HW One Line 2024Updated 09-27-2024 reference drawings.pdf
PDF 995 KB Posted
- Attached to
- Y1DA--503-25-107 Renovate for Prosthetics Lab design build | NCO 4 Construction West (VA-25-00072814)
- Solicitation number
- 36C24425R0090
About this file
These technical drawings are detailed hot water (HW) one-line and riser diagrams for a VA Medical Center renovation project, specifically documenting the hot water systems for the main building, Ambulatory Care, Blue T, and PT/OT additions. The drawings, dated August 19, 2022, show comprehensive piping layouts across multiple floors, including hot water supply (HWS), hot water return (HWR), and cold water (CW) systems with specific pipe sizes, temperature ratings, and circuit solver locations. The drawings include technical details such as water heater configurations, pump locations, temperature sensors, and riser connections for various building sections, with notes indicating that all sensors are new and existing piping may need modification during installation.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DWH-3
DWH-4
DWH-1
DWH-2
ET-1
SEE COLD WATER ONE-LINE ON
SHEET 1-P406 FOR CONTINUATION
SEE COLD WATER ONE-LINE ON
SHEET 1-P406 FOR CONTINUATION
HIGH TEMP DISH
WASHER IN 2A04A
HWP-1
HWP-2
FOR SPECIFIC VALVING AROUND
WATER HEATERS SEE SCHEMATICS
ON P400 SERIES SHEETS
TMV-BA10
BA15A SHOWERS
BA15A SINKS
3A06 SINK 3A08 SINK 3A09 SINK
BALL VALVE
BALANCING VALVE
CHECK VALVE
MIXING VALVE
ANTI-SCALD VALVE
3A03 SINK 3C08 SINK 3C16A SINK 3C16 SINK 3C14 SINK 3C18A SINK 3C18 SINK 3C17 SINK 3C21 SINK 3C21A SINK 3C22 SINK 3C23 SINK 3C24 SINK 3C25 SINK 1D27 SINK 1D28 SINK 1D30 SINK 1D31 SINK 1D32 SINK 1D33 SINK 1D34 SINK 1D35 SINK 1D36 SINK 1D37 SINK 1D38 SINK 1D40 SINK
CIRCUIT SOLVER
CS-15 Rm BC12
RISER 5
6A10 SINK 6A09 SINK
5A08 SINK 5A09 SINK
4A16 SINK 4A16A SINK 4A13 SINK 4A13
SHOWER
3A11A SINK 3A07A SINK 3A07 SNK 3A05 SINK
CS-22 Rn 2A04
RISER 4
6A12A
SHOWER
6A12A SINK
5A15A
SHOWER
5A11A
SHOWER
3A14 SINK 5A11A
SINK/SHOWER
CS-3 Rm BA06
RISER 3
6A15A
SHOWER
6A15A SINK
4A21A
SINK/SHOWER
4A21 SINK4A19 SINK4A17 SINK4A17A
SINK/SHOWER
4A14 SINK4A14A
SINK/SHOWER
3A13 SINK 3A14 SINK3A12 SINK
RISER 2
6A16 SINK6A19 SINK 6A16A SINK
5A16 SINK5A17 SINK 5A16A SINK
4A22A
SINK
4A22 SINK 4A18A
SINK
3A15 SINK
1E11B SINK
CS-2 Rm BA10
6A20 SINK
RISER 1
3A21 SINK
2A08 SINK 2A16 SINK
CS-1 Rm BA06
RISER 6
5A06 SINK
4A08 SINK
4A07 SINK
1E07 SINK
CS-4 Rm BA03
RISER 7
6A08A SINK
4A11 SINK 4A11A
SHOWER
4A09 SINK
4A09ASHOWER
4A05A SINK
2A04 SINK 1E11 SINK 1E14 SINK 1E12 SINK 1E08 SINK 1E22 SINK
RADIOLOGY FIXTURES
CS-5 Rm BA02
CS-18 Rm BC01
RISER 8
6A05 SINK
5A03 SINK
2B01 SINK
CS-6 Rm BA02
4C02 SINK 7A02 SINK
RISER 10
4B04 SINK
CS-7 Rm BB12
RISER 11
6B03A SINK 6B03A
SHOWER
4B05A SINK 4B05 SINK 4B10 SINK
CS-8 Rm BB12
