8

24x6 18x6

10x4

8"Ø

8x10 x8 x8

12x4

8" Ø

18x818x8

18x818x8

6"Ø

6"Ø

6" Ø

14x14 x1

8x x1

8" Ø

8x

12x12 x1

10"Ø10"Ø

10"Ø x1

30x8 18x8 x1

24x1024x8

8x x1

10x4

12x6

16x6 x6 x6 x4 x6

10x410x4 x1 x1 x1 x1

14x148"Ø

"Ø

10"Ø x1 x6

8x

8x6 x1

8x88x10 8x6 8"

Ø

8x8

8"Ø x1

8"

Ø

8x10

8" Ø

8"Ø x1 x1

"Ø

8"Ø 12x14

8x8

6"Ø

8"Ø8"Ø

6" Ø

6" Ø

10"Ø

10x10 8x8

6" Ø

6"Ø

6" Ø 6"Ø

10x10 10"Ø

6" Ø

16x16 14x12 8x12

8" Ø

12x1210x12

8" Ø 8" Ø8"

Ø x1

10x10 10x6

8x

14x8

14x8

14x6

10x14 10x10

10x10

6" Ø x6

8x4

8x4

8x4 x1 x1

8x4

8x4

8x

8x

8x

8x4

8x4

SCALE: 1/" = 1'-0"1 PART SECOND FLOOR PLAN - HVAC

BKM# 20069.01

Project Title

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

Drawing Title Date

Project No.

Drawing No.

Dwg. Of

Approved: Associate Director for Operations:

Approved: Director, Medical Center:

Drawn:Building No: Checked:

Location:

Additions:

Revisions:

1 5 6 7 8

21 3 4 5 6 7 8

A B

C D

E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot

DELLC

JOB No.

JAMES E. VAN ZANDT

VETERANS

ADMINISTRATION

MEDICAL CENTER

2 3 4

Consultants:Date

Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009

ARCHITECTURE

PLANNING

ENGINEERING

I CERTIFY THAT THESE DOCUMENT WERE PREPARED OR

APPROVED BY ME, AND THAT I AM A DULY LICENSED

ARCHITECT UNDER THE LAWS OF THE STATE OF

PENNSYLVANIA, LICENSE NUMBER ,

EXPIRATION DATE .

BURDETTE KOEHLER MURPHY

MECHANICAL / ELECTRICAL

CONSULTINTING ENGINEERING

6300 BLAIR HILL LANE SUITE 400

BALTIMORE, MARYLAND 21209

410.323.0600 - FAX 410.377.2543

& ASSOCIATES, INC.

COST ESTIMATING

12917 - 30TH AVENUE

PLATTSMOUTH, NEBRASKA 68048

402.298.8260 - FAX 402.298.8290

BUILDING COST CONSULTANTS

CLEAN ALL DUCTS AND

TEST DAMPERS

12/15/2020

503-19-101

200501D

SCALE: 1/16" = 1'-0"

8'-0"16'-0"0 32'-0"

PROJECT NORTH

TRUE NORTH

AR

L:

G :\2

.0 1\

D ra w in gs \A ca d\

AS

B

U

IL

T\ M

\1 -2

-H

- 2 N

D F

LR

P

LN

Pl ot te d By

: S ve tla na

Y ur id its ki y

| 6 /2

7/

:1

AM

KEY PLAN

RECORD DOCUMENTS - 29 JUNE 2022

THESE RECORD DOCUMENTS HAVE BEEN PREPARED ON THE BASIS OF INFORMATION FURNISHED

BY OTHERS. THE ARCHITECT / ENGINEER WILL NOT BE RESPONSIBLE FOR ERRORS OR OMISSIONS

WHICH HAVE BEEN INCORPORATED INTO THIS OR ANY OTHER DOCUMENT AS A RESULT.

As-Builts 06/29/2022

BKM SY 1-2-H2

BUILDING 1 - PART

2ND FLOOR PLAN - HVAC

GENERAL NOTES:

1. ALL DUCTWORK SHOWN ON THIS FLOOR SHALL BE EXISTING TO REMAIN. DUCTWORK IS

SHOWN ONLY TO DEMONSTRATE APPROXIMATE SCOPE OF DUCT CLEANING

REQUIREMENTS. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN FIELD.

2. CLEAN ALL SUPPLY, RETURN, EXHAUST, AND OUTSIDE AIR DUCTWORK IN ACCORDANCE

WITH SPECIFICATIONS.

3. ALL DIFFUSERS SHALL BE CLEANED BEFORE BEING REPLACED IN CEILING.

4. FIRE AND SMOKE DAMPERS SHOWN ON THIS PLAN SHALL NOT BE CONSIDERED TO BE A

COMPLETE INVENTORY OF ALL EXISTING DAMPERS.

5. CONTRACTOR SHALL TEST ALL FIRE AND SMOKE DAMPERS ON ALL FLOORS, WHETHER

INDICATED ON DRAWINGS OR NOT. CONTRACTOR SHALL INDICATE ANY INACCESSIBLE

DAMPERS IN THE TESTING PROCEDURE DOCUMENTATION. CONTRACTOR SHALL

CREATE A FINAL REPORT NOTING WHETHER DAMPERS WERE FOUND OR NOT.

6. CONTRACTOR SHALL PROVIDE AS-BUILT DRAWINGS OF EXACT LOCATIONS OF FIRE AND

SMOKE DAMPERS UPON COMPLETION OF PROJECT.

7. CONTRACTOR SHALL IDENTIFY ANY DAMAGES TO EXISTING ACCESS DOORS WHILE

SURVEYING THE FIRE DAMPERS AND INCLUDE THESE DAMAGES IN FINAL REPORT.

8. THE FACILITY WILL BE OCCUPIED AND OPERATING DURING THE DURATION OF THE

PROJECT. REFER TO SHEET H1 FOR ALLOWABLE WORK HOURS FOR EACH BUILDING.

ELECTRICAL NOTES:

1. ALL ELECTRICAL FED FIRE/SMOKE DAMPERS IN AREA OF WORK SHALL BE DE-ENERGIZED BEFORE

PERFORMING ANY CLEANING OR WORK.

2. MOTORS (EQUIPMENT) FEEDING DUCTS SHALL BE SHUTDOWN PRIOR TO CLEANING AND TESTING.

3. LOCKOUT/TAGOUT PROCEDURES SHALL BE STRICTLY ENFORCED.

4. RE-ENERGIZED DAMPERS ONCE WORK ON SECTION IS COMPLETE.

REFER TO 1-2-H1 FOR CONTINUATION

3B01

3B02

3B03

3B06 3B05

3B08 3B07

3B09 3B10

3B01A

3B01B

3B01B1

3B01C 3E03

3E01 3E01A

3E02

3E02A

3F15 3F16 3F18 3F20

3F21

3F19

3F17

3F14

3F24

3F13

3F12

3F11

3F10

3FO9

3F05

3E05

3E05D

3E04C 3E04B

3E04

3E04A

STAIR

B3

3E05C

3E05B

3E05A

3F08B

3F08A

3F08

3F01

3F02

3B09A 3B11

3B15

3B16

3B18

3B20

3B21

3B22E

3B22E1

3B19

3B17

3B14

3B13

3B12

3B22F

3B22

3B22A

3B22B 3B22C 3B22D 3B22G

3B22H

3F22

3F23

3F12A

3F25

3F11A 3F11A1

3F10A1

3F10A

3F26

3F06

3F06A 3F05A

3F07

STAIR

E3

3F04

3F04A

OR

3F03

CORRIDOR

3B1

CORRIDOR

3B2

CORRIDOR

3F1

3E01B x1

60x12 x1

24x1212x1212x8 x8 x1

8x

8x8

36x12 x1

26x6

30x12 x1

16x10 x1 x8 x8 x8

12x12 x1

54x12

30x12

8x

8x8

12x6 x8 x1 x1 x1

18x16

32x18 x1 x8

8x x1 x1

8"Ø x1

22x8 x2 x1 x1

14"Ø

SA DN

14"Ø

SA UP

FD

SD

SDSD SDSD

SD

SD

SD

SD

FD

BKM# 20069.01

Project Title

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

Drawing Title Date

Project No.

Drawing No.

Dwg. Of

Approved: Associate Director for Operations:

Approved: Director, Medical Center:

Drawn:Building No: Checked:

Location:

Additions:

Revisions:

1 5 6 7 8

21 3 4 5 6 7 8

A B

C D

E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot

DELLC

JOB No.

JAMES E. VAN ZANDT

VETERANS

ADMINISTRATION

MEDICAL CENTER

2 3 4

Consultants:Date

Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009

ARCHITECTURE

PLANNING

ENGINEERING

I CERTIFY THAT THESE DOCUMENT WERE PREPARED OR

APPROVED BY ME, AND THAT I AM A DULY LICENSED

ARCHITECT UNDER THE LAWS OF THE STATE OF

PENNSYLVANIA, LICENSE NUMBER ,

EXPIRATION DATE .

BURDETTE KOEHLER MURPHY

MECHANICAL / ELECTRICAL

CONSULTINTING ENGINEERING

6300 BLAIR HILL LANE SUITE 400

BALTIMORE, MARYLAND 21209

410.323.0600 - FAX 410.377.2543

& ASSOCIATES, INC.

COST ESTIMATING

12917 - 30TH AVENUE

PLATTSMOUTH, NEBRASKA 68048

402.298.8260 - FAX 402.298.8290

BUILDING COST CONSULTANTS

CLEAN ALL DUCTS AND

TEST DAMPERS

12/15/2020

503-19-101

200501D

PROJECT NORTH

TRUE NORTH

AR

L:

G :\2

.0 1\

D ra w in gs \A ca d\

AS

B

U

IL

T\ M

\1 -3

-H

- 3 R

D F

LR

P

LN

Pl ot te d By

: S ve tla na

Y ur id its ki y

| 6 /2

9/

:0

PM

KEY PLAN

SCALE: 1/8" = 1'-0"

4'-0"8'-0"0 16'-0" RECORD DOCUMENTS - 29 JUNE 2022

THESE RECORD DOCUMENTS HAVE BEEN PREPARED ON THE BASIS OF INFORMATION FURNISHED

BY OTHERS. THE ARCHITECT / ENGINEER WILL NOT BE RESPONSIBLE FOR ERRORS OR OMISSIONS

WHICH HAVE BEEN INCORPORATED INTO THIS OR ANY OTHER DOCUMENT AS A RESULT.