RISER 10A
6B02A SINK
6B02 SINK
4B08 SINK
6B05A SINK
6B05A SHOWER
5B06A SINK 5B06A SHOWER
4B16 SINK 4B16A
SINK/SHOWER
4B18
SINK/SHOWER
CS-10 Rm BB12
RISER 13
RISER 12
5B07A
SINK
5B03A
SINK
CS-9 Rm BB13
6B07A SINK 6B07A
SHOWER
RISER 14
5B08A SINK 5B08A
SHOWER
4B14A SINK 4B14 SINK 4B17 SINK
3E04 SINK
CS-11 Rm BB16
RISER 15
4B24 SINK 4B24A
SHOWER
4B26 SINK 4B25 SINK 4B25A
SHOWER
4B27 SINK
CS-12 Rm BB12
RISER 16
5B12 SINK
RISER 17
6B15A
SINK
6B13 SINK6B15A
SHOWER
6B14A
SINK
6B18
SINK
4B23 SINK
CS-13
Rm BB16A
RISER 18
5B17A
SHOWER
5B17A
SINK
5B13
SINK
5B19A
SINK
5B19A
SHOWER
CS-14 Rm BB16A
HWP-3
HWP-4
1F10A SINK
1F58 SINK 1F69 SINK 1F64 SINK 1F64 SINK 1F68 SINK 1F61 SINK 1F73 SINK 1F71 SINK
1F49 SINK 1F47 SINK 1F48A SINK 1F50 SINK 1F55 SINK 1F56 SINK 1F57 SINK 1F71 SINK
2B29O SINK2B29U SINK2B38A SINK2B36 SINK
5B52 SINK 2B49 SINK
DWH
DWH
TMV-BE01
HWP
AMBULATORY CARE / BLUE TEAM
ED RISER
1A39 SINK 1A40 SINK 1G06 SINK 1G12 SINK
1A19 SHOWER
1G16 SINK
1A10A SINK
1A10B SINK
1A11 SINK1A07 SINK
PT/OT RISER
1B09 SINK 1B08 SINK1B08D
SINK
1B08E
SINK
1B08E
SINK
1B09F
SINK
1B09E
SINK
1B09D
SINK
1B09C SINK 1B08C SINK1B09A
SINK
1B08A SINK1B08B SINK
1C03 SINK
1C05 SINK
1C04 SINK 1C30 SINK1C01A1 SINK
1B09 SINK 2C28 SINK2C26 SINK 2D07 SINK2D06 SINK2D27 SINK1B09E SINK2D11 SINK2D19 SINK2D17 SINK2D20 SINK
DWH
DWH
TMV-BD01
HWP
HWP
HWP
1C07 SINK1C10 SINK
1C13 SINK
1C11 SINK1C08 SINK 1C09 SINK
PT/OT/ED
CS-20
Rm 2D05
REVISIONS TO THESE CONTRACT DOCUMENTS BY AE WORKS, REFLECTING CHANGES IN THE WORK
MADE DURING BIDDING AND CONSTRUCTION, ARE BASED ON THE INFORMATION FURNISHED TO AE
WORKS BY THE CONTRACTOR. AE WORKS WILL NOT BE RESPONSIBLE FOR THE ACCURACY OR
COMPLETENESS OF THE INFORMATION PROVIDED BY THE CONTRACTOR, NOR DISCREPANCIES
BETWEEN THE OWNER OR CONTRACTOR-PROVIDED INFORMATION AND THE BUILT CONDITIONS.
HWS-28
HWR-29
PT/OT / PMR
ROOM BD01
H O
T W
A T
E R
R
E T
U R
N H
W R
E T
U R
N
#171 #182
#103
BASEMENT HOT WATER RETURN
#367
#366 #365 #167 #362
4-IN MAIN HOT WATER
HOT WATER RETURN
ROOM BE01
6TH FLOOR6TH FLOOR
6TH FLOOR
#368
#369
#166 #372 #371 #373 #374 #082
#229
TE-138
TE-139
COR 6A2
TE-140
#364 #363
TE-142
COR 6A2
#361
TE-146
TE-144
6" TE-145
TE-148 TE-149 TE-150 TE-152 TE-151 TE-153 TE-156 TE-155
7TH FLOOR
TE-157
TE-158
#254 #245
#246
#244
#232
#231
#237
#252
#239
1A36 SINK 1A33 SINK
1A30 SINK 1A29 SINK 1A32 SINK
1A31 SINK
1A28 SINK
1A21 SINK 1A26 SINK
1A27 SINK
CLOTHES
WASHER
CLOTHES
WASHER
CLOTHES
WASHER
BA10
2B26B SINK
2B26C SINK
2B29H SINK
2B29A SINK
2B29K
WASH
APPLIANCE
2B29J SINK
2B29N SINK
2B30A SINK
2B06L SINK2B06K SINK
2B06H SINK2B06J SINK
2B06G SINK 2B06J SINK 2B06F SINK
2B06E SINK
2B06S SINK
2B08 SINK
2B09 SINK
2B10 SINK
2B06L SINK 2B06L SINK 2B06N SINK
2B13 SINK
3B15 SINK3B16 SINK3B18 SINK3B20 SINK3B21 SINK