As-Builts 06/29/2022

R

EF

ER

T

O

-3 -H

FO

R C

O N

TI

N

U A

TI

O

N

SCALE: 1/8" = 1'-0"1 PART THIRD FLOOR PLAN - HVAC

BKM SY 1-3-H1

BUILDING 1 - PART

3RD FLOOR PLAN - HVAC

GENERAL NOTES:

1. ALL DUCTWORK SHOWN ON THIS FLOOR SHALL BE EXISTING TO REMAIN. DUCTWORK IS

SHOWN ONLY TO DEMONSTRATE APPROXIMATE SCOPE OF DUCT CLEANING

REQUIREMENTS. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN FIELD.

2. CLEAN ALL SUPPLY, RETURN, EXHAUST, AND OUTSIDE AIR DUCTWORK IN ACCORDANCE

WITH SPECIFICATIONS.

3. ALL DIFFUSERS SHALL BE CLEANED BEFORE BEING REPLACED IN CEILING.

4. FIRE AND SMOKE DAMPERS SHOWN ON THIS PLAN SHALL NOT BE CONSIDERED TO BE A

COMPLETE INVENTORY OF ALL EXISTING DAMPERS.

5. CONTRACTOR SHALL TEST ALL FIRE AND SMOKE DAMPERS ON ALL FLOORS, WHETHER

INDICATED ON DRAWINGS OR NOT. CONTRACTOR SHALL INDICATE ANY INACCESSIBLE

DAMPERS IN THE TESTING PROCEDURE DOCUMENTATION. CONTRACTOR SHALL

CREATE A FINAL REPORT NOTING WHETHER DAMPERS WERE FOUND OR NOT.

6. CONTRACTOR SHALL PROVIDE AS-BUILT DRAWINGS OF EXACT LOCATIONS OF FIRE AND

SMOKE DAMPERS UPON COMPLETION OF PROJECT.

7. CONTRACTOR SHALL IDENTIFY ANY DAMAGES TO EXISTING ACCESS DOORS WHILE

SURVEYING THE FIRE DAMPERS AND INCLUDE THESE DAMAGES IN FINAL REPORT.

8. THE FACILITY WILL BE OCCUPIED AND OPERATING DURING THE DURATION OF THE

PROJECT. REFER TO SHEET H1 FOR ALLOWABLE WORK HOURS FOR EACH BUILDING.

ELECTRICAL NOTES:

1. ALL ELECTRICAL FED FIRE/SMOKE DAMPERS IN AREA OF WORK SHALL BE DE-ENERGIZED BEFORE

PERFORMING ANY CLEANING OR WORK.

2. MOTORS (EQUIPMENT) FEEDING DUCTS SHALL BE SHUTDOWN PRIOR TO CLEANING AND TESTING.

3. LOCKOUT/TAGOUT PROCEDURES SHALL BE STRICTLY ENFORCED.

4. RE-ENERGIZED DAMPERS ONCE WORK ON SECTION IS COMPLETE.

ADDITIONAL HVAC SCOPE:

1. ROOM 3B01B: REMOVE AND REPLACE EXISTING DUCT TAPE WITH PERMANENT DUCT

CAP AT RETURN AIR DUCT OPENING ABOVE CEILING IN THIS AREA.

2. ROOM 3E03: REMOVE AND REPLACE DAMAGED PORTION OF EXISTING 8" ROUND

FLEXIBLE SUPPLY DUCTWORK ABOVE CEILING IN THIS AREA.

3. ROOM 3F06: REMOVE AND REPLACE EXISTING DUCT TAPE WITH PERMANENT DUCT CAP

AT RETURN AIR DUCT OPENINGS ABOVE CEILING IN THIS AREA (3 LOCATIONS).

REVISION 1 09/27/2021

BRIDGE

3D00

LOBBY

3D01

WAITING

3D02

3D02A 3D02B

3D07

3D08

3D06

3D11 3D10

3D09

3D27A

3D27B

3D27C 3D27D 3D27E 3D27F

3D27G

CARDIOVASCULAR

3D27

3D14

3D16

WAITING

3D21

3D22 3D23

3D28 3D29

3D31

3D32 3D253D24

WORK STATION

AREA 2

3D33

3D203D193D34

3D353D37

3D38 3D393D40

3D12

3D03 3D04 3D05

3D12A

3D12C

3D12B

3D13

3D15

3D17

3D18

3D26

3D27G1

STAIR

G3

STAIR

H3

CORRIDOR

3D1

CORRIDOR

3D2

ROOF ACCESS

x8

8x6

12x10

8x

10x10

10x10

6x

8x

8x8

8x10

12x10

8x12

8x10

8x10 12x10

16x10

10x10

8x8 8x8

8x8

16x10

24x8

10x4

8x8

24x8

10x6 x1 x1 x1 x1

32x16 x1 x1 x1 x1 x1

16x10 x6 x1 x1

38x16 x1 x1 x6

12x12

14x6

8x

18x12 x6

14x10

14x6

8x6

8x

12x10 10x10

8x106x10

12x12

10x10

8x

8x

16x12

12x10 x1 x1 x1

10x10 6x10 x1

8x x1

10x12 x1 x1 x1

28x10 26x10 20x10 x1

8x

14x10 x8 x8

8x x8

8x

6x

26x14 18x12 10x10

8x8

48x16 x1 x1 x1

30x1624x1420x12

8x x1

8x8 x8 x1

214x12 10x10 x1

416x10 x1

16x10 10x10 6x1012x10

6x10

8x

8x

8x x1

10x86x8

26x12 x1

8x8 10 x1 x1 x1

12x12

18x1214x12 8x8 x1

10x6

10x6 x1 x1

8x

8x 68x x8 x8

10x10

6x10 x1

10x6

12x10

DUCT CLEANING

ASSOCIATED WITH

THIRD FLOOR ADDITION

SHALL BE CONSIDERED

DEDUCT ALTERNATE #1

ALTERNATE NOT ACCEPTED

CLEANING NOT PERFORMED

Project Title

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

Drawing Title Date

Project No.