3B22A SINK 3B22F SINK 3F16 SINK 3F21 SINK 3F23 SINK 3F24 SINK 3F24 SINK 3F24 SINK 3F24 SINK
3F10A SINK3F24 SINK3F24 SINK
3F06 SINK3F04 SINK3F05 SINK3F04A SINK3F06A SINK3F05A SINK
3F08 SINK 3F08B SINK 3B02 SINK 3B03 SINK 3B10 SINK
1E37A SINK 1E37A SINK 1E37A TABLE 1E37A SINK
2A04 SINK 2A04 SINK 2A04 SINK 2A04 SINK 2A04 SINK
7A24 SINK 7A12 SINK 7A09 SINK7A05 SINK 7B12A SINK 7B16A SINK
2B18 SINK
6A20A SINK 6A20A
SHOWER
6A16A
SHOWER
5A16A
SHOWER
4A22A
SHOWER
4A18A
SHOWER
4A12 SINK
6A08A
SHOWER
6B02A SHOWER
5B03A
SHOWER
5B07A
SHOWER
6B04A SINK 6B04A
SHOWER
4B05A
SHOWER
4A11A SINK 4A09A SINK 4A05A SINK
5A15A SINK
5A11A SINK
5B09A SINK 5B09A SHOWER
6B06A SINK
6B06A SHOWER
6B09A SINK 6B09A
SHOWER
5B11A SINK 5B11A SHOWER
4B25A
SINK
4B24A
SINK
3E04 SINK
3E04 SINK
3E04 SINK
3E04 STERILIZER
3E04 STERILIZER
3E01A SINK
3E02A SINK
6B17A
SHOWER
6B14A
SHOWER
6B17A
SINK
5B16A
SHOWER
5B16A
SINK
5B18A
SINK
5B89A
SHOWER
BA16 SINK BA18 SINK BA20 SINK BA21 SINK
1E30 SINK 1E30 SINK 1E30 SHOWER 1E30 SHOWER
FOOT PEDAL
1A19 SINK
1G12 SINK
BC01 QUAD
SINK
BC01 SINKBC01 SINK
TE-32 RM BC01
BC04
HANDWASHER
BC04 SINK
#375
TE-154
3/4"
3/4" 3/4"
3/4"
3/4"
3/4" 3/4" 3/4" 3/4"
3/4" 3/4"
3/4"
3/4"
3/4"
3/4"
3/4"
1"
2"
1-1/2" 2" 1-1/2" 1-1/4"
2" 1" 1-1/2" 1"
1-1/4" 1-1/2" 1-1/2" 1-1/2" 1-1/2" 2-1/2" 1-1/2" 3/4" 1-1/2"
2"
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
418 BEAVER STREET
SEWICKLEY, PA 15143
PH: 412.287.7333
www.aeworks.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
FULLY SPRINKLERED
RECORD DRAWINGS
WATER RELATED ISSUES
INCLUDING MISC. RESTROOM
RENOVATIONS
503-17-110
AC AC
2907 PLEASANT VALLEY BOULEVARD
ALTOONA, PA 16602-4377
1-P407
HOT WATER ONE-LINE DIAGRAM
2022.08.19
18014
1/8" = 1'-0"1-P407
1 HOT WATER ONE-LINE
HW Fixtures Missing for 7th Floor
TE-160 COR 7A3
TE-141
TE-135 RM 4B25
TE-164 RM 4A19
TE-101
RM1B08
TE-100 RM 1B08
TE-98 RM 1B01
TE-99 RM 1B01
TE-102 RM 1B09
TE-95 COR 1A4
TE-96 COR 1A4
1F42 SINK 1F43 SINK
TE-89 RM 1F43
TE-106 Rm 2A04
TE-107 Rm 2A04
TE-125 Rm 3C28
1D28 SINK
3C
S
IN
K
TE-116 Cor 2D1
TE-119 Rm 2D05
2D
S
IN
K
2D
S
IN
K
TE-121
Cor 3A2
TE-122 Rm 3A07
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Line
VHAALTCHABON
Highlight
VHAALTCHABON
Line
VHAALTCHABON
Highlight
VHAALTCHABON
Line
VHAALTCHABON
Highlight
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Rectangle
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Line
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Highlight
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Line
VHAALTCHABON
Highlight
VHAALTCHABON
Line
VHAALTCHABON
Highlight
VHAALTCHABON
Line
VHAALTCHABON
Highlight
VHAALTCHABON
Line
VHAALTCHABON
Highlight
VHAALTCHABON
Line
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
WH-4 WH-3
P P
WH-1
HIGH TEMP SUPPLY
P P
WH-2
HIGH TEMP SUPPLY
TE-14
TE-15
SOLENOID VALVE
T
N.C.