Drawing No.

Dwg. Of

Approved: Associate Director for Operations:

Approved: Director, Medical Center:

Drawn:Building No: Checked:

Location:

Additions:

Revisions:

1 5 6 7 8

21 3 4 5 6 7 8

A B

C D

E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot

DELLC

JOB No.

JAMES E. VAN ZANDT

VETERANS

ADMINISTRATION

MEDICAL CENTER

2 3 4

Consultants:Date

Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009

ARCHITECTURE

PLANNING

ENGINEERING

I CERTIFY THAT THESE DOCUMENT WERE PREPARED OR

APPROVED BY ME, AND THAT I AM A DULY LICENSED

ARCHITECT UNDER THE LAWS OF THE STATE OF

PENNSYLVANIA, LICENSE NUMBER ,

EXPIRATION DATE .

BURDETTE KOEHLER MURPHY

MECHANICAL / ELECTRICAL

CONSULTINTING ENGINEERING

6300 BLAIR HILL LANE SUITE 400

BALTIMORE, MARYLAND 21209

410.323.0600 - FAX 410.377.2543

& ASSOCIATES, INC.

COST ESTIMATING

12917 - 30TH AVENUE

PLATTSMOUTH, NEBRASKA 68048

402.298.8260 - FAX 402.298.8290

BUILDING COST CONSULTANTS

CLEAN ALL DUCTS AND

TEST DAMPERS

12/15/2020

503-19-101

200501D

PROJECT NORTH

TRUE NORTH

AR

L:

G :\2

.0 1\

D ra w in gs \A ca d\

AS

B

U

IL

T\ M

\1 -3

-H

- 3 R

D F

LR

P

LN

Pl ot te d By

: S ve tla na

Y ur id its ki y

| 6 /2

9/

:0

PM

KEY PLAN

SCALE: 1/8" = 1'-0"

4'-0"8'-0"0 16'-0" RECORD DOCUMENTS - 29 JUNE 2022

THESE RECORD DOCUMENTS HAVE BEEN PREPARED ON THE BASIS OF INFORMATION FURNISHED

BY OTHERS. THE ARCHITECT / ENGINEER WILL NOT BE RESPONSIBLE FOR ERRORS OR OMISSIONS

WHICH HAVE BEEN INCORPORATED INTO THIS OR ANY OTHER DOCUMENT AS A RESULT.

As-Builts 06/29/2022

SCALE: 1/8" = 1'-0"1 PART THIRD FLOOR PLAN - HVAC

BKM SY 1-3-H3

BUILDING 1 - PART

3RD FLOOR PLAN - HVAC

R

EF

ER

T

O

-3 -H

FO

R C

O N

TI

N

U A

TI

O

N

GENERAL NOTES:

1. ALL DUCTWORK SHOWN ON THIS FLOOR SHALL BE EXISTING TO REMAIN. DUCTWORK IS

SHOWN ONLY TO DEMONSTRATE APPROXIMATE SCOPE OF DUCT CLEANING

REQUIREMENTS. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN FIELD.

2. CLEAN ALL SUPPLY, RETURN, EXHAUST, AND OUTSIDE AIR DUCTWORK IN ACCORDANCE

WITH SPECIFICATIONS.

3. ALL DIFFUSERS SHALL BE CLEANED BEFORE BEING REPLACED IN CEILING.

4. FIRE AND SMOKE DAMPERS SHOWN ON THIS PLAN SHALL NOT BE CONSIDERED TO BE A

COMPLETE INVENTORY OF ALL EXISTING DAMPERS.

5. CONTRACTOR SHALL TEST ALL FIRE AND SMOKE DAMPERS ON ALL FLOORS, WHETHER

INDICATED ON DRAWINGS OR NOT. CONTRACTOR SHALL INDICATE ANY INACCESSIBLE

DAMPERS IN THE TESTING PROCEDURE DOCUMENTATION. CONTRACTOR SHALL

CREATE A FINAL REPORT NOTING WHETHER DAMPERS WERE FOUND OR NOT.

6. CONTRACTOR SHALL PROVIDE AS-BUILT DRAWINGS OF EXACT LOCATIONS OF FIRE AND

SMOKE DAMPERS UPON COMPLETION OF PROJECT.

7. CONTRACTOR SHALL IDENTIFY ANY DAMAGES TO EXISTING ACCESS DOORS WHILE

SURVEYING THE FIRE DAMPERS AND INCLUDE THESE DAMAGES IN FINAL REPORT.

8. THE FACILITY WILL BE OCCUPIED AND OPERATING DURING THE DURATION OF THE

PROJECT. REFER TO SHEET H1 FOR ALLOWABLE WORK HOURS FOR EACH BUILDING.

ELECTRICAL NOTES:

1. ALL ELECTRICAL FED FIRE/SMOKE DAMPERS IN AREA OF WORK SHALL BE DE-ENERGIZED BEFORE

PERFORMING ANY CLEANING OR WORK.

2. MOTORS (EQUIPMENT) FEEDING DUCTS SHALL BE SHUTDOWN PRIOR TO CLEANING AND TESTING.

3. LOCKOUT/TAGOUT PROCEDURES SHALL BE STRICTLY ENFORCED.

S4

4C01A4C01

4C03

4C02

4A064A074A084A10

4A12

4A13

4A15

4A16

4A18

4A16A 4A18A

4A22A

4A22

STAIR

A4

4A21

4A21A

4A17

4A17A 4A14 4A14A

4A11

4A11A 4A09A 4A09

4A05A

4A05 4A03A

4A03

4A03B 4B05 4B05A

4B10 4B14 4B14A

4B17 4B21A

4B21

4B24 4B26 4B24A

4B28

4B27 4B25A

4B25

4B234B22

STAIR

B4

4B20

4B184B16A4B164B134B11 4B094B06

4B04 4B03

4B02

4B01

4A02

STAIR

C4

4A19

4B08

4A20

4A04

4A01

CORRIDOR

4A1

CORRIDOR

4A2

CORRIDOR

4B1

P3

P2 x8

20x12 x8

12x6 x6

12x8 12 x6 x6

12x8

12x8 28x8 x6 x6 x6

6"Ø 6"Ø

10x6 12 x1 x1

12x10 x1 x1 x8

16x9 x9

14x7 10"Ø

28x8 32x14 28x10 x8

32x12 28x10

8"Ø 12x10 x1

16x10

8" Ø x6 x1

12x10 x1

6" Ø

6"Ø x1 x6

22x8 x8 x8

12"Ø x7

F O

6" Ø x1 x1

06" Ø x1

16x9 10x6 8x412x6 x6 x4 x4

6"Ø

6" Ø x1

10x6 x6

6"Ø 12x10 x6

10x6 x8

10x6

6"Ø12 x1

6"Ø12 x1

6"Ø 12x106" Ø 12 x1

12x8 x1

22x8 x8

22x8

18x8 12x10 x1 x6

8x4 8x

8x 48x4

8x

6" Ø

6"Ø

8x

8x4

8x

40x8 x2 x2

12x6 x6 x6

24x1018x6

8" Ø

8"Ø

8" Ø x7

F O

8"Ø 12x10

12x10

12x10 x1 x6 x612 x6

8"Ø

8"Ø

8"Ø x1 x1 x6 x6

16"Ø

10x4

12x10

12x1012x10

8" Ø

8"Ø x1

12x10

12x10 x8

16x6

16x6 8x4

8x

10x4 x6 x6 x6

18x6

18x6

14x6 10x8 x6

8" Ø x1 x1 x6 x6

8x4

8"Ø

18x6 x1 x1

10x8

14x8

12x10 14"Ø

"Ø

8"Ø 8"Ø8x4

8x

12x10 x6

8"Ø12x8 14x4

10x6

10x10

10x4

8x

8x

14x8 x6 10x4

EF

12x10

EF

x5

"Ø

8x4

8x

10"Ø UP

FD FD FD FD FD FD

FD

FD

FDFDFDFDFDFD

FD

FD

FD FD FD

2 3

BKM# 20069.01

Project Title

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

Drawing Title Date

Project No.

Drawing No.

Dwg. Of

Approved: Associate Director for Operations:

Approved: Director, Medical Center:

Drawn:Building No: Checked:

Location:

Additions:

Revisions:

1 5 6 7 8

21 3 4 5 6 7 8

A B

C D

E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot

DELLC

JOB No.

JAMES E. VAN ZANDT

VETERANS

ADMINISTRATION

MEDICAL CENTER

2 3 4

Consultants:Date

Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009

ARCHITECTURE

PLANNING

ENGINEERING

I CERTIFY THAT THESE DOCUMENT WERE PREPARED OR

APPROVED BY ME, AND THAT I AM A DULY LICENSED

ARCHITECT UNDER THE LAWS OF THE STATE OF

PENNSYLVANIA, LICENSE NUMBER ,

EXPIRATION DATE .

BURDETTE KOEHLER MURPHY

MECHANICAL / ELECTRICAL

CONSULTINTING ENGINEERING

6300 BLAIR HILL LANE SUITE 400

BALTIMORE, MARYLAND 21209

410.323.0600 - FAX 410.377.2543

& ASSOCIATES, INC.

COST ESTIMATING

12917 - 30TH AVENUE

PLATTSMOUTH, NEBRASKA 68048

402.298.8260 - FAX 402.298.8290

BUILDING COST CONSULTANTS

CLEAN ALL DUCTS AND

TEST DAMPERS

12/15/2020

503-19-101

200501D

PROJECT NORTH

TRUE NORTH

AR

L:

G :\2

.0 1\

D ra w in gs \A ca d\

AS

B

U

IL

T\ M

\1 -4

-H

- 4

TH

F

LR

P

LN

Pl ot te d

By : S ve tla na Y ur id its ki y | 6

/2 7/

:2

AM

KEY PLAN

SCALE: 1/8" = 1'-0"

4'-0"8'-0"0 16'-0" RECORD DOCUMENTS - 29 JUNE 2022

THESE RECORD DOCUMENTS HAVE BEEN PREPARED ON THE BASIS OF INFORMATION FURNISHED

BY OTHERS. THE ARCHITECT / ENGINEER WILL NOT BE RESPONSIBLE FOR ERRORS OR OMISSIONS

WHICH HAVE BEEN INCORPORATED INTO THIS OR ANY OTHER DOCUMENT AS A RESULT.