TMV-BA10 BYPASS
HWS
HWS
TE-17
EXPANSION
TANK
(ET-1)
TE-20 TE-25
TE-21
TE-26
HIGH TEMP HWS
HIGH TEMP HWS
CW FROM BA06
CWS
TE-13
CWS
T
T
TE-16
HWP-3
HWP-4
HWR
TE-19
T
T
HWP-2
HWP-1
TE-22
TE-23
TE-10
HIGH TEMP HWR
TMV-BA10
PIPE CONTINUATION SYMBOL
TYPICAL ON VIEW 3 THIS SHEET &
1-EP10B-A
TMV-BA10
SOLENOID VALVE
N.C.
TMV-BA10
BYPASS
SEE CONTINUATION
ON 1-EP10B-A
2" HW
2" HW
2" HW
4" CW
4" CW
2" CW
RISER 2 & 3
CW & HW UP
SEE CONTINUATION
ON 1-EP10B-A
SEE CONTINUATION
ON 1-EP10B-A
SEE CONTINUATION
ON 1-EP10B-A
2" CW
SEE CONTINUATION
ON 1-EP10B-A
1 1/2" CW
CW FROM
SOFTENERS IN
BA11
2" HW-R
DWH-3DWH-4
DWH-1DWH-2
3/4" HW-R 140°
3/4" HW-R 140°
HWP-4HWP-3HWP-2HWP-1
1 1/4" HW-R 140°
1" HW
1 1/2" HW 140°
1 1/2" HW 140° 1 1/2" HW 140°
ET-1
1" HW 140°
SEE CONTINUATION
ON 1-EP10B-A
2" CW
1 1/2" HW 140°
1 1/2" HW 140° UP
3/4" HW-R UP
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
418 BEAVER STREET
SEWICKLEY, PA 15143
PH: 412.287.7333
www.aeworks.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
FULLY SPRINKLERED
RECORD DRAWINGS
WATER RELATED ISSUES
INCLUDING MISC. RESTROOM
RENOVATIONS
503-17-110
CJC CWC/AC
2907 PLEASANT VALLEY BOULEVARD
ALTOONA, PA 16602-4377
1-P401
MECHANICAL ROOM BA10 HOT WATER
HEATERS DIAGRAM
2022.08.19
18014
NOT TO SCALE1-P401
2 MECHANICAL ROOM BA10 HOT WATER HEATERS DIAGRAM - NEW WORK
1/2" = 1'-0"1-P401
3 BA10 ENLARGED PLUMBING PLAN
REVISIONS TO THESE CONTRACT DOCUMENTS BY AE WORKS, REFLECTING CHANGES IN THE WORK MADE DURING BIDDING AND CONSTRUCTION, ARE BASED ON THE INFORMATION FURNISHED TO AE WORKS BY THE
CONTRACTOR. AE WORKS WILL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF THE
INFORMATION PROVIDED BY THE CONTRACTOR, NOR DISCREPANCIES BETWEEN THE OWNER OR
CONTRACTOR-PROVIDED INFORMATION AND THE BUILT CONDITIONS.
TE-9
TE-18
CS-22 2A04 RISER 5 HWR 3/4 124
CSUSF-3/4"-125/170-CV1
CSUSF-3/4"-125/170-CV1
CSUSF-3/4"-125/170-CV1
CSUSF-3/4"-125/170-CV1
CSUSF-3/4"-125/170-CV1
CSUSF-3/4"-125/170-CV1
CSUSF-3/4"-125/170-CV1
CSUSF-3/4"-125/170-CV1
CSUSF-3/4"-125/170-CV1
CSUSF-3/4"-125/170-CV1
CSUSF-3/4"-125/170-CV1
CSUSF-3/4"-125/170-CV1
CSUSF-3/4"-125/170-CV1
CSUSF-3/4"-125/170-CV1
CS-2-125
CSUSF-1"-125/170-CV1
CSUSF-1"-125/170-CV1
CSUSF-3/4"-125/170-CV1
CSUSF-3/4"-125/170-CV1
CSUSF-1"-125/170-CV1
CSUSF-3/4"-125/170-CV1
CSUSF-3/4"-125/170-CV1
CS-21 2A04 NUTRITION HWR 3/4 124
CS-20 2D05 PT/OT HWR 1 124
CS-19 BA2 M & R (BASEMENT) HWR 3/4 124
CS-18 BC01 NUTRITION (2ND FLOOR) HWR 3/4 124
CS-17 BC04 CANTEEN (BASEMENT) HWR 1 124
CS-16 BC11 CHAPEL SINK (2ND FLOOR) HWR 1 124
CS-15 BC12 FUTURE PHARMACY (1ST FLOOR) HWR 2 124
CS-14 UNEXCAVATED RISER 18 HWR 3/4 124
CS-13 UNEXCAVATED RISER 16 & 17 HWR 3/4 124
CS-12 BB12 RISER 15 HWR 3/4 124
CS-11 BB16 RISER 14 HWR 3/4 124
CS-10 BB12 RISER 13 HWR 3/4 124
CS-9 BB13 RISER 12 HWR 3/4 124
CS-8 BB12 RISER 11 HWR 3/4 124
CS-7 BB12 RISER 10 HWR 3/4 124
CS-6 BA02 RISER 8 HWR 3/4 124
CS-5 BA02 RISER 7 HWR 3/4 124
CS-4 BA03 RISER 6 HWR 3/4 124
CS-3 BA06 RISER 4 HWR 3/4 124
CS-2 BA10 RISER 2 & 3 HWR 3/4 124
CS-1 BA06 RISER 1 HWR 3/4 124
TAG LOCATION SERVICE SYSTEM
SIZE
(IN)
TEMPERATURE
RATING
(F)
MODEL NUMBER
CIRCUIT SOLVER
W H -4
W H -3
W H -1
W H -2
TO 4" HWS RISER
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
Line
CW MAIN THRU WALL
FROM MAIN FEED FROM
SUB-BASEMENT
N.C.
HOSE
HOSE
T
O
P
O
C
P T
SIGHT GLASS1
ACTUATOR2
HWR FROM
BLDG.HWS TO
BLDG.
T-S
T-S
T-S
T-S
T-S
T-S
T-S
T-S
AMBULATORY CARE
DOMESTIC HOT
WATER HEATER #1
AMBULATORY CARE
DOMESTIC HOT
WATER HEATER #2
BLUE T BUILDING HR
BLUE T CW
BLUE T WH2 HWS
BLUE T WH1 HWS
BLUE T WH 1 HW IN
BLUE T WH 2 HW IN
BLUE T WH1/2 HR
BLUE T BUILDING HWS
1-DOMESTIC HOT WATER PUMP-13
1-DOMESTIC HOT WATER PUMP-24
3 4
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
418 BEAVER STREET
SEWICKLEY, PA 15143
PH: 412.287.7333
www.aeworks.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
FULLY SPRINKLERED
RECORD DRAWINGS
WATER RELATED ISSUES
INCLUDING MISC. RESTROOM
RENOVATIONS
503-17-110
CJC CWC/AC
2907 PLEASANT VALLEY BOULEVARD
ALTOONA, PA 16602-4377
1-P402
PT/OT AND AMB. CARE HOT WATER HEATER
DIAGRAMS
2022.08.19
18014
NOT TO SCALE1-P402
4 AMBULATORY CARE ADDITION HOT WATER HEATERS DIAGRAM - NEW WORK
REVISIONS TO THESE CONTRACT DOCUMENTS BY AE WORKS, REFLECTING CHANGES IN THE WORK MADE DURING BIDDING AND CONSTRUCTION, ARE BASED ON THE INFORMATION FURNISHED TO AE WORKS BY THE
CONTRACTOR. AE WORKS WILL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF THE
INFORMATION PROVIDED BY THE CONTRACTOR, NOR DISCREPANCIES BETWEEN THE OWNER OR
CONTRACTOR-PROVIDED INFORMATION AND THE BUILT CONDITIONS.
TE-76
TE-75
TE-73
TE-72
TE-69 HWR
TE-71
TE-74
TE-70
T P
O
C
O O
O O
CP-3
C C C
O O T
O
HWS TO BUILDING
O
HWR FROM
3rd Floor
TO HTG.
EQUIP.
C
C
O
RPZ BFP
O
T C
O
O
O
T C
T
O
O
O
INCOMING CW
TO BLDG./MECH.
EQUIP. RM.