As-Builts 06/29/2022

BKM BKM 1-4-H1

BUILDING 1

4TH FLOOR PLAN - HVAC

SCALE: 1/8" = 1'-0"1 FOURTH FLOOR PLAN - HVAC

GENERAL NOTES:

1. ALL DUCTWORK SHOWN ON THIS FLOOR SHALL BE EXISTING TO REMAIN. DUCTWORK IS

SHOWN ONLY TO DEMONSTRATE APPROXIMATE SCOPE OF DUCT CLEANING

REQUIREMENTS. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN FIELD.

2. CLEAN ALL SUPPLY, RETURN, EXHAUST, AND OUTSIDE AIR DUCTWORK IN ACCORDANCE

WITH SPECIFICATIONS.

3. ALL DIFFUSERS SHALL BE CLEANED BEFORE BEING REPLACED IN CEILING.

4. FIRE AND SMOKE DAMPERS SHOWN ON THIS PLAN SHALL NOT BE CONSIDERED TO BE A

COMPLETE INVENTORY OF ALL EXISTING DAMPERS.

5. CONTRACTOR SHALL TEST ALL FIRE AND SMOKE DAMPERS ON ALL FLOORS, WHETHER

INDICATED ON DRAWINGS OR NOT. CONTRACTOR SHALL INDICATE ANY INACCESSIBLE

DAMPERS IN THE TESTING PROCEDURE DOCUMENTATION. CONTRACTOR SHALL

CREATE A FINAL REPORT NOTING WHETHER DAMPERS WERE FOUND OR NOT.

6. CONTRACTOR SHALL PROVIDE AS-BUILT DRAWINGS OF EXACT LOCATIONS OF FIRE AND

SMOKE DAMPERS UPON COMPLETION OF PROJECT.

7. CONTRACTOR SHALL IDENTIFY ANY DAMAGES TO EXISTING ACCESS DOORS WHILE

SURVEYING THE FIRE DAMPERS AND INCLUDE THESE DAMAGES IN FINAL REPORT.

8. THE FACILITY WILL BE OCCUPIED AND OPERATING DURING THE DURATION OF THE

PROJECT. REFER TO SHEET H1 FOR ALLOWABLE WORK HOURS FOR EACH BUILDING.

ELECTRICAL NOTES:

1. ALL ELECTRICAL FED FIRE/SMOKE DAMPERS IN AREA OF WORK SHALL BE DE-ENERGIZED BEFORE

PERFORMING ANY CLEANING OR WORK.

2. MOTORS (EQUIPMENT) FEEDING DUCTS SHALL BE SHUTDOWN PRIOR TO CLEANING AND TESTING.

3. LOCKOUT/TAGOUT PROCEDURES SHALL BE STRICTLY ENFORCED.

4. RE-ENERGIZED DAMPERS ONCE WORK ON SECTION IS COMPLETE.

ADDITIONAL HVAC SCOPE:

1. ROOM 4A14: REMOVE AND REPLACE DAMAGED PORTION OF EXISTING FLEXIBLE

EXHAUST DUCTWORK ABOVE CEILING IN THIS AREA.

2. ROOM 4A16: REMOVE AND REPLACE DAMAGED PORTION OF EXISTING FLEXIBLE

SUPPLY DUCTWORK ABOVE CEILING IN THIS AREA.

3. ROOM 4B11: REMOVE AND REPLACE DAMAGED PORTION OF EXISTING FLEXIBLE

SUPPLY DUCTWORK ABOVE CEILING IN THIS AREA. PROVIDE NECESSARY

ACCESS TO ASSOCIATED INACCESSIBLE DAMPER.

REVISION 1 09/27/2021

EXISTING AHU-4

EXISTING AHU-5

EXISTING AHU-3

64x30

30x20

30x20 EA x2 x2 x1

58x18

EXISTING AHU-2

8x6

8x6

30x32

30x32

60x2612 x8

20x10

14x12 x1 x1

14x12

40x12

60x20

60x20

46x24

48x2452x2040x1240x12

FD

FD

FD

FD

DAMPER FUNCTIONAL

NOT REPLACED

DAMPER FUNCTIONAL

NOT REPLACED

DAMPER FUNCTIONAL

NOT REPLACED

** (2) FIRE DAMPERS ASSOCIATED WITH EXHAUST SYSTEMS

WERE FOUND FAULTY AND REPLACED. LOCATIONS

UNSPECIFIED **

58x18

EF-1

x4 x1

EF-12

EF-11

22x8 UP22x8 DN

48x24

22X8 ABANDONED

DUCT

EX 30x32

EX 36x32

EX 60x26

RX 14x12

EX 14x14

FD

FD FD

FD

FD

FD

EX 30x32

EX 36x32

EX 60x26

EX 14x14

14x12

FD

FD FD

FD

FD

FD

EX

4x

FD

x1

FD

4TH FLOOR

5TH FLOOR

BKM# 20069.01

Project Title

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

Drawing Title Date

Project No.

Drawing No.