T-S T-S T-S
T-S
T-S
T-S
T-S
T-S
T-S
O
T
C
T-S
C O
T-S
O C
PT/OT
DOMESTIC HOT
WATER HEATER #1
PT/OT
DOMESTIC HOT
WATER HEATER #2
CP-1 CP-2
O
3 4
TE-57
TE-58
TE-59
HWR
FROM
1st + 2nd
HWR
FROM
A-Wing + UCC
TE-62TE-60
TE-61
TE-63
TE-66
TE-64
TE-67TE-65
T-S TE-68
1-P402 NOT TO SCALE
3 PT/OT ADDITION HOT WATER HEATERS DIAGRAM - NEW WORK
W H-
W H-
W H-
W H-
ROOM BE01F
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Highlight
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Line
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
Highlight
SUB-BASEMENT
BASEMENT
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
FOURTH FLOOR
FIFTH FLOOR
SIXTH FLOOR
SEVENTH FLOOR
EIGHTH FLOOR
T-S
MAIN T RISER 1
6 FLOOR HW
R
IS
E R
T-S
MAIN T RISER 2
6 FLOOR HW
T-SMAIN T RISER 3
6 FLOOR HW
T-S
MAIN T RISER 4
6 FLOOR HW
T-S
MAIN T RISER 5
6 FLOOR HW
R
IS
E R
R
IS
E R
R
IS
E R
R
IS
E R
T-S MAIN T FLOOR 7 LOOP HW
T-SMAIN T FLOOR 7 LOOP HR
CANTEEN HOT WATER
R
IS
E R
R
IS
E R
R
IS
E R
T-ST-S MAIN T
RISER 6
6 FLOOR HW
MAIN T
RISER CANTEEN
FLOOR 6 HW
T-S
MAIN T
RISER 7
6 FLOOR HW
T-S
MAIN T
RISER 8
6 FLOOR HW
R
IS
E R
T-S MAIN T
RISER 10
6 FLOOR HW
R
IS
E R
A
T-S
MAIN T
RISER 10A
6 FLOOR HW
R
IS
E R
T-S
MAIN T
RISER 11
6 FLOOR HW
R
IS
E R
T-S
MAIN T
RISER 12
6 FLOOR HW
R
IS
E R
T-S MAIN T
RISER 13
6 FLOOR HW
T-S
MAIN T
RISER 14
6 FLOOR HW
LABELED DOWN
THRU SPD
T-S MAIN T
RISER 16
6 FLOOR HW
T-S
MAIN T
RISER 15
6 FLOOR HW
T-S
MAIN T
RISER SPD
6 FLOOR HW
T-S
MAIN T
RISER 17
6 FLOOR HW
T-S
MAIN T
RISER 18
6 FLOOR HW
R
IS
E R
R
IS
E R
R
IS
E R
R
IS
E R
R
IS
E R
T-S
T-S
T-S
MAIN T RISER 16 3 FLOOR HR
MAIN T RISER 13 3 FLOOR HR
MAIN T
RISER 15 & 16
3 FLOOR HR
T-S
MAIN T
RISER 15
3 FLOOR HR
TO YELLOW TEAM
T-S MAIN T
RISER 18
BSMT HR
1-1/2"
T-S MAIN T
RISER 17
BSMT HR
T-S MAIN T
RISER 14
BSMT HR
T-S MAIN T
RISER 12
BSMT HR
T-S
MAIN T RISER
10 3 FLOOR
HR
T-S MAIN T
RISER 10
BSMT HR
T-S MAIN T
RISER 11
BSMT HR
T-SMAIN T
RISER 13
BSMT HR
T-S MAIN T
RISER 15 & 16
BSMT HR
T-S MAIN T
RISER 8
BSMT HR
T-S MAIN T
RISER 7
BSMT HR
T-S MAIN T
RISER 4
BSMT HR
T-S MAIN T
RISER 3
BSMT HR
FROM YELLOW TEAM
T-SMAIN T
RISER 1
BSMT HR
T-SMAIN T
RISER 6
6 FLOOR HW
FROM YELLOW TEAM
T-S MAIN T
RISER 5
BSMT HR
T-SMAIN T
RISER 2
BSMT HR
T-SMAIN T SHOP LOOP BSMT HR
SUB-BASEMENT
BASEMENT
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
FOURTH FLOOR
FIFTH FLOOR
SIXTH FLOOR
SEVENTH FLOOR
EIGHTH FLOOR
3/4" HW-R
1-1/2" HW
3/4" HW-R
1-1/2" HW
3/4" HW-R
1-1/2" HW
3/4" HW
1" HW-R
1-1/2" HW
1-1/2" HW
3/4" HW
1-1/2" HW
1-1/4" HW
3/4" HW
1-1/2" HW
1" HW
3/4" HW-R
1-1/4" HW
1" HW
3/4" HW-R
1" HW
1-1/2" HW
1" HW
3/4" HW-R
1" HW-R
1-1/4" HW
1" HW
3/4" HW-R
1" HW
3/4" HW-R
1-1/2" HW
3/4" HW-R
2" HW
2" HW
1-1/2" HW
3/4" HW-R
1-1/2" HW
3/4" HW-R
1-1/2" HW
3/4" HW-R
2" HW
1-1/2" HW
3/4" HW-R
1-1/2" HW
1-1/2" HW
TO M&R SHOPS
TO RM BA10
NOTE: ALL SENSORS SHOWN ON THIS DRAWING ARE NEW. CONTRACTOR TO DEMOLISH EXISTING PIPING AND ADD NEW
PIPING AS NEEDED TO INSTALL CHLORINE, PH AND DISSOLVED SOLIDS SENSORS. FOR STRAP-ON TEMPERATURE
SENSORS CONTRACTOR TO REMOVE EXISTING INSULATION AS NEEDED TEMPERATURE SENSOR MANUFACTURER
INSTALLATION REQUIREMENTS.