Dwg. Of

Approved: Associate Director for Operations:

Approved: Director, Medical Center:

Drawn:Building No: Checked:

Location:

Additions:

Revisions:

1 5 6 7 8

21 3 4 5 6 7 8

A B

C D

E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot

DELLC

JOB No.

JAMES E. VAN ZANDT

VETERANS

ADMINISTRATION

MEDICAL CENTER

2 3 4

Consultants:Date

Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009

ARCHITECTURE

PLANNING

ENGINEERING

I CERTIFY THAT THESE DOCUMENT WERE PREPARED OR

APPROVED BY ME, AND THAT I AM A DULY LICENSED

ARCHITECT UNDER THE LAWS OF THE STATE OF

PENNSYLVANIA, LICENSE NUMBER ,

EXPIRATION DATE .

BURDETTE KOEHLER MURPHY

MECHANICAL / ELECTRICAL

CONSULTINTING ENGINEERING

6300 BLAIR HILL LANE SUITE 400

BALTIMORE, MARYLAND 21209

410.323.0600 - FAX 410.377.2543

& ASSOCIATES, INC.

COST ESTIMATING

12917 - 30TH AVENUE

PLATTSMOUTH, NEBRASKA 68048

402.298.8260 - FAX 402.298.8290

BUILDING COST CONSULTANTS

CLEAN ALL DUCTS AND

TEST DAMPERS

12/15/2020

503-19-101

200501D

PROJECT NORTH

TRUE NORTH

AR

L:

G :\2

.0 1\

D ra w in gs \A ca d\

AS

B

U

IL

T\ M

\1 -4

-H

- 4

TH

F

LR

P

LN

Pl ot te d

By : S ve tla na Y ur id its ki y | 6

/2 7/

:2

AM

KEY PLAN

SCALE: 1/8" = 1'-0"

4'-0"8'-0"0 16'-0" RECORD DOCUMENTS - 29 JUNE 2022

THESE RECORD DOCUMENTS HAVE BEEN PREPARED ON THE BASIS OF INFORMATION FURNISHED

BY OTHERS. THE ARCHITECT / ENGINEER WILL NOT BE RESPONSIBLE FOR ERRORS OR OMISSIONS

WHICH HAVE BEEN INCORPORATED INTO THIS OR ANY OTHER DOCUMENT AS A RESULT.

As-Builts 06/29/2022

BKM BKM 1-4-H2

BUILDING 1

4TH FLOOR PLAN - HVAC

SCALE: 1/8" = 1'-0"1 FOURTH FLOOR PLAN - MECHANICAL ROOM 453

GENERAL NOTES:

1. ALL DUCTWORK SHOWN ON THIS FLOOR SHALL BE EXISTING TO REMAIN. DUCTWORK IS

SHOWN ONLY TO DEMONSTRATE APPROXIMATE SCOPE OF DUCT CLEANING

REQUIREMENTS. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS IN FIELD.

2. CLEAN ALL SUPPLY, RETURN, EXHAUST, AND OUTSIDE AIR DUCTWORK IN ACCORDANCE

WITH SPECIFICATIONS.

3. ALL DIFFUSERS SHALL BE CLEANED BEFORE BEING REPLACED IN CEILING.

4. FIRE AND SMOKE DAMPERS SHOWN ON THIS PLAN SHALL NOT BE CONSIDERED TO BE A

COMPLETE INVENTORY OF ALL EXISTING DAMPERS.

5. CONTRACTOR SHALL TEST ALL FIRE AND SMOKE DAMPERS ON ALL FLOORS, WHETHER

INDICATED ON DRAWINGS OR NOT. CONTRACTOR SHALL INDICATE ANY INACCESSIBLE

DAMPERS IN THE TESTING PROCEDURE DOCUMENTATION. CONTRACTOR SHALL

CREATE A FINAL REPORT NOTING WHETHER DAMPERS WERE FOUND OR NOT.

6. CONTRACTOR SHALL PROVIDE AS-BUILT DRAWINGS OF EXACT LOCATIONS OF FIRE AND

SMOKE DAMPERS UPON COMPLETION OF PROJECT.

7. CONTRACTOR SHALL IDENTIFY ANY DAMAGES TO EXISTING ACCESS DOORS WHILE

SURVEYING THE FIRE DAMPERS AND INCLUDE THESE DAMAGES IN FINAL REPORT.

8. THE FACILITY WILL BE OCCUPIED AND OPERATING DURING THE DURATION OF THE

PROJECT. REFER TO SHEET H1 FOR ALLOWABLE WORK HOURS FOR EACH BUILDING.

ELECTRICAL NOTES:

1. ALL ELECTRICAL FED FIRE/SMOKE DAMPERS IN AREA OF WORK SHALL BE DE-ENERGIZED BEFORE

PERFORMING ANY CLEANING OR WORK.

2. MOTORS (EQUIPMENT) FEEDING DUCTS SHALL BE SHUTDOWN PRIOR TO CLEANING AND TESTING.

3. LOCKOUT/TAGOUT PROCEDURES SHALL BE STRICTLY ENFORCED.

4. RE-ENERGIZED DAMPERS ONCE WORK ON SECTION IS COMPLETE.

SCALE: 1/8" = 1'-0"2

PART FOURTH FLOOR PLAN - MECHANICAL ROOM 453

HVAC - DEMOLITION

SCALE: 1/8" = 1'-0"3

PART FOURTH FLOOR PLAN - MECHANICAL ROOM 453

HVAC - NEW WORK

SCALE: 1/8" = 1'-0"4

SECTION 1 - EXHAUST DUCTWORK

HVAC - NEW WORK

ADDITIONAL HVAC SCOPE:

1. REMOVE AND REPLACE EXISTING NON-FUNCTIONAL FIRE DAMPER ASSOCIATED

WITH EXISTING AHU-3 AT FLOOR PENETRATION IN 52x20 SUPPLY DUCT.