T-S
MAIN T MAIN RISER
FLOOR HW
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
418 BEAVER STREET
SEWICKLEY, PA 15143
PH: 412.287.7333
www.aeworks.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
FULLY SPRINKLERED
RECORD DRAWINGS
WATER RELATED ISSUES
INCLUDING MISC. RESTROOM
RENOVATIONS
503-17-110
CJC AC
2907 PLEASANT VALLEY BOULEVARD
ALTOONA, PA 16602-4377
1-P601
MAIN BUILDING HW RISER DIAGRAM
2022.08.19
18014
REVISIONS TO THESE CONTRACT DOCUMENTS BY AE WORKS, REFLECTING CHANGES IN THE WORK MADE
DURING BIDDING AND CONSTRUCTION, ARE BASED ON THE INFORMATION FURNISHED TO AE WORKS BY THE
CONTRACTOR. AE WORKS WILL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF THE
INFORMATION PROVIDED BY THE CONTRACTOR, NOR DISCREPANCIES BETWEEN THE OWNER OR
CONTRACTOR-PROVIDED INFORMATION AND THE BUILT CONDITIONS.
TE-138
TE-139
TE-140
TE-1xx
TE-160
TE-141
TE-146
TE-142
4" -C
OP
PE
R
4" -C
OP
PE
R
4" -C
OP
PE
R
4" -C
OP
PE
R
4"-COPPER
4" -C
OP
PE
R
R
IS
E R
R
IS
E R
R
IS
E R
C A
N T
E E
N H
O T
W A
T E
R
R
IS
E R
R
IS
E R
R
IS
E R
R
IS
E R
R
IS
E R
R
IS
E R
R
IS
E R
TE-143
TE-144
TE-145
TE-148
TE-149
TE-150
TE-38 Rm BA01
TE-39 Rm BA02
TE-28 Rm BA05
TE-11
TE-8 Rm CorBA2
TE-5 Rm BA11
TE-29 Rm BA05
TE-124 Rm 3B01B
TE-132 Rm 3E04
TE-131 Rm 3E05D
TE-129 Rm 3E05C
TE-130 Rm 3E05D
TE-46 Rm BB16TE-45 Rm BB13A
TE-42 Cor BB11 TE-41 Rm BB12
TE-43 Cor BB11
TE-48 Rm BB13
TE-49 Rm BB16A
TE-50 Rm BB16A
TE-158TE-157
TE-162
TE-155TE-156
TE-154
TE-153TE-151
TE-152
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
FOURTH FLOOR
T-S
T-S
BLUE T LOOP 2 FLOOR 1 HW
BLUE T LOOP 2 FLOOR 1 HR
T-S
T-SBLUE T LOOP 1 FLOOR 1 HW
BLUE T LOOP 1 FLOOR 1 HR
T-S
T-S
BLUE T LOOP 2 FLOOR 2 HW
BLUE T LOOP 2 FLOOR 2 HR
T-S
T-S
BLUE T LOOP 3 FLOOR 2 HW
BLUE T LOOP 3 FLOOR 2 HR
DENTAL
SOCIAL WORK OFFICE
T-S
T-S
BLUE T LOOP 1 FLOOR 2 HW
BLUE T LOOP 1 FLOOR 2 HR
PHARMACY
HISTOLOGY
T-S T-S
BLUE T LOOP 1 FLOOR 3 HW BLUE T LOOP 1 FLOOR 3 HR
T-S BLUE T LOOP 1 FLOOR 4 HR
ROOF
BASEMENT
FIRST FLOOR
SECOND FLOOR
THIRD FLOOR
FOURTH FLOOR
ROOF
TO RM BE01F
NOTE: ALL SENSORS SHOWN ON THIS DRAWING ARE NEW. CONTRACTOR TO DEMOLISH EXISTING PIPING AND ADD NEW PIPING AS NEEDED TO INSTALL CHLORINE, PH AND DISSOLVED SOLIDS SENSORS. FOR STRAP-ON TEMPERATURE SENSORS CONTRACTOR TO REMOVE EXISTING INSULATION AS NEEDED TEMPERATURE SENSOR MANUFACTURER
INSTALLATION REQUIREMENTS.
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
418 BEAVER STREET
SEWICKLEY, PA 15143
PH: 412.287.7333
www.aeworks.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
FULLY SPRINKLERED
RECORD DRAWINGS
WATER RELATED ISSUES
INCLUDING MISC. RESTROOM
RENOVATIONS
503-17-110
CJC AC
2907 PLEASANT VALLEY BOULEVARD
ALTOONA, PA 16602-4377
1-P602
AMB. CARE HWR RISER DIAGRAM
2022.08.19
18014
REVISIONS TO THESE CONTRACT DOCUMENTS BY AE WORKS, REFLECTING CHANGES IN THE WORK MADE DURING BIDDING AND CONSTRUCTION, ARE BASED ON THE INFORMATION FURNISHED TO AE WORKS BY THE
CONTRACTOR. AE WORKS WILL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF THE
INFORMATION PROVIDED BY THE CONTRACTOR, NOR DISCREPANCIES BETWEEN THE OWNER OR
CONTRACTOR-PROVIDED INFORMATION AND THE BUILT CONDITIONS.
TE-136 Rm 400
PENTHOUSE
TE-127 Cor 3F1 TE-126 Cor 3F1
TE-108 Rm 2B29G
TE-110 Rm 2B29A
TE-111 Rm 2B30D
TE-112 Rm 2B30D
TE-113 Cor2B2
TE-114 Cor 2B2
TE-89 Rm 1F43
TE-90 Rm 1F42
TE-91 Rm 1F41
TE-92 Rm 1F42
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
FIRST FLOOR
ROOF
AMB. CARE
HIMS
ROOM BD01B WATER HEATERS
PT/OT
PT/OT T LOOP 1 2ND FLOOR HWR
PT/OT T LOOP 1 2ND FLOOR HWT-S
T-S
PT/OT T LOOP 1 2ND FLOOR HWT-S
T-S
T-S
T-S
T-S
T-S
PT/OT T LOOP 1 1ST FLOOR HWR
PT/OT T LOOP 1 1ST FLOOR HW
PT/OT T LOOP 2 1ST FLOOR HW
PT/OT LOOP 2 1ST FLOOR HWR
PT/OT LOOP 2 1ST FLOOR HW
PT/OT LOOP 2 1ST FLOOR HWRT-S
T-S PT/OT LOOP 2 1ST FLOOR HW
PT/OT LOOP 2 1ST FLOOR HWRT-S
T-S PT/OT LOOP 1 1ST FLOOR HW
PT/OT LOOP 1 1ST FLOOR HWRT-S
SECOND FLOOR
NOTE: ALL SENSORS SHOWN ON THIS DRAWING ARE NEW. CONTRACTOR TO DEMOLISH EXISTING PIPING AND ADD NEW PIPING AS NEEDED TO INSTALL CHLORINE, PH AND DISSOLVED SOLIDS SENSORS. FOR STRAP-ON TEMPERATURE SENSORS CONTRACTOR TO REMOVE EXISTING INSULATION AS NEEDED TEMPERATURE SENSOR MANUFACTURER
INSTALLATION REQUIREMENTS.
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
418 BEAVER STREET
SEWICKLEY, PA 15143
PH: 412.287.7333
www.aeworks.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
FULLY SPRINKLERED
RECORD DRAWINGS
WATER RELATED ISSUES
INCLUDING MISC. RESTROOM
RENOVATIONS
503-17-110
CJC AC
2907 PLEASANT VALLEY BOULEVARD
ALTOONA, PA 16602-4377
1-P603
PT/OT AND AMB. CARE ADDITION HW RISER
DIAGRAM
2022.08.19
18014
REVISIONS TO THESE CONTRACT DOCUMENTS BY AE WORKS, REFLECTING CHANGES IN THE WORK MADE DURING BIDDING AND CONSTRUCTION, ARE BASED ON THE INFORMATION FURNISHED TO AE WORKS BY THE
CONTRACTOR. AE WORKS WILL NOT BE RESPONSIBLE FOR THE ACCURACY OR COMPLETENESS OF THE
INFORMATION PROVIDED BY THE CONTRACTOR, NOR DISCREPANCIES BETWEEN THE OWNER OR
CONTRACTOR-PROVIDED INFORMATION AND THE BUILT CONDITIONS.
PT / OT / PMR / UCC
TE-98 Rm 1B01
TE-99 Rm 1B01
TE-118 Rm 2D05
TE-119 Rm 2D05
TE-115 Cor 2D1
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
VHAALTCHABON
Highlight
File details come from the government source that posted it. Updated .