CONTRACTOR TO VERIFY EXACT DUCT SIZE.

2. REMOVE AND REPLACE EXISTING NON-FUNCTIONAL FIRE DAMPER ASSOCIATED

WITH EXISTING AHU-3 AT FLOOR PENETRATION IN 46x24 RETURN DUCT.

CONTRACTOR TO VERIFY EXACT DUCT SIZE.

3. REMOVE AND REPLACE EXISTING NON-FUNCTIONAL FIRE DAMPER ASSOCIATED

WITH EXISTING AHU-5 AT FLOOR PENETRATION IN 42x20 SUPPLY DUCT.

CONTRACTOR TO VERIFY EXACT DUCT SIZE.

4. REMOVE AND REPLACE EXISTING NON-FUNCTIONAL FIRE DAMPER ASSOCIATED

WITH EXISTING AHU-5 AT FLOOR PENETRATION IN 34x20 RETURN DUCT.

CONTRACTOR TO VERIFY EXACT DUCT SIZE.

5. REFER TO HVAC PART PLANS AND SECTION ON THIS SHEET FOR WORK IN THIS

AREA.

6. REMOVE EXISTING 14x12 STAINLESS STEEL EXHAUST DUCT FROM EXISTING FAN

EF-14 UP TO AND INCLUDING EXISTING FIRE DAMPER AT FLOOR PENETRATION.

7. INSTALL NEW 14x12 GALVANIZED EXHAUST DUCT AS REQUIRED TO PROVIDE

ADEQUATE ACCESS TO FIRE DAMPERS AT FLOOR PENETRATIONS. REFER TO

HVAC SECTION FOR ADDITIONAL REQUIREMENTS.

8. INSTALL NEW 14x12 GALVANIZED EXHAUST DUCT AS CLOSE TO FLOOR AS

POSSIBLE.

9. REPLACE EXISTING FIRE DAMPER AT FLOOR PENETRATION OF 14x12 EXHAUST

DUCT.

10. TEST AND CONFIRM OPERATION OF EXISTING FIRE DAMPER AT FLOOR

PENETRATION OF EXISTING 14x14 EXHAUST DUCT. REPLACE DAMPER IF

NON-FUNCTIONAL.

11. INSTALL NEW 12x12 ACCESS DOOR IN HORIZONTAL FACE OF NEW DUCT ELBOW

WHERE INDICATED. PROVIDE RECTANGULAR 90 DEGREE ELBOW WITHOUT

TURNING VANES TO ACCOMMODATE ACCESS.

12. INSTALL NEW 12x12 ACCESS DOOR IN VERTICAL FACE OF EXISTING 14x14

EXHAUST DUCT. LOCATE AS LOW ON DUCT AS POSSIBLE.

REVISION 1 09/27/2021

** DAMPER FUNCTIONAL. NOT REPLACED. **

** DAMPER FUNCTIONAL. NOT REPLACED. **

** DAMPER FUNCTIONAL. NOT REPLACED. **

5C01

5A055A065A08

5A095A10

5A13

5A14 5A165A175A20

5A19 5A15 5A11 5A07 5A07A HEARTH ROOM

5A03

5B03

5B07 5B08 5B11

5B13

5B16 5B19

5B21

5B185B17

5B15

5B125B105B095B06

5B05

5B04

5A01A5A02

STAIR

C5

STAIR

B5

STAIR

A5

5A19A 5A15A 5A11A 5B03A 5B07A 5B08A 5B11A

5B13A

5B16A 5B19A

5B18A5B17A 5B10A

5B09A5B06A

5B02

5A18

5A16A

5A12

FIRE EQUIPMENT

5A04

RECEPTION

5A01

5B14

5B20

5B01

CORRIDOR

5A1

CORRIDOR

5A2

CORRIDOR

5B1

CORRIDOR

5B2

S4

P3

P2

16"Ø 14"Ø

14x88x8

12"Ø

10"Ø

10x8

12"Ø

14"Ø 20x30

16"Ø

16"Ø

14x8

20x8 20x10

20x8 24x8 24x8

10x6

14x8

16x10

14"Ø

14"Ø

16x30

20x8

20x8 12x8

14"Ø

23x13 10"Ø

10"Ø6x8 22x10

28x10

40x6

18"Ø 14"Ø

16"Ø

28x24

10x6

10x6

10x6

10x6

10x6

10x6

10x6

10x6 10x6

18x6

18x6

18x6

18x6

12x6

12x6 12x6

12x6

10x10

12x12

14x10 10x10 8x8

10x1010x10 8x10

10x10

10x10

10x10

10x10

12"Ø

14x10

10x10

14x10

10x10

10x10

10x10

10x10

10x10

10x10

14x10

10x10

9"Ø

10x8

9"Ø

10x10

12"Ø

10x10

10x10

10x10 10x10

9"Ø

10x8 10x8

8"Ø

14x8 10x6

10x6

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .